Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00332 - 342 E 5th S - Solar InstallPermit Inspection Summary Permit Status of (Open) as of Report Date: 03/14/2019 1:37 pm Permit Details Permit Number: 18-00332 342 E 5th S - Solar Install 342 E 5th S Solar Panels Permit Issued Date: 06/25/2018 Permit Inspection Statistics 2Total Inspections Completed: 2Total Inspections Passed: Inspection Pass Rate: 100.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/13/2018PassLarry BeesleyBuilding - Final Solar Inspection The system looks good and installed as per the code. ThanksInspector Comments: Electrical Inspection Type 07/13/2018PassBret StoddardFinal Solar Inspection