Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 12-00070 - 242 W 6th S - Brighton Townhouse BldgPermit Inspection Summary Permit Status of (Open) as of Report Date: 03/06/2019 10:26 am Permit Details Permit Number: 12-00070 Brighton Townhouse Bldg #3 242 W 6th S Multi-Family Residential Permit Issued Date: 05/19/2014 Permit Inspection Statistics 22Total Inspections Completed: 15Total Inspections Passed: Inspection Pass Rate: 68.18% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 04/13/2012FailQuinton OwensFraming/Structure Inspection Missed nailing at 2 studs under back window of 3rd unit from south. BACK WALL TO BE 1 HR RATED. - to be inspected Note on firewalls: 2 hr rating is from foundation to roof sheathing and front to back sheathing to sheathing (including trusses and cantilevers) Inspector Comments: 05/09/2012PassQuinton OwensFooting Inspection 05/09/2012PassQuinton OwensFoundation Inspection 05/09/2012FailQuinton OwensFraming/Structure Inspection 5/8" drywall applied to back wall with 10% max openings.approved (5-3, Quinton) Cut TJI under upstairs bath (#2 & 5 - counting from south to north) Finish ends of firewall (floor joist & cantilevers incl) Cut TJI under Main floor 1/2 bath (#1, 3 & 5) 2 TJI's notched over anchor bolt (#3) needs bearing (hanger?) Overburn protection at roof can't have gaps at peak (#3 & 4) Inspector Comments: 05/23/2012FailQuinton OwensInsulation Inspection End units need insulation at exterior above mechanical room; Crawl space needs to be conditioned space when insulating walls (close off vents); Add insulation shield around B-vent in attic #5 (done 5-24). Window labels removed (One label found U-factor = .32). Reconnect main floor bath fans with vents in 4 & 5 (done 5-24) Inspector Comments: 05/24/2012PassQuinton OwensInsulation Inspection Conditioned crawl space and b-vent/insul. clearance (end units) inspect by final.Inspector Comments: 05/31/2012PassQuinton OwensFraming/Structure Inspection Finish all truss ends at firewall. Firecaulk electrical penetrations in firewall above dropped ceilings (5-29, QO) Remaining Firewalls approved 5-31, QO Inspector Comments: 06/05/2012PassQuinton OwensSheetrock/Drywall Inspection North 3 units approved with a few missed locations indicated to hangers. Uncover S.D. in back bedroom in north end unit.(6-1, QO) Photoelectric will be required in kitchen, and CO detector in upstairs hall. Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 12-00070 Brighton Townhouse Bldg #3 242 W 6th S Multi-Family Residential Permit Status of (Open) as of Report Date: 03/06/2019 10:26 am Permit Inspection Summary 08/13/2012FailQuinton OwensBuilding Final Holes in seal at bottom of tubs. Addressing to be visible from street.Inspector Comments: 08/17/2012PassQuinton OwensBuilding Final Address #'s on order for buildingsInspector Comments: 05/23/2014N/APLL ADMINSidewalk Inspection Electrical Inspection Type 05/17/2012PassBret StoddardCOM & MFR Electrical Service Inspection Approved to be energized for permanent power-inspected the service on the rough-in, therefore no separate ticket was written. Inspector Comments: 05/17/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover in the entire building.Inspector Comments: 08/03/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O. entire building.Inspector Comments: Mechanical Inspection Type 05/09/2012FailQuinton OwensHVAC Rough-in Finish dryer vents and venting exhaust fans. Seal ends of floor plenums. Floor plenum ends not blocked off in unit 1 Inspector Comments: 05/23/2012PassQuinton OwensHVAC Rough-in 08/13/2012FailQuinton OwensHVAC Final Inspection Insulation clearance to b-vent #15.Fix vent connection to WH (13). Protect comb. air vent on furnaces as on p. 18 of inst. manual. Installed Pasco 1725 anchors to WH (lower third also requires anchorage) Inspector Comments: 08/17/2012PassQuinton OwensHVAC Final Inspection Plumbing Inspection Type 04/19/2012PassDon AllenPlumbing Sewer Sewer Pressure Test - All good to cover from north of building to city sewerInspector Comments: 05/01/2012PassDon AllenPlumbing Rough-in all good.Inspector Comments: 05/04/2012PassDon AllenPlumbing Underground Inspection 09/10/2012PassDon AllenPlumbing Final Inspection all good for COInspector Comments: Page 2 of 2