HomeMy WebLinkAboutAPPLICATION - 19-00115 - Summerfield Master Plan Amend. Div.7 03.2019cW # IQ l70I 15 I Patz Date
Planned Unit
Development Application
Master Plan
REXBURG
CE
!
City of Rexburg
n„.:,,<„,
o
Rexbur
st
0
www.rexburg.org
Phone: 208.359.3020
Fox: 208.359.3022
2019
TIME: 5 Months minimum
Preliminary $500/phase
FEES
Number of phases
f bl7
Preliminary fee total c_
Y OF REXBURG
Final $500/phase
Number of phases
Final fee total
In addition to City of Rexburg fees, the County Surveyor Review fee will be calculated
by the Madison County Planning & Zoning office. Madison County will send the bill
directly to the applicant when the County Surveyor Review has been completed.
Fee Total $ Sa!
Fee(s) Paid: Yes/No
*A Planned Unit Development is combined with an appropriate existing zone, providing variations that
are specifically adopted as part of the MASTER PLAN or as part of an APPROVED PROJECT PLAN.
Submittal Requirements
Pre -application conference with staff prior to the submittal of this application.
A statement of the intended use of the proposed subdivision (Ex: Residential single family, Commercial, etc.)
PA site plan (see checklist p.4)
�7R1t A vicinity map showing the relationship of the proposed plat to the surrounding area ('h mile min. radius)
.rJ Preliminary Master Plan
® Four (4) copies of the completed application and any other documents you are submitting with it (4 copies of 24"x 36"
site plans, construction drawings, etc.)
❑ Digital .pdf copy of application and other documents submitted with application.
SUB -DIVIDER r/ II /
Name: kv�tlla.r ra A /I„� ., Address: rel �%� s ,I” f oJgtt Gl7 ^^ II
Phone Number: Y3f- 75'S-:bfio Cell Number: 't-- �- 9697 Email: L..� D ICa,.F°ltaen4e, t.OM
ENGINEER OR SURVEYOR
Name: &1'kk Lyon Address: Wo Fyyl )bp N6,19%
Phone Number: •35- 75-S' -Sl:I Cell Number: Email: al1C•,ac IO2aa o yal o° .c o•h
OWNER/CONTROLLER for ENTIRE DEVELOPMENT
Name: 8V 5wA'n.VA Address: 101 P;�� V,�W Z'r�^• e 3
Phone Number: Cell Number: 1Qe -('04 -5�IS— Email: 0-,tf.r 0
Please complete the following: (If not applicable, please fill in with N/A)
a) What is the land use and existing zoning of the proposed subdivision and the adjacent land?
b)
C)
d)
e)
Does the subdivision conform to present zoning?
Variance Requested:
Requesting annexation to City?
Requested zoning:
Yes A- No
Yes No X (If yes, attach written request)
Yes No JC
Page 1 of 6
The attached PUD plan has been prepared in accordance with the Subdivision and PUD Regulations of the City of Rexburg,
and the items needed for review are shown on the plan or plans, or explanations given with respect thereto. All applications
that are complete will be processed with due diligence and will be scheduled, dependent upon availability, for an upcoming
agenda.
3/i/
Signature of Applicant
Date
P.U.D. MASTER PLAN PROCESS
1. Ready Team Meeting
2. Pre -application meeting may be required
3. Complete application is received by Planning and Zoning and preliminary & final fees are paid
4. Work with Public Works to draft development agreement
5. Staff Reviews Preliminary Master Plan & Density Bonus Points are finalized (if increasing density above zone
requirements) (Revisions may require plans be resubmitted with changes completed)
6. Public is Notified
7. Staff Report is sent to applicant
8. Notice is posted on the property
9. P&Z Hearing
10. Applicant is notified of Council Date
11. City Council Meeting
12. Preliminary Master Plan Approved
13. Iso Phase Preliminary Plat Application is received by Planning & Zoning
(PLAT -Follow Preliminary Plat Procedures)
14. Final Plat Application is received by Planning & Zoning (Follow Final Plat Procedures)
15. Before development: 1) Sign & Record Development Agreement, 2) Provide a Financial Security Instrument, 3)
Obtain a Building Permit,
PRELIMINARY PLAT PROCESS
1. Pre -application meeting may be required
2. Complete application is received by Planning and Zoning and fees are paid
3. Preliminary plat reviews (Revisions may require plans be resubmitted with changes completed)
4. Work with public works to draft development agreement
5. Staff Report is sent to applicant
6. Planning & Zoning meeting
7. City Council Meeting
8. Start Final Plat Process
FINAL PLAT PROCESS
1. Complete application is received by Planning and
Zoning and fees are paid
2. Final plat reviews
(Revisions may require plans be resubmitted with
changes completed)
3. Staff Report is sent to applicant
4. County Surveyor review
5. P&Z Meeting
Page 2 of 6
6. City Council Meeting
7. Sign Development Agreement
8. Final Media (Mylar) is requested
9. Applicant seeks signatures on Final Media
10. Completed Mylar is recorded with County
11. Record number is communicated to Planning &
Zoning
Summerfield PUD Master Plan Amendment application
We are requesting an amendment to the Summerfield PUD master plan. The area in which we are
requesting to change is the 8.18 acres directly north of the 3.73 acre central park. This area is the
densest area of the Summerfield PUD. We are requesting that 114 town homes be allowed to be
constructed. 114 townhomes on 8.18 acres means that there would be just shy of 14 units per acre.
The design of the townhome we wish to build is extremely efficient and allows for a large portion of the
ground to be left as open space. As drawn there is 3.54 acres of open space or over 1350 square feet
per unit. 43.38% of the gross acreage will remain outside of buildings and paving areas. Each unit will
have an attached 2 car garage, there is 61 additional parking stalls for visitors.
The ally load design makes is so the front side of the building faces the city roads. Additionally there is a
large green scape area in front of each unit. This provides both a great curb appeal to the owners and a
pleasing street scape for others.