HomeMy WebLinkAboutSITE PLANS - 19-00100 - 445 E 7th N - Centennial Townhomes Final PlatDate:
Connect Engineering
APPROVAL SIGNATURES:
of
DEVELOPMENT DRAWINGS FOR:
STATE MAP
SHEET NO.
PLOT DATE: 3/18/2019 8:57 AM
Date:
The Civil Connection
1150 Hollipark Dr. Idaho Falls, ID 83401
208.681.8590
CITY OF REXBURG
Date:Deparment of Environmental Quality
1 15
REXBURG CENTENNIAL TOWNHOMES
REXBURG, ID
PRELIMINARY FOR
REVIEW ONLY
Sheet List Table
Sheet Number Sheet Title
1 COVER
2 NOTES SHEET
3 HORIZONTAL CONTROL
4 GRADING SHEET
5 RONDO STA 0+50 TO STA 5+00
6 RONDO STA 5+00 TO STA 8+50
7 RONDO STA 9+00 TO STA 11+50
8 RONDO STA 12+00 TO STA 15+50
9 RONDO STA 15+50 TO STA 18+71
10 GARNETT STA 0+75 TO STA 3+50
11 GARNETT STA 3+50 TO STA 7+25
12 PARKING LOT-POND 2 DESIGN
13 POND 1 DESIGN
14 STORM WATER POLLUTION PREVENTION
15 STORM WATER POLLUTION PREVENTION DETAILS
REXBURG, IDAHO
SITE MAP
VICINITY MAP
IMPROVEMENT DRAWINGS:
REXBURG CENTENNIAL TOWNHOMES
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
2
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
NO
T
E
S
S
H
E
E
T
RE
X
B
U
R
G
,
I
D
DEPARTMENT OF ENVIRONMENTAL QUALITY
900 N SKYLINE, SUITE B
IDAHO FALLS, IDAHO 83402
(208) 528-2650
CONTACTS
INTERMOUNTIAN GAS COMPANY
1527 HOLLIPARK DR
IDAHO FALLS IDAHO, IDAHO 83401
(208) 542-6632
ROCKY MOUNTAIN POWER
170 W 2ND N
REXBURG, ID 83440
(888) 221-7070
CITY OF REXBURG
35 N 1ST E,
REXBURG, ID 83440
(208) 359-3020
APPROVED BY ________________________DATE:____________
City of REXBURG
CABLE ONE
1525 SHERRY DR.
IDAHO FALLS, ID 83403
(208) 523-4567
GENERAL NOTES
1. All materials, workmanship, and construction of site improvements shall meet or exceed the work standards
and specifications set forth by the CITY OF REXBURG standard specifications and drawings, and
and requirements of the Idaho Standards for Public Works Construction, (ISPWC) current edition.
2. All material furnished on or for the project must meet the minimum requirements of the approving agencies
or as set forth herein, whichever is more restrictive.
3. The Contractor is cautioned that the location and/or elevation of existing utilities, as shown on these
plans, is based on records of the various utility companies and where possible, measurements taken in the
field. The Contractor must call the local utility location center at least 48 hours before any excavation
to request exact field locations of the utilities.
4. A Pre-Construction Conference shall be held a minimum of three (3) working days prior to start of work.
All Contractors, Subcontractors and/or Utility Contractors shall be present.
5. All lot dimensions and easements are to be taken from the Final Plat of the recorded subdivision plat.
6. The Contractor shall maintain all existing drainage and sanitary sewer facilities within the construction area
until the drainage improvements are in place and functioning.
7. All Contractors working within the project boundaries are responsible for compliance with all applicable
safety laws of any jurisdictional body including but not limited to, barricades, safety devices, control of
traffic, excavation, trenching, shoring, and security within and around the construction area.
8. Contractors must furnish proof that all materials installed on this project meet the requirements of Note
# 2 above at the request of the agency and/or Engineer.
9. CONNECT ENGINEERING must give approval prior to (a) backfilling trenches for pipe; (b) placing
of aggregate base; (c) placing of concrete; (d) placing of asphalt pavement. Work done without such
approval shall not relieve the Contractor from the responsibility of performing the work in an acceptable
manner. Contract work will not be accepted by the CITY OF REXBURG without the approval
of the Project Engineer.
10. Developmental drawings must be submitted to the CITY OF REXBURG Public Works Dept. prior to final
approval.
11. Only plan sets marked "Approved for Construction" shall be used by the project contractor(s). Use of any
plans on the job without the "Approved of Construction" stamp shall be grounds for the issuance of a stop
work order. Contractor must also maintain a set of plans stamped with approval by the Department of
Environmental Quality on site.
12. Contractor is responsible for property corner protection. The cost of $30 per corner will be held as retainage until all
interior corners are verified to be in place.
13. Each Contractor shall be responsible for acquiring any necessary NPDES permits, filing any NOI's or
NOT's, and preparing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the
Environmental Protection Agency. Contact the EPA at 208.378.5776 for the required information. Said
permit shall be presented to the Engineer at least forty-eight (48) hours prior to the beginning of construction.
14. The Contractor shall be responsible for keeping roadways free and clear of all construction debris and dirt
tracked in from the site.
15. All measures possible shall be taken to ensure erosion control with Best Management Practices.
16. Quantities shown are estimates by the Engineer. The Contractor must verify all quantities. If there is a
large discrepancy contact the Engineer.
17. All work must meet standards set forth by the American Disabilities Act (ADA) inside public rights of way.
18. Trench backfill Type 2A compaction "Water Settling" will not be an acceptable method of trench backfill
compaction.
19. All water valves, blow-offs and manholes will be placed so as not to conflict with any concrete curb, gutter,
valley gutter, and sidewalk improvements.
20. CONNECT ENGINEERING and/or Inspector shall make periodic visits to the project location to ensure that
the site improvements meet or exceed standards and design as per the approved construction drawings.
21. To receive final acceptance, Contractor must submit copy of field plans complete with construction notes
and As-Built information, corrections, changes, etc.
22. Contractor must have ISPWC manual (current edition) on-site during all phases of construction. Failure to
do so may result in non-acceptance of the site by DEQ, Engineer, City etc.
23. A copy of the Quality Control Signature sheet (with all applicable signatures) shall be delivered to CONNECT
ENGINEERING prior to the walk-thru.
24. A Right-of-Way Construction Permit from the CITY OF REXBURG Public Works is required for any
construction in the road right-of-way not shown on these improvement drawings.
25. Contractors shall provide a one (1) year warranty on all roads from the date of formal acceptance by the CITY
OF REXBURG.
26. Lot corners and centerline intersection monuments have been staked as shown on the recorded plat of this
subdivision. Should any of these monuments be lost or disturbed during construction Idaho Code 55-1613
requires said monuments will be reestablished by a professional land surveyor at the expense of the agency or
person causing the loss or disturbance.
STREET CONSTRUCTION
1. All construction within public right-of-way shall conform to the current edition of the ISPWC and
the CITY OF REXBURG standards. No exceptions to Policy Standards and the ISPWC will be allowed
unless specifically and previously approved in writing by the CITY OF REXBURG.
2. No construction shall begin before the Pre-Construction meeting, which the Contractor is required to
attend.
3. Sanitary sewer and storm drain manholes, cones and structures shall be set to specified elevation by their
respective contractors. All remaining manhole materials, except concrete collars, necessary to construct
manhole to finished grade in pavement areas shall be furnished by the Contractor for placement at finished
grade. For manholes not within pavement areas, the manhole rings shall be set to finished grade by their
respective contractor. Contractor shall contact the CITY OF REXBURG twenty-four (24) hours prior to
pouring concrete collars.
4. Contractor shall construct four inches (4") of asphalt pavement thickness at joint
locations for all pavement matches.
5. All reinforced concrete pipe shall conform to ASTM C-76 Specifications for the class of pipe indicated, and
shall be installed watertight.
6. All work will be inspected by CONNECT ENGINEERING and monitored by the CITY OF REXBURG in
accordance with the latest edition of the "IDAHO STANDARD PUBLIC WORKS CONSTRUCTION".
7. Borrow shall be obtained from sources designated or approved in writing by the Engineer.
8. Clearing and grubbing shall consist of removing all natural and artificial objectionable materials. Under no
circumstances shall roadways be placed on frozen or objectionable material.
9. The subgrade shall be excavated and bladed to remove all uneven areas and to secure a uniform surface
true to grade and line. The subgrade material shall then be scarified to a depth of eight inches (8"),
adjusted to within approximately 2% of optimum moisture content and compacted to the minimum density
required as stated in ISPWC.
10. All concrete used shall be Class 4 and have a strength of four thousand (4000) PSI in twenty-eight (28)
days. The concrete mix shall include Fly Ash for ASR mitigation. The mix design shall be approved by the
engineer. All concrete shall be cured by a liquid membrane-forming curing compound method,unless otherwise
specified in writing by the Engineer.
11. The plant mix should be a 12-inch SP3 PG 58-28, 1 to 10 million design ESALs superpave hot mix asphalt design.
12. All road stripping and excess topsoil shall be stockpiled out of the right-of-way and stored at Contractor's
expense.
13. A traffic control plan based on the latest edition of the Manual on Uniform Traffic Control Devices
(MUTCD) shall be approved by the CITY OF REXBURG Public Works Department prior to construction.
14. Parked equipment and stored materials shall be kept as far away from the travelway as feasible. Items
left overnight within 30 feet of the travel way shall be marked and/or protected.
STREET SIGNING
1.All road striping and traffic signing shall be designed, constructed, and placed according to the current Manual of
Uniform Traffic Control Devices (MUTCD) with the following exceptions:
1.1.All Stop and Yield signs used in any subdivision shall be a minimum 30" X 30", engineer grade sheeting is not
allowed.
1.2.All Road Name and Street signs shall have a minimum 4" legend. Both background and legend shall be
retro-reflective. Standard colors are white legend and green background except private roads, which will have
a blue background.
1.3.Substrate material shall be aluminum; no fiberglass or plastic will be accepted.
1.4.The minimum size for Speed Limit Signs shall be 24"W X 30"L with black legend on white background.
1.5.Posts shall be metal and shall be anchored with a "soil type" anchor. No concrete shall be used as an anchor.
Posts shall be 2" X 2" square and must meet break-a-way standards of the State of Idaho. No U-channel shall
be used.
1.6.The minimum height of signs shall be 6' from the road surface to the bottom of the sign.
1.7.Maintenance of all street and traffic signs will be the responsibility of the developer until the streets are
officially accepted for maintenance by the CITY OF REXBURG.
WATER NOTES
1. The water system shall be constructed to conform with the standards set forth in the "Idaho Regulations for
Public Drinking Water Systems" and the current CITY OF REXBURG standard drawings and specifications.
2. The pipe shall be installed in a workmanlike manner by persons properly qualified to perform said work and shall
be in conformance with the manufacturer's recommendations as approved by the City Engineer. All work and
materials must conform to current requirements of the CITY OF REXBURG. Water distribution mains shall
be constructed with class 50 DI pipe, AWWA C-900, DR 18 PVC or Pressure Class 250 DIP.
3. All water services shall be 1" DR7 (200 psi) PE IPS pipe and have a minimum cover of 5 feet per City of REXBURG std.
Detail sheet 13. Cap lines 15' inside property lines after installation of the water mains. The trenches shall be compacted
to 95% of maximum density to prevent further settlement. All mains shall be leak-tested, disinfected, flushed and bacteria
tested before connecting to the municipal system. Mueller thermal coil meter pit, or equivalent, required for all water
services.
4. Where it is necessary for sewer and water to cross each other and the sewer line is above or less than 18
inches below the water main, the sewer line crossing shall be either:
a. Non-Potable pipeline construction with potable water class pie for a minimum of ten (10) feet either side of
potable pipeline with a single twenty (20) feet section of potable water class pipe centered on the crossing; or
b. Sleeve non-potable or potable pipeline with potable water class pipe ten (10) feet either side of crossing.
Use of hydraulic cementitous materials such as concrete, controlled density fill, and concrete slurry encasement
is not allowed as a substitute for sleeving.
If potable pipeline is below non-potable pipeline, the non-potable pipeline must also be supported through the
crossing to prevent settling.
5. All tees, plugs, caps and bends, and at other locations where unbalanced forces exist, shall be secured and
anchored by concrete thrust blocks as shown on ISPWC std. dwgs.
6. CONNECT ENGINEERING will provide one (1) set of construction stakes for each of the following items:
water main lines, fire hydrants, and service connections.
7. Contractor to field verify all valve box lid elevations to assure that said lid elevations match final street grade.
8. The paving contractor shall be responsible for constructing concrete collars and final adjustments of water
valves to grade.
9. Pipes laid on a curve: the maximum joint deflection shall be 5 percent or the manufacturer's recommendation,
whichever is less.
10. The developer will test the compaction of the water pipeline bedding in accordance with the ISPWC
specifications construction inspection policy. Testing will be done by an outside testing laboratory. The cost of this
service shall be paid by the developer. However, if the test fails, the cost of the test and any retesting shall be
paid by the water contractor. The contractor shall coordinate with the developer's engineer and testing
laboratory to schedule the tests, his backfilling, and pipe laying operation.
11. The developer's engineer shall be present during all testing of the water line.
12. The horizontal separation of the water and sanitary sewer, or storm drain shall be a minimum of ten (10) feet.
13. The water line construction shall conform to the depth of public health and welfare regulations of public drinking.
A minimum of 5-foot cover for water lines water systems and disinfection specifications shall be kept.
14. Fire hydrants or temporary blow-offs shall be installed on dead-end water lines.
15. Water lines shall not exceed 8' in depth from finished grade.
16. At all times, when laying pipe is not in progress, open ends of the pipe shall be closed by a watertight plug or
other approved means. At the close of the day's work, or whenever workmen are absent from the job, the end
of the last laid section shall be plugged, capped, or tightly closed to prevent entry of foreign material.
17. All water main fittings to be mechanical joint; no flanged fittings.
18. A minimum of 18" vertical clearance must exist between potable and non-potable lines.
19. Fire hydrants shall be Mueller, Waterous, or Clow Brands with KOCHEK (model SZMC5054-3-Y Storz adapter or
approved equal. All fire hydrants shall be painted red.
20. Install No. 12AWG copper locating wire with insulation on all water pipe and water service lines. Utilize epoxy splice kits.
SEWER NOTES
1. Prior to construction, it shall be the responsibility of the contractor to inform all the utility companies of the
construction schedule.
2 All existing utility locations and depths are approximate and shall be verified by the contractor.
3. All elevations are based on the USED DATUM.
4. Manhole rim elevations as shown on the Construction Drawings are approximate. The manhole frames and
covers shall be constructed in accordance with the CITY OF REXBURG Standard Drawings. Rim elevations
shall be determined by the engineer in the field during construction.
5. Contractor shall repave any existing paved streets disturbed during construction.
6. Retain and protect all irrigation and drainage crossings. The contractor shall coordinate with the owner and the
Rexburg Irrigation Company (208-356-5251) for the inspection of the exposed irrigation and/or drainage pipe
crossings. If existing pipes are damaged, the affected pipe will be replaced by the contractor.
7. The developer's engineer shall be present during all testing of the sewer construction.
8. Retain and protect existing curb, gutter and sidewalk. if removal is necessary, replacement shall be incidental to
project.
9. The following type and class of pipe will be permitted: gravity pipe shall conform to ASTM D-3034, PVC, SDR
35, or other pipe approved in the CITY OF REXBURG Standards.
10. All work shall be constructed to the CITY OF REXBURG Standards. All work shall be approved by the CITY
OF REXBURG.
11. Sanitary sewer manhole cones shall be set a maximum of one (1) foot below specified ring elevations by sewer
contractor. All remaining manhole materials, other than concrete collars necessary to construct manhole to
finished grade, shall be furnished by the sewer contractor for placement at finished grade by street paving
contractor. All materials for concrete around manhole rings shall be supplied and constructed to finished grade
by street contractor. The owner's engineer shall be contacted 24 hours prior to placing concrete collars.
12. The trench backfill above the pipe zone will be inspected by the owner's engineer in accordance with the latest
edition of the Idaho Standards for Public Works Construction Specifications and the CITY OF REXBURG
Standards and Specifications.
13. Where PVC is utilized, a rubber ring or approved equivalent is to be installed where the pipe is in contact with
manhole base and/or manhole channel in order to insure a watertight seal.
14. Where it is necessary for sewer and water to cross each other and the sewer line is above or less than 18
inches below the water main, the sewer line crossing shall be either:
a. Non-Potable pipeline construction with potable water class pie for a minimum of ten (10) feet either side of
potable pipeline with a single twenty (20) feet section of potable water class pipe centered on the crossing; or
b. Sleeve non-potable or potable pipeline with potable water class pipe ten (10) feet either side of crossing.
Use of hydraulic cementitous materials such as concrete, controlled density fill, and concrete slurry
encasement is not allowed as a substitute for sleeving.
If potable pipeline is below non-potable pipeline the non-potable pipeline must also be supported through the
crossing to prevent settling.
15. Where the sewer main depth will allow, all sewer service lines shall be constructed to a depth of 9.5' at property
line. The contractor shall use 4" diameter PVC pipe or approved equivalent for all service lines. All sewer
service lines shall be constructed at a minimum grade of 1%.
16. Sewer service lines shall be 4" PVC and constructed to a point 5' from building foundation as shown. Except
where otherwise located, the sewer service lines shall be constructed as shown on plan.
17. The horizontal separation of the water and sewer mains shall be a minimum of ten (10) feet.
18. Contractor shall notify the CITY OF REXBURG City Engineer and the developer's engineer 48 hours in
advance of construction.
19. Water levels shall be maintained below the trench bottom during the pipe laying and joining operation. The
dewatering method shall be discussed with the engineer and approved prior to construction. Ditches and storm
drain facilities that are silted up due to the contractor's dewatering shall be cleaned and restored to their original
state.
20. Contractor shall locate and protect all underground utilities during construction.
21. The developer shall test the compaction of the sewer pipeline bedding in accordance with the the
ISPWC specifications, and will be done by an outside testing laboratory. The cost of this service shall
be paid by the developer. However, if the test fails, the cost of the test and any retesting shall be paid by the
contractor. The contractor shall coordinate with the developer's engineer and the testing laboratory to
schedule the tests, backfilling, and pipe laying operation.
22. After all utilities are constructed and just prior to paving, the contractor shall perform an air test on the sewer
system. The developer's engineer shall be present to witness the test. The contractor shall contact the
engineer 24 hours prior to testing. City of REXBURG requires low pressure air or hydrostatic testing, mandrel,
and CCTV inspection of the completed sewer.
23. The contractor shall leave the excavation for the upstream end of all service lines open for field verification of
the invert elevation by the engineer's inspector. The contractor shall not backfill the ends of service lines until
he has obtained approval from the engineer's inspector or made other arrangements for verification of service
line invert elevations.
24. Service and main piping shall be in accordance with ASTM 3034 and shall be SDR 35 or greater plastic pipe or
approved equal.
25. Service wyes shall be installed per the CITY OF REXBURG Standards.
26. Backfill compaction of drop manholes shall not be accepted without full time inspection by developer's engineer
during compaction work.
27. At all times, when laying pipe is not in progress, open ends of the pipe shall be closed by a watertight plug or
other approved means. At the close of the day's work, or whenever workmen are absent from the job, the end
of the last laid section shall be plugged, capped, or tightly closed to prevent entry of foreign material.
28. All visible leaks shall be repaired - even if the leakage is below allowable limits.
29. The developer's engineer shall be present during all testing of the sewer line.
30. A minimum of 18" vertical clearance must exist between potable and non-potable lines.
ELECTRICAL NOTES
1. All new electrical facilities shall be constructed in accordance with the current
Rocky Mountain Power Service Policy. Each utility shall be constructed to its own policy.
2. Electrical sectionalizing cabinets and bases (when required) will be provided by Rocky Mountain Power but shall be
installed by the Developer/Contractor.
3. All primary and secondary conduits shall be provided and installed by the Developer/Contractor. All
electrical conduits and 36" radius elbows shall be schedule 40 pvc.
4. The minimum power trench depth shall be 54" below finished grade. (Conduit to be installed 48" below
finish grade). Including 6" of sand bedding below and above top of conduits.
5. Primary and secondary conduit depths can be reduced to 18" of cover below finished grade with
approval by Rocky Mountain Power. Rigid galvanized steel conduit must be provided and installed by the
Developer/Contractor in a trench that is less than 48" deep.
6. The Contractor shall retain and protect all existing City power poles and electrical facilities during construction
except those facilities shown to be relocated or moved per Rocky Mountain Power contractors map.
7. Coordinate all electrical construction with Rocky Mountain Power.
8. Owner shall bear all costs to relocate or remove existing power poles, light poles, anchor guys, and
miscellaneous electrical facilities, except those facilities inside city rights of way.
9. The Owner/Developer shall provide all trenching, conduit and concrete light pole foundations for street
illumination along all Public Right of Way as per Rocky Mountain Power current service policy. In addition,
Owner/Developer shall purchase street light assembly provided and installed by Rocky Mountain Power.
10. If applicable, see Rocky Mountain Power Electrical site plan for off-site electrical and fiber optic facilities, layout,
and installation details.
11. With exception of conduit crossing, contractor shall install curb and gutter prior to power trench and conduit
installation. or (with Rocky Mountain Power approval) centerline of trench may be staked with cut/fill to bottom of
trench at all grade breaks and hubs at 25' intervals and offset stakes at all transformers, switch cabinets,
secondary pedestals etc.
12. Contact Rocky Mountain Power prior to construction.
48
7
2
BUILDING #1
1+
0
0
2+
0
0
3+
0
0
4+
0
0
5+
0
0
6+
0
0
7+
0
0
7+
6
2
0+
8
5
1+
0
0
2+
0
0
3+0
0
4+00 5+00 6+00 7+00 7+34
L2
L3
L4
C1
C
2
L5
L6
C
3
FF ELEV: 4873.75
FF ELEV: 4874.29 FF ELEV: 4874.72 FF ELEV: 4875.22
BUILDING #2BUILDING #3BUILDING #4
BUILDING #5BUILDING #6BUILDING #7BUILDING #8
BUILDING #9
BUILDING #10
BUILDING #11 BUILDING #12 BUILDING #13 BUILDING #14
BUILDING #15 BUILDING #17 BUILDING #18
BUILDING #20BUILDING #19
BUILDING #21 BUILDING #22 BUILDING #23
4
8
7
6
48
7
5
48
7
5
48
7
4
48
7
4
48
7
4
48
7
5
48
7
5
48
7
5
4
8
7
2
4871
487
4
4871
4873
48
7
2
48
7
0
4
8
7
3
48
7
4
48
7
5
4873
4874
4874
487
3
4874
4874
4874
487
3
4874
4874
487
3
4872
48
6
6
48
7
4
48
7
3
48
7
2
11
1
1
1
1
1
11
1
1 1
22
2
2
2
2 2
2
33
3
3
3 3
3
3
3 3
3
3
3
5
5
5
5
7
7
7
MAINTENANCE
GARAGE
OFFICE
4870.94
TBC-PI
OFF: -32.527 L
STA: 1+83.00
4871.35
TBC-PI
OFF: -17.027 L
STA: 1+83.00
4871.60
TBC-PI
OFF: -12.527 L
STA: 1+75.38
4872.00
TBC-PI
OFF: 12.638 R
STA: 1+79.39
4872.49
TBC-PI
OFF: 16.973 R
STA: 1+83.00
4872.89
TBC-PI
OFF: 32.500 R
STA: 1+83.00
4873.77
TBC-PI
OFF: 32.473 R
STA: 3+34.00
4873.11
TBC-PI
OFF: -32.527 L
STA: 3+37.75
4873.82
TBC-PI
OFF: 22.035 R
STA: 3+34.00
4873.23
TBC-PI
OFF: -22.082 L
STA: 3+37.75
4871.60
TBC-PI
OFF: -12.527 L
STA: 1+78.50
4873.92
TBC-PI
OFF: 12.552 R
STA: 3+42.50
48
7
1
4874
4872
ADA UNIT
ADA UNIT
10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00
9+84 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+0019+15
L8
L9
4
8
7
4
48
7
0
48
6
9
48
7
1
48
6
6
4874.06
POND TOP
4874.02
POND TOP
4874.02
POND TOP 4874.03
POND TOP
BUILDING #16
6
4874
48
7
1
48754875
4875
4872.23
TBC-PI
OFF: 12.473 R
STA: 1+75.38
ADA UNIT
48
7
3
48
7
4
4874
48
7
4
48724872
4870.30
POND BOTTOM
4870.30
POND BOTTOM
4873
4874
4873
4872
4875
4873
4872
4871
48704870
4872
487248734874
4874
4874
4873
4872
48
6
7
48
6
8
48
6
9
48
7
0
48
7
1
4
8
7
2
48
6
7
48
6
8
4872
4872
RONDO STREET
Number
L2
C1
L3
C2
L4
Station
Start: 0+53.00
End: 8+59.62
Start: 8+59.62
End: 9+26.77
Start: 9+26.77
End: 10+62.64
Start: 10+62.64
End: 11+29.80
Start: 11+29.80
End: 18+89.30
Radius
42.75
42.75
Length
806.62
67.15
135.87
67.16
759.50
Line/Chord Direction
N90° 00' 00.00"W
S45° 00' 00.00"W
S0° 00' 00.00"E
S45° 00' 18.61"E
N89° 59' 22.78"E
Start Point
Northing: 793014.90
Easting: 760609.85
Northing: 793014.90
Easting: 759803.24
Northing: 792972.15
Easting: 759760.49
Northing: 792836.28
Easting: 759760.49
Northing: 792793.53
Easting: 759803.24
End Point
Northing: 793014.90
Easting: 759803.24
Northing: 792972.15
Easting: 759760.49
Northing: 792836.28
Easting: 759760.49
Northing: 792793.53
Easting: 759803.24
Northing: 792793.67
Easting: 760562.74
GARNETT STREET
Number
L5
C3
L6
Station
Start: 0+84.75
End: 2+55.50
Start: 2+55.50
End: 3+13.98
Start: 3+13.98
End: 7+33.60
Radius
37.25
Length
170.75
58.48
419.62
Line/Chord Direction
S0° 02' 34.99"E
S45° 01' 17.50"E
N90° 00' 00.00"E
Start Point
Northing: 792808.84
Easting: 760125.17
Northing: 792638.09
Easting: 760125.30
Northing: 792600.87
Easting: 760162.55
End Point
Northing: 792638.09
Easting: 760125.30
Northing: 792600.87
Easting: 760162.55
Northing: 792600.87
Easting: 760582.17
SITE NOTES:
INSTALL 3" ROLL CURB PER ISPWC SD-702
INSTALL 1' FLUSH CURB PER DETAIL THIS SHEET
LANDSCAPING
INSTALL 8'X8' CONCRETE DUMPSTER PAD
STORM WATER RETENTION AREA
INSTALL MAIL BOX POD
INSTALL COMMERCIAL APPROACH PER ISPWC SD-807
6
4
2
3
7
1
5
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
3
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
HO
R
I
Z
O
N
T
A
L
C
O
N
T
R
O
L
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
LEGEND
PROPOSED CATCH BASIN
PROPOSED FIRE HYDRANT
EXIST. LIGHT POLE
PROPOSED STREET LIGHT
PROPOSED WATER VALVE
EXIST. SANITARY SEWER MANHOLE
EXIST. CURB & GUTTER
PROPERTY LINE
GRADE BREAK
SAW CUT
STREET RIGHT-OF-WAY (ROW)
EASEMENT LINE
EXIST. FENCE LINE
PROPOSED UNDERGROUND POWER
EXIST. SANITARY SEWER LINE
PROPOSED SANITARY SEWER LINE
PROPOSED WATER LINE
EXIST. WATERLINE
PROPOSED SANITARY SEWER SERVICE
PPROPOSED WATER SERVICE
EXISTING OVERHEAD POWER
EXISTING OVERHEAD TELEPHONE
EXISTING GAS SERVICE
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
PROPOSED CONCRETE SIDEWALK
PROPOSED ASPHALT
PROPOSED LANDSCAPING
PROPOSED BUILDINGS
EXISTING ASPHALT TO BE PROTECTED
PROPOSED STORM DRAIN MANHOLE
PROPOSED CURB & GUTTER
PROPOSED STORM DRAINLINE
EXIST. POWER POLE
PROPOSED SANITARY SEWER MANHOLE
SURVEY NOTE:
THIS SITE PLAN CONFORMS TO AN ACTUAL SURVEY THAT WAS PERFORMED ON THE GROUND
BY A LICENSED LAND SURVEYOR IN AND FOR THE STATE OF IDAHO. IT IS THE OWNER’S
RESPONSIBILITY TO CONSTRUCT ALL STRUCTURES SHOWN ON THIS SITE PLAN IN
ACCORDANCE WITH SAID SURVEY.
DEVELOPMENT NOTES
1.ALL STREETS AND PARKING AREA INSIDE P.U.D. WILL BE PRIVATELY MAINTAINED AND
OPERATED. THE CITY OF REXBURG WILL NOT TAKE OVER PRIVATE STREETS.
2.ALL EASEMENTS INSIDE P.U.D. ARE CONSIDERED PUBLIC UTILITY EASEMENTS.
WIDTH VARIES DEPENDED ON USE.
3.POTABLE WATER AND SANITARY SEWER WILL BE INSTALLED IN A 22' WIDE P.U.E FOR
CITY MAINTENANCE.
BENCHMARK
1/2" IRON ROD NO CAP
NORTHING: 75677.9090'
EASTING: 792706.527'
ELEVATION: 4872.45' (NAVD88)
STORM WATER REQUIREMENTS
TOTAL STORAGE REQUIRED = 30,358 cu. ft. (per 100 year-1 hour storm event)
TOTAL STORAGE AVAILABLE = 31,369 cu. ft
SITE INFORMATION
PARCEL ZONING = MDR2
TOTAL BUILDINGS = 23
SINGLE FAMILY ATTACHED BUILDINGS = 103 ATTACHED HOMES
TOTAL AREA OF PROPERTY = 510,548 SQ. FT. (11.72 ACRES)
ALLOWED DENSITY = 20 UNITS PER ACRE
DESIGN DENSITY= 8.92 UNITS PER ACRE
LANDSCAPE REQUIREMENTS
TOTAL REQUIRED(25%) = 127636.95 SQ. FT.(2.93 ACRES)
TOTAL PROVIDED = 220094.9 SQ. FT.(5.05 ACRES)
PROVIDED PERCENT = 43%
STORAGE POND CALCULATIONS USED
VOLUME
CALC.
AVAILABLE
VOLUME
81287.4 0.9 1.5
AREA (sq.ft.)PRECIPITATION FACTOR INTENSITY (in)
FIRE CODE NOTE:
D103.6.1 ROADS 20 TO 26 FEET IN WIDTH.
FIRE LANE SIGNS AS SPECIFIED IN SECTION D103.6 SHALL
BE POSTED ON BOTH SIDES OF THE FIRE APPARATUS ACCESS
ROADS THAT ARE 20 26 FEET WIDE (6096 TO 7925 MM)
BASIS OF BEARING:
GENERAL NOTE:
ALL PUBLIC IMPROVEMENTS SHALL BE CONSTRUCTED
IN ACCORDANCE WITH THE CURRENT CITY OF REXBURG ENGINEERING
STANDARD SPECIFICATIONS AND
STANDARD DRAWINGS.
PROPOSED PROJECT AMMENITIES
1.PARK AREAS, PICNIC TABLES, BENCHES, AND BBQ GRILLS
PARKING REQUIREMENTS
PARKING SPACES REQUIRED = 2 SPACES PER DWELLING UNIT
PARKING SPACES PROVIDED
206 DWELLING UNIT SPACES
82 GUEST SPACES (INCLUDES ON STREET PARKING)
TOTAL = 288
SURVEY NOTE:
THIS SITE PLAN CONFORMS TO AN ACTUAL SURVEY THAT WAS
PERFORMED ON THE GROUND BY A LICENSED LAND SURVEYOR IN
AND FOR THE STATE OF IDAHO. IT IS THE OWNER'S RESPONSIBILITY
TO CONSTRUCT ALL STRUCTURES SHOWN ON THIS SITE PLAN IN
ACCORDANCE WITH SAID SURVEY.
BUILDING INDEX
2/1
BED/BATH LENGTH x DEPTH (ft)BUILDING
1,2,3,15,16,
17,18,19,20
2/1 132 x 279,10,21,22,23
180 x 405,6,7,12
13,14
BUILDING TOTAL S.F.
3348
6156
TOTAL REQ.
0.125
INTENSITY (ft)
9,145 (cu.ft.)
44.83'
20.00'
20.01'
25.13'
20.42'
90.19'
44.39'
23.04'
20.00'
69.35'
55.11'
82.13'
115.95'
24.00'
10.00'
20.00'
56.08'
63.37'
41.60'
26.00'
12.00'38.29'
68.00' ROW
34.50' TBC34.00' P.U.E.
26.00'
12.00'
58.25'
20.01'
26.00'
34.50' TBC34.00' P.U.E.
34.00' P.U.E.
POND 1
POND 2
176 x 27 4464
1/1
RONDO ST
RONDO ST
GARNETT ST
ST
O
N
E
B
R
I
D
G
E
R
D
VARIES 34.50'VARIES
2.00'
1.00'2.5" PLANT MIX PAVEMENT
4" 3/4" AGGREGATE BASE
12" GRANULAR BORROW
8.00' ON-STREET
PARKING
2.75' TYP
15.25'16.25'
CL
34.00' PUE
3" ROLL CURB
PER ISPWC STD 702
INSTALL 1' FLUSH CURB
PER DETAIL THIS SHEET
2%2%
RONDO/GARNETT 34.5' TYPICAL SECTION
SCALE 1"=5'
METER PIT
FIRE
HYDRANT
2.5" PLANT MIX PAVEMENT
4" 3/4" AGGREGATE BASE
12" GRANULAR BORROW
3" ROLL CURB
PER ISPWC STD 702 INSTALL 1' FLUSH CURB
PER DETAIL THIS SHEET
2%2%
GARNETT 27' TYPICAL SECTION
SCALE 1"=5'
5.00'
SIDEWALK
2.00'
27.00'
12.50'
3.00'
TYP
12.50'
VARIES VARIES
34.00' P.U.E.
METER PIT
FIRE
HYDRANT
CL
1. GRADE AND ALIGNMENT SEE GRADING PLAN ON INDIVIDUAL SHEETS.
2. BASE: 4-INCH COMPACTED DEPTH OF 3/4-INCH MINUS CRUSHED AGGREGATE
BASE MATERIAL, PLACE AS SPECIFIED AND PAID UNDER SECTION-802 ISPWC;
COMPACTED TO EXCEED 95% OF STANDARD PROCTOR; A MINIMUM WIDTH OF
3-FEET TO GRADE, PRIOR TO SETTING CURB FORMS.
3. 1/2-INCH PREFORMED EXPANSION JOINT MATERIAL (AASHTO M 213) AT
TERMINAL POINT OF RADII.
4. CONTINUOUS PLACEMENT PREFERRED, SCORE INTERVALS 10-FEET MAXIMUM
SPACING.
FLUSH CURB
NOT TO SCALE
1.00'
ASHPALT
0.33'
1.00'
BUILDING HEIGHT (ft)
24.0
24.0
24.0
7TH NORTH
PUBLIC
IMPROVEMENTS
12.00'
E 7TH N
POWER NOTE:
SEE ROCKY MOUNTAIN POWER CONTRACTOR'S MAP FOR
PROPOSED POWER FACILITIES. POWER INFORMATION SHOWN ON
THIS DRAWING REPRESENTS ESTIMATED LOCATIONS ONLY. FOR
ACCURATE LOCATIONS SEE RM POWER CONTRACTOR MAP.
ROAD
OTHER 282849 0.6 1.5 0.125 21,213 (cu.ft.)
STORAGE
LOCATION
TOTAL 364136 N/A N/A N/A 30358 (cu.ft.)
ROAD
OTHER
TOTAL
POND 2POND 1 TOTAL
81287 (sq.ft.)66858 (sq.ft.)14429 (sq.ft.)
282849 (sq.ft.)228074 (sq.ft.)54775 (sq.ft.)
364136 (sq.ft.)294932 (sq.ft.)69204 (sq.ft.)
REQUIRED
VOLUME
TOTAL
TOTAL
30359 (cu.ft.)
31369 (cu.ft.)
STONBRIDGE ST
PUBLIC
IMPROVEMENTS
20.00'
20.00'
5.00' SIDEWALK
5.00'
SIDEWALK
CURB STOP
2.75'
POND 2
POND 2
24626 (cu.ft.)
24734 (cu.ft.)
POND 1
5731 (cu.ft.)
POND 1
6635 (cu.ft.)
8.00'
24.0
24.0
11
8
4
1/1
1/1 (ADA)
2/1 (ADA)
120 x 40 4050
122 x 40 4157
178 x 27 4632 24.0
8.00'
3.02'
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
4
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
GR
A
D
I
N
G
S
H
E
E
T
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
0+50 1+00
48
7
4
.
3
48
7
4
.
2
9
48
7
4
.
2
48
7
4
.
2
1
2+00
48
7
4
.
1
48
7
4
.
0
7
48
7
3
.
9
48
7
3
.
9
4
3+00
48
7
3
.
9
48
7
3
.
8
9
48
7
3
.
6
48
7
3
.
6
2
4+00
48
7
3
.
4
48
7
3
.
4
1
48
7
3
.
3
48
7
3
.
3
4
5+00
48
7
3
.
2
48
7
3
.
1
5
-2.00%
2.00%-1.03%
-0.42%
PV
I
S
t
a
.
=
0
+
5
3
.
0
0
El
e
v
.
=
4
8
7
4
.
2
1
3
PV
I
S
t
a
.
=
1
+
0
0
.
0
0
El
e
v
.
=
4
8
7
5
.
1
5
3
PV
I
S
t
a
.
=
1
+
2
1
.
6
4
El
e
v
.
=
4
8
7
4
.
7
2
0
PV
I
S
t
a
.
=
1
+
4
6
.
7
4
El
e
v
.
=
4
8
7
4
.
4
6
2
Install 5' of 8" C50 DI Pipe @ 5' Min Cover
Install 15' of 8" C50 DI Pipe @ 5' Min Cover
Install 415' of 8" C50 DI Pipe @ 5' Min Cover
Install 401' of 8" SDR-35 San. Pipe @ 0.40%
SSMH 4
Sta:4+90.78 OFF:5.00R
Rim:4873.13
INV IN:4866.67
INV OUT:4866.57
SSMH 3
Sta:0+90.02 OFF:5.07R
Rim:4874.98
INV IN:4864.97
INV IN:4864.97
INV IN:4864.97
INV OUT:4864.87
Install 333' of 12" ADS N 12 Storm Pipe
@
0
.
4
2
%
Install 368' of 8" SDR-35 San. Pipe @ 0.40%
Install 41' of 8" C50 DI Pipe @ 5' Min Cover
CB# 11
Sta:3+27.07 OFF:-16.75L
GRATE:4873.30
INV OUT:4869.33
BUILDING #1
6+
0
0
7+
0
0
0501.4.1.B.1-08-P
CB# 11
0602.4.1.F.1-I
0+53 1+00 2+00 3+00 4+00 5+00
0402.4.1.A.1-08-D
STA: 1+16.25
OFF: -5.27L
0401.4.1.A.1-08-D L2
FF ELEV: 4874.72
FF ELEV: 4875.22
RONDO STREET
STA:1+00.00
BUILDING #2
BUILDING #5
BUILDING #6
4874.97
TBC-PC
1+47.00
4874.89
TBC-PC
6+26.76
4874.32
TBC-PI
1+47.04
4875.34
TBC-PI
7+11.26
48
7
5
48
7
5
48
7
5
4
8
7
2
487
4
0501.4.1.B.1-08-P
RONDO STREET
STA:0+53.00
0401.4.1.A.1-06-D
0401.4.1.A.1-06-D
0601.4.1.A.13-12
SSMH 4
4873.57
TBC-LP
3+27.07
-17.25 L
4874.59
TBC-FLUSH 4874.47
TBC-FLUSH
4874.35
TBC-FLUSH 4874.23
TBC-FLUSH
4874.17
TBC-FLUSH
4873.86
TBC-FLUSH
4873.80
TBC-FLUSH
4873.68
TBC-FLUSH
4873.56
TBC-FLUSH 4873.44
TBC-FLUSH
4873.38
TBC-FLUSH
4874.23
TBC
4874.10
TBC
4873.98
TBC 4873.85
TBC
4873.73
TBC
4873.61
TBC
4873.43
TBC
4873.31
TBC 4873.19
TBC
4873.06
TBC
4872.94
TBC
4872.81
TBC
4875.39
BSW
0401.4.1.A.1-08-D
4875.34
TBC-PI
7+11.22
STONEBRIDGE ST
STA:6+68.99
-0
.
5
8
%
-0.7
1
%
-
1
.
0
7
%
-1.
0
7
%
0502.4.1.A.1-01
-3
.
7
4
%
-2
.
7
8
%
-4
.
7
0
%
-3
.
9
1
%
-4
.
8
7
%
-5
.
8
3
%
-5
.
4
7
%
-4
.
6
5
%
-3
.
8
3
%
-4
.
4
2
%
-3
.
6
1
%
-2
.
7
9
%
0403.4.1.A.1
STA:5+32.24
OFF:-24.54L
0402.4.1.A.1-06-D
STA: 5+32.24
OFF: -12.12L
4874.89
TBC-PC
6+26.72
4874.65
TBC-FLUSH
4874
FF ELEV: 4875.68 FF ELEV: 4875.16
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
5
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
RO
N
D
O
S
T
A
0
+
5
0
T
O
S
T
A
5
+
0
0
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
RONDO STREET PROFILE VIEW
RONDO STREET VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION PRIOR TO CONNECTION
PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS AND COORDINATE WITH
EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND NON-POTABLE LINES
ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING SERVICES AND INSTALL IF NOT EXISTING.
6.FOR IMPROVEMENTS ON STONEBRIDGE SEE 7TH NORTH AND STONEBRIDGE STREET
IMPROVEMENT DRAWINGS
0401.4.1.A.1-06-D INSTALL 6" WATER
PIPE C50-DI
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.B.1-886-D INSTALL 8"x8"x6"
TEE C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
0403.4.1.A.1-01 INSTALL
WATEROUS
BRAND FH
ASSEMBLY
0402.4.1.A.1-06-D INSTALL 6"
WATER VALVE
C50-DI
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
5
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01 0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0504.4.1.B.1-04
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
WATER SERVICES (RONDO STREET)
BUILDING
#1
#1
#1
#1
#2
#2
#2
#2
STATION OFFSET
METER PIT
STATION OFFSET
END
#5
#5
#5
#5
#5
#5
#6
#6
#6
#6
#6
#6
SEWER SERV. (RONDO ST)
BUILDING
#1
#1
#1
#1
#2
#2
#2
#2
END
STATION OFFSET
#5
#5
#5
#5
#5
#5
#6
#6
#6
#6
#6
#6
1+63.07 24.99' R 1+63.07 35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
24.99' R
24.99' R
24.99' R
24.99' R
24.99' R
24.99' R
24.99' R
1+69.07
2+01.82 2+01.82
2+64.67 2+64.67
3+20.68 3+20.68
3+59.66 3+59.66
3+90.66 3+90.66
4+68.29 4+68.29
5+06.12 5+06.12
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
1+60.84 1+60.84
2+07.40 2+07.40
2+20.90 2+20.90
2+67.32 2+67.32
2+80.82 2+80.82
3+32.89 3+32.89
3+47.19 3+47.19
4+04.46 4+04.46
4+07.46 4+07.46
4+64.81 4+64.81
4+68.33 4+68.33
5+27.19 5+27.19
2+07.82
2+70.67
3+13.01
3+66.61
3+96.66
4+62.29
5+12.12
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
1+54.84
2+13.40
2+14.90
2+73.32
2+74.82
3+26.89
3+53.19
3+98.46
4+13.46
4+58.81
4+74.33
5+21.19
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
-0.44%
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
5+00
48
7
3
.
2
48
7
3
.
1
5
48
7
3
.
1
48
7
3
.
1
0
6+00
48
7
2
.
8
48
7
2
.
7
9
48
7
2
.
0
48
7
1
.
9
8
7+00
48
7
1
.
4
48
7
1
.
4
0
48
7
1
.
4
48
7
1
.
4
4
8+00
48
7
1
.
3
48
7
1
.
3
0
8+50
48
7
1
.
2
48
7
1
.
2
2
0.45%PV
I
S
t
a
.
=
6
+
6
0
.
0
0
El
e
v
.
=
4
8
7
2
.
3
2
8
Install 183' of 8" C50 DI Pipe @ 5' Min Cover
Install 142' of 8" C50 DI Pipe @ 5' Min Cover
CB# 12
Sta:6+59.98 OFF:-16.75L
GRATE:4871.92
INV IN:4867.92
INV OUT:4867.82
Install 333' of 12" ADS N 12 Storm Pipe @ 0.42%
Install 368' of 8" SDR-35 San. Pipe @ 0.40%
Install FH
Flange: 4873.23
Install 204' of 12" ADS N 12 Storm Pipe @ 0.22%
SSMH 6
0502.4.1.A.1-01
0602.4.1.F.1-I
0601.4.1.A.13-12
CB# 13
5+00 6+00 7+00 8+000401.4.1.A.1-08-D 0402.4.1.A.1-08-D
STA: 7+16.25
OFF: -5.25L
L2
FF ELEV: 4873.75
FF ELEV: 4874.29
BUILDING #3 BUILDING #4
BUILDING #7
BUILDING #8
0401.4.1.A.1-06-D
0401.4.1.A.1-06-D
SSMH 4
0401.4.1.A.1-08-D0501.4.1.B.1-08-P
4873
TBC-PC
8+65.54
0602.4.1.F.1-I
4873.55
TBC-PC
8+56.37
4873.44
TBC-FLUSH
4873.38
TBC-FLUSH 4873.08
TBC-FLUSH
4873.01
TBC-FLUSH 4872.89
TBC-FLUSH
4872.77
TBC-FLUSH
4872.70
TBC-FLUSH 4872.77
TBC-FLUSH 4873.09
TBC-FLUSH
4873.15
TBC-FLUSH
4873.28
TBC-FLUSH
4873.41
TBC-FLUSH
4873.54
TBC-FLUSH
4873.58
TBC-FLUSH
4872.94
TBC
4872.81
TBC 4872.64
TBC
4872.51
TBC
4872.39
TBC
4872.26
TBC
4872.25
TBC
4872.38
TBC
4872.57
TBC
4872.71
TBC 4872.84
TBC
4872.98
TBC
CB# 12
4873
4874
0401.4.1.B.1-408-D
STA: 8+59.14
OFF: -5.250L
4873.54
TBC-FLUSH
4872.19
TBC-LP
6+59.98
-17.25 L
A
D
A
U
N
I
T
0401.4.1.A.1-08-D
0502.4.1.A.1-01
0502.4.1.A.1-01
-5
.
8
3
%
-5
.
3
3
%
-6
.
2
9
%
-6
.
3
2
%
-3
.
0
0
%
-1
.
9
7
%
-1
.
9
2
%
-2
.
7
9
%
-3
.
6
7
%
-6
.
1
3
%
-5
.
7
7
%
-4
.
9
6
%
-5
.
4
7
%
0403.4.1.A.1
STA:5+32.24
OFF:-24.54L
0401.4.1.B.1-886-D
STA: 5+32.24
OFF: -5.25L
0402.4.1.A.1-06-D
STA: 5+32.24
OFF: -12.12L
48724872
0601.4.1.A.13-12
4872
FF ELEV: 4874.66 FF ELEV: 4874.40
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
6
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
RO
N
D
O
S
T
A
5
+
0
0
T
O
S
T
A
8
+
5
0
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
RONDO STREET PROFILE VIEW
RONDO STREET PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING
UTILITIES LOCATION PRIOR TO
CONNECTION PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING
UTILITY LOCATIONS AND COORDINATE
WITH EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE
BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL
CLEARANCE BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING
SERVICES AND INSTALL IF NOT EXISTING.
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.A.1-06-D INSTALL 6" WATER
PIPE C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
6
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
4
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-010404.4.1.B.1-010404.4.1.B.1-010404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0401.4.1.B.1-886-D INSTALL 8"x8"x6"
TEE C50-DI
0401.4.1.B.1-408-D INSTALL 8" 45°
BEND C50-DI
0402.4.1.A.1-06-D INSTALL 6"
WATER VALVE
C50-DI
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0403.4.1.A.1-01 INSTALL
WATEROUS
BRAND FH
ASSEMBLYDESIGN SURFACE
EXISTING PROFILE
WATER SERVICES (RONDO STREET)
BUILDING
#3
STATION OFFSET
METER PIT
STATION OFFSET
END
#7
#8
SEWER SERV. (RONDO ST)
BUILDING
#3
#4
END
STATION OFFSET
#7
#8
25.00' R 35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
20.50' L 50.25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
50+25' L
#3
#3
#3
#4
#4
#4
#7
#7
#7
#7
#7
#8
#8
#8
#3
#3
#3
#4
#4
#7
#7
#7
#7
#7
#8
#8
#8
5+45.73 5+45.73
5+82.95 5+82.95
6+55.40 6+55.40
7+03.33 7+03.33
25.00' R
25.00' R
25.00' R
25.00' R
25.00' R
25.00' R
7+23.14 7+23.14
7+68.18 7+68.18
8+34.15 8+34.15
5+45.34 5+45.34
5+91.10 5+91.10
6+05.18 6+05.18
6+59.09
6+56.87 6+56.87
6+59.09
7+11.63 7+11.63
7+37.98 7+37.98
7+88.76 7+88.76
7+91.43 7+91.43
5+39.73
5+88.95
6+62.90
6+95.83
7+31.55
7+74.18
8+40.15
5+39.34
5+97.10
5+99.18
6+49.37
6+65.09
7+11.63
7+30.48
7+82.76
7+97.43
8+43.60
0504.4.1.B.1-04
8+49.62 8+49.62
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
0.43%
8+50
48
7
1
.
2
48
7
1
.
2
2
9+00
48
7
1
.
1
48
7
1
.
0
8
48
7
1
.
2
48
7
1
.
1
9
10+00
48
7
1
.
5
48
7
1
.
4
6
48
7
1
.
6
48
7
1
.
5
5
11+00
48
7
1
.
6
48
7
1
.
5
9
11+50
48
7
1
.
3
48
7
1
.
2
9
-0.51%
PV
I
S
t
a
.
=
8
+
6
7
.
5
6
El
e
v
.
=
4
8
7
3
.
2
5
6
PV
I
S
t
a
.
=
1
1
+
2
9
.
7
8
El
e
v
.
=
4
8
7
1
.
9
1
9
0.40%
SSMH 6
Sta:8+58.97 OFF:5.00R
Rim:4873.32
INV IN:4868.24
INV OUT:4868.14
SSMH 7
Sta:8+87.75 OFF:-1.56L
Rim:4873.12
INV OUT:4868.42
Install 30' of 8" SDR-35 San. Pipe @ 0.60%
Install 64' of 8" C50 DI Pipe @ 5' Min Cover
Install 60' of 8" C50 DI Pipe @ 5' Min Cover
Install 47' of 8" C50 DI Pipe @ 5' Min Cover
Install 27' of 8" C50 DI Pipe @ 5' Min Cover
SSMH 8
Sta:9+36.38 OFF:-5.00L
Rim:4872.81
INV OUT:4868.48
Install 136' of 8" SDR-35 San. Pipe @ 0.60%
CB# 14
Sta:10+72.12 OFF:-33.59L
GRATE:4871.38
INV IN:4866.91
INV OUT:4866.81
CB# 15
Sta:11+29.86 OFF:-16.75L
GRATE:4871.51
INV IN:4866.75
INV OUT:4866.65
SSMH 9
Sta:10+74.03 OFF:-5.00L
Rim:4872.08
INV IN:4867.66
INV OUT:4867.56
SSMH 10
Sta:11+29.80 OFF:-5.00L
Rim:4871.82
INV IN:4867.38
INV OUT:4867.28Install 46' of 8" SDR-35 San. Pipe @ 0.40%
Install 26' of 12" ADS N 12 Storm Pipe @ 0.22%
Install 330' of 8" SDR-35 San. Pipe @ 0.43%
Install 142' of 8" C50 DI Pipe @ 5' Min Cover Install 84' of 8" C50 DI Pipe @ 5' Min Cover
Install 164' of 12" ADS N 12 Storm Pipe @ 0.22%
CB# 13
Sta:8+66.54 OFF:-16.40L
GRATE:4872.86
INV IN:4867.37
INV OUT:4867.27
0501.4.1.B.1-08-P
SSMH 6
SSMH 7
SSMH 8 SSMH 9
0502.4.1.A.1-01
0502.4.1.A.1-01
CB# 13 0601.4.1.A.13-12
9
+
0
0
10+00
11+
0
0
SSMH 10
0401.4.1.A.1-08-D
0402.4.1.A.1-08-D
STA: 11+41.14
OFF: 4.63R
0602.4.1.F.1-I
0602.4.1.F.1-I
L3
C1
C2
BUILDING #9
BUILDING #10
BU
I
L
D
I
N
G
#
1
5
0502.4.1.A.1-01
4873.00
TBC-PC
8+65.54
4872.95
TBC-POC
9+14.39
4872.74
TBC-PI
9+24.22
4872.46
TBC-PC
9+20.36 CB# 14
4871.62
TBC-PC
10+80.95
4871.89
TBC-PC
10+69.83
4872.12
TBC-PI
10+77.89
4872.53
TBC-PC
10+63.51
0602.4.1.F.1-I
0502.4.1.A.1-01
CB# 15
0501.4.1.B.1-08-P
0401.4.1.A.1-08-D
4873.23
TBC-PI
9+26.39
4873.55
TBC-PC
8+56.37
4872.28
TBC-PI
11+33.05 4871.78
TBC-PI-LP
11+29.90
4872
4870
4873
48744875
0601.4.1.A.13-12
4873.54
TBC-FLUSH
4873.58
TBC-FLUSH
STA: 8+59.14
OFF: -5.250L
4873.54
TBC-FLUSH
4873.28
TBC-FLUSH
4873.14
TBC-FLUSH
4872.67
TBC-FLUSH
4872.61
TBC-FLUSH
4872.45
TBC-FLUSH
4872.37
TBC-FLUSH
4872.32
TBC-FLUSH
4872.29
TBC-FLUSH
4
8
7
3
MA
I
N
T
E
N
A
N
C
E
GA
R
A
G
E
OF
F
I
C
E
AD
A
U
N
I
T
0401.4.1.B.1-886-D
STA: 10+15.06
OFF: 7.10R
0403.4.1.A.1
STA:10+15.00
OFF:20.77R
4873.42
TBC-FLUSH
0401.4.1.A.1-08-D
0502.4.1.A.1-01
0401.4.1.B.1-408-D
STA: 10+73.95
OFF: 9.012R
4872.99
TBC-FLUSH
4872.94
TBC-FLUSH
0401.4.1.B.1-408-D
STA: 9+30.04
OFF: 6.957R
0402.4.1.A.1-06-D
STA: 10+15.05
OFF: 10.27R
-9.13%
-0.55%
-2
.
1
2
%
-5.08%
-3.72%
-5
.
1
2
%
-5
.
9
2
%
-5
.
6
8
%
-4
.
9
6
%
-2
.
0
3
%
-1.92%
0401.4.1.B.1-408-D
STA: 11+15.45
OFF: 7.431R
AD
A
U
N
I
T
0601.4.1.A.13-12
48
7
2
FF ELEV: 4874.50FF ELEV: 4875.00
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
7
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
RO
N
D
O
S
T
A
9
+
0
0
T
O
S
T
A
1
1
+
5
0
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
RONDO PROFILE VIEW
RONDO PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES
LOCATION PRIOR TO CONNECTION PROPOSED
UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING UTILITY
LOCATIONS AND COORDINATE WITH EACH UTILITY
COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN
ALL POTABLE AND NON-POTABLE LINES ARE MET PER
IDEQ AND CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING SERVICES AND
INSTALL IF NOT EXISTING.
6.INSTALL POTABLE WATER CLASS PIPE FOR STORM
SEWER WHERE 18" VERTICAL CLEARANCE IS NOT MET
SEE PAGE 2 NOTE 14 SEWER NOTES.
0401.4.1.A.1-06-D INSTALL 6" WATER
PIPE C50-DI
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.B.1-408-D INSTALL 8" 45°
BEND C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.A.1-01 INSTALL SD
MANHOLE TYPE A
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
R25.00'
RONDO STREET
SHEET 5
RONDO STREET
SHEET 5
141.95'
27.00'
0403.4.1.A.1-01 INSTALL
WATEROUS
BRAND FH
ASSEMBLY
0401.4.1.B.1-886-D INSTALL 8"x8"x6"
TEE C50-DI
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0402.4.1.A.1-06-D INSTALL 6"
WATER VALVE
C50-DI
20.00'
R4.50'
0602.4.1.A.1-02 INSTALL FRENCH
DRAIN PER ISPWC
SD-611
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0504.4.1.B.1-04
DESIGN PROFILE
EXISTING SURFACE
WATER SERVICES (RONDO STREET)
BUILDING
#4
STATION OFFSET
METER PIT
STATION OFFSET
END
SEWER SERV. (RONDO ST)
BUILDING END
STATION OFFSET
#9
#9
#9
#10
#10
#10
#15
#15
#4
#9
#9
#9
#10
#10
#10
#15
#15
8+73.54 23.55' R 8+79.04 44.07' R
8+86.83 27.75' R 8+93.04 62.63' R
9+09.26 21.68' R 9+10.43 37.27' R
9+68.20 9+68.2021.25' R 31.50' R
31.50' R21.25' R
10+59.88 31.50' R10+59.88 21.25' R
10+94.43 53.96' R10+94.42 24.96' R
11+03.57 52.63' R11+05.34 27.90' R
11+30.81 35.25' R11+30.81 24.96' R
8+74.90 40.52' R
8+95.10 57.86' R
9+07.54 39.70' R
9+62.22 31.50' R
10+23.63 31.50' R
10+53.93 31.50' R
10+94.76 58.73' R
11+06.67 48.23' R
11+27.07 35.40' R
10+29.63 10+29.63
0401.4.1.A.1-06-D
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
12+00
48
7
2
.
0
48
7
2
.
0
0
48
7
2
.
1
48
7
2
.
1
4
13+00
48
7
2
.
1
48
7
2
.
0
5
48
7
3
.
1
48
7
3
.
1
4
14+00
48
7
3
.
0
48
7
3
.
0
2
48
7
3
.
1
48
7
3
.
1
3
15+00
48
7
3
.
2
48
7
3
.
2
5
15+50
48
7
3
.
4
48
7
3
.
3
7
0.40%
CB# 16
Sta:12+45.59 OFF:-16.75L
GRATE:4871.97
INV IN:4865.72
INV IN:4865.71
INV OUT:4865.62
Install 226' of 12" ADS N 12 Storm Pipe @ 1.40%
CB# 18
Sta:14+72.05 OFF:-16.75L
GRATE:4872.88
INV OUT:4868.88
SSMH 12
Sta:14+59.58 OFF:-5.01L
Rim:4873.14
INV IN:4865.85
INV IN:4865.85
INV OUT:4865.77
Install 330' of 8" SDR-35 San. Pipe @ 0.43%
Install 24' of 8" C50 DI Pipe @ 5' Min Cover
Install 7' of 8" C50 DI Pipe @ 5' Min Cover
Install 22' of 8" C50 DI Pipe @ 5' Min Cover
Install 294' of 8" SDR-35 San. Pipe @ 0.40%
Install 376' of 8" C50 DI Pipe @ 5' Min Cover
Install 197' of 8" C50 DI Pipe @ 5' Min Cover
Install 103' of 8" C50 DI Pipe @ 5' Min Cover
0+
8
5
1+
0
0
CB# 18
12+00 13+00 14+00 15+00
0501.4.1.B.1-08-P
0402.4.1.A.1-08-D
STA: 14+74.73
OFF: 5.06R
0602.4.1.F.1-I
0602.4.1.F.1-I
0601.4.1.A.13-12
0601.4.1.A.13-12
0601.4.1.A.13-12
L4
L5
RONDO STREET
STA:14+51.74
BUILDING #11
BUILDING #12
BUILDING #17
4874
CB# 16
4872.52
TBC-FLUSH 4873.05
TBC-FLUSH
4873.16
TBC-FLUSH
4873.28
TBC-FLUSH
4873.33
TBC-FLUSH
4873.80
TBC-FLUSH
4873.92
TBC-FLUSH
4873.41
TBC
4873.29
TBC
4873.01
TBC
4872.88
TBC
4872.76
TBC
4872.65
TBC
4872.53
TBC
4872.41
TBC 4872.24
TBC
4872.00
TBC
4872.12
TBC
4873.15
TBC-LP
14+72.00
-17.25 L
4873.40
TBC-PC
14+13.30
4873.72
TBC-PI
1+42.25
4873.38
TBC-PI
1+42.27
4874
4874
SSMH 12
0502.4.1.A.1-01
ADA UNIT
0402.4.1.A.1-08-D
STA: 14+41.89
OFF: 4.99R
0401.4.1.B.1-886-D
STA: 14+97.31
OFF: 5.05R
0401.4.1.A.1-08-D
BUILDING #16
4872.58
TBC-FLUSH
0402.4.1.A.1-08-D
STA: 1+11.37
OFF: 2.16R
-3
.
0
8
%
-4
.
5
9
%
-3
.
6
7
%
-2
.
7
5
%
-4
.
5
3
%
-3
.
6
0
%
-3
.
3
9
%
-4
.
1
8
%
-2
.
6
6
%
-3
.
4
5
%
-4
.
2
3
%
-4
.
2
9
%
4873.70
TBC-PI
14+90.26
GARNETT STREET
STA:0+84.75
0401.4.1.B.1-888-D
STA:14+49.58
OFF: 4.998R
0403.4.1.A.1
STA:14+97.31
OFF:24.54R
0401.4.1.A.1-06-D 4872.87
TBC-FLUSH
4872.93
TBC-FLUSH
4873.17
TBC
4873.75
TBC-FLUSH
0402.4.1.A.1-06-D
STA: 14+97.31
OFF: 13.29R
4873
GARNETT STREET
STA:1+00.00
FF ELEV: 4873.31
FF ELEV: 4873.99 FF ELEV:
FF ELEV: 4875.19
FF ELEV: 4874.33FF ELEV: 4874.00
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
8
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
RO
N
D
O
S
T
A
1
2
+
0
0
T
O
S
T
A
1
5
+
5
0
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
RONDO STREET PROFILE VIEW
RONDO ST PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES LOCATION
PRIOR TO CONNECTION PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS
AND COORDINATE WITH EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF
REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND
CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING SERVICES AND INSTALL IF
NOT EXISTING.
6.INSTALL POTABLE WATER CLASS PIPE WHERE VERTICAL
CLEARANCE IS NOT MET SEE PAGE 2 NOTE 14 SEWER NOTES.
0401.4.1.A.1-06-D INSTALL 6" WATER
PIPE C50-DI
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.B.1-886-D INSTALL 8"x8"x6"
TEE C50-DI
0401.4.1.B.1-888-D INSTALL 8"x8"x8"
TEE C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
8
0402.4.1.A.1-06-D INSTALL 6"
WATER VALVE
C50-DI
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0403.4.1.A.1-01 INSTALL
WATEROUS
BRAND FH
ASSEMBLY0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
6
GARNETT STREET
SHEET 9
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-040504.4.1.B.1-040504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0504.4.1.B.1-04
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-010404.4.1.B.1-010404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0504.4.1.B.1-04
0404.4.1.B.1-01
SEE NOTE 6
DESIGN PROFILE
EXISTING SURFACE
WATER SERVICES (RONDO STREET)
BUILDING
STATION OFFSET
METER PIT
STATION OFFSET
END
SEWER SERV. (RONDO ST)
BUILDING END
STATION OFFSET
#11#11 11+97.08 20.50' L 11+97.08 50.25' L
#11 12+01.16 20.50' L 12+01.16
#11 20.50' L12+57.73 12+57.73
#12 20.50' L12+72.42 12+72.42
#12 20.50' L13+29.15 13+29.15
#12 20.50' L13+33.60 13+33.60
#12 20.50' L13+90.60 13+90.60
#12 20.50' L13+92.10 13+92.10
#12 20.50' L14+53.24 14+53.24
#13 20.50' L14+65.53 14+65.53
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
#13 20.50' L 50.25' L15+21.51 15+21.51
#13 20.50' L 50.25' L15+25.24 15+25.24
#15 11+90.87 25.00' R 11+90.85 35.25' R
#15 12+37.05 25.00' R 12+37.05 35.25' R
#16 25.00' R 35.25' R12+70.13 12+70.13
#16 25.00' R 35.25' R13+24.18 13+24.18
#16 25.00' R 35.25' R13+80.98 13+80.98
#16 31.99' R 35.25' R14+28.50 14+28.50
#17 25.00' R 35.25' R14+93.28 14+93.28
#17 25.00' R 35.25' R15+41.34 15+41.34
11+91.13 50.25' L
#11 12+07.21 50.25' L
#11 12+51.74 50.25' L
#12 12+78.44 50.25' L
#12 13+23.16 50.25' L
#12 13+39.61 50.25' L
#12 13+84.62 50.25' L
#12 13+98.12 50.25' L
#12 14+47.28 50.25' L
#13 14+71.57 50.25' L
#13 15+15.62 50.25' L
#13 15+31.24 50.25' L
#15 11+84.96 35.25' R
#15 12+31.05 35.25' R
#16 12+64.13 35.25' R
#16 13+18.17 35.25' R
#16 13+74.97 35.25' R
#16 14+22.50 35.25' R
#17 14+87.28 35.25' R
#17 15+35.34 35.25' R
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
SEE NOTE 6
0501.4.1.A.1-08-C
ENSURE 1.5'
MINIMUM CLEARANCE
0501.4.1.B.1-08-C INSTALL C-900
WATER CLASS
PIPE 10' EACH
SIDE OF WATER
CROSSING
0706.4.1.E.1-04
0706.4.1.E.1-040706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
15+50
48
7
3
.
4
48
7
3
.
3
7
16+00
48
7
3
.
4
48
7
3
.
4
4
48
7
3
.
6
48
7
3
.
5
7
17+00
48
7
3
.
9
48
7
3
.
8
7
48
7
4
.
0
48
7
4
.
0
4
18+00
48
7
4
.
1
48
7
4
.
1
1
48
7
4
.
2
48
7
4
.
1
9
19+00
PV
I
S
t
a
.
=
1
7
+
2
4
.
4
1
El
e
v
.
=
4
8
7
4
.
2
9
7
PV
I
S
t
a
.
=
1
8
+
3
6
.
9
7
El
e
v
.
=
4
8
7
3
.
6
2
2
PV
I
S
t
a
.
=
1
8
+
6
3
.
2
9
El
e
v
.
=
4
8
7
3
.
8
4
1
PV
I
S
t
a
.
=
1
8
+
8
9
.
2
8
El
e
v
.
=
4
8
7
4
.
3
6
1
2.00%-0.60%
0.83%
Install 376' of 8" C50 DI Pipe @ 5' Min Cover
Install 15' of 8" C50 DI Pipe @ 5' Min Cover
SSMH 14
Sta:18+25.98 OFF:-5.00L
Rim:4873.59
INV OUT:4867.85
SSMH 13
Sta:17+53.30 OFF:-5.00L
Rim:4874.02
INV IN:4867.12
INV OUT:4867.02
Install 73' of 8" SDR-35 San. Pipe @ 1.00%
Install 294' of 8" SDR-35 San. Pipe @ 0.40%
SD FD# 2
Sta:18+36.89 OFF:-26.75L
Rim:4873.87
INV IN:4869.21
CB# 8
Sta:18+36.89 OFF:-16.75L
GRATE:4873.21
INV OUT:4869.24
4+
0
0
5+
0
0
0501.4.1.B.1-08-P
SSMH 14
16+00 17+00 18+00 18+890501.4.1.B.1-08-P
0401.4.1.A.1-08-D
0602.4.1.F.1-I
0601.4.1.A.13-12
L4
RONDO STREET
STA:18+89.28
STONEBRIDGE ST
STA:4+47.76
BUILDING #13
BUILDING #14
BUILDING #17 BUILDING #18
SD FD# 2
48
7
4
0402.4.1.A.1-08-D
STA: 18+73.79
OFF: 5.00R
4874.49
TBC-PC
4+05.48
4873.60
TBC-PC
6+67.19
4874.01
TBC-PI
18+42.27
4874.16
TBC-PI-LP
4+89.98
0602.4.1.A.1-02
CB# 8
4873.80
TBC-FLUSH
4873.92
TBC-FLUSH
4874.04
TBC-FLUSH
4874.16
TBC-FLUSH
4874.21
TBC-FLUSH
4874.50
TBC-FLUSH
4874.56
TBC-FLUSH
4874.59
TBC-FLUSH
4874.42
TBC-FLUSH
4874.24
TBC-FLUSH
4874.16
TBC-FLUSH
4873.55
TBC
4873.77
TBC
4873.91
TBC
4874.13
TBC
4874.06
TBC
4873.94
TBC
4873.78
TBC 4873.64
TBC
4873.54
TBC
4873.41
TBC
4874
4874
0502.4.1.A.1-01
SSMH 13
0502.4.1.A.1-01
L9
4
8
7
4
-0.
5
8
%
-1.2
7
%
0401.4.1.B.1-886-D
STA: 14+97.31
OFF: 5.05R
-3
.
6
0
%
-2
.
7
3
%
-2
.
9
6
%
-2
.
8
6
%
-4
.
1
9
%
-3
.
8
9
%
-2
.
7
2
%
-2
.
6
3
%
-2
.
5
9
%
-3
.
3
9
%
TBC-FLUSH
0402.4.1.A.1-06-D
STA: 14+97.31
OFF: 13.29R
4875
FF ELEV: 4874.74
FF ELEV: 4875.08
FF ELEV: 4875.54FF ELEV: 4875.19
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
9
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
DI
P
L
O
M
A
T
S
T
A
1
5
+
5
0
T
O
S
T
A
1
8
+
7
1
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
RONDO STREET PROFILE VIEW
RONDO STREET PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING
UTILITIES LOCATION PRIOR TO
CONNECTION PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING
UTILITY LOCATIONS AND COORDINATE
WITH EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE
BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL
CLEARANCE BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING
SERVICES AND INSTALL IF NOT EXISTING.
6.FOR IMPROVEMENTS ON STONEBRIDGE
STREET SEE NORTH 7TH AND
STONEBRIDGE STREET IMPROVEMENTS
DRAWINGS.
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
RO
N
D
O
S
T
R
E
E
T
SH
E
E
T
7
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
0401.4.1.B.1-888-D INSTALL 8"x8"x8"
TEE C50-DI
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-010404.4.1.B.1-01
0404.4.1.B.1-01 0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01 0404.4.1.B.1-01
0404.4.1.B.1-01 0404.4.1.B.1-01
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-040504.4.1.B.1-04
0504.4.1.B.1-04 0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
DESIGN PROFILE
EXISTING SURFACE
WATER SERVICES (RONDO STREET)
BUILDING
#13
STATION OFFSET
METER PIT
STATION OFFSET
END
SEWER SERV. (RONDO ST)
BUILDING END
STATION OFFSET
#13
20.50' L 50.25' L15+25.24 15+25.24
#13 20.50' L 50.25' L15+82.31 15+82.31
#13 20.50' L 50.25' L15+84.43 15+84.43
#13 20.50' L 50.25' L16+42.85 16+42.85
#14 20.50' L 50.25' L16+55.48 16+55.48
#14 20.50' L 50.25' L17+14.79 17+14.79
#14 20.50' L 50.20' L17+16.29 17+16.29
#14 20.50' L 50.20' L17+74.72 17+74.72
#14 20.50' L 50.20' L17+76.23 17+76.23
#14 20.50' L 50.20' L18+35.30 18+35.30
#17 25.00' R 35.25' R15+41.34 15+41.34
#17 25.00' R 35.25' R16+00.43 16+00.43
#17 25.00' R 35.25' R16+40.88 16+40.88
#18 25.00' R 35.25' R16+70.76 16+70.76
#18 25.00' R 35.25' R17+12.35 17+12.35
#18 25.00' R 35.25' R17+72.17 17+72.17
#18 25.00' R 35.25' R18+33.81 18+33.81
15+31.24 50.25' L
#13 15+76.31
#13 15+90.43
#13 16+36.85
#14 16+61.48
#14 17+08.79
#14 17+22.27
#14 17+68.72
#14 17+82.83
#14 18+29.07
#17 15+35.34 35.25' R
#17 15+94.43 35.25' R
#17 16+34.89 35.25' R
#18 16+64.77 35.25' R
#18 17+06.35 35.25' R
#18 17+66.17 35.25' R
#18 18+22.37 35.25' R
0504.4.1.B.1-04
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
50.25' L
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
0+75 1+00
48
7
3
.
1
48
7
3
.
1
3
48
7
3
.
1
48
7
3
.
0
7
2+00
48
7
3
.
0
48
7
2
.
9
9
48
7
3
.
0
48
7
2
.
9
6
3+00
48
7
3
.
0
48
7
3
.
0
4
3+50
48
7
3
.
2
48
7
3
.
2
1
PV
I
S
t
a
.
=
1
+
0
0
.
0
0
El
e
v
.
=
4
8
7
3
.
2
0
6
PV
I
S
t
a
.
=
1
+
1
7
.
2
5
El
e
v
.
=
4
8
7
3
.
5
5
1
PV
I
S
t
a
.
=
1
+
7
6
.
7
9
El
e
v
.
=
4
8
7
3
.
3
1
3
PV
I
S
t
a
.
=
3
+
2
3
.
5
0
El
e
v
.
=
4
8
7
3
.
9
8
9
2.00%-0.40%
0.46%
-0.40%
CB# 19
Sta:1+76.80 OFF:-13.00L
GRATE:4872.98
INV OUT:4868.98
Install 128' of 12" ADS N 12 Storm Pipe @ 0.41%
SSMH 12
Sta:0+95.00 OFF:-7.85L
Rim:4873.14
INV IN:4865.85
INV IN:4865.85
INV OUT:4865.77
Install 5' of 8" C50 DI Pipe @ 5' Min Cover
Install 142' of 8" C50 DI Pipe @ 5' Min Cover
Install 58' of 8" C50 DI Pipe @ 5' Min Cover
Install 138' of 8" SDR-35 San. Pipe @ 0.40%
Install 41' of 8" SDR-35 San. Pipe @ 0.40%
SSMH 16
Sta:3+09.56 OFF:-6.89L
Rim:4873.79
INV IN:4864.87
INV OUT:4864.77
Install ???' of 8" C50 DI Pipe @ 5' Min Cover
Install 414' of 8" SDR-35 San. Pipe @ 0.40%
SD MH 7
Sta:2+80.77 OFF:34.99R
Rim:4874.46
INV IN:4868.46
INV IN:4868.46
INV OUT:4868.36
Install 161' of 12" ADS N 12 Storm Pipe @ 0.36%
SSMH 17
Sta:2+53.28 OFF:-7.73L
Rim:4873.51
INV IN:4865.14
INV OUT:4865.04
487
2
0+85 1+00 2+00
3+
0
0
CB# 18
14
+
0
0
15
+
0
0
0402.4.1.A.1-08-D
STA: 14+74.73
OFF: 5.06R
0401.4.1.A.1-08-D
0401.4.1.B.1-208-D
STA:3+09.77
OFF: 8.077 R
0602.4.1.F.1-I
0601.4.1.A.13-12
0602.4.1.A.1-01
L5
C3
RONDO STREET
STA:14+51.74
BU
I
L
D
I
N
G
#
1
2
BU
I
L
D
I
N
G
#
2
1
4873.28
TBC-FLUSH
4873.33
TBC-FLUSH
4873.80
TBC-FLUSH
4873.29
TBC
4873.01
TBC
4872.88
TBC
4872.76
TBC
4873.15
TBC-LP
14+72.00
-17.25 L
4873.40
TBC-PC
14+13.30
4873.72
TBC-PI
1+42.25
4873.38
TBC-PI
1+42.27
0501.4.1.B.1-08-P
4
8
7
4
SSMH 12
0602.4.1.F.1-I
CB# 19
SD MH 7
0502.4.1.A.1-01
0502.4.1.A.1-01
0401.4.1.A.1-08-D
4
8
7
3
4874
4873
4872
4873.80
TBC-PC
2+11.36 4874.14
TBC-PI
2+61.27
4873.61
TBC-PC
2+55.49
4873.84
TBC-PI
3+24.54
4874.26
TBC-PI
3+42.08
4874.05
TBC-FLUSH
4874.14
TBC-FLUSH
SSMH 16
0502.4.1.A.1-01
0501.4.1.B.1-08-P
0501.4.1.B.1-08-P
4873.78
TBC
3+
0
0
3+
8
4
GARNETT STREET
STA:2+38.40
SSMH 17
4873.60
TBC-PI
OFF: -12.687 L
STA: 3+49.17 1+
5
0
1+98
0601.4.1.A.13-12
4873.25
TBC-LP
1+76.78
-13.50 L
4871
48
7
2
AD
A
U
N
I
T
0402.4.1.A.1-08-D
STA: 14+41.89
OFF: 4.99R
0401.4.1.B.1-886-D
STA: 14+97.31
OFF: 5.05R
4874.29
TBC-FLUSH
-3.04%
L1
0
L11
0602.4.1.A.1-02
4871
4873.96
TBC-PI
OFF: 12.548 R
STA: 3+47.77
0402.4.1.A.1-08-D
STA: 1+11.37
OFF: 2.16R
-2.75%
-4.53%
-4.18%
-2.61%
-2.82%
-2.15%
-2.66%
4873.70
TBC-PI
14+90.26
GARNETT STREET
STA:0+84.75 0401.4.1.B.1-888-D
STA:14+49.58
OFF: 4.998R
0403.4.1.A.1
STA:14+97.31
OFF:24.54R
4873
4874
4
8
7
4
4874
0401.4.1.A.1-06-D
4873.17
TBC
0401.4.1.B.1-408-D
STA: 2+53.85
OFF: 3.987R
FD MH #5
4873.75
TBC-FLUSH
0402.4.1.A.1-06-D
STA: 14+97.31
OFF: 13.29R
4
8
7
3
4
8
7
2
GARNETT STREET
STA:1+00.00
POND 2-PARKING LOT
STA:3+75.04
FF
E
L
E
V
:
48
7
3
.
9
9
FF
E
L
E
V
:
48
7
5
.
1
9
FF
E
L
E
V
:
48
7
4
.
8
2
FF
E
L
E
V
:
48
7
5
.
3
8
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
10
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
GA
R
N
E
T
T
S
T
A
0
+
7
5
T
O
S
T
A
3
+
5
0
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURGGARNETT STREET PROFILE VIEW
GARNETT STREET PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES
LOCATION PRIOR TO CONNECTION PROPOSED
UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING UTILITY
LOCATIONS AND COORDINATE WITH EACH UTILITY
COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE LINES ARE MET PER
IDEQ AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL CLEARANCE
BETWEEN ALL POTABLE AND NON-POTABLE LINES
ARE MET PER IDEQ AND CITY OF REXBURG
STANDARDS
5.CONTRACTOR TO VERIFY EXISTING SERVICES AND
INSTALL IF NOT EXISTING.
6.INSTALL POTABLE WATER CLASS PIPE FOR SEWER
WHERE VERTICAL CLEARANCE IS NOT MET SEE
PAGE 2 NOTE 14 SEWER NOTES.
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.B.1-208-D INSTALL 8" 22.5°
BEND C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.A.1-01 INSTALL SD
MANHOLE TYPE A
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
GARNETT STREET
SHEET 10
RONDO STREET
SHEET 7
RONDO STREET
SHEET 8
PARKING LOT
SHEET 11 0401.4.1.B.1-888-D INSTALL 8"x8"x8"
TEE C50-DI
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
SEE NOTE 6
MAIL BOX POD
DESIGN PROFILE
EXISTING SURFACE
WATER SERVICES (GARNETT STREET)
BUILDING
#21
STATION OFFSET
METER PIT
STATION OFFSET
END
SS SERV. (GARNETT ST)
BUILDING END
STATION OFFSET
#21
2+78.74 18.14' R 2+87.80 57.67' R
#21 3+12.66 20.54' R 3+12.96 35.22' R
#19 3+15.33 25.00' L 3+15.33 35.25' L
#19 25.00' L 35.25' L3+58.21 3+58.21
2+90.02 53.28' R
#21 3+06.62 36.63' R
#19 3+21.47 35.25' L
0404.4.1.B.1-01
0504.4.1.B.1-04
0404.4.1.B.1-01
Install 20' C-900 Potable Water Class Pipe,
10' each side of water crossing @ 0.40%
See Note 6
0501.4.1.A.1-08-C
0501.4.1.B.1-08-C INSTALL C-900
WATER CLASS
PIPE 10' EACH
SIDE OF WATER
CROSSING
0706.4.1.E.1-04
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
INSURE 1.5' MINIMUM CLEARANCE
INSURE 1.5' MINIMUM CLEARANCE
DATUM ELEV
4860.00
4864
4868
4872
4876
4880
3+50
48
7
3
.
2
48
7
3
.
2
1
4+00
48
7
3
.
4
48
7
3
.
4
3
48
7
3
.
5
48
7
3
.
5
1
5+00
48
7
3
.
7
48
7
3
.
6
6
48
7
3
.
9
48
7
3
.
8
9
6+00
48
7
3
.
9
48
7
3
.
8
9
48
7
4
.
0
48
7
3
.
9
6
7+00
48
7
4
.
1
48
7
4
.
0
9
7+25
48
7
3
.
9
48
7
3
.
9
5
PV
I
S
t
a
.
=
4
+
1
6
.
2
7
El
e
v
.
=
4
8
7
3
.
6
1
8
PV
I
S
t
a
.
=
5
+
5
5
.
3
0
El
e
v
.
=
4
8
7
4
.
2
3
7
PV
I
S
t
a
.
=
6
+
5
0
.
9
0
El
e
v
.
=
4
8
7
3
.
8
5
5
PV
I
S
t
a
.
=
6
+
9
4
.
5
2
El
e
v
.
=
4
8
7
4
.
1
1
6
PV
I
S
t
a
.
=
7
+
1
4
.
0
0
El
e
v
.
=
4
8
7
4
.
5
0
6
-0.40%
-0.40%0.45%0.60%
2.00%
Install 414' of 8" SDR-35 San. Pipe @ 0.40
%
SSMH 1
Sta:7+24.10 OFF:-5.00L
Rim:4874.27
INV IN:4863.12
INV IN:4863.12
INV OUT:4863.02
Install 45' of 8" C50 DI Pipe @ 5' Min Cover
Install 18' of 8" C50 DI Pipe @ 5' Min Cover
CB# 5
Sta:6+65.04 OFF:-16.75L
GRATE:4873.53
INV OUT:4869.36CB# 20
Sta:4+16.81 OFF:-16.75L
GRATE:4873.21
INV OUT:4869.04
SD FD# 1
Sta:6+65.04 OFF:-26.75L
Rim:4874.24
INV IN:4869.30
Install 161' of 12" ADS N 12 Storm Pipe @ 0.36%
Install 340' of 8" C50 DI Pipe @ 5' Min
C
o
v
e
r
2+
0
0
3+
0
0
4+00 5+00 6+00 7+00 7+34
0501.4.1.B.1-08-P
0401.4.1.A.1-08-D
0401.4.1.A.1-08-D
0602.4.1.A.1-02
0602.4.1.F.1-I
L6
GARNETT STREET
STA:7+14.09
STONEBRIDGE ST
STA:2+54.96
BUILDING #20
BUILDING #19
BUILDING #22
BUILDING #23
CB# 5
SD FD# 1
0402.4.1.A.1-08-D
STA: 6+95.55
OFF: 5.00R
48
7
5
48
7
5
48
7
4
48
7
4
4874.91
TBC-PC
2+12.69
4874.00
TBC-PC
2+72.19
4874.34
TBC-PI
6+67.13
4874.22
TBC-PI
2+97.19
4875.58
BSW
0602.4.1.F.1-I
0601.4.1.A.13-12
4874
4874.26
TBC-PI
3+42.08
4873.97
TBC-FLUSH
4874.01
TBC-FLUSH
4874.15
TBC-FLUSH
4874.27
TBC-FLUSH 4874.57
TBC-FLUSH 4874.51
TBC-FLUSH
4874.39
TBC-FLUSH
4874.28
TBC-FLUSH
4873.80
TBC
4873.86
TBC 4873.98
TBC
4874.09
TBC
4873.98
TBC
4873.92
TBC
4873.59
TBC
4873.53
TBC
4873.55
TBC
4873.66
TBC
4873.78
CB# 20
0601.4.1.A.13-12
4874
4873.48
TBC-LP
4+16.84
-17.25 L
GARNETT STREET
STA:7+33.60
-0
.
8
2
%
-0.5
3
%
-3
.
3
9
%
-3
.
5
7
%
-2
.
8
2
%
-2
.
5
0
%
-3
.
2
8
%
-2
.
8
8
%
-2
.
1
0
%
-2
.
1
0
%
-2
.
9
8
%
4873
0401.4.1.B.1-886-D
STA: 6+49.78
OFF: 5.33R
0401.4.1.A.1-06-D
0402.4.1.A.1-08-D
STA: 6+49.79
OFF: 11.95R0403.4.1.A.1
STA:6+49.79
OFF:24.54R
4874.82
FF ELEV: 4875.01
FF ELEV: 4875.42FF ELEV: 4875.09
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
11
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
GA
R
N
E
T
T
S
T
A
3
+
5
0
T
O
S
T
A
7
+
2
5
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
GARNETT STREET PROFILE VIEW
GARNETT STREET PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING
UTILITIES LOCATION PRIOR TO
CONNECTION PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING
UTILITY LOCATIONS AND COORDINATE
WITH EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE
BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL
CLEARANCE BETWEEN ALL POTABLE AND
NON-POTABLE LINES ARE MET PER IDEQ
AND CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING
SERVICES AND INSTALL IF NOT EXISTING.
6.FOR IMPROVEMENTS ON STONEBRIDGE
STREET SEE 7TH NORTH AND
STONEBRIDGE DRIVE IMPROVEMENT
DRAWINGS
GA
R
N
E
T
T
S
T
R
E
E
T
SH
E
E
T
9
0401.4.1.A.1-06-D INSTALL 6" WATER
PIPE C50-DI
0401.4.1.A.1-08-D INSTALL 8" PIPE
C50-DI @ 5' MIN
COVER
0401.4.1.B.1-886-D INSTALL 8"x8"x6"
TEE C50-DI
0501.4.1.B.1-08-P INSTALL 8" SDR 35
SANITARY SEWER
PIPE @ 0.4%
0502.4.1.A.1-01 INSTALL 4' SS MH
PER ISPWC SD-501
0504.4.1.B.1-04 INSTALL 4" SDR 35
SANITARY SEWER
SERVICE @ 2% MIN
TO EASEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
0403.4.1.A.1-01 INSTALL
WATEROUS
BRAND FH
ASSEMBLY
0402.4.1.A.1-06-D INSTALL 6"
WATER VALVE
C50-DI
0402.4.1.A.1-08-D INSTALL 8"
WATER VALVE
C50-DI
0404.4.1.A.1-01 INSTALL 1" WATER
SERVICE AND METER
PIT PER REXBURG
STD PG 13
0602.4.1.A.1-01 INSTALL SD
MANHOLE TYPE A
0602.4.1.A.1-02 INSTALL FRENCH
DRAIN PER ISPWC
SD-611
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
0404.4.1.B.1-01
0404.4.1.B.1-01 0404.4.1.B.1-01 0404.4.1.B.1-01 0404.4.1.B.1-01 0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0404.4.1.B.1-01
0504.4.1.B.1-04
0504.4.1.B.1-040504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
0504.4.1.B.1-04
SEE 7TH NORTH AND STONEBRIDGE
STREET DRAWINGS
WATER SERVICES (GARNETT STREET)
BUILDING
#19
STATION OFFSET
METER PIT
STATION OFFSET
END
SEWER SERV. (GARNETT ST)
BUILDING END
STATION OFFSET
#19
20.50' L 35.25' L4+20.41 4+20.41
#19 35.25' L4+70.28 4+70.28
#20 35.25' L4+97.24 4+97.24
35.25' L5+44.78 5+44.78
35.25' L
#20
#20 6+05.08 6+05.08
35.25' L#20
25.00' R 35.25' R#21 6+57.46 6+57.46
35.21' R#22 4+05.77 4+05.77
35.22' R#22 4+42.88 4+42.88
35.23' R#22 5+18.69 5+18.69
35.24' R#23 5+46.28 5+46.28
35.25' R#23 5+90.02 5+90.02
35.25' R#23
35.25' L3+64.21
#19 35.25' L4+26.40
#19 35.25' L4+64.31
#20 35.25' L5+03.26
#20 35.25' L5+38.78
#20 35.25' L6+11.13
#20 35.25' L6+58.17
#21 3+71.62
#22 3+99.77
#22 4+36.87
#22 5+12.80
#23 5+37.30
#23 5+84.01
#23 35.25' R6+59.67
20.50' L
20.50' L
20.50' L
20.50' L
20.50' L
25.00' R
25.00' R
25.00' R
25.00' R
25.00' R
25.00' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
35.25' R
0706.4.1.E.1-04
0706.4.1.E.1-04 INSTALL 4" CONCRETE
SIDEWALK PER ISPWC
SD-709
0706.4.1.E.1-04
6+45.47 6+45.47
6+52.19 6+52.19
DATUM ELEV
4860.00
4864
4868
4872
4876
1+00
48
6
6
.
0
48
6
5
.
9
9
2+00
48
7
2
.
0
48
7
1
.
9
6
48
7
2
.
4
48
7
2
.
4
4
3+00
48
7
2
.
9
48
7
2
.
9
1
48
7
4
.
0
48
7
4
.
0
2
3+85
Install 33' of 12" ADS N 12 Storm Pipe @ 0.22%
Install 16' of 12" ADS N 12 Storm Pipe @ 3.80%
CB# 17
Sta:1+83.50 OFF:-31.11L
GRATE:4870.70
INV OUT:4865.94SD MH 6
Sta:1+67.90 OFF:-31.17L
GRATE:4870.46
INV IN:4865.35
INV IN:4865.35
INV OUT:4865.25
4
:
1
S
L
O
P
E
4:1
S
L
O
P
E
POND 2-PARKING LOT
Number
L7
Station
Start: 1+00.00
End: 3+83.86
Radius Length
283.86
Line/Chord Direction
N90° 00' 00.00"E
Start Point
Northing: 792655.19
Easting: 759850.25
End Point
Northing: 792655.19
Easting: 760134.11
POND 2 VERTICAL
Number
L12
L13
L14
Station
Start: 1+00.00
End: 2+33.13
Start: 2+33.13
End: 2+42.70
Start: 2+42.70
End: 3+10.19
Radius Length
133.13
9.57
67.49
Line/Chord Direction
N0° 13' 56.41"W
S88° 46' 31.57"E
N0° 05' 30.10"E
Start Point
Northing: 792510.25
Easting: 759879.02
Northing: 792643.38
Easting: 759878.48
Northing: 792643.17
Easting: 759888.05
End Point
Northing: 792643.38
Easting: 759878.48
Northing: 792643.17
Easting: 759888.05
Northing: 792710.67
Easting: 759888.16
B
U
I
L
D
I
N
G
#
1
5
4866
4871.60
TBC-PI
OFF: -12.527 L
STA: 1+75.380601.4.1.A.13-12
1+
0
0
4870
4869
4871
4866
-2
5
.
0
0
%
-14.66%
4870.50
POND TOP
4870.69
POND TOP
4870.70
POND TOP
4870.53
POND TOP
4865
4864
4863
4864
4865.50
POND BOTTOM
4865.50
POND BOTTOM
4862.84
POND BOTTOM
1+00 2+00
3+00 3+10
0601.4.1.A.13-12
4872.23
TBC-PI
OFF: 12.473 R
STA: 1+75.38
4862.84
POND BOTTOM
4870.75
POND TOP
L12
L1
3
L14
4867
4868
4869
4870
4871
4867
4868
48
7
2
FF
E
L
E
V
:
48
7
4
.
0
0
DATUM ELEV
4860.00
4864
4868
4872
1+00
48
7
0
.
5
48
7
0
.
5
0
48
6
5
.
5
48
6
5
.
5
0
2+00
48
6
5
.
5
48
6
5
.
5
0
48
6
2
.
8
48
6
2
.
8
4
3+00
48
6
9
.
2
48
6
9
.
1
7
3+10.19
48
7
1
.
2
48
7
1
.
2
1
4
:
1
S
L
O
P
E
4:1
S
L
O
P
E
Install 33' of 12" SDR-35 San. Pipe @ 0.22%
48
7
2
2+
0
0
3+0
0
0602.4.1.A.1-01
0602.4.1.F.1-I
0601.4.1.A.13-12
0602.4.1.A.1-01
L5
C
3
487
3
0602.4.1.F.1-I
CB# 19
SD MH 7
487
3
4872
48
6
6
48
7
4
48
7
3
48
7
2
4873.80
TBC-PC
2+11.36
4874.14
TBC-PI
2+61.27
4873.61
TBC-PC
2+55.49
4874.05
TBC-FLUSH
4874.14
TBC-FLUSH
SSMH 16
4870.94
TBC-PI
OFF: -32.527 L
STA: 1+83.00
4871.35
TBC-PI
OFF: -17.027 L
STA: 1+83.00
4871.60
TBC-PI
OFF: -12.527 L
STA: 1+75.38
4872.49
TBC-PI
OFF: 16.973 R
STA: 1+83.00
4872.89
TBC-PI
OFF: 32.500 R
STA: 1+83.00
4873.77
TBC-PI
OFF: 32.473 R
STA: 3+34.00
4873.11
TBC-PI
OFF: -32.527 L
STA: 3+37.75
4873.82
TBC-PI
OFF: 22.035 R
STA: 3+34.00
4873.23
TBC-PI
OFF: -22.082 L
STA: 3+37.75
0601.4.1.A.13-12
1+00 2+00 3+00 3+84
GARNETT STREET
STA:2+38.40
4871.60
TBC-PI
OFF: -12.527 L
STA: 1+78.50
4873.92
TBC-PI
OFF: 12.552 R
STA: 3+42.50
4873.60
TBC-PI
OFF: -12.687 L
STA: 3+49.17
1+00 1+50
1+
0
0
1+
9
8
0601.4.1.A.13-12
L7
48
7
1
48
7
0
48
6
9
48
7
1
48
6
6
4874.29
TBC-FLUSH
-2
.
0
1
%
-1.43%
-0.59%
-2
.
8
7
%
-25.00%
-1
4
.
6
6
%
-3
.
0
4
%
4870.50
POND TOP
4870.69
POND TOP
4870.70
POND TOP
4870.53
POND TOP
L10
L1
1
CB# 17
SD MH 6
0602.4.1.A.1-02
4874
48
7
1
48
6
5
48
6
4
48
6
3
48
6
4
4865.50
POND BOTTOM
4865.50
POND BOTTOM
4862.84
POND BOTTOM
1+
0
0
2+
0
0
3+
0
0
3+
1
0
0601.4.1.A.13-12
4873.96
TBC-PI
OFF: 12.548 R
STA: 3+47.77
4872.23
TBC-PI
OFF: 12.473 R
STA: 1+75.38
4862.84
POND BOTTOM
4870.75
POND TOP
L1
2
L13
L1
4
-2
.
1
5
%
48
7
3
48
7
4
4874
48
7
4
FD MH #5
48
6
7
48
6
8
48
6
9
48
7
0
48
7
1
4
8
7
2
48
6
7
48
6
8
4872
4872
POND 2-PARKING LOT
STA:3+75.04
FF ELEV: 4875.38
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
12
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
PA
R
K
I
N
G
L
O
T
-
P
O
N
D
2
D
E
S
I
G
N
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
PARKING LOT - POND 2 HORIZONTAL
PLAN VIEW
NOTE:
1.CONTRACTOR TO FIELD VERIFY EXISTING UTILITIES
LOCATION PRIOR TO CONNECTION PROPOSED UTILITIES.
2.CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS
AND COORDINATE WITH EACH UTILITY COMPANY.
3.ENSURE 10' MINIMUM CLEARANCE BETWEEN ALL POTABLE
AND NON-POTABLE LINES ARE MET PER IDEQ AND CITY OF
REXBURG STANDARDS.
4.ENSURE 18" MINIMUM VERTICAL CLEARANCE BETWEEN ALL
POTABLE AND NON-POTABLE LINES ARE MET PER IDEQ AND
CITY OF REXBURG STANDARDS
5.CONTRACTOR TO VERIFY EXISTING SERVICES AND INSTALL
IF NOT EXISTING.
GA
R
N
E
T
T
S
T
R
E
E
T
SH
E
E
T
8
EXISTING SURFACE
DESIGN SURFACE ON ALIGNEMENT
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.F.1-I INSTALL NEENAH
R-3067 CATCH BASIN
PER ISPWC SD-601
0602.4.1.A.1-01 INSTALL SD
MANHOLE TYPE A
MAIL BOX POD
42.05'
DESIGN SURFACE
EXISTING SURFACE
PARKING LOT - POND 2 HORIZONTAL
PROFILE VIEW
POND 2 VERTICAL PLAN VIEW
POND 2 VERTICAL PLAN VIEW
62.46'
INVERT OUT: 4865.18'
DATUM ELEV
4860.00
4864
4868
4872
4876
1+00
48
7
5
.
0
48
7
5
.
0
3
1+49.63
48
7
5
.
4
48
7
5
.
3
8
Install 41' of 12" ADS N 12 Storm Pipe @ 3.80%
4
:
1
S
L
O
P
E
4:1
S
L
O
P
E
FD MH #5
Sta:1+28.49 OFF:-23.59L
Rim:4870.81
INV IN:4866.81
48
7
2
0602.4.1.A.1-01
SD MH 7
48
7
4
48
7
3
48
7
2
1+00 1+50
1+
0
0
1+
9
8
0601.4.1.A.13-12
48
7
1
STA:2+87.80
OFF:57.67'R
4874.06
POND TOP
4874.02
POND TOP
4874.02
POND TOP
4874.03
POND TOP
0602.4.1.A.1-02
48
7
1
48
7
3
48
7
4
4870.30
POND BOTTOM
4870.30
POND BOTTOM
FD MH #5
POND 1 VERTICAL
Number
L11
Station
Start: 1+00.00
End: 1+98.18
Radius Length
98.18
Line/Chord Direction
N0° 09' 57.02"W
Start Point
Northing: 792508.15
Easting: 760064.77
End Point
Northing: 792606.33
Easting: 760064.49
POND 1 HORIZONTAL
Number
L10
Station
Start: 1+00.00
End: 1+49.63
Radius Length
49.63
Line/Chord Direction
N89° 45' 16.55"E
Start Point
Northing: 792557.31
Easting: 760039.02
End Point
Northing: 792557.52
Easting: 760088.65
487
2
0601.4.1.A.13-12
0602.4.1.A.1-01
SD MH 7
4874
4873
4872
4874.14
TBC-PI
2+61.27
1+
0
0
1+
5
0
1+00 1+98
0601.4.1.A.13-12
4871
4874.06
POND TOP
4874.02
POND TOP
4874.02
POND TOP
4874.03
POND TOP
0602.4.1.A.1-02
4871
4873
4874
4870.30
POND BOTTOM
4870.30
POND BOTTOM
FD MH #5
DATUM ELEV
4860.00
4864
4868
4872
4876
1+00
48
7
4
.
4
48
7
4
.
3
5
48
7
3
.
6
48
7
3
.
6
0
1+98.18
48
7
3
.
4
48
7
3
.
3
8
4
:
1
S
L
O
P
E
4:1
S
L
O
P
E
FD MH #5
Sta:1+72.86 OFF:2.85R
Rim:4870.81
INV IN:4866.81
Install 41' of 12" ADS N 12 Storm Pipe @ 3.80%
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
13
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
PO
N
D
1
D
E
S
I
G
N
RE
X
B
U
R
G
,
I
D
APPROVED BY ________________________DATE:____________
City of REXBURG
POND 1 HORIZONTAL PLAN VIEW
EXISTING SURFACE
DESIGN SURFACE
0601.4.1.A.13-12 INSTALL 12" ADS N
12 STORM PIPE @
0.22% MIN. SLOPE
0602.4.1.A.1-01 INSTALL SD
MANHOLE TYPE A
0602.4.1.A.1-02 INSTALL FRENCH
DRAIN PER ISPWC
SD-611
POND 1 HORIZONTAL PROFILE
POND 1 VERTICAL PLAN VIEW
POND 1 VERTICAL PROFILE
DESIGN SURFACE
EXISTING SURFACE
MAINTENANCE
GARAGE
OFFICE
1+00 1+50
1+
0
0
1+
9
8
L7
ADA UNIT
ADA UNIT
9+8410+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+0019+15
ADA UNIT
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
14
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
ST
O
R
M
W
A
T
E
R
P
O
L
L
U
T
I
O
N
P
R
E
V
E
N
T
I
O
N
RE
X
B
U
R
G
,
I
D
POTENTIAL POLLUTANTS
CHEMICAL MSDS #LOCATION
TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR
OFFSITE OPERATONS
START DATE END DATE
TO BE FILLED OUT BY CONTRACTOR
AREA TO BE DISTURBED
STABILIZE CONSTRUCTION ENTRANCE/EXIT
COMBINATION STAGING AREA & VEHICLE
EQUIPMENT CLEANING, FUELING AND MAIN.
MATERIALS STORAGE AREA &
STOCKPILE MANAGEMENT
SILT FENCE OR EROSION EEL
STORM WATER DRAINAGE
SEQUENCE OF MAJOR ACTIVITIES
ACTIVITY START DATE END DATE
POTENTIAL POLLUTANTS
CHEMICAL MSDS #LOCATION
TO BE FILLED OUT BY CONTRACTOR TO BE FILLED OUT BY CONTRACTOR
OFFSITE OPERATONS
START DATE END DATE
TO BE FILLED OUT BY CONTRACTOR
BEST MANAGEMENT PRACTICES NOTES
1. This plan should be revised and updated to address changes in site conditions,
new or revised government regulations, and additional on-site
storm water pollution. Additional erosion control measures may be required.
2. All revisions to this plan must be documented on the SWPPP Revision
Documentation Form.
3. Current versions of the SWPPP, the NOI, and the NOC will be kept on site for
the duration of the project. These items will be available for the
use of all operators and site personal involved with erosion and sediment
controls, and be available to EPA visiting the site. A notice will be
posted near the construction entrance during construction, containing the
SWPPP, the NOI and the NOC.
4. Fugitive dust blowing from the site shall be controlled by spraying water and
dust control polymers as needed on dry areas of the site.
5. The contractor will be responsible for supervision and inspection of all erosion
and sedimentation controls and for ensuring the SWPPP is
implemented.
6. Prior to beginning earth-moving activities, including clearing and grubbing, all
clearing limits, easements, setbacks, sensitive areas and their buffers
will be clearly marked to prevent environmental damage both on and off the
site.
7. If sediment is accidentally transported on to the street it will be removed from
the street surface on a daily basis.
8. All off-site construction shall be stabilized at the end of the working day.
9. All waste material will be collected and stored in a securely lidded dumpster.
The dumpster will meet all local and state solid water management
regulations.
10. Portable sanitary units will be provided for use by all workers for the entire
project. Sanitary waste will be collected regularly for the portable units
by an approved sanitary waste management contractor.
11. All exposed soils will be stabilized with vegetation or covered no more than 14
days after the construction activity in that portion of the site has
temporarily or permanently ceased.
12. Existing and new vegetation will be maintained to the maximum extent
practicable to prevent the contamination of storm water with sediment.
13. The contractor shall be responsible for adjusting the erosion control measure;
due to grade changes during the development of the project.
14. Maintain on the site or have readily available sufficient oil and grease absorbing
materials to contain and clean up fuel or chemical spills and leaks.
15. Adequate energy dissipation, erosion control, and soil stabilization measures
will be provided for all point source discharges of storm water,
including run-on discharges and outlets for onsite discharges.
16. Temporary and permanent swells and small detention ponds will be used as
necessary to reduce the velocity of runoff and enhance particle settling.
17. Consistent with the general permit requirements, all potential pollutants other
than sediment will be handled and disposed of in a manner that does
not affect contamination of stormwater.
18. Materials used during construction with the potential to impact storm water, will
be stored, managed, used, and disposed of in a manner that
minimizes the potential for releases to the environment and especially in the
storm water.
19. If a spill of pollutants threatens storm water at the site, the spill response
procedures must be implemented in a timley manner to prevent the
release of pollutants.
20. All temporary and permanent erosion and sediment control BMPs will be
maintained and repaired as needed to assure continued performance
of their intended use.
21. All temporary erosion control and sediment control BMPs will be removed
within 30 days after final site stabilization is achieved or after the
temporary BMPs are no longer needed.
22. Regardless of recommended maintenance schedule, all control measures and
inspections shall be performed within 24 hours following any
storm of 0.5 inches or greater. An inspection report shall be kept at all times
and should be retained for at least three (3) years from the date
the site is stabilized.
23. All contractors providing services on the project which may cause storm water
pollution will be given a copy of the SWPPP and appropriate
training regarding stormwater pollution prevention.
NOTE:
1.AFTER ASPHALT PAVING HAS TAKEN PLACE STORM WATER DEVELOPED WILL BE
DIRECTED TO RETENTION BASINS AND PIPING PER THE APPROVED SITE PLAN
AND PERCOLATE IN DESIGNATED AREAS
2.INLET PROTECTION TO BE PLACED ON ALL STORM DRAIN INLETS AFTER
INSTALLATION THROUGH THE DURATION OF THE PROJECT.
3.WITCH HAT TO BE PLACED ON NEAREST TWO (2) INLET BOXES TO BE
PROJECTED THROUGH THE DURATION OF PROJECT.
LEGEND
Concrete Washout
SEDIMENTATION AREA
CONCRETE WASHOUT
WITCH HAT
APPROVED BY ________________________DATE:____________
City of REXBURG
CHECK BY
SHEETS
DRAWN BY
JOB NO:
DATE:
OF
SHEET
BDJTKP
SH
E
E
T
N
A
M
E
:
PR
O
J
E
C
T
:
LO
C
A
T
I
O
N
:
18-016
DATE:DATE: March 18, 2019
DA
T
E
RE
V
I
S
I
O
N
S
CL
I
E
N
T
:
Th
e
C
i
v
i
l
C
o
n
n
e
c
t
i
o
n
11
5
0
H
o
l
l
i
p
a
r
k
D
r
.
I
d
a
h
o
F
a
l
l
s
,
I
D
8
3
4
0
1
20
8
.
6
8
1
.
8
5
9
0
PRELIMINARY FOR
REVIEW ONLY
15
15
RE
X
B
U
R
G
C
E
N
T
E
N
N
I
A
L
T
O
W
N
H
O
M
E
S
ST
O
R
M
W
A
T
E
R
P
O
L
L
U
T
I
O
N
P
R
E
V
E
N
T
I
O
N
D
E
T
A
I
L
S
RE
X
B
U
R
G
,
I
D
NOTES:
TRENCH SHALL BE A MINIMUM OF 4" WIDE AND 6" DEEP TO BURY
AND ANCHOR THE GEOTEXTILE FABRIC. FOLD MATERIAL TO FIT
TRENCH & BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL.
WOOD POSTS SHALL BE A MINIMUM SIZE OF 1 1/8" X 1 1/8" OAK OR
HICKORY.
100' M
I
N
I
M
U
M
E
X
C
E
P
T
5
0
'
M
I
N
I
M
U
M
F
O
R
PROJE
C
T
S
I
T
E
S
O
F
L
E
S
S
T
H
A
N
1
A
C
R
E
PROPOSED
SIDEWALK
3"-4" TOP DRESSING OF 2" STONE
6"-8" COMPACTED.
FRACTURED STONE.
3' MAX.
2-3 4"
BOLTS
COMPACTED BACK
FILL AROUND POST
NOTES:
1. MAILBOX SHALL CONTAIN AT ALL TIMES:
A) CITY APPROVED CONSTRUCTION PLANS
B) DEQ APPROVED CONSTRUCTION PLANS
C) ANY SITE INSPECTON FORMS
2. MAILBOX SHALL BE LOCKED AT ALL TIMES
PRESSURE
TREATED 2 x 6
4 x 4
POST
4 x 4
POST
POST "NPDES" PERMIT
1112"
1312"
2312"
4'
24" MIN.
4'
24" MIN.
12" MIN.
12"
6"
EROSION EEL
EROSION EEL
EROSION EEL
SILT FENCE
TRUCK WASHOUT
MAIL BOX
STABILIZED CONSTRUCTION ENTRANCE
CURB CUT TO BE INSTALLED
FOR NEW SITE ENTRANCE
CURB CUT TO BE INSTALLED
FOR NEW SITE ENTRANCE
TOTAL 9"-12" OF
COMPACTED STONE
SANDBAG SHALL BE INSTALLED
IN FLOW LINE DOWNSTREAM OF
CONSTRUCTION ENTRANCE
WOOD POSTS 4'-0" MIN.
LENGTH 2'-0" MIN.
DEPTH IN GROUND
GEOTEXTILE FABRIC
ONLY
BACKFILL AND
COMPACT TRENCH
WITH EXCAVATED SOIL.
ATTACH THE FABRIC TO THE
POSTS WITH WIRE STAPLES
OR WOODEN LATH AND NAILS.
NOT TO SCALE
FLOW
DIRE
C
T
I
O
N
SEE BALLAST DETAIL
NOT TO SCALE
BALLAST DETAIL
NOT TO SCALE
SLOPE ENTRANCE TO WASHOUT AREA FOR
CONTAINMENT PURPOSES
WASHOUT AREA MUST BE
ENCLOSED W/ SILT FENCE
PROVIDE BERM AROUND
WASHOUT AREA
EXCAVATE BOTTOM 1' TO PROVIDE
LOWERED BOWL-LIKE AREA
WASHOUT TO BE LINED WITH CLEAN
ROCK OR RIP-RAP TO ACT AS FILTER
AND EROSION CONTROL
NOT TO SCALE
APPROVED BY ________________________DATE:____________
City of REXBURG