Loading...
HomeMy WebLinkAboutWELD TEST - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 4103 E 605 N Suite 2 Rigby, ID 208.970.6237 Taylor Chevrolet Remodel/ Addition 18014 Taylor Chevrolet Manufab 8/21/18 Clear 2:00 PM 70 5:00 PM I arrived on site and began my observations of the contractor welding the bottom welds for the HSS beams at 8 locations. I observed the contractor perform the root pass and remove the slag prior to welding the next subsequent layers. I observed that the welds appeared to have adequate penetration and the surface was free from porosity and visual inclusions. I notified the contractor of my observations prior to leaving. Digitally signed by Jacob Christensen Date: 2018.08.22 16:02:07 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: