Loading...
HomeMy WebLinkAboutCOMCHECK - 16-00572 - 262 N 2nd W - Grace Baptist - AdditionCOMcheck Software Version COMcheckWeb Envelope Compliance Certificate Project Title: 2012 IECC Project Type:Addition Permit No.16-00572 Vertical Glazing / Wall Area:8% Location:Rexburg, Idaho Climate Zone:6b Construction Site:Owner/Agent:Designer/Contractor: Project Information Energy Code: Grace Baptist Curch addition Building Area Floor Area 1-Religious building : Nonresidential 1127 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof: Attic Roof, Wood Joists, [Bldg. Use 1 - Religious building]1127 0.0 50.0 0.019 0.021 Ext. Wall: Wood-Framed, 16in. o.c., [Bldg. Use 1 - Religious building]932 22.0 0.0 0.061 0.051 Window: Vinyl Frame: Operable, Perf. Type: Energy code default, Double Pane with Low-E, Clear , SHGC 0.70, [Bldg. Use 1 - Religious building] 73 ------0.550 0.430 Door: Insulated Metal, Swinging, [Bldg. Use 1 - Religious building]21 ------0.310 0.370 Floor: Unheated Slab-On-Grade, Vertical 3 ft., [Bldg. Use 1 - Religious building] (b) 116 ---10.0 0.510 0.540 (a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements. (b)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2012 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name - Title Signature Date Envelope PASSES: Design 1% better than code Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 81 ofPage Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version COMcheckWeb Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2012 IECC Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C402.3.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable C402.3.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C402.3.2. 2 [PR15]1 Skylights in office, storage, automotive service, manufacturing, non-refrigerated warehouse, retail store, and distribution/sorting area have a measured haze value > 90 percent unless designed to exclude direct sunlight. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 82 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C402.2.6 [FO3]2 Slab edge insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C402.2.6 [FO5]2 Slab edge insulation depth/length. Slab insulation extending away from building is covered by pavement or >= 10 inches of soil. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C403.2.8. 1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 83 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C402.4.1, C402.4.2 [FR16]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.4.3, C402.4.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable C402.4.7 [FR17]3 Vestibules are installed on all building entrances. Doors have self-closing devices. Complies Does Not Not Observable Not Applicable C402.3.3, C402.3.4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.3.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.2.7 [FR14]2 U-factor of opaque doors associated with the building thermal envelope meets requirements. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 84 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.4.5. 1 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C402.4.5. 2 [ME58]3 Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 85 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C402.4.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable C402.4.2. 1 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C303.2 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C402.2.5 [IN8]2 Floor insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 86 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C402.4.6 [FI37]1 Weatherseals installed on all loading dock cargo doors. Complies Does Not Not Observable Not Applicable C402.4.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 87 ofPage Project Title: Data filename: Grace Baptist Curch addition 11/18/16Report date: 88 ofPage