HomeMy WebLinkAboutPUBLIC WORKS REVIEW SUMMARY - 18-00285 - 2300 University Blvd - Madison High School Stadium - New ConstructionReview
Report
Current Public Works Review - Site Plan Status: REVISIONS
Application Number: 18-00285Permit Details
Application Received Date: 05/29/2018
Commercial Addition
Application Approved Date:
Application Approved Status: ACPTW/COND
05/29/2018
2300 University Blvd
Madison High School Stadium - New Construction
Status of Plan Reviews Completed
05/29/2018Electrical Review N/A
05/31/2018Public Works Review - Site Plan REVISIONS
06/05/2018Fire Department Review - Site Plan COMPLETED
06/06/2018Planning and Zoning Review - Site Plan REVISIONS
07/31/2018Plumbing Review RESUBMIT
07/31/2018HVAC Review COMPLETED
07/31/2018Electrical Review REVISIONS
08/01/2018Planning and Zoning Review - Site Plan REVISIONS
08/01/2018Public Works Review - Site Plan REVISIONS
08/02/2018Building Review REVISIONS
08/08/2018Planning and Zoning Review - Site Plan APPW/COND
Permit Review Status
Plan Reviews Still in Progress
Public Works Review - Site Plan
Electrical Review
Public Works Review - Site Plan
Building Review
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Plans are approved for a footing/foundation
ONLY permit?
YES
Checked for linked cases YES
Sewer: Line size/slope/type materials REVISIONSSampling manhole required after each grease
trap. No sewer main lines on new plans. Civil
Drawings are missing. Missing sewer services to
several buildings on old civil plans.
Main line existing only installing future stubs per
City of Rexburg Standards.
*Revisions Response :
Reviewed By: Joel Gray
Review Date: 08/01/2018
Plan Review Details
joel.gray@rexburg.org
Public Works Review - Site Plan Status: REVISIONS
Page 1 of 2
Approval of plans does not constitue approval of variance from code
Public Works Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Water : Connection to main line REVISIONSNo water main lines on new drawings. Civil
Drawings are missing.
Some coordination between Civil and
Architectural plans for water line sizes and
locations.
*Revisions Response :
Water : Valve placement REVISIONSValves required at future service lines.
Has DEQ approved the water lines?
*Revisions Response :
Site Lighting : Photometric layout N/ANo site lighting on plans.
Street : Sidewalk setback/continuos N/A
No utility boxes in right of way?N/A
Water : DI class 50 in right of way .COMPLETED
Parking Lot: Accessibility/layout COMPLETED
Page 2 of 2
Approval of plans does not constitue approval of variance from code