Loading...
HomeMy WebLinkAboutWELD TEST 4 - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Taylor Chevrolet Addition 18014 Taylor Chevrolet Manufab 8/20/18 Clear 8:00 AM 58 11:00 AM I arrived on site and began my observations of the deck welding for the new addition. I observed that the contractor had finished welding the roof decking to conform with the 36/7 pattern called for in the plans. I also observed that the contractor used a pneumatic crimper for the button punches. I notified the contractor of my observations prior to leaving the project. Digitally signed by Jacob Christensen Date: 2018.08.22 16:04:59 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: