Loading...
HomeMy WebLinkAboutENGINEERING RESULTS - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 338 Oaktrail Dr. Rexburg, ID 208.970.6237 Taylor Chevrolet Addition 18014 Taylor Chevrolet K&C Concrete 7-10-18 sunny 2:00pm 90 4:00pm arrived on site contractor already was placing concrete. I observed the reinforcement for the footings and vertical reinforcement for the foundation walls. Test results were reported to the contractor before leaving. Jacob Christensen Digitally signed by Jacob Christensen Date: 2018.07.13 10:55:39 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: