Loading...
HomeMy WebLinkAboutPUBLIC WORKS REVIEW SUMMARY - 18-00285 - 2300 University Blvd - Madison High School Stadium - New ConstructionReview Report Current Public Works Review - Site Plan Status: REVISIONS Application Number: 18-00285Permit Details Application Received Date: 05/29/2018 Commercial Addition Application Approved Date: Application Approved Status: ACPTW/COND 05/29/2018 2300 University Blvd Madison High School Stadium - New Construction Status of Plan Reviews Completed 05/29/2018Electrical Review N/A 05/31/2018Public Works Review - Site Plan REVISIONS 06/05/2018Fire Department Review - Site Plan COMPLETED 06/06/2018Planning and Zoning Review - Site Plan REVISIONS 07/31/2018Plumbing Review RESUBMIT 07/31/2018HVAC Review COMPLETED 07/31/2018Electrical Review REVISIONS 08/01/2018Planning and Zoning Review - Site Plan REVISIONS 08/01/2018Public Works Review - Site Plan REVISIONS 08/02/2018Building Review REVISIONS 08/08/2018Planning and Zoning Review - Site Plan APPW/COND Permit Review Status Plan Reviews Still in Progress Public Works Review - Site Plan Electrical Review Public Works Review - Site Plan Building Review DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Plans are approved for a footing/foundation ONLY permit? YES Checked for linked cases YES Sewer: Line size/slope/type materials REVISIONSSampling manhole required after each grease trap. No sewer main lines on new plans. Civil Drawings are missing. Missing sewer services to several buildings on old civil plans. Main line existing only installing future stubs per City of Rexburg Standards. *Revisions Response : Reviewed By: Joel Gray Review Date: 08/01/2018 Plan Review Details joel.gray@rexburg.org Public Works Review - Site Plan Status: REVISIONS Page 1 of 2 Approval of plans does not constitue approval of variance from code Public Works Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Water : Connection to main line REVISIONSNo water main lines on new drawings. Civil Drawings are missing. Some coordination between Civil and Architectural plans for water line sizes and locations. *Revisions Response : Water : Valve placement REVISIONSValves required at future service lines. Has DEQ approved the water lines? *Revisions Response : Site Lighting : Photometric layout N/ANo site lighting on plans. Street : Sidewalk setback/continuos N/A No utility boxes in right of way?N/A Water : DI class 50 in right of way .COMPLETED Parking Lot: Accessibility/layout COMPLETED Page 2 of 2 Approval of plans does not constitue approval of variance from code