HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00208 - 656 Hillside Dr - New SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 03/06/2019 10:18 am Permit Details Permit Number: 17-00208 656 Hillside Dr - New SFR 656 Hillside Dr Building - Single Family Residence Permit Issued Date: 06/20/2017 Permit Inspection Statistics 23Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 73.91% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/20/2017PARTPASSTed DyeResidential Footing Inspection Front 3rd of house footings only(garage and back part of house yet to be poured). Inspector Comments: 06/26/2017PassLarry BeesleyResidential Footing Inspection 06/29/2017PassLarry BeesleyResidential Footing Inspection 07/17/2017PassLarry BeesleyFoundation Inspection The rebar was close to forms at the bottom of the back west wall. The contractor said they would move it before they pour that wall. They were about to start their pour when I left. (9:15 AM) 7-17-17 Inspector Comments: 12/22/2017FailLarry BeesleySheeting The sheeting is nailed good. There are three windows that need staples at the seal. All of the blocking is missing. Install the blocks and staples the sheets to the blocks, then call for a re inspection. Thanks Inspector Comments: 01/31/2018PassLarry BeesleySheeting Most of the blocks are in, just make sure that they are at every brace wall panel. The brace wall panels are 20 from the start to start. R602.10.2 Inspector Comments: 03/06/2018FailLarry BeesleyResidential Framing/Structure Inspection All of the ducts are not frame in or boxed around. The ducts in the garage will also need to be insulated and boxed in so they can be sheet-rocked.The strap on the garage back wall needs to b nailed.You need hangers on the stair jacks going upstairs, and framing on the downstairs headroom area doesn't look like it is finished. You need to add studs and blocks from the girders and beams all the way to the foundation or footings.One stud under each truss in the girders. Make all of the corrections and check all of your framing to make sure it is completed and then call for a re inspection. If you have any questions call me at 208-932-6339 Make sure that the plans and truss speck sheets are available when I do the re-inspections. Thanks Larry Inspector Comments: 03/14/2018PassLarry BeesleyResidential Framing/Structure Inspection Thanks Josh for making these corrections. It looks good and you are good to Insulate. Inspector Comments: 03/21/2018PassLarry BeesleyResidential Insulation Inspection The insulation is all good now. Thanks for making those few corrections.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 17-00208 656 Hillside Dr - New SFR 656 Hillside Dr Building - Single Family Residence Permit Status of (Open) as of Report Date: 03/06/2019 10:18 am Permit Inspection Summary 04/12/2018PassLarry BeesleySheeting The sheeting installed on the inside of the garage door wall of the garage as per the engineers specks. It looks good, you can sheet rock over the OSB now. Thanks Inspector Comments: 06/20/2018PassLarry BeesleySidewalk Inspection The gravel is correct depth and compacted good. ThanksInspector Comments: 08/02/2018PARTPASSLarry BeesleyResidential Building Final You are approved for a Temporary C.O. All of the work that is listed in this report needs to be completely finished by September 3 2018 Thanks Inspector Comments: 08/03/2018PassLarry BeesleyResidential Sheetrock/Drywall Inspection This inspection was not called in, but I do remember looking at the sheet rock when I did a sheeting inspection in April. Most of the house was hung and part of the garage was done. I had Josh add more screws in the ceiling where there is living space above the garage. Inspector Comments: Please call Josh before inspection 208-881-8092Inspector Comments: 12/20/2018PassLarry BeesleyResidential Building Final All of the unfinished items have been completed and the house is now good for the full C.O. Thanks, Larry Inspector Comments: Electrical Inspection Type 02/21/2018PassBret StoddardResidential Electrical Rough-in 02/21/2018PassBret StoddardResidential Electrical Service Inspection 07/23/2018PassBret StoddardResidential Electrical Final Inspection Mechanical Inspection Type 02/09/2018PARTPASSDon AllenHVAC Rough-in 07/20/2018FailDon AllenHVAC Final Inspection 08/02/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 07/24/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing undergroundInspector Comments: 02/09/2018PassDon AllenPlumbing Rough-in Good to cover the plumbingInspector Comments: 07/20/2018PassDon AllenPlumbing Final Inspection Page 2 of 2