Loading...
HomeMy WebLinkAboutINTERIOR LIGHTING COMPLIANCE - 08-00033 - Johnson Precast ShopCOMcheck Software Version 3.5.2 Interior Lighting Compliance Certificate ,tea- ECG ---.77 Report Date: 02/05/08 r Data filename: Unfifled.cck Section 1: Project Information Project Type: New Construction Project Title : Coring Shop Construction Site: 551 East Moody Road Rexburg, ID 83440 Permit No. Applied for Permit Date: Still Waiting Owner/Agent: Johnson Precast 551 East Moody Road Rexburg, ID 83440 208-656-9977 jpc@ida.net Section 2: General Information Building Use Description by: Building Type Floor Area Storage, Industrial and Commercial 1200 Section 3: Requirements Checklist Interior Lighting: F1 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts 720 640 YES 0800033 Johnson Precast Sl-iop Designer/Contractor: Johnson Precast 551 East Moody Road Rexburg, ID 83440 208-656-9977 jpc@ida.net APPROVE ELE RICAL INSPECTOR Exterior Lighting: F1 2. Efficacy greater than 45 lumens/W. Exceptions: Specialized lighting highlighting features of historic buildings; signage; safety or secudty, lighting; low -voltage landscape lighting. Controls, Switching, and Wiring: Lj 3. Independent controls for each space (switch/occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. Li 4. Master switch at entry to hotelimotel guest room. ❑ 5. Each space provided with a manual control to provide uniform light reduction capability. Exceptions: Only one luminaire in space; An occupant -sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or guest room; Areas greater than 250 sq.ft. Lj 6. Automatic lighting shutoff control in spaces greater than 250 sq.ft in buildings larger than 5,000 sq.ft. Exceptions., Areas with only one luminaire, corridors, storerooms, restrooms, or public lobbies. Project Title: Coring Shop Report date: 02/05/08 Data filename: Untitled.cck Page 3 of 9 LI 7. Photocell/astronomical time sN �n exterior lights. Exceptions: Lighting intended for 24 hour use. ❑ 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions. Electronic high -frequency ballasts: Luminaires not on same switch. Section 4: Compliance Statement Compliance Statement. The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2001 IECC, Chapter 8, requirements in COMcheck Version 3.5.2 and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date Project Title: Coring Shop Report date: 02/05/08 Data filename: Untitled.cck Page 4 of 9 2001 IECC COMcheck Software Version 3.5.2 Interior Lighting Application Worksheet Report Date: Data filename: Untided.cck Section 1: Allowed Lighting Power Calculation A B C D Floor Area Allowed Allowed Watts Watts / ft2 Storage, Industrial and Commercial 1200 0.6 720 Total Allowed Watts = 720 Section 2: Proposed Lighting Power Calculation A Fixture ID: Description I Lamp I Wattage Per Lamp I Ballast B C D E Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Storage, Industrial and Commercial (1200 sq.ft.) Compact Fluorescent 1: Twin Tube 40W / Electronic 2 4 160 640 Total Proposed Watts = 640 Section 3: Compliance Calculation If the Total Allowed Wafts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 720 Total Proposed Watts = 640 Project Compliance = 80 Interior Lighting PASSES: Design 11% better than code. Title: Coring Shop Report date: 02/05/08 Data filename: Untitled.cck Page 5 of 9