HomeMy WebLinkAboutINSPECTION SUMMARY - 18-00582 - 33 N 3rd E - Solar PanelsPermit
Inspection
Summary
Permit Status of (Open) as of Report Date: 01/15/2019 11:58 am
Permit Details Permit Number: 18-00582
33 N 3rd E - Solar Panels
33 N 3rd E
Solar Panels
Permit Issued Date: 11/09/2018
Permit Inspection Statistics
3Total Inspections Completed:
2Total Inspections Passed:
Inspection Pass Rate: 66.67%
Permit Inspection History *Refer to Individual Inspection Report for more Details
Building Inspection Type
12/19/2018PassLarry BeesleyBuilding - Final Solar Inspection
The panels were installed the way the speck showed with the L Fast Flashing kits
and screwed into the trusses. The snow covered the arrays on the front of the
house and the garage. I could see most of the array on the back of the house. I
spoke with Seth of Final Solar and he assured me that every thing was installed
as per the specks. Thanks
Inspector Comments:
Electrical Inspection Type
12/05/2018FailBret StoddardFinal Solar Inspection
12/14/2018PassBret StoddardFinal Solar Inspection