HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00283 -155 W 2nd S Suite 120 - Idaho Central Credit Union - Tenant FinishPermit Inspection Summary Permit Status of (Issue) as of Report Date: 03/28/2019 9:02 am Permit Details Permit Number: 18-00283 Idaho Central Credit Union - Tenant Finish 155 W 2nd S Suite 120 Commercial Tenant Finish Permit Issued Date: 06/15/2018 Permit Inspection Statistics 24Total Inspections Completed: 14Total Inspections Passed: Inspection Pass Rate: 58.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/03/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection Inspection of tenant space exterior wall framing approved. Insulation is not complete at electrical panel on south wall and at column enclosure on north wall. Interior framing not ready for inspection. Inspector Comments: as early as possibleInspector Comments: 07/09/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection Interior steel stud framing approved. Cover is pending on electrical rough inspection. Inspector Comments: 07/09/2018PARTPASSQuinton OwensCommercial Insulation Inspection 07/17/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Approved for taping except where insulation is still missing in stud cavity with electrical panel. * Fire rated separation walls are not rated yet at penetrations. Inspector Comments: 08/09/2018PassTed DyeCommercial Framing/Structure Inspection 08/16/2018PassQuinton OwensSuspending Ceiling Inspection 09/04/2018FailTed DyeCommercial Building Final 03/21/2019PassQuinton OwensCommercial Building Final Electrical Inspection Type 06/15/2018PassBret StoddardElectrical Underground Inspection 07/02/2018PARTPASSBret StoddardCommercial Electrical Rough-in 07/13/2018PassBret StoddardCommercial Electrical Rough-in 08/31/2018PassBret StoddardCommercial Electrical Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 18-00283 Idaho Central Credit Union - Tenant Finish 155 W 2nd S Suite 120 Commercial Tenant Finish Permit Status of (Issue) as of Report Date: 03/28/2019 9:02 am Permit Inspection Summary Fire Inspection Type 08/07/2018PassDale PickeringFire Sprinkler Rough-in 08/20/2018FailDavid DavisFire Sprinkler Final Inspection They wanted us to see the system was in place and ready to be covered with the ceiling tiles. System is up and running but needs to have the riser alarms and signage added. They are going to finish this and be ready to have a final done. Inspector Comments: 09/02/2018PassDale PickeringFire Department Final Inspection 03/04/2019PassDale PickeringFire Sprinkler Final Inspection Mechanical Inspection Type 07/02/2018FailDon AllenHVAC Rough-in 07/03/2018PARTPASSDon AllenHVAC Rough-in 08/20/2018PARTPASSDon AllenHVAC Final Inspection Good to cover the duct work in the main lobby with the gridInspector Comments: 03/25/2019PassDon AllenHVAC Final Inspection Plumbing Inspection Type 06/15/2018PassDon AllenPlumbing Rough-in 07/02/2018PassDon AllenPlumbing Underground Inspection Good to cover the plumbing underground.Inspector Comments: 07/02/2018PassDon AllenPlumbing Rough-in 09/04/2018PassDon AllenPlumbing Final Inspection Page 2 of 2