HomeMy WebLinkAboutPLANS 2 - 19-00062 - Maverik - Exterior & Interior RemodelVICINITY ITY DAPS
CITYMAP
TiviTlym b1TaTR+
STREET MAP
■
Ia'ifa.
i;� on
i ounw ii
�4fn�'n
;i c6fo im
I M.31110 SE
A
MAVERIK REXBERG 195
75 NORTH 2ND EAST
REXBURG, IDAHO
DRAWING INDEX
GERNERAL PROJECT
STRUCTURAL DRAWINGS
G0.0
COVER SHEET
5001
GENERAL STRUCTURAL NOTES
G0.1
GENERAL NOTES
5002
GENERAL STRUCTURAL NOTES
G1.0
SMALL TYPES
5100
FLOOR AND ROOF PLANS
5103
ENTRY ELEVATI ONS AND DETAILS
CIVIL DRAWINGS
5501
STRUCTURAL DETAILS
Cl
COVER/INDEX
5601
SCHEDULES
C2
NOTES/LEGENDS
C3
EXISTI NC�IDEM0LITION PLAN
MECHANICAL DRAWINGS
C4
PROPOSED SITE/GRADING/UTILITY PLAN
M-1.0
MECHANICAL FLOOR PLAN
.ARCHITECTURAL DRAWINGS
PLUMBING DRAWINGS
A0.1
DEMOLITION PLAN
P-1.0
PLUMBING WASTE AND VENT PLAN
A1.1
FRAMING PLAN
P-2.0
PLUMBING COLD AND HOT WATER PLAN
A1.2
FLOOR PLAN
P-2.1
PLUMBING FILTERED WATER PLAN
A1.4
EQUIPMENT LISTS A. B & C
P-2.2
PLUMBING HEAT TRACE AND GAS PLAN
A1.5
EQUIPMENT FLOOR PLAN
P-3.0
PLUMBING SCHEDULES, NOTES AND DETAILS
A1.6
REFLECTED CEILING PLAN
A1.7
ARCHITECTURAL ROOF PLAN
REFRIGERATION
FLOOR PLAN
A2.1
ELEVATIONS
R-1.0
REFRIGERATION FLOOR PLAN
A2.2
ELEVATIONS
R -D1
REFRIGERATION DETAILS
A4.1
SECTIONS
A6.1
DOOR SCHEDULE
ELECTRICAL DRAWINGS
A8.1
AR OH I TE CTU RA L FI NI SH & COLOR SCHEDULES
E-1.0
ELECTRICAL N0TIES AND SCHEDULES
A9.1
MI LLWO R K CASH WRAP PLAN, SECTIONS, &
E-2.0
ELECTRICAL LIGHTING PLAN
ELEVATIONS
E-3.0
ELECTRICAL POSrS'ERPLA N
A9.2
MI LILWORK DETAILS
E-3.1
ENLARGED POWER PLAN
A10.1
ARCHITECTURAL DETAILS
E-3.3
ELECTRICAL ROOF PLAN
A10.2
ARCHITECTURAL DETAILS
E-3.4
EQUIPMENT PANEL SCHEDULE
E -D1
ELECTR I CAL D ETAI LS
Mil aiW+l AMithi'+l!*:CNV
PROJECT DIRECTORY
OWNER
MAVERIK STORES INC.
LEX PORTER
185 SOUTH STATE 9800
SALT LAKE CITY, UT 84111
(307) 880-7106
ARCHITECT
1ZW ARCHI TECTS
SPENCER ANDERSON
135 E. CENTER ST.
NORTH SALT LAZE, UT 84054
(801) 936-1343
SPENCERA@JZW-A.COM
CI A USTRUCTU RAL EN GI NEER
REEVE & ASSOCIATES, INC.
920 CHAMBERS STREET, SUITE 14
OGDEN, UT 84403
(801) 621-3100
MECHANICALIELECTRI CAL
NEILSON ENGINEERING
156 NORTH TWELFTH AVENUE
POCATELLO, ID 83201
(208) 234-0918
CODE SUMMARY
.APPLICABLE CODE:
2015 INTERNATIONAL BUILDING CODE. (I.B.C.)
2015 INTERNATIONAL MECHANICAL CODE
2015 INTERNATIONAL PLUMBING CODE
2015 INTERNATIONAL FIRE CODE
2015 INTERNATIONAL ENERGY CONSERVATION CODE
2017 NATIONAL ELECTRIC CODE
2009 100 ANSI A117.1
OCCUPANCY CLASSIFICATION: M
DESCRIPTION: GAS STATION/CONVENIENCE STORE
CONSTRUCTION TYPE: V -B
BUILDING HEIGHT: EXISTING
RETAIL.AREA(W1REST ROOMS):E XI STI NG
BUILDING AREA: EXISTING 2.564 S.F.
FIRE SPRINKLERS: NONE
FIRE RESISTANCE RATINGS OF EXTERIOR WALLS
TABLE 601 AND 602 - NON -RATED
Copyr�ht 2019 JZ IN A rchke cts - The Purchaser is granted a .single use !!cense for crostructlan only. These plans are copyrighted and are so*ctto copyr,+ghtpro tection as an "archke dural wo rk' ander the copyrght act. The protection imfudes but is not lknited to the Overall form as we#as the ar(angenew and composkb) OFspaces. Under so ch protection, unauthorized use of these p.0.9A work, or structure represented wNresuftkr the cessation ofconstmctlan and/or monetary compensation to JZ INArchkects.
ISSUE DATE:
FEBRUARY 07, 2019
;j ;1031 *4 9 0 [1] ky� Il =1 ;I
17-038
REVISIONS:
No. Date Description
(5
LU
m
X
LU
Z;
i I r�1� #
iFfs ffT i
02/2012
IGAHO
P H I T
$ '1 1 4 � 1 1 1 1
F r T
**IMPORTANT**
BID AND CONSTRUCTION DOCUMENTS SHOULD NOT BE SEPARATED OR
ISSUED AS PARTIAL SETS TO SUBCONTRACTORS.
BIDDERS ARE RESPONSIBLE FOR ALL PORTIONS OF THE DOCUMENTS THAT
PERTAIN TO THE WORK COVERED BY SUB -BIDS. BIDDER ASSUMES FULL
RESPONSIBILITY FOR ERRORS OR MISINTERPRETATIONS RESULTING FROM
USE OF PARTIAL SETS OF BIDDING DOCUMENTS BY ITSELF OR ANY SUB -
BIDDER.
PLEASE NOTE AND UNDERSTAND GENERAL NOTES ON PAGE G-0.1 AND ON
PROJECT SHEETS.
CONFLICTING INFORMATION OR ERRORS FOUND IN THE BID OR
CONSTRUCTION DOCUMENTS SHOULD BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT IMMEDIATELY SO THAT QUESTIONS AND CONCERNS MAY
BE CLARIFIED BY ADDENDUM. IN THE EVENT OF A CONFLICT IN THE
DRAWINGS, BIDDER SHOULD NOT ASSUME THAT THE LEAST EXPENSIVE
OPTION WILL MEET THE PROJECT REQUIREMENTS.
DOCUMENTS REPRESENT THE PROJECT IN WHOLE, PRICING SHOULD
REPRESENT THE SAME.
AT CONCLUSION OF THE WORK, GENERAL CONTRACTOR SHALL PROVIDE
OWNER'S REPRESENTATIVE WITH ONE FULL-SIZE (2406) HARD COPY AND ONE
CD WITH SCANNED PDF FILES AS PROJECT RECORD DRAWINGS. SEE
SPECIFICATIONS.
ALL PRODUCTS ON THIS PROJECT SHALL BE INSTALLED PER MANUFACTURER'S
REQUIREMENTS AND SPECIFICATIONS.
CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO THE
START OF CONSTRUCTION.
— D ALL INTERIOR WALLS TO BE WRAPPED WITH 5/8" GYPSUM WALL BOARD,
TAPED, FILLED, AND FINISHED AS PER ROOM FINISH SCHEDULE AND OWNER.
SEAL AROUND ALL ELECTRICAL, PLUMBING, OR MECHANICAL PENETRATIONS
AT EXTERIOR WALL OR ROOF ASSEMBLIES.
ALL EXTERIOR DOORS SHALL BE WEATHER STRIPPED AND AIR TIGHT
ASSEMBLIES.
Copyright ��I9 JZW Architects The Purchaser �s ranted a single use license far construction only. These laps are copyrighted and are sub "ect to ea ri ht Protection as an "architectural work" under the ca ri ht act. The protection includes but is not limited to the overall farm as well as the arrangement and composition of spaces. Under such protection, unauthorized use of these laps work or structure represented will result in the cessation of construction and or monetary compensation to JZW Architects.
t g g y pl py g p pY g p g mp p p p p / y p
PROJECT NUMBER
17-038
ISSUE DATE:
FEBRUARY 07, 2019
REVISIONS:
No. Date Description
NOTE. -
Bid documents should not be
separated or issued as partial sets to
subcontractors. Bidders are
responsible for all portions of the
documents that pertain to work
covered by sub -bids. Bidder assumes
full responsibility for error or
misinterpretations resulting from
partial sets of Bidding Documents by
itself or any sub -bidder.
Conflicting information ar errors
found in the construction documents
Should be brought to the attention of
the architect immediatly. In the event
0 a canflictin the drawings, bidder
should not assume the least
expensive option will meet the
project requirements.
MpYEgIl(
J
LO
Cn
r_1
1
UCEWS- D
A44I SORr
02/20/2
PAUL 19 r"A'AGGK
STA E OF IDAHO
GENERAL NOTES
0--! I T
i o• o� T
./
0= r T q
�
NO
W
W
Q
m
p
D
Z
-
N
�
O
X
Z
w
LO
W
~
Q
1
UCEWS- D
A44I SORr
02/20/2
PAUL 19 r"A'AGGK
STA E OF IDAHO
GENERAL NOTES
0--! I T
i o• o� T
./
0= r T q
BOARD AND BATT
SIDING
FURRING STRIPS AS REQUIRED BY
MAN UF.
11/2" CONTINUOUS
RIG D I NSULATION
MTL. FLASHING RUN 6" UP BEHIND
BOARD & BATT, COLOR TO MATCH
BOARD & BATT, PROVIDE
SUBMITTAL FOR APPROVAL.
MAX 5/8" SPACING
STONE VENEER CAP. SEE
ELEVATIONS
3/4" MORTAR BED
18" GAUGE WOVEN WIRE
MESH
STONE VENEER WAINSCOT.
SEE ELEVATIONS
EXTERIOR
LIQUID -APPLIED AIR
INFILTRATION BARRIER
WALL TYPE 1
1 1/2" = 1'-O"
2" METAL STUDS
2 518"
FIELD VERIFY
5/8" TYPE "X"
GYPSUM BOARD.
TYPE "213" - GYP BOARD AND FIBERGLASS REINFORCED PANEL (F.R,P.) TO 12'-0" A.F.F..
2
G1.D
WALL TYPE 2
1 1/2" = 1'-0"
G1.D
PER MANUFACTURER
�je
WALK IN COOLER/FREEZER
AS NOTED BY OTHERS.
TYPE "5A" - GYP. BOARD FINISH ON THE RETAIL SIDE.
TYPE "5C" GYP BOARD AND FIBERGLASS REINFORCED PANEL. (F.R.P.) TO 12'-0" A.F.F.
WALL TYPE 5
1 1/2`1 = 1t -Of'
4
G1.D
3-5/8" METAL STUDS,
5/8" TYPE "X"
GYPSUM BOARD.
4 7/8"
FIELD
5/8" TYPE "X"
GYPSUM BOARD.
TYPE "1313" - FIBER GLASS REINFORCED PANEL ("F.R.P.") TO 12'- 0"
A.F.F. ON ONE SIDE OF WALL.
NOTE: 5/8" GYPSUM BOARD TO BE SUBSTITUTED WITH 5/8" GREEN
BOARD BEHIND ALL. TILE.
WALL TYPE 13
1 1/2" = 1'-0"
Copyright ��19 JZW Architects The Purchaser is ranted a single use license far construction only. These laps are copyrighted and are sub "ect to copyright protection as an "architectural work" under the ca ri ht act. The protection includes but is not limited to the overall farm as well as the arrangement and ca composition of spaces. Under such protection, unauthorized use of these Ions work or structure represented will result in the cessation of construction and or monetary compensation to JZW Architects.
t g g Y plp pyg p amp p p p p 1 / y p
PROJECT NUMBER
17-088
ISSUE DATE:
FEBRUARY 07, 2019
REVISIONS:
No. Date Description
NOTE. -
Bid documents should not be
separated or issued as partial sets to
subcontractors. Bidders are
responsible for all portions of the
documents that pertain to work
covered by sub -bids. Bidder assumes
full responsibility for error or
misinterpretations resulting from
partial sets of Bidding Documents by
itself or any sub -bidder.
Conflicting information or errors
found in the construction documents
Should be brought to the attention of
the architect immediatly. In the event
ofa canflictin the drawings, bidder
should not assume the least
expensive option will meet the
project requirements.
J
JIVEIRI
q
V{�ISM
OWTECT
AR -135M
02/20/2
PA 1La'� `/�ARNOCK
STATE OF IDAHO
WALL TYPES
0--! I T
i s o• o� T
�
NO
W
W
Q
m
p
D
}C
Z
N
�
O
X
Z
w
W
~
Q
V{�ISM
OWTECT
AR -135M
02/20/2
PA 1La'� `/�ARNOCK
STATE OF IDAHO
WALL TYPES
0--! I T
i s o• o� T
Project Narrative/Notes/Revisions
1. 01/29/18 JM — COMPLETED DESIGN FOR CLIENT & CITY REVIEW.
MAVERIK, INC.
200 East 1st North
Site Plans
RE%BURG, MADISON COUNTY, IDAHO
APRIL 2014
\\\ \ \«
\ \ \ \ \ \
EX. CURB &GUTTER � �
Ex. ACCESS
Ex. SIDEWALK
100 -0-
7
T — — — — — N90'0 '00"W
— — — — f o Q 1 °
I I I l l I \\ \\ \ \\ \\ \ If
I g I I I ► I I J� \ \\ \\ \ \ \\
— — — — o 0I w \\ \\ \\ \ \\ \\ \\
I I
I�II}III 'I \\ \\\\ \\ \� \\\\
X
\ \\ \ \\
m \\ \\ \\ \ \\ \ \\ I
— — 56.00' I I \ \\ \ \ \\ \ \ \
N9or0000 — — — — — I I W \\ \ \ \ \\ \
--------� ----- I °\ \° I \\ \\\\ \\ \\ \\
i.
I I a o I I \\ \\ \\\ \\ I
p I EXISTING
I MAVERIK
DID
LLJ
�\
[#177=7Z Ld f \ \ \\. \ \ \\ I
• \
N90-00-00" 1 \ \ \ \ \ \\ \
-- 156.00' \\\\\\\\\\\\ I
I \ \
20 0 20 40 60
Scale. 1 " = 20'
RIv.: Srl}r µars,
4N'i.ti if f �.tH I.I f�'Y7il .f .II r' IIII 1+4r
usuum ur wexl)ura "I
SrT.nhr mftk Mkflinrfll
P7 cu.: �1N�aRWrsnl:lr .
Vicinity Map
NOT TO SCALE
Sheet Index
Sheet 1 - Cover/Index Sheet
Sheet 2 - Notes/Legend
Sheet 3 - Existing/Demolition Plan
Sheet 4 - Proposed/Grading/Utility Plan
Know what's NOW.
C8II before you dig.
""Engineer's Notice To contractors
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED FROM AVAILABLE INFORMATION PROVIDED BY
OTHERS. THE LOCATIONS SHOWN ARE APPROXIMATE AND SHALL BE CONFIRMED IN THE
FIELD BY THE CONTRACTOR, SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN
ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS
REQUIRED TO CONTACT THE UTILITY COMPANIES AND TAKE DUE PRECAUTIONARY MEASURE
TO PROTECT ANY UTILITY LINES SHOWN, AND ANY OTHER LINES OBTAINED BY THE
�,CONTRACTQR'S RESEARCH, AND OTHERS NOT OF RECORD OR NOT SHOWN ON THESE PLANS
""Developer
Contact:
Paul
Heywood
— Maverik, Inc
185
South State Str., Suite 800
Salt
Lake City,
Ut. 84111
PH:
(801) 574
— 4449
""ProjectContact:
Project Manager: J. DRAPER
Project Engineer:
�S\QN 4-4,4-4,c . �.\CEN5F0
14388
4A�rf of 1oP�
HAiHA�
CONSULTANTS
1d Reeve
& Associates, Inc.
5160 S 1500 W
RIVERDALE, UTAH 84405
TEL: 801 �621-3100
FAX: 801 621-2666
www.reeve—assoc.com
LAID PLANNERS • CK ENAEERS
LAID SUR4EM * 7RNM EHGRM
STRUIDWRAL EN EERS • LANDSCAPE ARCHIiEM
PROJECT NUMBER: 5799-193
NOTE:
Bid documents should not be separated or issued as
partial sets to subcontractors. Bidders are responsible
for all portions of the documents that pertain to the
work covered by sub—bids. Bidder assumes full
responsibility for errors or misinterpretations resulting
from use of partial sets of Bidding Documents by itself
or any sub—bidder.
Conflicting information or errors found in the
construction documents should be brought to the
attention of the architect immediately so that questions
and concerns may be clarified by addendum. In the
event of a conflict in the drawings, bidder should not
assume that the least expensive option will meet the
project requirements,
STORE ##195
MAVERIK, Inc.
75N200E
Rexburg, ID
#
DATE
DESC.
1
01103119
Existing Site Plan
l�
F
ISSUE;
Y
■
PROJECT NO:
5799-193
DRAWN BY:
STORE ##195
MAVERIK, Inc.
75N200E
Rexburg, ID
#
DATE
DESC.
1
01103119
Existing Site Plan
ISSUE;
January 2019
PROJECT NO:
5799-193
DRAWN BY:
JCM
CHECKED BY:
JNR
SHEET TITLE
Cover/Index
C1
General Nous:
1. ALL CONSTRUCTION MUST STRICTLY FOLLOW THE STANDARDS AND SPECIFICATIONS SET FORTH BY:
GOVERNING UTILITY MUNICIPALITY, GOVERNING CITY OR COUNTY (IF UN-INCORPORATETED), INDIVIDUAL
PRODUCT MANUFACTURERS, AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AND THE DESIGN ENGINEER.
THE ORDER LISTED ABOVE IS ARRANGED BY SENIORITY. IF A CONSTRUCTION PRACTICE IS NOT SPECIFIED
BY ANY OF THE LISTED SOURCES, CONTRACTOR MUST CONTACT DESIGN ENGINEER FOR DIRECTION.
2. CONTRACTOR TO STRICTLY FOLLOW GEOTECHNICAL RECOMMENDATIONS FOR THIS PROJECT. ALL GRADING
INCLUDING BUT NOT LIMITED TO CUT, FILL, COMPACTION, ASPHALT SECTION, SUBBASE, TRENCH
EXCAVATLON%BACKFILL, SITE GRUBBING, RETAINING WALLS AND FOOTINGS MUST BE COORDINATED
DIRECTLY WITH THE PROJECT GEOTECHNICAL ENGINEER.
3. TRAFFIC CONTROL, STRIPING &' SIGNAGE TO CONFORM TO CURRENT GOVERNING AGENCIES
TRANSPORTATION ENGINEER'S MANUAL AND MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES,
4. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED TO ITS ORIGINAL
CONDITION AT NO COST TO OWNER.
5. CONSULT ALL OF THE DRAWINGS AND SPECIFICATIONS FOR COORDINATION REQUIREMENTS BEFORE
COMMENCING CONSTRUCTION.
6. AT ALL LOCATIONS WHERE EXISTING PAVEMENT ABUTS NEW CONSTRUCTION, THE EDGE OF THE EXISTING
PAVEMENT SHALL BE SAWCUT TO A CLEAN, SMOOTH EDGE.
7. ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE MOST RECENT, ADOPTED
EDITION OF ADA ACCESSIBILITY GUIDELINES.
8. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING SURE THAT
ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION
SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED THOROUGHLY REVIEWED PLANS AND OTHER
DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES.
9. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND NOTIFYING ENGINEER OR INSPECTING AUTHORITY 48
HOURS IN ADVANCE OF COVERING UP ANY PHASE OF CONSTRUCTION REQUIRING OBSERVATION.
10. ANY WORK IN THE PUBLIC RIGHT-OF-WAY WILL REQUIRE PERMITS FROM THE APPROPRIATE CITY,
COUNTY OR STATE AGENCY CONTROLLING THE ROAD, INCLUDING OBTAINING REQUIRED INSPECTIONS.
11. ALL DIMENSIONS, GRADES & UTILITY DESIGNS SHOWN ON THE PLANS SHALL BE VERIFIED BY THE
CONTRACTOR PRIOR TO CONSTRUCTION, CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES
PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES.
12. CONTRACTOR MUST VERIFY ALL EXISTING CONDITIONS BEFORE BIDDING AND BRING UP ANY QUESTIONS
BEFOR€HAND,
13. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE
RECOMMENDATIONS SET FORTH BY THE GEOTECHNICAL ENGINEER.
14. CATCH SLOPES SHALL BE GRADED AS SPECIFIED ON GRADING PLANS.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FLAGGING, CAUTION SIGNS, LIGHTS, BARRICADES,
FLAGMEN, AND ALL OTHER DEVICES NECESSARY FOR PUBLIC SAFETY.
16. CONTRACTOR SHALL, AT THE TIME OF BIDDING AND THROUGHOUT THE PERIOD OF THE CONTRACT, BE
LICENSED IN THE SAT WHERE THE PROJECT I LOCATE AND SHALL. BE BONDABLE FOR AN AMOUNT
STATE S D
EQUAL TO OR GREATER THAN THE AMOUNT BID AND TO DO THE TYPE OF WORK CONTEMPLATED IN THE
PLANS AND SPECIFICATIONS. CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL
CLASS AND TYPE OF WORK CALLED FOR IN THE PLANS AND SPECIFICATIONS.
17. CONTRACTOR SHALL INSPECT THE SITE OF THE WORK PRIOR TO BIDDING TO SATISFY HIMSELF BY
PERSONAL EXAMINATION OR BY SUCH OTHER MEANS AS HE MAY PREFER OF THE LOCATIONS OF THE
PROPOSED WORK AND OF THE ACTUAL CONDITIONS OF AND AT THE SITE OF WORK. IF, DURING THE
COURSE OF HIS EXAMINATION, A BIDDER FINDS FACTS OR CONDITIONS WHICH APPEAR TO HIM TO BE IN
CONFLICT WITH THE LETTER OR SPIRIT OF THE PROJECT PLANS AND SPECIFICATIONS, HE SHALL
CONTACT THE ENGINEER FOR ADDITIONAL INFORMATION AND EXPLANATION BEFORE SUBMITTING HIS BID.
SUBMISSION OF A BID BY THE CONTRACTOR SHALL CONSTITUTE ACKNOWLEDGMENT THAT, IF AWARDED
THE CONTRACT, HE HAS RELIED AND IS RELYING ON HIS OWN EXAMINATION OF (1) THE SITE OF THE
WORK, (2) ACCESS TO THE SITE, AND (3) ALL OTHER DATA AND MATTERS REQUISITE TO THE
FULFILLMENT OF THE WORK AND ON HIS OWN KNOWLEDGE OF EXISTING FACILITIES ON AND IN THE
VICINITY OF THE SITE OF THE WORK TO BE CONSTRUCTED UNDER THIS CONTRACT. THE INFORMATION
PROVIDED BY THE ENGINEER IS NOT INTENDED TO BE A SUBSTITUTE FOR, OR A SUPPLEMENT TO, THE
INDEPENDENT VERIFICATION BY THE CONTRACTOR TO THE EXTENT SUCH INDEPENDENT INVESTIGATION OF
SITE CONDITIONS IS DEEMED NECESSARY OR DESIRABLE BY THE CONTRACTOR. CONTRACTOR SHALL
ACKNOWLEDGE THAT HE HAS NOT RELIED SOLELY UPON OWNER-- OR ENGINEER --FURNISHED INFORMATION
REGARDING SITE CONDITIONS IN PREPARING AND SUBMITTING HIS BID.
18. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY FACILITIES AND
TELEPHONE SERVICES AS REQUIRED FOR THE CONTRACTOR'S USE DURING CONSTRUCTION.
19. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR WRITTEN
AUTHORIZATION FROM THE OWNER, ENGINEER, AND/OR GOVERNING AGENCIES.
20, CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH MARKS, CONTROL
POINTS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL EXPENSES FOR
REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR DISTURBANCE.
21. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS DURING
THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.
THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, THE
CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS
PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE
ENGINEER.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND TESTING OF ALL
FACILITIES CONSTRUCTED UNDER THIS CONTRACT, ALL TESTING SHALL CONFORM TO THE REGULATORY
AGENCY'S STANDARD SPECIFICATIONS. ALL TESTING AND INSPECTION SHALL BE PAID FOR BY THE OWNER;
ALL RE -TESTING AND/OR RE -INSPECTION SHALL BE PAID FOR BY THE CONTRACTOR.
23. IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER PLACEMENT
OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST OF REPLACING OR REPAIRING EXISTING
IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR
REPLACEMENT. THERE WILL BE NO EXTRA COST DUE TO THE CONTRACTOR FOR REPLACING OR
REPAIRING EXISTING IMPROVEMENTS.
24. WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE INSTALLATION OF THE
WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES SHALL BE REPLACED AT THE
CONTRACTOR'S EXPENSE WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE
ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE APPROVAL OF THE
OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY.
25. CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS -BUILT RECORD DRAWINGS
SHOWING THE FINAL LOCATION AND LAYOUT OF ALL STRUCTURES AND OTHER FACILITIES. AS -BUILT
RECORD DRAWINGS SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL
IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE PREPARED AND
SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, THE CONTRACTOR SHALL
DELIVER TO THE ENGINEER ONE SET OF NEATLY MARKED AS -BUILT RECORD DRAWINGS SHOWING THE
INFORMATION REQUIRED ABOVE. AS -BUILT RECORD DRAWINGS SHALL BE REVIEWED AND THE COMPLETE
AS -BUILT RECORD DRAWING SET SHALL BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS
A PRECONDITION TO THE FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE.
26. WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS BUT NOT
IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS TO PREVAIL AND
THAT ONLY MATERIALS AND WORKMANSHIP OF THE HIGHEST QUALITY ARE TO BE USED.
27. CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK
CALLED FOR IN THE PROJECT PLANS AND SPECIFICATIONS. THEREFORE, THE OWNER IS RELYING UPON THE
EXPERIENCE AND EXPERTISE OF THE CONTRACTOR. PRICES PROVIDED WITHIN THE CONTRACT DOCUMENTS
SHALL INCLUDE ALL LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND
THAT THE WORK BE COMPLETED IN ACCORDANCE WITH THE TRUE INTENT AND PURPOSE OF THESE PLANS
AND SPECIFICATIONS. THE CONTRACTOR SHALL BE COMPETENT, KNOWLEDGEABLE AND HAVE SPECIAL SKILLS IN
THE NATURE, EXTENT AND INHERENT CONDITIONS OF THE WORK TO BE PERFORMED. CONTRACTOR SHALL
ALSO ACKNOWLEDGE THAT THERE ARE CERTAIN PECULIAR AND INHERENT CONDITIONS EXISTENT IN THE
CONSTRUCTION OF THE PARTICULAR FACILITIES WHICH MAY CREATE, DURING THE CONSTRUCTION PROGRAM,
UNUSUAL OR UNSAFE CONDITIONS HAZARDOUS TO PERSONS, PROPERTY AND THE ENVIRONMENT. CONTRACTOR
SHALL BE AWARE OF SUCH PECULIAR RISKS AND HAVE THE SKILL AND EXPERIENCE TO FORESEE AND TO
ADOPT PROTECTIVE MEASURES TO ADEQUATELY AND SAFELY PERFORM THE CONSTRUCTION WORK WITH
RESPECT TO SUCH HAZARDS.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL STRIPING AND/OR PAVEMENT MARKINGS
NECESSARY TO TIE EXISTING STRIPING INTO FUTURE STRIPING. METHOD OF REMOVAL SHALL BE BY GRINDING
OR SANDBLASTING.
29. CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS NECESSARY TO
PROTECT WORKMEN FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4 FEET OR MORE, FOR EXCAVATIONS
4 FEET OR MORE IN DEPTH, THE CONTRACTOR SHALL COMPLY WITH LOCAL, STATE AND NATIONAL SAFETY
CODES, ORDINANCES. OR REQUIREMENTS FOR EXCAVATION AND TRENCHES.
30, ALL EXISTING GATES AND FENCES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS. PROTECT ALL GATES
AND FENCES FROM DAMAGE
Utility Notes:
1. CONTRACTOR SHALL COORDINATE LOCATION OF NEW "DRY UTILITIES" WITH THE APPROPRIATE UTILITY
COMPANY, INCLUDING BUT NOT LIMITED TO: TELEPHONE SERVICE, GAS SERVICE, CABLE, POWER,
INTERNET,
2. EXISTING UTILITIES HAVE BEEN SHOWN ON THE PLANS USING A COMBINATION OF ON --SITE SURVEYS (BY
OTHERS). PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE
EACH UTILITY COMPANY LOCATE IN THE FIELD, THEIR MAIN AND SERVICE LINES 48 HOURS IN ADVANCE
OF PERFORMING ANY EXCAVATION WORK. THE CONTRACTOR SHALL RECORD THE BLUE STAKES ORDER
NUMBER AND FURNISH ORDER NUMBER TO OWNER AND ENGINEER PRIOR TO ANY EXCAVATION. IT WILL
BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES
THAT ARE NOT MEMBERS OF BLUE STAKES. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO
PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF
THIS CONTRACT_ ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE
CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND
UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT.
3. CONTRACTOR SHALL POT HOLE ALL UTILITIES TO DETERMINE IF CONFLICTS EXIST PRIOR TO BEGINNING
ANY EXCAVATION. NOTIFY ENGINEER OF ANY CONFLICTS. CONTRACTOR SHALL VERIFY LOCATION AND
INVERTS OF EXISTING UTILITIES TO WHICH NEW UTILITIES WILL BE CONNECTED. PRIOR TO COMMENCING
ANY EXCAVATION WORK THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES IN ACCORDANCE WITH
THE REQUIRED PROCEDURES.
4. CARE SHOULD BE TAKEN IN ALL EXCAVATIONS DUE TO POSSIBLE EXISTENCE OF UNRECORDED UTILITY
LINES. EXCAVATION REQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND.
CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING
CONSTRUCTION OPERATIONS AT HIS EXPENSE.
5. ALL VALVES AND MANHOLE COVERS SHALL BE RAfSED OR LOWERED TO MEET FINISHED GRADE.
6. CONTRACTOR SHALL CUT PIPES OFF FLUSH WITH THE INSIDE. WALL OF THE BOX OR MANHOLE.
7. CONTRACTOR SHALL GROUT AT CONNECTION OF PIPE TO BOX WITH NON -SHRINKING GROUT, INCLUDING
PIPE VOIDS LEFT BY CUTTING PROCESS, TO A SMOOTH FINISH.
t3. CONTRACTOR SHALL GROUT WITH NON -SHRINK GROUT BETWEEN GRADE RINGS AND BETWEEN BOTTOM OF
INLET LID FRAME AND TOP OF CONCRETE BOX
9. SILT AND DEBRIS IS TO BE CLEANED OUT OF ALL STORM DRAIN BOXES. CATCH BASINS ARE TO BE
MAINTAINED IN A CLEANED CONDITION AS NEEDED UNTIL AFTER THE FINAL BOND RELEASE INSPECTION.
10. CONTRACTOR SHALL CLEAN ASPHALT, TAR OR OTHER ADHESIVES OFF OF ALL MANHOLE LIDS AND INLET
GRATES TO ALLOW ACCESS,
11, EACH TRENCH SHALL BE EXCAVATED SO THAT THE PIPE CAN BE LAID TO THE ALIGNMENT AND GRADE
AS REQUIRED. TETE TRENCH WALL SHALL BE SO BRACED THAT THE WORKMEN MAY WORK SAFELY AND
EFFICIENTLY. ALL TRENCHES SHALL BE DRAINED SO THE PIPE LAYING MAY TAKE PLACE IN DE -WATERED
CONDITIONS.
12. CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES WITH WHICH TO
REMOVE PROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION.
13. MAINTAIN A MINIMUM 18" VERTICAL SEPARATION DISTANCE BETWEEN ALL UTILITY CROSSINGS.
14. CONTRACTOR SHALL START INSTALLATION AT LOW POINT OF ALL NEW GRAVITY UTILITY LINES.
15. ALL BOLTED FITTINGS MUST BE GREASED AND WRAPPED.
16. UNLESS SPECIFICALLY NOTED OTHERWISE, MAINTAIN AT LEAST 2 FEET OF COVER OVER ALL STORM DRAIN
LINES AT ALL TIMES (INCLUDING DURING CONSTRUCTION).
17. ALL WATER LINES SHALL BE INSTALLED A MINIMUM OF 60" BELOW FINISHED GRADE_
18. ALL SEWER LINES AND SEWER SERVICES SHALL HAVE A MINIMUM SEPARATION OF 10 FEET, PIPE EDGE
TO PIPE EDGE, FROM THE WATER LINES. IF A 10 FOOT SEPARATION CAN NOT BE MAINTAINED, THE
SEWER LINE AND WATER LINE SHALL BE LAID IN SEPARATE TRENCHES AND THE BOTTOM OF THE WATER
LINE SHALL BE AT LEAST 18" ABOVE THE TOP OF THE SEWER LINE.
19. CONTRACTOR SHALL INSTALL THRUST BLOCKING AT ALL WATERLINE ANGLE POINTS AND TEES.
20. ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO INSTALLATION OF CURB, GUTTER, SIDEWALK
AND STREET PAVING.
21. CONTRACTOR SHALL INSTALL MAGNETIC LOCATING TAPE CONTINUOUSLY OVER ALL NONMETALLIC PIPE.
Erosion Control General Notes:
THE CONTRACTOR TO USE BEST MANAGEMENT PRACTICES FOR PROVIDING
EROSION CONTROL FOR CONSTRUCTION OF THIS PROJECT. ALL MATERIAL AND
WORKMANSHIP SHALL CONFORM TO GOVERNING AGENCIES ORDINANCES AND ALL WORK
SHALL BE SUBJECT TO INSPECTION BY THE COUNTIES, ALSO, INSPECTORS WILL
HAVE THE RIGHT TO CHANGE THE FACILITIES AS NEEDED.
CONTRACTOR SHALL KEEP THE SITE WATERED TO CONTROL DUST. CONTRACTOR
TO LOCATE A NEARBY HYDRANT FOR USE AND TO INSTALL TEMPORARY METER.
CONSTRUCTION WATER COST TO BE INCLUDED IN BID.
WHEN GRADING OPERATIONS ARE COMPLETED AND THE DISTURBED GROUND IS
LEFT OPEN FOR 14 DAYS OR MORE, THE AREA SHALL BE FURROWED PARALLEL
TO THE CONTOURS.
THE CONTRACTOR SHALL MODIFY EROSION CONTROL MEASURES TO
ACCOMMODATE PROJECT PLANNING.
ALL ACCESS TO PROPERTY WILL BE FROM PUBLIC RIGHT-OF-WAYS.
THE CONTRACTOR IS REQUIRED BY STATE AND FEDERAL REGULATIONS TO
PREPARE A STORM WATER POLLUTION PREVENTION PLAN AND FILE A "NOTICE OF
INTENT" WITH THE GOVERNING AGENCIES.
Maintenance:
ALL BEST MANAGEMENT PRACTICES (BMP'S) SHOWN ON THIS PLAN MUST BE
MAINTAINED AT ALL TIMES UNTIL PROJECT CLOSE-OUT.
THE CONTRACTOR'S RESPONSIBILITY SHALL INCLUDE MAKING BI -WEEKLY CHECKS
ON ALL EROSION CONTROL MEASURES TO DETERMINE IF REPAIR OR SEDIMENT
REMOVAL IS NECESSARY. CHECKS SHALL BE DOCUMENTED AND COPIES OF THE
INSPECTIONS KEPT ON SITE.
SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH RAINFALL. THEY MUST BE
REMOVED WHEN THE LEVEL OF DEPOSITION REACHES APPROXIMATELY ONE-HALF
THE HEIGHT OF BARRIER,
SEDIMENT TRACKED ONTO PAVED ROADS MUST BE CLEANED UP AS SOON AS
PRACTICAL, BUT IN NO CASE LATER THAN THE END OF THE NORMAL WORK DAY.
THE CLEAN UP WILL INCLUDE SWEEPING OF THE TRACKED MATERIAL, PICKING IT
UP, AND DEPOSITING IT TO A CONTAINED AREA.
EXPOSED SLOPES:
ANY EXPOSED SLOPE THAT WILL REMAIN UNTOUCHED FOR LONGER THAN 14
DAYS MUST BE STABILIZED BY ONE OR MORE OF THE FOLLOWING METHODS:
A) SPRAYING DISTURBED AREAS WITH A TACKIFIER VIA HYDROSEED
B) TRACKING STRAW PERPENDICULAR TO SLOPES
C) INSTALLING A LIGHT -WEIGHT, TEMPORARY EROSION CONTROL BLANKET
Notice to Contractor:
THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING
UNDERGROUND UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON RECORDS OF THE VARIOUS UTILITY
COMPANIES AND/OR MUNICIPALITIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE
INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL
THE APPROPRIATE UTILITY COMPANIES AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT
FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL
EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
THE CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE
ENGINEERS HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT.
S urvev Control Note:
THE CONTRACTOR OR SURVEYOR SHALL BE RESPONSIBLE FOR FOLLOWING THE NATIONAL
SOCIETY OF PROFESSIONAL SURVEYORS (NSPS) MODEL STANDARDS FOR ANY SURVEYING OR
CONSTRUCTION LAYOUT TO BE COMPLETED USING REEVE & ASSOCIATES, INC. SURVEY DATA
OR CONSTRUCTION IMPROVEMENT PLANS, PRIOR TO PROCEEDING WITH CONSTRUCTION STAKING,
THE SURVEYOR SHALL BE RESPONSIBLE FOR VERIFYING HORIZONTAL CONTROL FROM THE
SURVEY MONUMENTS AND FOR VERIFYING ANY ADDITIONAL CONTROL POINTS SHOWN ON AN
ALTA SURVEY, IMPROVEMENT PLAN, OR ANY ELECTRONIC DATA PROVIDED. THE SURVEYOR
SHALL ALSO USE THE BENCHMARKS AS SHOWN ON THE PLAN, AND VERIFY THEM AGAINST NO
LESS THAN FIVE (5) EXISTING HARD IMPROVEMENT ELEVATIONS INCLUDED ON THESE PLANS
OR ON ELECTRONIC DATA PROVIDED. IF ANY DISCREPANCIES ARE ENCOUNTERED, THE
SURVEYOR SHALL IMMEDIATELY NOTIFY REEVE & ASSOCIATES, INC. AND RESOLVE THE
DISCREPANCIES BEFORE PROCEEDING WITH ANY CONSTRUCTION STAKING.
Legend
W
= PROPOSED CULINARY MATER LINE
FC
= FENCE CORNER
- -EX.W - -
- = EXISTING (CULINARY WATER ]LIFE.
FF
= FINISH FLOOR
_SS-
= PROPOSED SANITARY SEWER LINE
FFE
= FINISH FLOOR ELEVATION
- -EX.SS -
- = EXISTING SANITARY SEXIER LINE
FG
= FINISHED GRADE
SD
= PROPOSED STORM DRAIN LINE
FH
= FIRE HYDRANT
- -EX.SD -
- = EXISTING STORM DRAIN LINE
FL
= FLOW LINE
= FENCE LINE
GB
= GRADE BREAK
+�
= PROPOSED (FIRE HYDRANT
INV
= INVERT
C5
= EXISTING FIRE HYDRANT
L. F.
= LINIEAR FEET
0
= PROPOSED MANHOLE
NG
= NATURAL GRADE
0
= EXISTING MANHOLE
PP
= POWER/UTILITY POLE
•
= PROPOSED SEWER CLEAN-CUT
P. U . E.
= PUBLIC UTILITY BASEMENT
I
= PROPOSED GRATE VALVE
RCP
= REINFORCED CONCRETE PIPE
x
= EXISTING GATE VALVE
RIM
= RIM OF MANHOLE
19
= PROPOSED WATER METER
R.O.W.
= RIGHT-OF-WAY
El
= EXISTING WATER METER
SD
= STORM DRAIN
m
= PROPOSED CA'T'CH BASIN
SS
= SANITARY SEWER
= EXISTING CATCH BASIN
TBC
= TOP BACK OF CURE
= PLUGS BVI 2' BLOW -CFF
TOA
= TOP OF ASPHALT
Lb
= PLUG & BLOCK
TOC
= TOP OF CONCRETE
rC:D
=STREET LIGHT
TOFF
= TCP OF FINISHED FLOOR
i
= SIGN
TOI
= TOP OF PUMP ISLAND
BLDG
= BUILDING
TSW
= TOP OF SIDEWALK
C&G
= CURB & GUTTER
W
= CULINARY ®NATER
CB
=+CATCH BASIN
WM
= WATER METER
C. F.
= CUEIC FEET
F7
= EXISTING ASPHALT ]PAVEMENT
C,F.S.
= CUEIC FEET PER SECOND
= PROPOSED CONCRETE
a �
14386
0
�9rf
R
NgTHAI4
CONSULTANTS
Re eve
Associates, Inc.
5160 S 1500 W
RIVERDALE, UTAH 84405
TEL: 801 621-3100
FAX: 801 621--2656
www.reeve-assoa.eam
LAND PLANNERS ' CIVIL ENGINEERS
LAND SURVEYORS • TRAFFIC ENGWEERS
STRUCTURAL ENGINEERS * LANDSCAPE AROCIEC15
PROJECT NUMBER, 5799-193
NOTE:
Bid documents should not be separated or issued as
partial sets to subcontractors, Bidders are responsible
for all portions of the documents that pertain to the
work covered by sub -bids. Bidder assumes full
responsibility for errors or misinterpretotions resulting
from use of partial sets of Bidding Documents by itself
or any sub -bidder,
Conflicting information or errors found in the
construction documents should be brought to the
attention of the architect immediately so thot questions
and concerns may be clarified by addendum. In the
event of a conflict in the drawings, bidder should not
assume that the least expensive option will meet the
project requirements.
0pvERlq
STORE ##195
MAVERIK, Inc,
75 N 200 E
Rexburg, ID
#
DATE
DESC.
1
01/03/19
Existing Site Plan
ISSUE_
January 2019
PROJECT NO:
5799-193
DRAWN BY:
JCM
CHECKED BY:
JNR
SHEET TITLE
Notes/Legend
C2
0
to
LD
EX. ACCESS
EX.5JGN4L TSB
EX. SIDEWALK
�s oow MAVERIK SIGN 1 axe � EUX.
EX.WV TB
7 — 7
o \I I o I I o
EXISTING
8 --------- o o o
i i r� ill �i
70.4
I ❑ 13� I
I I I
' I
� r
---It
-
1 �I
I — I EXI& ING CANOPHIPS
I I I F_ 4.00'
I EX.SHED TO
I BE REMOVED I ------------------
`! '
i — I I CONCRETE TO BE REM(?VED { —
-
i — — FOR NEW ENTRY FEATURE I I — — — — —� I i
! I EX.SHED TO I (SEE ARCH PIANS) I +
' I BE REMOVED
Le...._ ------
{
} I I t
PARKING TO BE I ! I
s ' RE—STRIPED
E
09
6.0
' I EXISTING MAVERIK {
j I I (4872.86) FFE {
CONCRETE TO BE REMOVED
1 I FOR NEW ENTRY FEATURE {
(SEE ARCH PLANS)
ADA RAMP TO BE I `+ L— — —f — —�J
REMOVED/RELOCATED
�
I I I ,
i I I---------eA— r
+ I I +
j I CONCRETE TO BE REMOVED—
I — — — — — !i�
CA I FOR NEW ENTRY FEATURE .I—
I I (SEE ARCH PLANS) 4.00
----=------- ---_JEE
a
L�
- -_ ------------ - - - - -- __ - - - -- -- --N%Y=Oft
15fi +DO'
— —EX.CB EX.SO
EX.so '
+ a
�+ EX. X
E
10 0 TO 20 30
Scale: 1 " = 10'
p
Know what'ablelow.
Call before you dig.
CONSULTANTS
4 6)&Associates, Re e e Inc.
5160S1500W
RIVERDALE, UTAH 84405
TEL: 801} 621-3100
FAX: 801 } 621-2665
www.reeve-assoc.com
LAND PLANNERS • CPA MIM
LAND SJZVEYOR5 • TRAFFIC ENG16 is
STRIlMRAL ENGNM * LANDSCAPE ARCHIIECI'S
PROJECT NUMBER: 5799-193
NOTE:
Bid documents should not be separated or issued as
partial sets to subcontractors. Bidders are responsible
for all portions of the documents that pertain to the
work covered by sub—bids. Bidder assumes full
responsibility for errors or misinterpretations resulting
from use of partial sets of Bidding Documents by itself
or any sub—bidder.
Conflicting information or errors found in the
construction documents should be brought to the
attention of the architect immediately so that questions
and concerns may be clarified by addendum. In the
event of a conflict in the drawings, bidder should not
assume that the least expensive option will meet the
project requirements.
11V E IR��.
STORE #195
MAVERIK, Inc.
75N200E
Rexburg, ID
#
DATE
DESC.
1
01/03119
Existing Site Plan
ISSUE:
January 2019
PROJECT NO:
5799-193
DRAWN BY:
JCM
CHECKED BY:
JNR
SHEET TITLE
Existing/Demolition
Plan
C3