HomeMy WebLinkAboutAPPLICATION - 18-00708 - 150 E 2nd N - CUP DormitoryCW
a•�u:�=
Conditional Use Permit Application
Dormitory
City of Rexburg
35 North 19 East Phone: 208.359.3020
Rexburg, ID 83440 Fax: 208.359.3022 www.rexbLrg.org
TIME: About 80 days
Submittal Requirements
•ru,,,. , , „ t
iZF X BURG
CUP:
$250.00
Publication:
Daw
Total Fees Due:
$550.00
Fee(s) Paid: Yes/No
Legal Description of the Property (Please attach)
kl4te plan drawn to scale showing the actual dimension and the shape of the lot to be built upon; exact size
and location of existing buildings on the lot; the exact location and dimensions of the proposed budding(s),
structures or alterations, parking, landscaping, screening, solid waste storage, etc.
Elevation plans — detailed drawings of front, rear, and sides to show compliance with architectural features
and design requirements. Please show the conditional uses from Planning & Zoning and City Courted
meeting on the submitted plans for final signatures.
— signed and notarized
Narrative statement —The statement should discuss the general compatibility of the proposed
development with adjacent properties and the neighborhood, and the effects of the following on the
adjoining property: noise, glare, traffic generated, vibration, odor, fumes, drainage, building height, massing,
and solid waste.
(The following questions wig aid in drsAing this statement.)
1. What is the current zone of the parcel?
2. What are the adjacent zones of the properties surrounding the lot for the proposed use?
3. How many units are planned? How many beds are planned per unit? Will this be student housing, multi-
family for young families, singles and couples, or elderly?
4. How big is the parcel on which the use is planned?
5. What is the estimated daily traffic to be generated? Will the traffic be primarily private vehicles or
commercial trucks?
G. What provisions have been made for fire protection? Where is the nearest fire hydrant? Is any point of
the building further than 150 feet from access sufficient in width for fire -fighting equipment?
7. Where will solid waste generated be stored? Is access adequate for the City collection?
8. What is the type of noise that will be generated by the use? What are the hours of noise generation?
9. Will storm water drainage be retained on site? Is an existing storm drain available? Is it at capacity? If so,
will new facilities be constructed?
Four (4) conies of the application and all supporting documents will be needed
Digital .pdf copy of application and supporting documents submitted to Planting & Zoning office
I
Applicant
Name: Address: � f
City: State: — Zip: D�Phone:
G� �/ c
Email: /
Owner (Complete if owner not applicant)
Name: Address:
City: State: Zip: Phone:
Email:
Property to be Covered b
Address: Zone:
Pe t:
Sa 2 r -
Existing use of property:
All applications that are complete will be processed with due diligence and will be scheduled, dependent
upon availability, for an upcoming agenda.
Formal notice will be sent to the applicant after approval of a Conditional Use Permit. Notice will state the
conditions of the permit. If conditions are violated or not met there will be a 90 -day period to cure the
problem. '�*ure to comply with the terms may result in revocation of the Conditional Use Permit.
Date
Signature
Conditional Use Permit Procedures
1. Complete application is received and fees are paid.
2. Proposal is placed on internal Strategic Development meeting for staff taking place Tuesdays at 4p.m.
3. Documents are transmitted to staff for review.
4. Planning and Zoning Commission meeting is scheduled.
5. Notification is mailed to landowners within 300' 15 days before hearing.
6. Proposal is posted on the property.
7. Staff Review is sent to applicant.
8. P&Z Agenda is published & sent to applicant
9. Hearing is placed before Planning and Zoning Commission.
10. If a material change is requested, another hearing may be scheduled before the Commission.
11. If park, nursery school, day care centers, churches, synagogues, temples, funeral or crematory service, home
occupation, development with 4 or less dwelling units, gov. buildings, household goods warehouse and
storage, or reduce parking space size in parking structures, tbg Permit needs 9.4 eo through Commission.
12. All other uses go before City Council.
13. If material changes to the permit are made, additional City Council hearing will be needed.
14. Applicant receives a copy of the conditions of the permit to sign.
Recorded at Madison County. (*If conditions are not met within 90 days. CUP will be revoked.)
r