HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00584 - 278 Dividend Dr - Premier RemodelPermit
Inspection
Summary
Permit Status of (Issue) as of Report Date: 03/05/2019 9:25 am
Permit Details Permit Number: 17-00584
278 Dividend Dr. - Premier Remodel
278 Dividend Dr
Commercial Remodel
Permit Issued Date: 01/10/2018
Permit Inspection Statistics
20Total Inspections Completed:
12Total Inspections Passed:
Inspection Pass Rate: 60.00%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
02/20/2018FailTed DyeCommercial Framing/Structure Inspection
02/28/2018PassTed DyeCommercial Sheetrock/Drywall Inspection
04/06/2018PassTed DyeSuspending Ceiling Inspection
04/27/2018FailTed DyeCommercial Building Final
08/13/2018PassQuinton OwensCommercial Sheetrock/Drywall Inspection
01/23/2019FailTed DyeCommercial Building Final
1-22-19
Insulation boot needed in ADA bathroom on drain line and supplies.
Inspector Comments:
02/01/2019PassQuinton OwensCommercial Building Final
Electrical Inspection Type
02/12/2018PARTPASSBret StoddardCommercial Electrical Rough-in
04/16/2018PassBret StoddardCommercial Electrical Rough-in
07/18/2018PARTPASSBret StoddardCommercial Electrical Rough-in
01/23/2019FailBret StoddardCommercial Electrical Final Inspection
01/31/2019PassBret StoddardCommercial Electrical Final Inspection
Fire Inspection Type
02/12/2018FailBret StoddardFire Alarm Rough-in
02/01/2019PassBret StoddardFire Alarm Rough-in
02/04/2019FailBret StoddardFire Alarm Final Inspection
02/26/2019PassBret StoddardFire Alarm Final Inspection
Mechanical Inspection Type
04/27/2018PassDon AllenHVAC Final Inspection
04/27/2018PassDon AllenHVAC Rough-in
Page 1 of 2
(Continued)
Permit Details Permit Number: 17-00584
278 Dividend Dr. - Premier Remodel
278 Dividend Dr
Commercial Remodel
Permit Status of (Issue) as of Report Date: 03/05/2019 9:25 am
Permit
Inspection
Summary
Plumbing Inspection Type
07/24/2018PassDon AllenPlumbing Rough-in
01/22/2019PassDon AllenPlumbing Final Inspection
Page 2 of 2