HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00185 - 359 W 4th S - The Landing - S Bldg 2 - 28 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Issued Date: 02/20/2018 Permit Inspection Statistics 87Total Inspections Completed: 32Total Inspections Passed: Inspection Pass Rate: 36.78% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/08/2017PARTPASSTed DyeCommercial Footing Inspection 06/14/2017PassTed DyeFoundation Inspection 06/21/2017PassTed DyeCommercial Footing Inspection Spot footings.Inspector Comments: 07/11/2017PassTed DyeCommercial Footing Inspection South section of the East Units.Inspector Comments: 07/11/2017PassTed DyeFoundation Inspection North side of east units.Inspector Comments: 07/14/2017PARTPASSQuinton OwensFoundation Inspection Piers for east half of egress balcony and elevator foundation. * piers for stairs are not secured and ready for pour. Need 1-1/2" rebar clearance to forms. Inspector Comments: 07/19/2017PassTed DyeCommercial Footing Inspection Shovel footings on building "B" WestInspector Comments: 07/20/2017PassTed DyeFoundation Inspection 07/31/2017PARTPASSTed DyeCommercial Footing Inspection 08/03/2017PassTed DyeFoundation Inspection 08/15/2017PassTed DyeCommercial Footing Inspection 09/19/2017FailTed DyeSheeting Sheeting inspection on S.West building 1st and 2nd levels only. All locations that missed having the sheeting nailed to the studs have been marked with green paint. Inspector Comments: Sheeting east of breezeway: * Numerous locations missed nailing or spacing too far. * Inspection discontinued. Have framer double check nailing prior to re inspection. Inspector Comments: 09/27/2017FailQuinton OwensSheeting Re-inspection of first and second floor sheeting west of breezway - APPROVEDInspector Comments: Page 1 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary 10/02/2017PARTPASSQuinton OwensSheeting Approved for cover: * Roof sheathing only on building section west of breezeway. Inspector Comments: 10/12/2017PARTPASSTed DyeSheeting Building B, East building,1st floor; Sheeting on the 1st floor is ok to cover.Inspector Comments: 10/24/2017PassTed DyeSheeting Level 2 of South East buildingInspector Comments: 10/26/2017PassTed DyeSheeting Inspection of 4th floor, East half.Inspector Comments: 11/03/2017FailTed DyeCommercial Framing/Structure Inspection Truss inspection onlyInspector Comments: 11/06/2017PARTPASSTed DyeCommercial Framing/Structure Inspection Roof truss's inspection onlyInspector Comments: 11/13/2017FailTed DyeCommercial Framing/Structure Inspection Inspected just the very west unit Those things that need to be fixed are marked with orange paint. The rest of the units should be fixed in like manner. Those plastic pipes that do not have the annular space needed for fire caulk should have sheetrock place on top or bottom of the plate leaving an annular large enough to have the right amount of fire caulk. Small pipes = 3/8" Large pipes up to 3" should have 5/8' to 3/4" Inspector Comments: 11/14/2017PARTPASSTed DyeCommercial Framing/Structure Inspection This inspection is for the west half of the 4th floor of building B.Inspector Comments: 11/16/2017FailTed DyeCommercial Framing/Structure Inspection Inspection of Building B, 3rd Floor, West Half.Inspector Comments: Page 2 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary 2nd Level of west section of south building (2104-2107): * "squash blocks" needed in floor under point loads next to doors and windows. * Multiple or Large holes too close to bearing points (per manufacturer tables) * Interior bearing walls (fire-rated) have some open penetrations in top and bottom plates missing "fireblocking" (fire caulking is not required through plates inside rated walls intersecting a rated ceiling) * Open penetrations in non-bearing wall top & bottom plates require fire caulking * Add vertical fireblock at gap in double walls every 10 ft (insulation?) * Notched joist flange in unit 2204 & 2207 * Bathtub drains are not completed * "Fireblock" penetrations in floor above separation walls * Multiple tears in flexible exhaust vents * Fire caulk penetrations at intersecting rated and non-rated walls. * Insulate exterior walls by tubs to required R-value, including behind grab bar reinforcement and corners. * Shims at bearing on south window header in unit 2207. Inspector Comments: What is rating of stucco in breezeway?Inspector Comments: Page 3 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary 11/28/2017FailQuinton OwensCommercial Framing/Structure Inspection First floor inspection notes; By Ted Unit 2104 * Anchor bolts needed in bearing walls (being verified by architect/engineer) * Wall left of washer and dryer is loose. Concrete nails needed in the bottom plate. * Squash blocks needed above window and door king studs and trimmers(3 total on each side). * Fire caulk penetrations in top plates and through rim joist between units. Unit 2105 * Anchor bolts in bearing walls. * Squash blocks * Fire block all penetrations in top plates and rim joist between units. * Duct of exhaust vent is broken in multipal locations. * Mechanical has not been completed. * Nail plates needed for plumbing pipes. Unit 2106 * Nail plates for plumbing pipes. * Squash blocks. * Fire caulk all penetrations in top plates and rim. * Anchor bolts in bearing walls. Unit 2107 * Squash blocks * Fire caulk all penetrations in top plates and rim joists between units. * Plumbing nail plates through out unit * More backing is needed behind toilet of the east bathroom * Fire caulk gas lines through the rim joist between units. * Anchor bolts in bearing walls. Inspector Comments: 11/30/2017PARTPASSQuinton OwensCommercial Insulation Inspection East section of building: 4th level spray foam insulation under roof deck approved to finish insulating roof with blown insulation. Remainder of 3rd & 4th level insulation behind tubs completed for cover - correction still in progress to east exterior wall for proper R-20 min. Floors were not all ready to insulate - missing squash blocks at windows and doors are being installed. Inspector Comments: 12/04/2017FailTed DyeCommercial Sheetrock/Drywall Inspection Pre-rock behind tubs has not been fire taped. Units inspected are 2404, 2405, 2406 and 2407. Call back to inspect fire tape behind tubs. All other walls are approved to have drywall hung from units 2404 through 2407. Inspector Comments: Page 4 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary 12/04/2017PARTPASSTed DyeCommercial Insulation Inspection 12/04/2017PARTPASSTed DyeCommercial Framing/Structure Inspection UNITS INSPECTED: 2304-2307Inspector Comments: 12/05/2017PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 12/06/2017PARTPASSTed DyeCommercial Insulation Inspection 2204-2207Inspector Comments: 12/07/2017PARTPASSTed DyeResidential Insulation Inspection 12/13/2017PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection * 4th floor east section (units 1,2,& 3) approved for taping. * 3rd floor pre-rock in bathrooms: missing drywall rating in chase on west end; gaps in corner to be rated behind tubs (finish drywall will seal corners above tubs)- approved to hang drywall in bedrooms, hallway, exterior walls and ceilings. * 2nd floor east section (units 1,2,& 3): gaps in corner to be rated behind tubs (finish drywall layer will seal corners above tubs); some units are not done with rating in chase by tubs. Inspector Comments: 12/18/2017FailTed DyeCommercial Insulation Inspection 12/29/2017PARTPASSQuinton OwensCommercial Framing/Structure Inspection Items that are carried over from the 12-27-17 are; 2201 nail plates 2202 fire caulk smurf tube. 2203 nail plates needed on drain pipe above east tub. fire caulk water lines in east separation wall in floor cavity 2304 Fire alarm wire needs to have fire caulk in the annular cavity located on east living room studded wall. 2205 More fire caulk is needed around the sprinkler line 2206 fire caulk smurf tube 2207 fire caulk smurf tube ***Check water lines in each unit in the floor joist where the go through the separation wall for fire caulk.*** Inspector Comments: 01/01/2018FailTed DyeCommercial Sheetrock/Drywall Inspection 01/05/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection LEVEL 3 Inspected fire taping in pre-rock locations. APPROVED LEVEL 2 Chase dryall. Inspector Comments: 01/09/2018PARTPASSTed DyeCommercial Insulation Inspection 01/10/2018PassTed DyeCommercial Sheetrock/Drywall Inspection Fire caulk completed on 1st and 4th floors.Inspector Comments: Page 5 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary 01/16/2018PARTPASSTed DyeResidential Sheetrock/Drywall Inspection 2nd floor drywall is ok to tape and texture 3rd floor 2304 A 1hr. fire rating is needed around the exhaust vent in the east bathroom. all other locations in 2301-2304 are good to hang the furdowns. All Mechanial closets on 3rd level need to have the gas line fire caulked where they penetrate the ceiling, and all penetrations through the seperation wall between units need to be fire caulked Inspector Comments: 01/31/2018PassTed DyeCommercial Sheetrock/Drywall Inspection Units inspected;2101-2102, 2104-2107 These units are approved to tape and texture. Inspector Comments: 02/09/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection * Pre-rock behind tubs on 4th level only - approved to install tubs * Concealed cavities next to some tubs are not all completed and will be re-inspected. Inspector Comments: 02/09/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection Roof framing only - Approved to insulate roof.Inspector Comments: 02/22/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Date of inspection was 2-2-18Inspector Comments: * Concern for fire rating around horizontal PVC pipe in exercise area. May need to hang walls all the way up and rate dropped ceiling below pipe. Inspector Comments: 03/20/2018PARTPASSQuinton OwensCommercial Insulation Inspection Approval to cover is pending on all rough-in approvals.Inspector Comments: 04/05/2018PARTPASSTed DyeCommercial Building Final Page 6 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary Electrical Inspection Type 10/31/2017N/ABret StoddardCommercial Electrical Rough-in 11/07/2017PARTPASSBret StoddardResidential Electrical Rough-in 11/14/2017PARTPASSBret StoddardResidential Electrical Rough-in 11/28/2017PARTPASSBret StoddardCommercial Electrical Rough-in 12/05/2017PARTPASSBret StoddardResidential Electrical Rough-in 12/07/2017PARTPASSBret StoddardResidential Electrical Rough-in 12/07/2017PassBret StoddardResidential Electrical Service Inspection 12/13/2017PassBret StoddardCOM & MFR Electrical Service Inspection 12/22/2017PARTPASSBret StoddardResidential Electrical Rough-in 01/08/2018PARTPASSBret StoddardResidential Electrical Rough-in 01/16/2018PARTPASSBret StoddardCommercial Electrical Rough-in 01/25/2018PARTPASSBret StoddardCommercial Electrical Rough-in 02/20/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/14/2018PARTPASSBret StoddardCommerical Electrical Final Inspection 03/28/2018PARTPASSBret StoddardCommerical Electrical Final Inspection 04/04/2018PassBret StoddardResidential Electrical Final Inspection 06/04/2018FailBret StoddardCommercial Electrical Final Inspection Fire Inspection Type 10/19/2017N/ADale PickeringFire Sprinkler Rough-in 11/29/2017PassDale PickeringFire Sprinkler Rough-in 11/29/2017PassDale PickeringFire Sprinkler Rough-in 12/11/2017PassDale PickeringFire Sprinkler Rough-in 12/11/2017PassDale PickeringFire Sprinkler Rough-in 12/11/2017PassDale PickeringFire Sprinkler Rough-in 02/06/2018N/ADale PickeringFire Sprinkler Rough-in 03/26/2018PassDale PickeringFire Sprinkler Hydro 04/04/2018FailBret StoddardFire Alarm Final Inspection 04/05/2018PassBret StoddardFire Alarm Final Inspection 04/06/2018PassDale PickeringFire Sprinkler Final Inspection Page 7 of 8 (Continued) Permit Details Permit Number: 17-00185 The Landing - South Bldg 2 - 28 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:12 am Permit Inspection Summary Mechanical Inspection Type 10/18/2017PassDon AllenHVAC Rough-in 12/06/2017PassDon AllenHVAC Rough-in 01/22/2018PARTPASSDon AllenHVAC Rough-in 01/25/2018PassDon AllenHVAC Rough-in 02/23/2018PassDon AllenHVAC Rough-in 04/02/2018FailDon AllenHVAC Final Inspection The following apt. need duct sealant on the duct work 2406 2407 2301 2305 2102 2101 The following apt. exhaust fans in the bathrooms don't work 2303 2302 2307 2206 2207 2204 2205 2201 2202 Inspector Comments: 04/04/2018PassDon AllenHVAC Final Inspection Good for the C/OInspector Comments: Plumbing Inspection Type 07/11/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing under ground as per prints. Will need to look at the underground if any thing changes from the print. Inspector Comments: 07/24/2017PassDon AllenPlumbing Sewer Good to cover the sewer line according to Brian Hill on 7/21/2017Inspector Comments: 08/09/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing under groundInspector Comments: 10/27/2017PARTPASSDon AllenPlumbing Rough-in 01/25/2018FailDon AllenPlumbing Rough-in 04/02/2018PARTPASSDon AllenPlumbing Final Inspection The ADA apt. needs to be finished trimmed out.Inspector Comments: 04/05/2018PassDon AllenPlumbing Final Inspection Page 8 of 8