Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00309 - 525 S Center St - BYUI - Austin Bldg RemodelPermit Inspection Summary Permit Status of (Issue) as of Report Date: 04/03/2019 12:27 pm Permit Details Permit Number: 17-00309 BYUI - Austin Bldg Remodel 525 S Center St Commercial Remodel Permit Issued Date: 08/02/2017 Permit Inspection Statistics 28Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 53.57% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 10/24/2017PassTed DyeCommercial Framing/Structure Inspection Steel stud construction. All joints have the proper connection(screwed to gether).Inspector Comments: 10/30/2017PassTed DyeCommercial Sheetrock/Drywall Inspection 12/11/2017PassQuinton OwensSuspending Ceiling Inspection HVAC ducts still to be connected and inspected. Fireproofing to be patched in various locations. One light by retracting wall motor still needs seismic ties. Ceiling grid installation is approved. Inspector Comments: 01/04/2018PassTed DyeCommercial Building Final 04/26/2018PassTed DyeCommercial Footing Inspection 05/30/2018PARTPASSQuinton OwensCommercial Building Final Accessible restrooms only inspected and approved on north end of main level.Inspector Comments: Electrical Inspection Type 09/07/2017PARTPASSBret StoddardCommerical Electrical Final Inspection 10/20/2017PARTPASSBret StoddardCommercial Electrical Rough-in 12/08/2017PARTPASSBret StoddardCommercial Electrical Rough-in 01/04/2018PARTPASSBret StoddardCommerical Electrical Final Inspection 02/05/2018PARTPASSBret StoddardElectrical Underground Inspection 02/08/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/07/2018PARTPASSBret StoddardCommercial Electrical Rough-in 04/17/2018PARTPASSBret StoddardCommerical Electrical Final Inspection 09/06/2018PassBret StoddardCommercial Electrical Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 17-00309 BYUI - Austin Bldg Remodel 525 S Center St Commercial Remodel Permit Status of (Issue) as of Report Date: 04/03/2019 12:27 pm Permit Inspection Summary Fire Inspection Type 09/08/2017PassDale PickeringFire Sprinkler Hydro 09/08/2017PassDale PickeringFire Sprinkler Rough-in 01/04/2018PARTPASSBret StoddardFire Alarm Final Inspection 04/18/2018PARTPASSBret StoddardFire Alarm Final Inspection 02/25/2019PassBret StoddardFire Alarm Final Inspection Mechanical Inspection Type 01/04/2018PARTPASSDon AllenHVAC Final Inspection Need the air test for the duct system in the welding lab room 170. in rooms 221 213 204 202 202a 204 206 208 210 and 212 are good to hold classes in. Inspector Comments: 02/25/2019PassDon AllenHVAC Final Inspection Plumbing Inspection Type 10/17/2017PassDon AllenPlumbing Rough-in good to cover the sinksInspector Comments: 01/04/2018PassDon AllenPlumbing Final Inspection The 2 sinks that where installed in room 202 was done to code.Inspector Comments: 01/24/2018PassDon AllenPlumbing Underground Inspection Good to cover the plumbing underground in the basement of the buildingInspector Comments: 02/07/2018PassDon AllenPlumbing Rough-in 05/30/2018PARTPASSDon AllenPlumbing Final Inspection 02/25/2019PassDon AllenPlumbing Final Inspection Page 2 of 2