HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00332 - 342 E 5th S - Solar InstallPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 03/14/2019 1:37 pm
Permit Details Permit Number: 18-00332
342 E 5th S - Solar Install
342 E 5th S
Solar Panels
Permit Issued Date: 06/25/2018
Permit Inspection Statistics
2Total Inspections Completed:
2Total Inspections Passed:
Inspection Pass Rate: 100.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
07/13/2018PassLarry BeesleyBuilding - Final Solar Inspection
The system looks good and installed as per the code. ThanksInspector Comments:
Electrical Inspection Type
07/13/2018PassBret StoddardFinal Solar Inspection