HomeMy WebLinkAboutWELD TEST 4 - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Inspector Signature:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Allied Testing & Inspection
4103 E 605 N Suite 2 Rigby, ID 208.970.6237
Taylor Chevrolet Addition
18014
Taylor Chevrolet
Manufab 8/20/18
Clear
8:00 AM
58
11:00 AM
I arrived on site and began my observations of the deck welding for the new addition. I observed that the
contractor had finished welding the roof decking to conform with the 36/7 pattern called for in the plans. I
also observed that the contractor used a pneumatic crimper for the button punches. I notified the contractor
of my observations prior to leaving the project.