Permit Status of (Issue) as of Report Date: 03/28/2019 9:02 am
Permit Details Permit Number: 18-00283
Idaho Central Credit Union - Tenant Finish
155 W 2nd S Suite 120
Commercial Tenant Finish
Permit Issued Date: 06/15/2018
Permit Inspection Statistics
24Total Inspections Completed:
14Total Inspections Passed:
Inspection Pass Rate: 58.33%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
07/03/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Inspection of tenant space exterior wall framing approved.
Insulation is not complete at electrical panel on south wall and at column
enclosure on north wall. Interior framing not ready for inspection.
Inspector Comments:
as early as possibleInspector Comments:
07/09/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection
Interior steel stud framing approved. Cover is pending on electrical rough
inspection.
Inspector Comments:
07/09/2018PARTPASSQuinton OwensCommercial Insulation Inspection
07/17/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Approved for taping except where insulation is still missing in stud cavity with
electrical panel.
* Fire rated separation walls are not rated yet at penetrations.
Inspector Comments:
08/09/2018PassTed DyeCommercial Framing/Structure Inspection
08/16/2018PassQuinton OwensSuspending Ceiling Inspection
09/04/2018FailTed DyeCommercial Building Final
03/21/2019PassQuinton OwensCommercial Building Final
Electrical Inspection Type
06/15/2018PassBret StoddardElectrical Underground Inspection
07/02/2018PARTPASSBret StoddardCommercial Electrical Rough-in
07/13/2018PassBret StoddardCommercial Electrical Rough-in
08/31/2018PassBret StoddardCommercial Electrical Final Inspection
Page 1 of 2
(Continued)
Permit Details Permit Number: 18-00283
Idaho Central Credit Union - Tenant Finish
155 W 2nd S Suite 120
Commercial Tenant Finish
Permit Status of (Issue) as of Report Date: 03/28/2019 9:02 am
Permit
Inspection
Summary
Fire Inspection Type
08/07/2018PassDale PickeringFire Sprinkler Rough-in
08/20/2018FailDavid DavisFire Sprinkler Final Inspection
They wanted us to see the system was in place and ready to be covered with the
ceiling tiles. System is up and running but needs to have the riser alarms and
signage added. They are going to finish this and be ready to have a final done.
Inspector Comments:
09/02/2018PassDale PickeringFire Department Final Inspection
03/04/2019PassDale PickeringFire Sprinkler Final Inspection
Mechanical Inspection Type
07/02/2018FailDon AllenHVAC Rough-in
07/03/2018PARTPASSDon AllenHVAC Rough-in
08/20/2018PARTPASSDon AllenHVAC Final Inspection
Good to cover the duct work in the main lobby with the gridInspector Comments:
03/25/2019PassDon AllenHVAC Final Inspection
Plumbing Inspection Type
06/15/2018PassDon AllenPlumbing Rough-in
07/02/2018PassDon AllenPlumbing Underground Inspection
Good to cover the plumbing underground.Inspector Comments:
07/02/2018PassDon AllenPlumbing Rough-in
09/04/2018PassDon AllenPlumbing Final Inspection
Page 2 of 2