Loading...
HomeMy WebLinkAboutTEMP CO - 18-00245 - 17 S 4th W - Snellgrove Townhomes - #403CITY OF REXBURG ----(\,\,,----Americas Family Community Building Permit Number Site Address Description of Building or Portion of Building covered by Certificate Name and Address of Owner Contractor Applicable Edition of Code Construction Type Use and Occupancy (sq. ft.) TEMPORARY Certificate of Occupancy 18-00245 17 S 4th W City of Rexburg Department of Community Development 35 N. 1st E. / Rexburg, ID. 83440 Phone (208) 359-3020 / Fax (208) 359-3022 Design Occupant Load Sprinkler System Required? Sprinkler System Provided? Snellgrove Townhomes - #403 Woodshed Properties LLC 342 W 1st S, ID 83440 KOS Developing LLC IRC 2012 VB R-3 Residential - One and two family homes 680 sq ft - Square footage - Unfinished basement 1,380 sq ft - Square footage - Main and upper Levels 680 sq ft - Square footage - Unfinished basement N/A No No Special Conditions The individual spaces need to marked with cones to keep construction workers from parking there. When work on the North building starts you need to have candles with rope to separate construction traffic from residence. Parking lot needs to be paved along with the sidewalks and curbing on 4th West by May 30th 2019. Carports need to be built after pavement is placed. Grading of the dirt and landscaping need to be completed in early spring. Well need to look at water meter for final grade will also need to make sure that the main clean out for the sewer line has the clearance necessary. TEMPORARY This Certificate, issued pursuant to the requirements of Section 111 of the International Building Code, certifies that, at the time of issuance, this building or that portion of the building that was inspected on the date listed was found to be in compliance with the requirements of the code for the group and division of occupancy and the use for which the proposed occupancy was classified. There shall be no further change in the existing occupancy classification of the building nor shall any structural changes, modifications or additions be made to the building or any portion thereof until the Building Official has reviewed and approved said future changes. Date C.O. Issued January 28, 2019 Building Official: �-=--'---=-.,__ ________ _Public Works: �;;? �-;.,......------------ February 1, 2019