Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00271 - 251 Baldwin Dr - New SFRPermit Inspection Summary Permit Status of (Issue) as of Report Date: 01/29/2019 3:13 pm Permit Details Permit Number: 18-00271 251 Baldwin Dr - New SFR 251 Baldwin Dr Building - Single Family Residence Permit Issued Date: 05/24/2018 Permit Inspection Statistics 23Total Inspections Completed: 18Total Inspections Passed: Inspection Pass Rate: 78.26% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 07/10/2018PassLarry BeesleyResidential Footing Inspection The forms and the re bar is located correctly. You are good to pour the concrete. Thanks Inspector Comments: 07/12/2018PassLarry BeesleyFoundation Inspection The forms and re bar are good, you are good to pour the concrete. ThanksInspector Comments: 08/20/2018PassLarry BeesleySheeting The sheeting is nailed correctly and looks good. You are good to move forward. Thanks Inspector Comments: 08/30/2018FailLarry BeesleyResidential Framing/Structure Inspection The nuts on the anchor bolts are not tight.Check all of them. The HVAC INSPECTION HAS NOT BEEN SIGNED OFF YET. Thanks, Larry Inspector Comments: 09/04/2018PassLarry BeesleyResidential Framing/Structure Inspection All of the corrections have been completed. Thanks You are good to insulate. 9-4-18 Inspector Comments: 09/05/2018PassLarry BeesleyResidential Insulation Inspection Venting and insulation is good. You can hang the sheet rock. ThanksInspector Comments: 09/07/2018PassLarry BeesleyResidential Sheetrock/Drywall Inspection Most of the house is hung and is good . I will run up Saturday morning and look at the rest. Inspector Comments: 09/10/2018FailTed DyeResidential Footing Inspection Call fora re-inspection when rebar is placed as per city spec's.Inspector Comments: 11/05/2018FailLarry BeesleyResidential Building Final This house looks very good. Make the two corrections and call for a re inspection. Thanks Larry Inspector Comments: 11/06/2018PassLarry BeesleyResidential Building Final The corrections have been completed and you are good for the C.O. The house looks good. Thanks,Larry Inspector Comments: 01/29/2019PassLarry BeesleySidewalk Inspection The gravel was good on the sidewalk.Inspector Comments: Page 1 of 2 (Continued) Permit Details Permit Number: 18-00271 251 Baldwin Dr - New SFR 251 Baldwin Dr Building - Single Family Residence Permit Status of (Issue) as of Report Date: 01/29/2019 3:13 pm Permit Inspection Summary Electrical Inspection Type 07/31/2018PassBret StoddardResidential Electrical Service Inspection 08/30/2018PassBret StoddardResidential Electrical Rough-in 11/05/2018PassBret StoddardResidential Electrical Final Inspection Mechanical Inspection Type 08/30/2018FailQuinton OwensHVAC Rough-in * Seal joist penetrations through return air plenum above living room. * Gas line found laying against a gusset plate. Protect gas pipe from edge of steel plate or bend corner of gusset down. Inspector Comments: 08/31/2018FailQuinton OwensHVAC Rough-in 8/31/18: Penetrations in return air plenum above living room still not sealed at re-inspection. Inspector Comments: 09/04/2018PassDon AllenHVAC Rough-in 10/29/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 07/19/2018PassDon AllenPlumbing Water 07/19/2018PassDon AllenPlumbing Sewer Good to cover the sewer.Inspector Comments: 07/20/2018PassDon AllenPlumbing Underground Inspection Good to cover Plumbing UndergroundInspector Comments: 08/23/2018PassDon AllenPlumbing Rough-in 10/29/2018PassDon AllenPlumbing Final Inspection Page 2 of 2