Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00386 - 485 N 2nd E - Mongolian Restaurant - RemodelPermit Inspection Summary Permit Status of (Issue) as of Report Date: 02/28/2019 1:39 pm Permit Details Permit Number: 18-00386 Mongolian Restaurant - Remodel 485 N 2nd E Commercial Remodel Permit Issued Date: 08/03/2018 Permit Inspection Statistics 16Total Inspections Completed: 11Total Inspections Passed: Inspection Pass Rate: 68.75% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 09/13/2018PassTed DyeCommercial Sheetrock/Drywall Inspection 10/05/2018FailQuinton OwensCommercial Building Final Tables and chairs are not set up yet, but may be checked for aisle and aisle access requirements when done. Inspector Comments: 10/10/2018FailTed DyeCommercial Building Final 02/27/2019PassTed DyeCommercial Building Final Electrical Inspection Type 09/10/2018PassBret StoddardCommercial Electrical Rough-in 10/02/2018FailBret StoddardCommercial Electrical Final Inspection 10/09/2018PassBret StoddardCommercial Electrical Final Inspection Fire Inspection Type 09/24/2018PassBret StoddardFire Alarm Final Inspection 10/08/2018PassDale PickeringFire Department Final Inspection Mechanical Inspection Type 09/25/2018FailDon AllenHVAC Rough-in Need to finish welding the holes in the grease duct.Inspector Comments: 10/05/2018PassDon AllenHVAC Rough-in good to cover the grease duct workInspector Comments: 10/09/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 08/14/2018PassDon AllenPlumbing Underground Inspection Good to cover Plumbing UndergroundInspector Comments: 09/04/2018PassDon AllenPlumbing Rough-in 10/04/2018PARTPASSDon AllenPlumbing Final Inspection 10/09/2018PassDon AllenPlumbing Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 18-00386 Mongolian Restaurant - Remodel 485 N 2nd E Commercial Remodel Permit Status of (Issue) as of Report Date: 02/28/2019 1:39 pm Permit Inspection Summary Page 2 of 2