HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00196 & 11-00197 - 459 S 5th W - University Gateway Apts 2 & Site Plan - Unit 12Permit
Inspection
Summary
Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am
Permit Details Permit Number: 11-00197
University Gateway Apts 2 & Site Plan - 12 Units
459 S 5th W
Multi-Family Residential
Permit Issued Date: 09/19/2014
Permit Inspection Statistics
22Total Inspections Completed:
19Total Inspections Passed:
Inspection Pass Rate: 86.36%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
06/10/2011PassPLL ADMINResidential Footing Inspection
As per Jon Berry
East and partial N & S footings look good
Completed
Int Footings look good.
Inspector Comments:
06/14/2011PassPLL ADMINFoundation Inspection
As per Jon Berry
Same as footings looks good
6/22 completed
Inspector Comments:
04/03/2012FailPLL ADMINResidential Framing/Structure Inspection
As per Jon Berry
12/14 Shear wall are not per plans.
4/3 Framing ok plastic piping needs fire caulking at ceiling/floor
4/10 Bath fans ck'd good for fire caulking
Inspector Comments:
08/22/2012PassPLL ADMINResidential Framing/Structure Inspection
As per Jon Berry
Framing completed.
Inspector Comments:
08/22/2012PassPLL ADMINResidential Insulation Inspection
As per Jon Berry
PCW
Inspector Comments:
08/22/2012PassPLL ADMINResidential Sheetrock/Drywall Inspection
As per Jon Berry
Top floor and 2 north 2nd floor units OK to cover.
PCW
*approved
Inspector Comments:
Page 1 of 3
(Continued)
Permit Details Permit Number: 11-00197
University Gateway Apts 2 & Site Plan - 12 Units
459 S 5th W
Multi-Family Residential
Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am
Permit
Inspection
Summary
08/29/2012PassPLL ADMINSidewalk Inspection
As per Jon BerryInspector Comments:
08/29/2012FailPLL ADMINResidential Building Final
As per Jon Berry
Sink and Lav faucets missing. HVAC and building completed.
Inspector Comments:
03/28/2017PassQuinton OwensCommercial Building Final
Plumbing final (trim out) re-inspection was approvedInspector Comments:
Electrical Inspection Type
04/03/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in
Approved for cover entire building-SE cable is stubbed into meter bases and not
terminated yet-will re-inspect on the service inspection.
Inspector Comments:
04/12/2012PassBret StoddardResidential Electrical Service Inspection
Approved to be energized for permanent power-2 services/mains.Inspector Comments:
08/07/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection
Approved for a final and C.O.-12 plex.Inspector Comments:
Fire Inspection Type
03/20/2012PassDale PickeringFire Sprinkler Hydro
200 psi 2 hours.
Approve for cover on entire building (18) approve hydro test.
Inspector Comments:
08/24/2012PassPLL ADMINFire Alarm Final Inspection
As per Jon Berry
4/9/12 FACP must have 4.7 AH battery
Fire alarm final completed.
Inspector Comments:
08/29/2012PassPLL ADMINFire Sprinkler Final Inspection
As per Jon Berry
Sprinkler sys hydro at 200# 2 hrs and piping ok to cover.
Sprinkler final completed.
Inspector Comments:
Page 2 of 3
(Continued)
Permit Details Permit Number: 11-00197
University Gateway Apts 2 & Site Plan - 12 Units
459 S 5th W
Multi-Family Residential
Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am
Permit
Inspection
Summary
Mechanical Inspection Type
04/10/2012PassPLL ADMINHVAC Rough-in
As per Jon Berry
2nd floor N unit cot completed. All others OK to cover. Will check later.
Inspector Comments:
08/29/2012PassPLL ADMINHVAC Final Inspection
As per Jon Berry
OK. HVAC completed.
Inspector Comments:
Plumbing Inspection Type
01/11/2012PassDon AllenPlumbing Underground Inspection
it was covered before I got thereInspector Comments:
03/26/2012PassDon AllenPlumbing Rough-in
rough-in in is all good to coverInspector Comments:
05/01/2012PassDon AllenPlumbing Sewer
08/27/2012FailDon AllenPlumbing Final Inspection
Need to finish out trim in all apartments.Inspector Comments:
12/18/2012PassDon AllenPlumbing Final Inspection
Page 3 of 3