Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am
Permit Details Permit Number: 12-00071
Brighton Townhomes Bldg #4
242 W 6th S
Multi-Family Residential
Permit Issued Date: 05/28/2014
Permit Inspection Statistics
21Total Inspections Completed:
16Total Inspections Passed:
Inspection Pass Rate: 76.19%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
04/13/2012PassQuinton OwensSheeting
-Need to nail south wall at top of stairs by window, and across bottom of upstairs
window north end of back wall.
-Back wall to be 1 hr rated for closeness to future bldg to the west.
ACTION REQUIRED: Inspection of back fire wall before covering.
Inspector Comments:
05/02/2012PassQuinton OwensFraming/Structure Inspection
5/8 type x on exterior back wall. Foundation to roof sheathing.
10% max openings allowed.
Inspector Comments:
6/8/12 QO: - overburn protection at roof peaks.
-"Firecaulk" elec. penetrations through firewalls.
-Notched TUI's without 1 1/2'' bearing front of bldg (also one on north end of
bldg)
-Framing member on ceiling above crawl space access for drywall support
-Middle and south of middle holes in TUI (for elect) through top chord. (need
approval)
Action Required: re-inspection. (ok to insulate).
Inspector Comments:
06/13/2012PassQuinton OwensFraming/Structure Inspection
6/13/12 - upper floors ok for drywall
-main floor finish firewall for inspection.
Inspector Comments:
06/20/2012PassPLL ADMINFraming/Structure Inspection
JB: fire walls inside units look good.
Could not inspect crawl space.
Action required: crawl spaces need to be inspected.
As per Jon Berry.
Inspector Comments:
06/26/2012PassQuinton OwensSheetrock/Drywall Inspection
6/21/12 JB: Units 1, 2 & 5 drywall ok to cover.
6/26/12 QO: add screws to missed locations as indicated. Ok to tape.
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 12-00071
Brighton Townhomes Bldg #4
242 W 6th S
Multi-Family Residential
Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am
Permit
Inspection
Summary
08/13/2012FailQuinton OwensBuilding Final
-16" gap in floor joist insul. west end (craw space)
-Finish insulation in crawl space #17, #16
-Finish condensate pipe to drain #16
-Furnace exhaust to slope back to furnace in #17 (double check slope)
-Supply info on water heater anchors.
-Unit #'s for EMS ok?
Inspector Comments:
08/17/2012FailQuinton OwensBuilding Final
Address to be easily visible from street. Void in insulation at floor joist at west
end of units 19 & 20. Finish insulation in #16 & 17 (Space to small to insert batts
in 19 & 17 - may need blown insulation). Address to be visible from street.
Inspector Comments:
08/20/2012PassQuinton OwensFooting Inspection
Existing foundation done in 2004Inspector Comments:
08/20/2012PassQuinton OwensFoundation Inspection
Existing foundation done in 2004Inspector Comments:
08/22/2012PassQuinton OwensInsulation Inspection
Upper floor only ready for drywall.(6/14, QO) Crawl space not done yet, seal
around kitchen window in unit 2nd from north end. Mainfloor needs firewall
inspection. Crawl Spaces completed at Final inspection
Inspector Comments:
08/22/2012PassQuinton OwensBuilding Final
Bldg 4 Mech and Bldg Final approved (temp)
Address ID to be installed.
Inspector Comments:
Electrical Inspection Type
06/01/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover.Inspector Comments:
06/01/2012PassBret StoddardCOM & MFR Electrical Service Inspection
Approved to be energized for permanent power service.Inspector Comments:
08/03/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O. entire building.Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 12-00071
Brighton Townhomes Bldg #4
242 W 6th S
Multi-Family Residential
Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am
Permit
Inspection
Summary
Mechanical Inspection Type
06/08/2012FailQuinton OwensHVAC Rough-in
Finish sealing ends of main duct (incl. topside) Duct passing over crawl space
access (2nd from north) Conflict with comb. air and bath fan (2nd from south)
Inspector Comments:
06/08/2012FailQuinton OwensHVAC Rough-in
-Finish sealing holes in main duct at ends (incl. top0
-Duct passing over crawlspace access (2nd from north)
-Conflict with comb. air & bath fan (2nd from south)
Inspector Comments:
06/14/2012PassQuinton OwensHVAC Rough-in
08/13/2012FailQuinton OwensHVAC Final Inspection
Finish condensate pipe to drain (16). Furnace exhaust to slope back to furnace
(17). Cap missing on top of B-vent (19). Comb. air vent protection (per manual
p.18). Pasco 1725 anchors fastened to water heater (what about lower third
strap as required).
Inspector Comments:
08/22/2012PassQuinton OwensHVAC Final Inspection
Plumbing Inspection Type
05/03/2012PassDon AllenPlumbing Rough-in
4/18/12 DA: All good to cover.Inspector Comments:
09/07/2012PassDon AllenPlumbing Final Inspection
all good for C/OInspector Comments: