Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00577 - 117 S 2nd E - Mattson Apts - Bldg B NO 23 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Issued Date: 03/27/2017 Permit Inspection Statistics 81Total Inspections Completed: 28Total Inspections Passed: Inspection Pass Rate: 34.57% Permit Inspection History *Refer to Individual Inspection Report for more Details 01/05/2018FailQuinton OwensPlanning and Zoning Final Inspection * Three parking stalls do not pass due to columns under cantilever on Building 2 reducing width to 7 feet. Only one extra parking stall was provided above required quantity. 2 more parking stalls are required. * Missing "Van accessible" parking stall signage (South end ADA stall) Inspector Comments: 04/09/2018PassQuinton OwensPlanning and Zoning Final Inspection Occupancy total has been reduced per parking shortage of 2 stalls. (see CUP) Full occupancy total can be granted after owner adds 2 approved parking stalls. Inspector Comments: Building Inspection Type 03/21/2017PARTPASSQuinton OwensCommercial Footing Inspection Exterior continuous footing from north stair around north wing to west side of building. Inspector Comments: Doors accessing mechanical closets from bathroom shall be sealed and have self-closing device. ONLY REQUIRED IF ACCESS DOOR IS INSIDE BATHROOM. (response approved) Inspector Comments: 03/24/2017PassTed DyeCommercial Footing Inspection Exterior footings.Inspector Comments: 03/27/2017PARTPASSQuinton OwensFoundation Inspection Foundation walls except for small section on east side of south wing for access use. Inspector Comments: 04/19/2017PassTed DyeFoundation Inspection 04/19/2017PassTed DyeCommercial Footing Inspection Seven spot footings located on the South end of the North building. Three on the inside of the building and four on the out side between building between the north building and the south building. Inspector Comments: 04/28/2017PassTed DyeCommercial Footing Inspection Shovel footing under concrete floor on the north building.Inspector Comments: 07/13/2017PARTPASSQuinton OwensSheeting Completed east 1/2 of north wing roof sheathing. Postponed rest of inspection to clear off rest of roof for inspection. Inspector Comments: Page 1 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary 07/17/2017PARTPASSTed DyeSheeting Sheeting inspection included; All four levels of east facing sheeting and the roof top sheeting. Inspector Comments: 07/26/2017FailTed DyeSheeting Those area's that missed being nailed have been marked with green paint. Check previous inspected walls (east walls). Some missed being done. Inspector Comments: 07/26/2017FailTed DyeResidential Framing/Structure Inspection Hold downs and floor to floor strap inspection only. A strap on both the 1st and 2nd floor was missed on the north side next to the bump out. Inspector Comments: 08/03/2017PassTed DyeCommercial Insulation Inspection Inspected vapor barrier behind showers on 4th floor.Inspector Comments: 08/07/2017PassTed DyeCommercial Sheetrock/Drywall Inspection 08/14/2017PARTPASSTed DyeCommercial Framing/Structure Inspection 08/17/2017PARTPASSTed DyeCommercial Framing/Structure Inspection 09/05/2017PARTPASSTed DyeCommercial Insulation Inspection 2nd floor insulation inspection in pre-rock area's OK to cover in pre-rock area's Inspector Comments: 09/05/2017PassTed DyeCommercial Sheetrock/Drywall Inspection Pre-rock drywall inspecton only. OK to tape in those area's Inspector Comments: 09/05/2017PARTPASSTed DyeCommercial Framing/Structure Inspection Inspection for pre rock area only.Inspector Comments: 09/12/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 1st level ceiling prerock inspection onlyInspector Comments: 09/13/2017FailTed DyeCommercial Framing/Structure Inspection Inspected pre-rock areas in units and corridors on the 2nd level. Drywall concealed area's before fire caulking them. Inspector Comments: 09/18/2017PARTPASSTed DyeCommercial Insulation Inspection Level 3 Pre-rock area insulation inspection only. Checked foam insulation in TJI block locations in North closets on levels 1-3. Inspector Comments: 9/15/17: Inspected rated pre-rock above dropped ceiling areas on 2nd floor. * Approved to tape ceiling area in units 201, 202, 204, & 205 * 203 & 206 ceilings are still being hung. * Sides are not all completed in approved units, but will be inspected later for rating or fire blocking as needed. Inspector Comments: Page 2 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary 09/18/2017PassTed DyeCommercial Sheetrock/Drywall Inspection Inspected pre-rock in 203 and 206. Also looked at drywall on walls for fire blocking at furdown location. Inspector Comments: 09/22/2017FailTed DyeCommercial Framing/Structure Inspection Level 4 inspectionInspector Comments: 09/26/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection 3rd level, 3 units in NE corner. * Pre-rock areas only approved for taping Inspector Comments: 09/29/2017PARTPASSQuinton OwensResidential Sheetrock/Drywall Inspection 3rd Level Corridor ceiling and 3 south end units pre-rock only is approved for taping. Inspector Comments: 10/02/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Pre-rock area only approved for taping in remaining five units on 3rd level only.Inspector Comments: 10/02/2017PARTPASSQuinton OwensCommercial Insulation Inspection Insulation inspection on 4th level, 6 units on north end only. * Finish vapor barrier above showers on exterior walls * Add vapor barrier where stacked drywall is in the way. Inspector Comments: 10/06/2017FailQuinton OwensCommercial Sheetrock/Drywall Inspection 4th level drywall inspection: No units found ready for inspection. Not approved for taping. Inspector Comments: 10/09/2017PARTPASSTed DyeCommercial Insulation Inspection Fourth floor, Units 310-315 to complete the insulation inspection of fourth floor.Inspector Comments: 10/09/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Inspection of units 301,303 and 304? The upper levels (4th floor) of These Town Homes. Inspector Comments: 10/11/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Town house, upper bedroom levels(4th floor)only; units 306, 308 and 309 are OK to tape. Inspector Comments: 10/16/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection 4th level in units 310, 312, 314, & 315 only approved for taping. Some rated separation walls are NOT completed and may be re-inspected (all drywall used is 5/8" type x) Inspector Comments: 10/17/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Unit 301 Ok tape and textureInspector Comments: 10/18/2017PARTPASSTed DyeCommercial Framing/Structure Inspection Framing inspection of exterior walls only. Rooms that exterior walls inspected are 204, 206 ,206 Storage room, 207, 210, 211, and 214. Inspector Comments: Page 3 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary 10/18/2017PARTPASSTed DyeCommercial Insulation Inspection Insulation inspection on units 301, 303, 305, 306, 308, 309 and 310.These units are OK to cover. Inspector Comments: 10/19/2017PassTed DyeCommercial Framing/Structure Inspection Units 311,313, 315, 314 and 312 the framing passed and they are approved to insulate. Inspector Comments: 10/20/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Rooms inspected and approved for tape and texture are; 305, 306, 308 and the town house's upper levels 311 ,313 and main level of town house #309. Inspector Comments: 10/20/2017PARTPASSTed DyeCommercial Insulation Inspection 2nd floor insulation has been been completed.Inspector Comments: 10/23/2017PARTPASSTed DyeResidential Sheetrock/Drywall Inspection Drywall inspection of rooms 310, 313, 314 and 315. Approved for tape and texture. Inspector Comments: 10/26/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection On 10-26-17 I inspected Units 311 and 312 that passed. Units 207 and 204 need Electrical and plumbing in furdowns Fire Caulked. Inspector Comments: 10/27/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 3rd floor corridor pre-rock and fire caulk inspection Fire taping of drywall in furdowns; Units 204, 207, 210, 211 and 214 Inspector Comments: 10/30/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Units 204, 204 Mechanical rm., 207 and 210 are OK to tape and texture.Inspector Comments: 11/01/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 11/02/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 11/03/2017PassTed DyeCommercial Sheetrock/Drywall Inspection Unit 211 Drywall inspection.Inspector Comments: 11/09/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Drywall inspection of units 111,107, 108 and 118. Approve to tape and textureInspector Comments: 11/09/2017PassTed DyeCommercial Insulation Inspection 11/15/2017PassTed DyeCommercial Sheetrock/Drywall Inspection Drywall inspection and passed; Rooms 118, 114, Storage 112, Club house, South stair tower, North stair tower and 215. All good to be taped and textured. Inspector Comments: 11/27/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Levels 3 & 4 only: * Fire caulking behind cabinets completed. * Refrigerator water line box is not rated. Inspector Comments: Page 4 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary 12/28/2017PARTPASSTed DyeCommercial Building Final 3rd floor inspection only Units inspected that were approved: 301-309, 311 and 312. Unit 310; needs to have a hole on the side of the outlet corrected. 2 sinks need top have counter tops and plumbing completed Inspector Comments: Page 5 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary 01/02/2018FailTed DyeCommercial Building Final Page 6 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary Unit 1205; Approved 1205 Mechanical room; Fire caulk holes that have the insulation in them. Fire caulk the thermastat wire. Fire caulk around condensation lines. STORAGE ROOM;Patch holes in ceiling Fire caulk arooound elecddtrical conduits Fire caulk gas line Fire caulk around electrical switch next to door. Their is more than the allowed 1/8" that has been tested for a rated penetration through a separation wall. :Unit 1203; Fan in north bathroom is not working properly. 1203 Mechanical room is locked. Unit 1201 Approved 1201 Mechanical room; Fire caulk around the 1-1/2" electrical flex. Fire foam condensating line. Fire tape seams between water lines from water heater. Fire caulk thermastat wire Unit 1202; ADA unit Grab bars are missing in ADA bathroom. Insulate suppoies and drain lines after they have been completed. 1202 Mechanical room; Locked Unit 1204; Approved 1204 Mechanical room; Fill holes that havve insulation in then with fire caulk Fire caulk thermastat wire. 1ST FLOOR Custodean closet; Approved Unit 1104; Smoke/C.O. detector needed outside bedrooms. Landing missing outside of sliding glass doors. 1104 Mechanical closet; ??? Unit 1105;Cleanout covers missing in the utility room, middle and south bathrooms. Smoke/C.O. detector missing out side of bedrooms 1105 Mechanical room; Tape seams on separation wall. Fire caulk water lines Fire caulk condensation line. Storage room Approved Electrical/ Data room; Fire caulk conduits through ceiling. Fire tape above electrical panel. Unit 1103; Smoke/C.O. detector needed out side of bedrooms. Clean out covers missing under vanity sink in south, middle bathrroom and in wall in north bathroom. Create a annulat space around all water and gas lines then fire caulk. Unit 1101; Clean out cover is missing under north vanity sink. Smoke/C.O detectors missing outside of bedrooms. 1101 Mechanical room; Fire tape top corner of corridor sepatation wall Create an annular space aroun water and gas lines an the fire caulk. Inspector Comments: Page 7 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary Fire caulk therastat wire. 01/04/2018PARTPASSTed DyeCommercial Building Final Electrical Inspection Type 09/20/2017PARTPASSBret StoddardResidential Electrical Rough-in 09/28/2017PassBret StoddardCOM & MFR Electrical Service Inspection 10/17/2017PARTPASSBret StoddardResidential Electrical Rough-in 10/20/2017PARTPASSBret StoddardResidential Electrical Rough-in 10/24/2017PARTPASSBret StoddardCommercial Electrical Rough-in 10/26/2017PARTPASSBret StoddardCommercial Electrical Rough-in 10/30/2017PassBret StoddardCommercial Electrical Rough-in 11/21/2017PassBret StoddardCOM & MFR Electrical Service Inspection 12/27/2017FailBret StoddardResidential Electrical Final Inspection 12/29/2017PARTPASSBret StoddardResidential Electrical Final Inspection 01/04/2018PassBret StoddardResidential Electrical Final Inspection Fire Inspection Type 08/24/2017PassDale PickeringFire Sprinkler Rough-in 01/04/2018PARTPASSDale PickeringFire Sprinkler Hydro 01/04/2018PassBret StoddardFire Alarm Final Inspection 04/18/2018PassJoel GrayFire Underground Inspection 04/18/2018PassDale PickeringFire Sprinkler Hydro See notes on Partial Pass done on 1/4/18Inspector Comments: Mechanical Inspection Type 09/13/2017PassDon AllenHVAC Rough-in Passed. - Shane Hill Inspector Comments: 10/16/2017FailDon AllenHVAC Rough-in 10/17/2017PassDon AllenHVAC Rough-in 12/27/2017PassDon AllenHVAC Final Inspection 01/04/2018PassDon AllenHVAC Final Inspection GOOD FOR THE C/O ON ALL FLOORS.Inspector Comments: Page 8 of 9 (Continued) Permit Details Permit Number: 16-00577 117 S 2nd E - Mattson Apartments - Bldg B NO 23 Units 117 S 2nd E New Multi-Family Residential/Dormitory Permit Status of (Open) as of Report Date: 05/23/2019 10:33 am Permit Inspection Summary Plumbing Inspection Type 04/10/2017PassDon AllenPlumbing Underground Inspection Good to cover the 6 inch sewer main lineInspector Comments: 10/19/2017PassDon AllenPlumbing Water Good to cover the water on the 1st and 2nd floorInspector Comments: 12/29/2017PassDon AllenPlumbing Final Inspection need to finish the plumbing in rooms.1311 needs a sink installed 1303 and1301 extension tail peace on the sinks is installed wrong.1202 on ADA sink installed.1201 on sink. the mechanical rooms on the 2nd floor was locked did not look at any of them. Inspector Comments: 01/04/2018PARTPASSDon AllenPlumbing Final Inspection Approved for a temp. C/O. will need to see the sink in the bathroom located in the gym after its installed. Inspector Comments: Inspections Required Public Works Final Inspection Fire Sprinkler Final Inspection Fire Department Final Inspection Sidewalk Inspection Page 9 of 9