HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00002 - 157 N 2nd E - Singing Waffle - RemodelPermit
Inspection
Summary
Permit Status of (Cancelled) as of Report Date: 04/17/2019 10:05 am
Permit Details Permit Number: 18-00002
157 N 2nd E - Singing Waffle - Remodel
157 N 2nd E
Commercial Remodel
Permit Issued Date:
Permit Inspection Statistics
3Total Inspections Completed:
1Total Inspections Passed:
Inspection Pass Rate: 33.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
01/03/2018PassQuinton OwensCommercial Framing/Structure Inspection
* Approved to hang drywall
* As discussed with Dave over phone about Exit signs, emergency lighting is
required where 2 exits are required. Corridor identified as needing emergency
lighting. A light approved near middle of corridor shall light both ends of hall.
* Exit sign is needed at entry to corridor and at west end of corridor (I was told
that a door will be at both ends of the corridor). Swing is required to be in the
direction of egress. Exit sign (Proposed Elco Lighting Model EE81S Self
Illuminating Exit Sign shows as listed per UL924 standard)
* Panic hardware is required for all doors serving as egress for the assembly
space. Door at east end of corridor was wanted to be locked for security reasons
- this door ONLY shall be secured in open position while used for assembly as
agreed with Dave and may be without panic hardware only if lock is needed as
noted - otherwise panic hardware will be required at all 3 doors.
Inspector Comments:
01/09/2018FailQuinton OwensCommercial Building Final
Finish panic hardware and occupant load sign for at least a temporary occupancy
(pending approval from other final inspections). Complete other items as soon as
possible and request re-inspection.
Inspector Comments:
Plumbing Inspection Type
01/10/2018PARTPASSDon AllenPlumbing Final Inspection
Inspections Required
Plumbing Rough-in
Commercial Electrical Rough-in
HVAC Rough-in
Plumbing Final Inspection
Commerical Electrical Final Inspection
HVAC Final Inspection
Commercial Building Final
Commercial Building Final