Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00351 - 98 Marigold St - New Mobile Home #98Permit Inspection Summary Permit Status of (Open) as of Report Date: 03/13/2019 8:18 am Permit Details Permit Number: 18-00351 98 Marigold St - New Mobile Home #98 98 Marigold St Residential Mobile Home Permit Issued Date: 06/27/2018 Permit Inspection Statistics 4Total Inspections Completed: 3Total Inspections Passed: Inspection Pass Rate: 75.00% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/26/2018PARTPASSLarry BeesleyResidential Building Final I inspected the support blocking and the sway bracing tie down, and they all are good. You will need to call for and electrical inspection, and also for a building final after the skirting and steps are all completed. Thanks, Larry Inspector Comments: 08/27/2018PassLarry BeesleyResidential Building Final All of the set up and stair and skirting have been completed according to the code. The address number are not on yet but the manager said they would get them on right away. Thanks Inspector Comments: Electrical Inspection Type 07/30/2018PassBret StoddardResidential Electrical Service Inspection Plumbing Inspection Type 07/26/2018PassDon AllenPlumbing Final Inspection The water and the sewer was hooked up to code.Inspector Comments: