HomeMy WebLinkAboutBACKUP DATASHEET - 19-00075 - 772 Nina Dr - Tesla Powerwall ElectricalTESLA.COM/ENERGY
Backup Gateway
POWERWALL
740 mm
(29.1 in)
378 mm
(14.9 in)
129 mm
(5.1 in)
The Backup Gateway for Tesla Powerwall provides energy management
and monitoring for solar self-consumption, time-based control, and
backup.
The Backup Gateway controls connection to the grid, automatically
detecting outages and providing a seamless transition to backup
power. When equipped with a circuit breaker, the Backup Gateway can
be installed at the service entrance.
The Backup Gateway communicates directly with Powerwall, allowing
you to monitor energy use and manage backup energy reserves from
any mobile device with the Tesla app.
ENVIRONMENTAL SPECIFICATIONS
Operating Temperature –20°C to 50°C (–4°F to 122°F)
Operating Humidity (RH)Up to 100%, condensing
Maximum Elevation 3000 m (9843 ft)
Environment Indoor and outdoor rated
Enclosure Type NEMA 3R
Ingress Rating IP44
MECHANICAL SPECIFICATIONS
Dimensions 740 mm x 378 mm x 129 mm
(29.1 in x 14.9 in x 5.1 in)
Weight 16.4 kg (36 lbs)
Mounting options Wall mount
PERFORMANCE SPECIFICATIONS
AC Voltage (Nominal)230 V, 120/240 V
Feed-In Type Single & Split Phase
Grid Frequency 50 and 60 Hz
Disconnect Current 200 A
Maximum Input Short Circuit Current 10 kA
Overcurrent Protection Device1 100–200 A; Service Entrance Rated
Overvoltage Category Category IV
AC Meter Revenue grade (+/– 1%)
Connectivity Ethernet, Cellular (3G)2, Wi-Fi
User Interface Tesla App
Operating Modes Support for solar self-consumption,
time-based control, and backup
Backup Operation Automatic disconnect for seamless
backup transition
Modularity Supports up to 10 AC-coupled
Powerwalls
Warranty 10 years
COMPLIANCE INFORMATION
Certifications UL 1642, UL 1741, IEC 62109-1,
CSA C22.2.107.1
Grid Connection Worldwide Compatibility
Emissions FCC Part 15 Class B, ICES 003,
IEC 61000-6-3, EN 55024,
EN 301489-1, EN 301489-7,
EN 301489-17
Environmental RoHS Directive 2011/65/EU,
WEEE Directive 2012/19/EU,
Battery Directive 2006/66/EC
REACH Regulation
Seismic AC156, IEEE 693-2005 (high)
2018-03-22
1 Circuit breaker required for installation at service entrance.
2 Cellular connectivity subject to network operator service coverage and signal strength.