Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00085 - 880 W Parkside Dr - Basement FinishPermit Inspection Summary Permit Status of (Open) as of Report Date: 03/07/2019 10:00 am Permit Details Permit Number: 12-00085 880 W Parkside Dr - Basement Finish 880 W Parkside Dr SFR Basement Finish Permit Issued Date: 06/02/2014 Permit Inspection Statistics 6Total Inspections Completed: 5Total Inspections Passed: Inspection Pass Rate: 83.33% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 03/15/2012PassQuinton OwensFraming/Structure Inspection Fur out walls and interior partitions. No altering of structural members.Inspector Comments: 11/28/2012PassQuinton OwensInsulation Inspection Thermal envelope completed to code when built.Inspector Comments: 11/28/2012PassQuinton OwensBuilding Final Move ladder to bdrm window well. Finished 1 bedroom & "hobby" room.Inspector Comments: Electrical Inspection Type 03/15/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover with the exception that an outlet is added on the short wall before covering in the bedroom-not covering right now-will be covering after they have a final inspection in the living room, need to verify that the smoke alarms are wired together throughout the entire house-will re-inspect on the final. Inspector Comments: 11/28/2012FailBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Need to install a listed transfer switch for generator tie-in, AFCI for bedroom is existing in main panel, unfinished bathroom and mech. room area, call for a re-inspect when ready. Inspector Comments: Mechanical Inspection Type 11/28/2012PassQuinton OwensHVAC Final Inspection Inspections Required SFR-A,R,B, MFR,MFR-A,R Electrical Rough-in