Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00583 - 235 S 4th W - Duplex ConversionPermit Inspection Summary Permit Status of (Issue) as of Report Date: 03/05/2019 9:20 am Permit Details Permit Number: 17-00583 235 S 4th W - Remodel 235 S 4th W Single Family Residential Remodel Permit Issued Date: 09/20/2017 Permit Inspection Statistics 9Total Inspections Completed: 4Total Inspections Passed: Inspection Pass Rate: 44.44% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 02/27/2018PassLarry BeesleyResidential Sheetrock/Drywall Inspection The sheet rock is all correct size and screwed on correctly. the chase for the bath fan and vent pipe is also good and fire caulked as needed. The post has been strapped to the beams. Go ahead with the taping and texture, trim and paint and then call for your final inspections before anyone moves in. Thanks! Inspector Comments: 08/30/2018FailLarry BeesleyResidential Building Final There are a few things to be corrected or completed for the final C.0. One other thing that you need is a 2A10BC Fire extinguisher in the kitchen mounted on a wall plain sight. Complete these items on the list in this report and the Electrical and call for re inspections. Thanks, Larry Inspector Comments: 09/07/2018PARTPASSLarry BeesleyResidential Building Final The parking needs to be approved to get your C.O. You will need to bring in your parking proposal to Val or some in the planing and zoning department. I f you call ahead to Porter he can direct you to one of them. Thanks Inspector Comments: Electrical Inspection Type 09/26/2017PARTPASSBret StoddardResidential Electrical Rough-in Electrical Rough is passed in full per Bret.Inspector Comments: 08/30/2018FailBret StoddardResidential Electrical Final Inspection 09/07/2018PassBret StoddardResidential Electrical Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 17-00583 235 S 4th W - Remodel 235 S 4th W Single Family Residential Remodel Permit Status of (Issue) as of Report Date: 03/05/2019 9:20 am Permit Inspection Summary Plumbing Inspection Type 11/29/2017FailDon AllenPlumbing Rough-in On nov.11 at 3 pm I was called because work was being done at this address. Plumbers was on the job site they were told to leave because no permite was pulled. If any more work is done with out a permit there will be dubble charged on the Fees Inspector Comments: 12/12/2017PassDon AllenPlumbing Rough-in The plumbing on the water heater for the T&P valve and the drain for the washer box where install to code.This was the only plumbing work that could be done on this permit. Still need the the water hooked up to the water heater. Need to know the plumber that is going doing that. We also need to know who the plumber that is going to run the rest of the plumbing in the apartment. Any other worn that is going to be done will needs another permit. Just a reminder the all plumbing, mechanical, and electrical needs to be done by a licensed contractor in the field that is being done. Inspector Comments: 09/04/2018PassDon AllenPlumbing Final Inspection Inspections Required Residential Building Final Page 2 of 2