Loading...
HomeMy WebLinkAboutCOMCHECK - 17-00448 - 407 W 1st N - Homestead Bldg 3 - AdditionI -f--vcl�t48 COMcheck Software Version 4.0.6.0 Mechanical Compliance Certificate Project Information Energy Code: Project Title: Location: Climate Zone: Project Type: Construction Site: Rexburg, ID Additional Efficiency Package Unspecified Mechanical Systems List Quantity System Type & Description 2012 IECC Homestead Building 3 Addn Rexburg, Idaho 6b New Construction Owner/Agent: Designer/Contractor: Dwayne Sudweeks Engineered Systems Assoc., Inc. 1355 E. Center St. Pocatello, ID 83201 208-233-0501 dcs@engsystems.com 18 HVAC System 1 (Single Zone): Packaged Terminal Heat Pump Heating Mode: Capacity = 9 kBtuth, Proposed Efficiency = 3.50 COP, Required Efficiency = 2.97 COP Cooling Mode: Capacity = 9 kBtu/h, Proposed Effidency = 12.00 EER, Required Efficiency: 11.30 EER Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 1 Supply, Constant Volume, 330 CFM, 0.1 motor nameplate hp HVAC System 2 (Single Zone): Heating: 1 each - Central Furnace, Gas, Capacity = 135 kBtulh Proposed Efficiency = 95.00% Et, Required Efficiency = 80.00% Et Cooling: 1 each - Split System, Capacity = 54 kBtuth, Air -Cooled Condenser, No Economizer, Economizer exception: Low Capacity Residential Proposed Efficiency = 13.00 SEER, Required Efficiency: 13.00 SEER Fan System: FAN SYSTEM 2 -- Compliance (Motor nameplate HP method) : Passes Fans: FAN 3 Supply, Constant Volume, 1920 CFM, 1.0 motor nameplate hp Water Heater 2: Gas Instantaneous Water Heater, Capacity: 0 gallons, Input Rating: 199 Btulh w/ Circulation Pump Proposed Efficiency: 90.00 EF, Required Efficiency: 0.67 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2012 IECC requirements In COMcheck Version 4.0.6.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: Homestead Building 3 Addn Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Homestead3.cck Report cave: iutuwir Page 1 of 10 Name -Title Si nature' Date Project Title: Homestead Building 3 Addn Report date: 10/05/17 Data filename: C:\Users\Dwayne 15\Documents\COMcheck\Homestead3.cck Page 2 of 10