Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00071 - 242 W 6th S - Brighton Townhomes Bldg #4Permit Inspection Summary Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am Permit Details Permit Number: 12-00071 Brighton Townhomes Bldg #4 242 W 6th S Multi-Family Residential Permit Issued Date: 05/28/2014 Permit Inspection Statistics 21Total Inspections Completed: 16Total Inspections Passed: Inspection Pass Rate: 76.19% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 04/13/2012PassQuinton OwensSheeting -Need to nail south wall at top of stairs by window, and across bottom of upstairs window north end of back wall. -Back wall to be 1 hr rated for closeness to future bldg to the west. ACTION REQUIRED: Inspection of back fire wall before covering. Inspector Comments: 05/02/2012PassQuinton OwensFraming/Structure Inspection 5/8 type x on exterior back wall. Foundation to roof sheathing. 10% max openings allowed. Inspector Comments: 6/8/12 QO: - overburn protection at roof peaks. -"Firecaulk" elec. penetrations through firewalls. -Notched TUI's without 1 1/2'' bearing front of bldg (also one on north end of bldg) -Framing member on ceiling above crawl space access for drywall support -Middle and south of middle holes in TUI (for elect) through top chord. (need approval) Action Required: re-inspection. (ok to insulate). Inspector Comments: 06/13/2012PassQuinton OwensFraming/Structure Inspection 6/13/12 - upper floors ok for drywall -main floor finish firewall for inspection. Inspector Comments: 06/20/2012PassPLL ADMINFraming/Structure Inspection JB: fire walls inside units look good. Could not inspect crawl space. Action required: crawl spaces need to be inspected. As per Jon Berry. Inspector Comments: 06/26/2012PassQuinton OwensSheetrock/Drywall Inspection 6/21/12 JB: Units 1, 2 & 5 drywall ok to cover. 6/26/12 QO: add screws to missed locations as indicated. Ok to tape. Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 12-00071 Brighton Townhomes Bldg #4 242 W 6th S Multi-Family Residential Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am Permit Inspection Summary 08/13/2012FailQuinton OwensBuilding Final -16" gap in floor joist insul. west end (craw space) -Finish insulation in crawl space #17, #16 -Finish condensate pipe to drain #16 -Furnace exhaust to slope back to furnace in #17 (double check slope) -Supply info on water heater anchors. -Unit #'s for EMS ok? Inspector Comments: 08/17/2012FailQuinton OwensBuilding Final Address to be easily visible from street. Void in insulation at floor joist at west end of units 19 & 20. Finish insulation in #16 & 17 (Space to small to insert batts in 19 & 17 - may need blown insulation). Address to be visible from street. Inspector Comments: 08/20/2012PassQuinton OwensFooting Inspection Existing foundation done in 2004Inspector Comments: 08/20/2012PassQuinton OwensFoundation Inspection Existing foundation done in 2004Inspector Comments: 08/22/2012PassQuinton OwensInsulation Inspection Upper floor only ready for drywall.(6/14, QO) Crawl space not done yet, seal around kitchen window in unit 2nd from north end. Mainfloor needs firewall inspection. Crawl Spaces completed at Final inspection Inspector Comments: 08/22/2012PassQuinton OwensBuilding Final Bldg 4 Mech and Bldg Final approved (temp) Address ID to be installed. Inspector Comments: Electrical Inspection Type 06/01/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover.Inspector Comments: 06/01/2012PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power service.Inspector Comments: 08/03/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O. entire building.Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 12-00071 Brighton Townhomes Bldg #4 242 W 6th S Multi-Family Residential Permit Status of (Open) as of Report Date: 03/06/2019 10:58 am Permit Inspection Summary Mechanical Inspection Type 06/08/2012FailQuinton OwensHVAC Rough-in Finish sealing ends of main duct (incl. topside) Duct passing over crawl space access (2nd from north) Conflict with comb. air and bath fan (2nd from south) Inspector Comments: 06/08/2012FailQuinton OwensHVAC Rough-in -Finish sealing holes in main duct at ends (incl. top0 -Duct passing over crawlspace access (2nd from north) -Conflict with comb. air & bath fan (2nd from south) Inspector Comments: 06/14/2012PassQuinton OwensHVAC Rough-in 08/13/2012FailQuinton OwensHVAC Final Inspection Finish condensate pipe to drain (16). Furnace exhaust to slope back to furnace (17). Cap missing on top of B-vent (19). Comb. air vent protection (per manual p.18). Pasco 1725 anchors fastened to water heater (what about lower third strap as required). Inspector Comments: 08/22/2012PassQuinton OwensHVAC Final Inspection Plumbing Inspection Type 05/03/2012PassDon AllenPlumbing Rough-in 4/18/12 DA: All good to cover.Inspector Comments: 09/07/2012PassDon AllenPlumbing Final Inspection all good for C/OInspector Comments: Page 3 of 3