Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00314 - 155 W 2nd S - Rocky Mountain Chocolate Factory - Tenant FinishPermit Inspection Summary Permit Status of (Issue) as of Report Date: 03/13/2019 1:05 pm Permit Details Permit Number: 18-00314 Rocky Mountain Chocolate Factory - Tenant Finish 155 W 2nd S Commercial Tenant Finish Permit Issued Date: 07/13/2018 Permit Inspection Statistics 20Total Inspections Completed: 16Total Inspections Passed: Inspection Pass Rate: 80.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/27/2018PassTed DyeCommercial Insulation Inspection 08/01/2018PassTed DyeCommercial Sheetrock/Drywall Inspection Mechanical has not passed yet so if there is drywall to be removed it will need to be done at that time. Contractor assumes the responsibility. Inspector Comments: 08/01/2018PassTed DyeCommercial Framing/Structure Inspection Framing was done with the main shell on exterior walls. Other walls completed and ok. Inspector Comments: 09/28/2018FailTed DyeCommercial Framing/Structure Inspection 10/04/2018FailQuinton OwensSuspending Ceiling Inspection * Fire block penetrations through slab above back room. * Drain pipe above back room has been cut off and left open ended. * Add fire collar around 4" or larger PVC pipes through rated walls. * Furnace vent penetration through concrete wall shall be fire rated. Inspector Comments: 10/16/2018PassTed DyeCommercial Building Final 02/06/2019PassTed DyeSuspending Ceiling Inspection Electrical Inspection Type 07/19/2018PARTPASSBret StoddardCommercial Electrical Rough-in 07/30/2018PassBret StoddardCommercial Electrical Rough-in 10/08/2018PassBret StoddardCommercial Electrical Rough-in 10/10/2018PassBret StoddardCommercial Electrical Final Inspection Fire Inspection Type 08/01/2018FailDale PickeringFire Sprinkler Rough-in 10/11/2018PassDale PickeringFire Sprinkler Rough-in 10/12/2018PassBret StoddardFire Alarm Final Inspection 03/04/2019PassDale PickeringFire Department Final Inspection 03/04/2019PassDale PickeringFire Sprinkler Final Inspection Passed on Cedars Building B as a whole ca16-00038 as per Dale Pickering.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 18-00314 Rocky Mountain Chocolate Factory - Tenant Finish 155 W 2nd S Commercial Tenant Finish Permit Status of (Issue) as of Report Date: 03/13/2019 1:05 pm Permit Inspection Summary Mechanical Inspection Type 10/09/2018PassDon AllenHVAC Rough-in 10/10/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 07/27/2018PassDon AllenPlumbing Rough-in 10/10/2018PassDon AllenPlumbing Final Inspection Page 2 of 2