HomeMy WebLinkAboutCONCRETE TEST - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name:
Project Number:
Client:
Contractor:Date:
Weather:
Time start:
Temperature:
Time End:
Concrete Reinforcement
Concrete Placment
Epoxy Bolt/ Anchors
Post Tensioned Concrete
Masonry Reinforcement Structural Steel Spray-Applied Fireproofing
Masonry Grout Placement
High Strength Grout
Earthwork Inspection
Welding
High Strength Bolting
Cold Weather Concrete
Roads/ Utilities
Other
Daily Field Diary
Observations, Items, and Locations
Deficiencies:
Inspector Signature:Certification #:
Page 1 of 2
NoYes
°F
Description: Description: Description:
Allied Testing & Inspection
338 Oaktrail Dr. Rexburg, ID 208.970.6237
Taylor Chevrolet Addition and Remodel
18014
Taylor Chevrolet
K&C Concrete 7/12/18
Clear
4:00 PM
85
6:00 PM
I arrived on site and began my observations of the reinforcement for the foundation walls and concrete
piers. I observed that the contractor had placed the reinforcement in general conformance with the project
documents and had placed the bolts for the columns prior to the concrete being placed. The first load of
concrete was tested and an air content of 9.9% was observed. The driver spun the drum to reduce the air
content. The concrete was tested again from the truck and the air content was 8.8%. I then tested the
concrete from the hose of the pump and a 4.0% air content was recorded. The contractor was notified of
the air test results as they were completed.
Jacob
Christensen
Digitally signed by Jacob Christensen Date: 2018.07.13 11:08:17 -06'00'
8129697
Page 2 of 2