Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00486 - 665 Canyon Springs Dr - New SFRPermit Inspection Summary Permit Status of (Open) as of Report Date: 02/25/2019 3:43 pm Permit Details Permit Number: 17-00486 665 Canyon Springs Dr - New SFR 665 Canyon Springs Dr Building - Single Family Residence Permit Issued Date: 09/14/2017 Permit Inspection Statistics 26Total Inspections Completed: 21Total Inspections Passed: Inspection Pass Rate: 80.77% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 09/18/2017PassLarry BeesleyResidential Footing Inspection Re bar is done per the code and forms look good.Inspector Comments: 09/19/2017PassLarry BeesleyFoundation Inspection Re bar is correct and lapped correctly, looks good. Thanks9-19-17Inspector Comments: 01/30/2018FailLarry BeesleySheeting A few studs were missed on the nailing and the garage door needs more nails in the trimmers and header. There is also some blocking for the sheeting missing in the garage. I marked everything with green paint. Please call for a re inspection when corrections have been completed. Thanks Inspector Comments: 02/15/2018PassLarry BeesleySheeting All of the corrections on the nailing have been completed. THANKSInspector Comments: 03/23/2018PassLarry BeesleySheeting The sheeting inspection had passed on 2-15-18 ThanksInspector Comments: 03/26/2018FailLarry BeesleyResidential Framing/Structure Inspection The stud by the panel in the garage was cut out , you need to add one to the side of the cut stud. Make the other corrections and call for a re inspection. Inspector Comments: 04/05/2018PassLarry BeesleyResidential Framing/Structure Inspection You steel need a stud along side the meter base in the garage. I will check that at the insulation inspection. You are good to insulate. Inspector Comments: 04/12/2018PassLarry BeesleyRadon-Ground Inspection The radon has been marked on the pipe. 4-12-18Inspector Comments: 04/12/2018FailLarry BeesleyResidential Insulation Inspection There are a few things that need to be corrected on the insulation as I listed in this report. Also you steel need to add a stud in the garage next to the meter base panel where the Electrician cut the stud out to fit his panel. The panel is only screwed to the sheeting. Inspector Comments: 04/13/2018PassLarry BeesleyResidential Insulation Inspection You are good to sheet rock. ThanksInspector Comments: 04/24/2018PassDon AllenResidential Sheetrock/Drywall Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 17-00486 665 Canyon Springs Dr - New SFR 665 Canyon Springs Dr Building - Single Family Residence Permit Status of (Open) as of Report Date: 02/25/2019 3:43 pm Permit Inspection Summary 04/27/2018PARTPASSQuinton OwensResidential Sheetrock/Drywall Inspection Framing support for drywall covering duct shall be 24" o.c. (in basement)Inspector Comments: 05/03/2018PassTed DyeResidential Sheetrock/Drywall Inspection 08/01/2018PassLarry BeesleySidewalk Inspection The forms and gravel are good, you are good to pour the concrete. ThanksInspector Comments: 08/29/2018PassLarry BeesleyResidential Building Final The inspetions have all passed and the house is good for the C.O. ThanksInspector Comments: Electrical Inspection Type 03/26/2018PassBret StoddardResidential Electrical Rough-in 03/26/2018PassBret StoddardResidential Electrical Service Inspection 08/28/2018PassBret StoddardResidential Electrical Final Inspection Mechanical Inspection Type 03/26/2018PassDon AllenHVAC Rough-in good to cover the mechanical rough in.Inspector Comments: 04/05/2018PassDon AllenHVAC Rough-in 08/28/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 10/11/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing under groundInspector Comments: 10/24/2017PassDon AllenPlumbing Water Good to cover the water line. Will look at the water meter at the final of project.Inspector Comments: 10/24/2017PassDon AllenPlumbing Sewer Good to cover the sewer lineInspector Comments: 03/26/2018FailDon AllenPlumbing Rough-in radon piping needs top be marked on every floor and attic.Inspector Comments: 08/28/2018PassDon AllenPlumbing Final Inspection Page 2 of 2