HomeMy WebLinkAboutBUILDING REVIEW SUMMARY - 18-00285 - 2300 University Blvd - Madison High School Stadium - New ConstructionReview Report Current Building Review Status: REVISIONS Application Number: 18-00285Permit Details Application Received Date: 05/29/2018 Commercial Addition Application Approved Date: Application Approved Status: ACPTW/COND 05/29/2018 2300 University Blvd Madison High School Stadium - New Construction Status of Plan Reviews Completed 05/29/2018Electrical Review N/A 05/31/2018Public Works Review - Site Plan REVISIONS 06/05/2018Fire Department Review - Site Plan COMPLETED 06/06/2018Planning and Zoning Review - Site Plan REVISIONS 07/31/2018Plumbing Review RESUBMIT 07/31/2018HVAC Review COMPLETED 07/31/2018Electrical Review REVISIONS 08/01/2018Planning and Zoning Review - Site Plan REVISIONS 08/01/2018Public Works Review - Site Plan REVISIONS 08/02/2018Building Review REVISIONS 08/08/2018Planning and Zoning Review - Site Plan APPW/COND Permit Review Status Plan Reviews Still in Progress Public Works Review - Site Plan Electrical Review Public Works Review - Site Plan Building Review DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Fire resistance rating of building elements meet Sect. 704 & Table 601 REVISIONS Plans note construction to be III-B. This requires load-bearing structural members on the outside of the building to have the same fire resistance rating as exterior bearing walls (704.10) UNLESS sprinkler protection is extended under projections as identified in IBC 1406.3, exception 3. *Revisions Response : Occupant load is identified on plans as per IBC Section 1004 REVISIONSNo occupant load provided for spectator seating. Does "Bleachers by others" mean there are more plans to be submitted? Cannot determine code compliance for unidentified occupant load. *Revisions Response : Reviewed By: Quinton Owens Review Date: 08/02/2018 Plan Review Details quinton.owens@rexburg.org Building Review Status: REVISIONS Page 1 of 3 Approval of plans does not constitue approval of variance from code Building Review (Continued) D ESCRIPTIO N CO MMEN TS STATUS Aisles meet the requirements of IBC Section 1018 REVISIONSNo detailed drawing of grandstand seating. *Revisions Response : Assembly Exiting meets the requirements of IBC Section 1029 REVISIONSNot able to review grandstand seating. No detailed drawings of assembly seating area are in plans. *Revisions Response : Accessible Entrances are provided as per IBC Section 1105 REVISIONSDid not find ramp details for access to bleachers. *Revisions Response : Assembly Area Seating meets the requirements of IBC Section 1108.2 REVISIONSNo detailed drawing of grandstand seating. *Revisions Response : Special Inspection Contractor is identified (IBC 1704.2.1) REVISIONSWho will be performing special inspections? *Revisions Response : Amount of Plumbing Fixtures meets the requirements of IBC Chapter 29 REVISIONS* The note referencing the additional required restrooms are available inside the high school implies that the high school will be unlocked during any event at the stadium for potential restroom needs. Can this be verified by the school district? There is also a 500 ft travel limitation to the restrooms. * There are only 10 toilets/urinals available general public men's use while the other fixtures are in the "team rooms" Estimated about 4400 occupant load (2200 male/2200 female) for spectator seating without bleacher details. *Revisions Response : Special Inspections are required as per IBC Chapter 17 COMPLETED Use classification is identified as per IBC Section 302 Only A-3 occupancy is listed for the Grandstand. The IBC identifies grandstands as A-5. The team rooms and other spaces under the bleachers could be A-3 making the structure a mixed occupancy. Using the more restrictive A-3 occupancy as shown on plans the Grandstand is approved as a non-separated, mixed use occupancy. COMPLETED Page 2 of 3 Approval of plans does not constitue approval of variance from code Building Review (Continued) D ESCRIPTIO N CO MMEN TS STATUS Additional Inspector Comments: Assigned for review 5/29. No stadium plans, only site plans. Page 3 of 3 Approval of plans does not constitue approval of variance from code