Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 11-00196 & 11-00197 - 459 S 5th W - University Gateway Apts 2 & Site Plan - Unit 12Permit Inspection Summary Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am Permit Details Permit Number: 11-00197 University Gateway Apts 2 & Site Plan - 12 Units 459 S 5th W Multi-Family Residential Permit Issued Date: 09/19/2014 Permit Inspection Statistics 22Total Inspections Completed: 19Total Inspections Passed: Inspection Pass Rate: 86.36% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/10/2011PassPLL ADMINResidential Footing Inspection As per Jon Berry East and partial N & S footings look good Completed Int Footings look good. Inspector Comments: 06/14/2011PassPLL ADMINFoundation Inspection As per Jon Berry Same as footings looks good 6/22 completed Inspector Comments: 04/03/2012FailPLL ADMINResidential Framing/Structure Inspection As per Jon Berry 12/14 Shear wall are not per plans. 4/3 Framing ok plastic piping needs fire caulking at ceiling/floor 4/10 Bath fans ck'd good for fire caulking Inspector Comments: 08/22/2012PassPLL ADMINResidential Framing/Structure Inspection As per Jon Berry Framing completed. Inspector Comments: 08/22/2012PassPLL ADMINResidential Insulation Inspection As per Jon Berry PCW Inspector Comments: 08/22/2012PassPLL ADMINResidential Sheetrock/Drywall Inspection As per Jon Berry Top floor and 2 north 2nd floor units OK to cover. PCW *approved Inspector Comments: Page 1 of 3 (Continued) Permit Details Permit Number: 11-00197 University Gateway Apts 2 & Site Plan - 12 Units 459 S 5th W Multi-Family Residential Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am Permit Inspection Summary 08/29/2012PassPLL ADMINSidewalk Inspection As per Jon BerryInspector Comments: 08/29/2012FailPLL ADMINResidential Building Final As per Jon Berry Sink and Lav faucets missing. HVAC and building completed. Inspector Comments: 03/28/2017PassQuinton OwensCommercial Building Final Plumbing final (trim out) re-inspection was approvedInspector Comments: Electrical Inspection Type 04/03/2012PassBret StoddardSFR-A,R,B, MFR,MFR-A,R Electrical Rough-in Approved for cover entire building-SE cable is stubbed into meter bases and not terminated yet-will re-inspect on the service inspection. Inspector Comments: 04/12/2012PassBret StoddardResidential Electrical Service Inspection Approved to be energized for permanent power-2 services/mains.Inspector Comments: 08/07/2012PassBret StoddardSFR, SFR-B, SFR-A, SFR-R, MFR, MFR-A, MFR-R Electrical Final Inspection Approved for a final and C.O.-12 plex.Inspector Comments: Fire Inspection Type 03/20/2012PassDale PickeringFire Sprinkler Hydro 200 psi 2 hours. Approve for cover on entire building (18) approve hydro test. Inspector Comments: 08/24/2012PassPLL ADMINFire Alarm Final Inspection As per Jon Berry 4/9/12 FACP must have 4.7 AH battery Fire alarm final completed. Inspector Comments: 08/29/2012PassPLL ADMINFire Sprinkler Final Inspection As per Jon Berry Sprinkler sys hydro at 200# 2 hrs and piping ok to cover. Sprinkler final completed. Inspector Comments: Page 2 of 3 (Continued) Permit Details Permit Number: 11-00197 University Gateway Apts 2 & Site Plan - 12 Units 459 S 5th W Multi-Family Residential Permit Status of (Open) as of Report Date: 03/04/2019 11:37 am Permit Inspection Summary Mechanical Inspection Type 04/10/2012PassPLL ADMINHVAC Rough-in As per Jon Berry 2nd floor N unit cot completed. All others OK to cover. Will check later. Inspector Comments: 08/29/2012PassPLL ADMINHVAC Final Inspection As per Jon Berry OK. HVAC completed. Inspector Comments: Plumbing Inspection Type 01/11/2012PassDon AllenPlumbing Underground Inspection it was covered before I got thereInspector Comments: 03/26/2012PassDon AllenPlumbing Rough-in rough-in in is all good to coverInspector Comments: 05/01/2012PassDon AllenPlumbing Sewer 08/27/2012FailDon AllenPlumbing Final Inspection Need to finish out trim in all apartments.Inspector Comments: 12/18/2012PassDon AllenPlumbing Final Inspection Page 3 of 3