Permit Status of (Issue) as of Report Date: 03/20/2019 12:31 pm
Permit Details Permit Number: 17-00289
Cedars Bldg B - Biomat Buildout
155 W 2nd S Suite 140
Commercial Tenant Finish
Permit Issued Date: 04/05/2018
Permit Inspection Statistics
26Total Inspections Completed:
11Total Inspections Passed:
Inspection Pass Rate: 42.31%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
04/13/2018PARTPASSTed DyeCommercial Insulation Inspection
04/19/2018PARTPASSTed DyeCommercial Insulation Inspection
04/19/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
Partial drywall inspection.Inspector Comments:
04/25/2018PARTPASSTed DyeCommercial Insulation Inspection
Urathane insulation on wall seperating the garage from the interior. South walls.Inspector Comments:
06/01/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection
Fire rated penetrations inspected above dropped ceiling in Janitor Room 130 and
approved for cover. Room 129 also requires inspection of fire barrier above
suspended tile ceiling but is not ready. Fire barriers also enclose rooms 131, 133,
and 138 on west end.
Only room 130 is approved for hanging the dropped ceiling (verify with
mechanical contractor if small sections of removed pipe insulation needs to be
replaced or not).
Inspector Comments:
06/12/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection
This inspection was of the pipe that was located above the ceiling in the bath
room closest to the stair and on the left side. It ran vertically in the drywall so it
needed to have a 2 hr box around it.
The box provided looks OK
Inspector Comments:
06/14/2018PARTPASSTed DyeCommercial Framing/Structure Inspection
07/24/2018PARTPASSTed DyeCommercial Building Final
-Fall protection for tools as workers work on HVAC units.
-Turn in your proposals for tool fall protection.
-Room numbers are not on.
Inspector Comments:
12/05/2018PassTed DyeCommercial Building Final
12/05/2018PassTed DyeCommercial Sheetrock/Drywall Inspection
12/05/2018PassTed DyeCommercial Insulation Inspection
Page 1 of 2
(Continued)
Permit Details Permit Number: 17-00289
Cedars Bldg B - Biomat Buildout
155 W 2nd S Suite 140
Commercial Tenant Finish
Permit Status of (Issue) as of Report Date: 03/20/2019 12:31 pm
Permit
Inspection
Summary
Electrical Inspection Type
04/02/2018N/ABret StoddardCommercial Electrical Rough-in
04/05/2018PARTPASSBret StoddardCommercial Electrical Rough-in
04/26/2018PassBret StoddardCommercial Electrical Rough-in
06/20/2018PARTPASSBret StoddardCommercial Electrical Final Inspection
07/12/2018PARTPASSBret StoddardCommercial Electrical Final Inspection
07/17/2018PassBret StoddardCommercial Electrical Final Inspection
08/16/2018PassBret StoddardCommercial Electrical Final Inspection
Fire Inspection Type
07/19/2018FailBret StoddardFire Alarm Final Inspection
07/24/2018PassBret StoddardFire Alarm Final Inspection
03/04/2019PassDale PickeringFire Department Final Inspection
03/04/2019PassDale PickeringFire Sprinkler Final Inspection
Passed on Cedars Building B as a whole ca16-00038 as per Dale Pickering.Inspector Comments:
Mechanical Inspection Type
04/30/2018FailDon AllenHVAC Rough-in
07/16/2018PassDon AllenHVAC Final Inspection
Plumbing Inspection Type
07/23/2018PassDon AllenPlumbing Final Inspection