Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 16-00572 - 262 N 2nd W - Grace Baptist - AdditionPermit Inspection Summary Permit Status of (Open) as of Report Date: 05/23/2019 8:59 am Permit Details Permit Number: 16-00572 262 N 2nd W - Grace Baptist - Addition 262 N 2nd W Commercial Addition Permit Issued Date: 12/06/2016 Permit Inspection Statistics 18Total Inspections Completed: 13Total Inspections Passed: Inspection Pass Rate: 72.22% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 11/02/2016PassTed DyeCommercial Footing Inspection 11/03/2016PassTed DyeFoundation Inspection 12/06/2016FailTed DyeCommercial Framing/Structure Inspection 12/22/2016PassTed DyeCommercial Insulation Inspection 01/04/2017PassTed DyeCommercial Sheetrock/Drywall Inspection Forgot to check for Fire extinguisher - Will be checked with re-inspection.Inspector Comments: 03/08/2017FailQuinton OwensCommercial Building Final Not allowed for residential type use (sleeping areas would require smoke and carbon monoxide detectors) Inspector Comments: Fire extinguisher, class 2A-10B-C, is required.Inspector Comments: Post sign by stove limiting appliance to warming use only. Inspector Comments: Note: Steps will require handrail on both sides. Guardrail is required where floor is more than 30" above adjacent elevation. Inspector Comments: 03/15/2017FailQuinton OwensCommercial Building Final ** Temporary C.O. approved until April 30, 2017 ** Inspector Comments: * Request for added use Review for overnight sleeping unit approved based on following: C.O. detector required just outside sleeping areas. Smoke detector required inside sleeping room. Egress window is required in sleeping room. Re-inspection will be required. Inspector Comments: 05/31/2017FailQuinton OwensCommercial Building Final Correction for ADA threshold height not done yet.Inspector Comments: 02/12/2018PassQuinton OwensCommercial Building Final Interest in overnight sleeping accommodations have been postponed and will require a new permit and inspections to add this use to building. Inspector Comments: 03/01/2018PassTed DyeCommercial Building Final Page 1 of 2 (Continued) Permit Details Permit Number: 16-00572 262 N 2nd W - Grace Baptist - Addition 262 N 2nd W Commercial Addition Permit Status of (Open) as of Report Date: 05/23/2019 8:59 am Permit Inspection Summary Electrical Inspection Type 12/21/2016PassBret StoddardCommercial Electrical Rough-in 03/08/2017FailBret StoddardElectrical Final Inspection COM-A,R,T 03/09/2017PassBret StoddardCommerical Electrical Final Inspection Mechanical Inspection Type 12/14/2016PassDon AllenHVAC Rough-in 03/15/2017PassDon AllenHVAC Final Inspection GOOD FOR THE C/OInspector Comments: Plumbing Inspection Type 11/18/2016PassDon AllenPlumbing Underground Inspection GOOD TO COVER THE PLUMBING UNDERGROUNDInspector Comments: 12/29/2016PassDon AllenPlumbing Rough-in Good to cover the plumbing rough inInspector Comments: 03/07/2017PassDon AllenPlumbing Final Inspection Page 2 of 2