Loading...
HomeMy WebLinkAboutCONCRETE TEST - 18-00187 - 819 S Yellowstone Hwy - Taylor Chevrolet - RemodelProject Name: Project Number: Client: Contractor:Date: Weather: Time start: Temperature: Time End: Concrete Reinforcement Concrete Placment Epoxy Bolt/ Anchors Post Tensioned Concrete Masonry Reinforcement Structural Steel Spray-Applied Fireproofing Masonry Grout Placement High Strength Grout Earthwork Inspection Welding High Strength Bolting Cold Weather Concrete Roads/ Utilities Other Daily Field Diary Observations, Items, and Locations Deficiencies: Inspector Signature:Certification #: Page 1 of 2 NoYes °F Description: Description: Description: Allied Testing & Inspection 338 Oaktrail Dr. Rexburg, ID 208.970.6237 Taylor Chevrolet Addition and Remodel 18014 Taylor Chevrolet K&C Concrete 7/12/18 Clear 4:00 PM 85 6:00 PM I arrived on site and began my observations of the reinforcement for the foundation walls and concrete piers. I observed that the contractor had placed the reinforcement in general conformance with the project documents and had placed the bolts for the columns prior to the concrete being placed. The first load of concrete was tested and an air content of 9.9% was observed. The driver spun the drum to reduce the air content. The concrete was tested again from the truck and the air content was 8.8%. I then tested the concrete from the hose of the pump and a 4.0% air content was recorded. The contractor was notified of the air test results as they were completed. Jacob Christensen Digitally signed by Jacob Christensen Date: 2018.07.13 11:08:17 -06'00' 8129697 Page 2 of 2 Description: Description: Description: Description: Additional Comments: