Loading...
HomeMy WebLinkAboutPLANS & REVIEW PLUMBING - 17-00766 - 125 Valley River Dr - Stan's Paint - Tenant Improvement[Icii: l r rq OI .r r 1:I l.i .... .... ,. ':r. IFrf< .'. eq (j! C I T Y O F REXBURG CW America's Family Community Community Development Department 35 North 1•' East Rexburg,ID 83440 Permit Technician (208) 372.2341 Inspection Hotline (208) 372-2344 Current Building Review Status: REVISIONS Permit Details Application Number: 17-00766 Stan's Paint - Plumbing Remodel 125 Valley River Or Permit Review Status Plan Reviews Still in Progress Building Review Plan Review Details Building Review Status: REVISIONS Reviewed By: Quinton Owens quinton.owens@rexburg.org Means of egress meets requirements of IBC Section 1003 and 1005 Commercial Remodel Application Received Date: 12/12/2017 Application Approved Date: 12/13/2017 Application Approved Status: APPW/ERCP Status of Plan Reviews Completed Electrical Review COMPLETED 12/22/2017 Plumbing Review APPW/COND 12/28/2017 HVAC Review APPW/COND 12/28/2017 HVAC Review COMPLETED 01/04/2018 Building Review REVISIONS 01/12/2018 Review Date: 01/12/2018 with appropriate comment/documentation as needed.' Interior use/Furnishings? REVISIONS 'Revisions Response Occupant load is identified on plans as per IBC Use of space? Section 1004 'Revisions Response Building complies with IECC (IBC 1301) New conditioned space requires compliance with energy code. Insulation value of walls, roof, windows, and doors shall meet prescriptive energy code requirements or an energy compliance report may be submitted. 'Revisions Response : Use classification is shown on plans as per IBC Section 302 "Revisions Response Penetrations comply with IBC Section 714 for rated assemblies Amount of Plumbing Fixtures meets the requirements of IBC Chapter 29 Use of space is not identified. Approval will be based on inspection and use of space. Maximum occupant load is 15 (one single user restroom) Approval of plans does not constitoe approval of variance from code Page 1 of 2 REVISIONS REVISIONS REVISIONS COMPLETED COMPLETED C I TY OF REXBURG America's Family Community Building Review (Continued) 0 Toilets, Bathing Fac., Sinks, Kit. and Drink. Fount. Grab bars, sink height, dispensers, mirror, etc COMPLETED meet IBC Sec. 1109 shall meet accessibility requirements. Only restroom layout is provided. Service Facilities comply with IBC 1109.12 If provided, a sales/service counter shall be no COMPLETED more than 36" above Floor for a length of at least 36'. /10/al irk rel -e 4- Ply revfcG.W (aA(e �/li Fallaw up o. Old, reulsiows due- 60 nom iLb4 2�Z havritq. a, re5t' cense , P�Fcr rrd0 b C K Ch11A -Ervvct.i led report- P6r F'e+r islav�5 % CK, Cklraati, e+ti Z/2/1 F revos61 a resp° -•tire. Aran-- w` CK Clw ` , 7aZ/18 ask -;,j "fie 4k, eitar5y-�- " Gh.� Sn-iml ke- veld Werk L✓iH- J--Ln-"l toahc ,- "v i%.. Cie" f -( me- T 1^aa 0( 0 f? 0 *NOril6 kad cam,, y }rVo JVe-WL -) Eremil Fravw Jek.oy GJa�son, �/Z�/!S claim,n� ur�r�� cowl/ian.Ge i5 ✓taf rcqut (rte! per•- Z'GB� g!l ` O RPfiPov�;L to ddv L.+..tiy 1 mt—'a o 2/2-3114 C Gari F7i+ +y t�/-iort �// !Jots re�ui— efv-f'�% "k -API i6mtG Far /*k a/lered Par hoxt aG Ie,W em A4al rra•rr m/fGrst�/oy( 441trGby re{2Ui-r4j LO)vl�/ianGc u//j�LL - �,anv,arsiov� {n a coKdi;S'v+�cisPaue- is also cQ,<srdeF,-�I (/ 31611T Ze-4e-r-- received FrzWU &Z4,^/ 4d4l5o7i- accePi,--d 6y ,SfeVe Zollih /� /:ev e< con*P y�n� wif�r efxer� Cade re�ur��.�re,..fs i!•dF tl+e1��G For- alfr�ahrns . Approval of plans does not constitue approval of varianre from code Page 2 of 2 Quinton Owens From: Quinton Owens Sent: Friday, February 23, 2018 2:40 PM To: Johnny Watson Subject: RE: CK Chan Paint Store Johnny, Thank you for the reference. At first, section 811 does appear to not require energy code upgrades in conjunction with definition in 504 for level 2 alterations. The commentary does makes the clarification saying "only a degree of possible improvement in energy performance of the building is intended to be achieved by making the new elements meet the IECC requirements. So, while this section may not require "the entire building or structure to comply with the energy requirements", "the alterations shall conform to the energy requirements of the IECC.." The fact that this paint store area was unconditioned space and has been altered into conditioned space, it would be a negative impact on energy efficiency of the building overall. Even if the area was already conditioned space, the CMU wall being an alteration of itself would be required to meet energy requirements based on what IEBC, section 811 is saying. I will mention your case to Val on Monday to see if he has anything to add. Thank you again for submitting it as an option. Quinton Owens Chief Building Inspector/Plans Examiner Community Development Department City of Rexburg, Idaho (208)359-3020 x2173 REXBURG From: Johnny Watson [ma !Ito: iwatson(cbi rwa.com] Sent: Thursday, February 22, 2018 3:05 PM To: Quinton Owens Cc: CK Chan (ckcproperties888@)cimail.com) Subject: CK Chan Paint Store Quinton, We recognize that remodels can be challenging but CK has almost 90,000 sf of the identical construction envelope as the New Paint Store. We would like to apply Section 811 Energy Conservation of the 2015 IEBC for the very limited remodel of the existing space. That section allows for a limited remodel without requiring the entire building or structure to comply with current IECC requirements. It does require that any mechanical or lighting upgrades to comply. Please let us know if this section will allow the Owner to fill a currently vacant space? Sincerely, Johnny Watson jwatson C@I jr,Ni.Conn ASSOCIATES 4 SSTy�k)�`¢. 1152 Bond Avenue Suite A Rexburg, Idaho 83440 (208) 359-2309 Fac(208)359-2171