HomeMy WebLinkAboutWELD TEST - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Inspector Signature:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Allied Testing & Inspection
4103 E 605 N Suite 2 Rigby, ID 208.970.6237
Taylor Chevrolet Remodel/ Addition
18014
Taylor Chevrolet
Manufab 8/21/18
Clear
2:00 PM
70
5:00 PM
I arrived on site and began my observations of the contractor welding the bottom welds for the HSS beams
at 8 locations. I observed the contractor perform the root pass and remove the slag prior to welding the
next subsequent layers. I observed that the welds appeared to have adequate penetration and the surface
was free from porosity and visual inclusions. I notified the contractor of my observations prior to leaving.
Digitally signed by Jacob Christensen Date: 2018.08.22 16:02:07 -06'00'
8129697
Page 2 of 2
Description: Description:
Description: Description:
Additional Comments: