Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00464 - 591 Turin Way - Cantamere - Bldg 5 - 4 PlexPermit Inspection Summary Permit Status of (Issue) as of Report Date: 08/22/2018 10:42 am Permit Details Permit Number: 17-00464 Cantamere - Lot 2 - Building 5 - 4 Plex 630 S Yellowstone Hwy Multi-Family Residential Permit Issued Date: 10/12/2017 Permit Inspection Statistics 23Total Inspections Completed: 17Total Inspections Passed: Inspection Pass Rate: 73.91% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 10/16/2017PassTed DyeFoundation Inspection 10/16/2017PassTed DyeCommercial Footing Inspection 10/23/2017PassTed DyeCommercial Footing Inspection 11/14/2017PassTed DyeSheeting 03/07/2018PassTed DyeCommercial Framing/Structure Inspection 03/08/2018FailTed DyeCommercial Insulation Inspection When fire blocking and fire caulking (fire collars) Please call for a re-inspectionInspector Comments: 03/19/2018FailQuinton OwensCommercial Sheetrock/Drywall Inspection 03/20/2018PassQuinton OwensCommercial Sheetrock/Drywall Inspection 08/15/2018FailTed DyeCommercial Building Final 08/22/2018PassTed DyeCommercial Building Final Electrical Inspection Type 03/06/2018PassBret StoddardCommercial Electrical Rough-in 03/06/2018PassBret StoddardCOM & MFR Electrical Service Inspection 08/13/2018PassBret StoddardCommerical Electrical Final Inspection Fire Inspection Type 03/14/2018PassDale PickeringFire Sprinkler Rough-in 08/13/2018FailBret StoddardFire Alarm Final Inspection 08/15/2018PassDavid DavisFire Department Final Inspection 08/15/2018PassBret StoddardFire Alarm Final Inspection Mechanical Inspection Type 03/06/2018PassDon AllenHVAC Rough-in 08/13/2018FailDon AllenHVAC Final Inspection 08/15/2018PassDon AllenHVAC Final Inspection Page 1 of 2 (Continued) Permit Details Permit Number: 17-00464 Cantamere - Lot 2 - Building 5 - 4 Plex 630 S Yellowstone Hwy Multi-Family Residential Permit Status of (Issue) as of Report Date: 08/22/2018 10:42 am Permit Inspection Summary Plumbing Inspection Type 01/10/2018PassDon AllenPlumbing Rough-in 08/13/2018FailDon AllenPlumbing Final Inspection 08/15/2018PassDon AllenPlumbing Final Inspection Inspections Required Plumbing Underground Inspection Fire Underground Inspection Public Works Initial Site Inspection Plumbing Water Plumbing Sewer Fire Sprinkler Hydro Suspending Ceiling Inspection Fire Sprinkler Final Inspection Public Works Final Inspection Planning and Zoning Final Inspection Sidewalk Inspection Commercial Insulation Inspection Commercial Sheetrock/Drywall Inspection Commercial Building Final Page 2 of 2