Loading...
HomeMy WebLinkAboutINSPECTION SUMMARY - 17-00184 - 359 W 4th S - The Landing - N Bldg 1 - 26 UnitsPermit Inspection Summary Permit Status of (Open) as of Report Date: 11/20/2018 8:07 am Permit Details Permit Number: 17-00184 The Landing - North Bldg 1 - 26 Units 359 W 4th S Multi-Family Residential Permit Issued Date: 02/20/2018 Permit Inspection Statistics 83Total Inspections Completed: 37Total Inspections Passed: Inspection Pass Rate: 44.58% Permit Inspection History *Refer to Individual Inspection Report for more Details Building Inspection Type 06/14/2017PassTed DyeCommercial Footing Inspection Vertical rebar is tied in place.Inspector Comments: 06/21/2017PassTed DyeCommercial Footing Inspection Spot footingsInspector Comments: 06/22/2017PassTed DyeFoundation Inspection 07/14/2017PassQuinton OwensFoundation Inspection Piers for east half of egress balcony and elevator foundation.Inspector Comments: 08/03/2017PassTed DyeFoundation Inspection 08/05/2017PassTed DyeCommercial Footing Inspection 10/19/2017PassTed DyeSheeting Sheeting inspection of roof plywood on North building both A and B. South building A, checked sheeting on pop up on 4th floor about center of building A on the South Exterior Wall. Inspector Comments: 10/23/2017PARTPASSTed DyeSheeting 2nd and 3rd level sheeting inspectionInspector Comments: 10/30/2017FailTed DyeSheeting Inspection of 1st 2nd 3rd and the 4th floor for nailing ov sheeting to studs. Those areas that missed having the sheeting nailed to the studs have been marked with green marking paint. The sheeting needs to be nailed all around the building on the bottom plate with galv. nails. Make corrections then please call for a reinspection. Thank You Inspector Comments: 10/31/2017PARTPASSTed DyeSheeting Sheeting completed on building 1, east half, 4 floors.Inspector Comments: 11/06/2017PassTed DyeCommercial Framing/Structure Inspection Roof truss inspection only.Inspector Comments: 11/06/2017PassTed DyeSheeting All corrections have been completed. OK to cover exterior.Inspector Comments: Page 1 of 5 (Continued) Permit Details Permit Number: 17-00184 The Landing - North Bldg 1 - 26 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:07 am Permit Inspection Summary 11/09/2017PassTed DyeSheeting Sheeting inspections completed. All of building #1Inspector Comments: 02/07/2018FailQuinton OwensCommercial Sheetrock/Drywall Inspection Pre-rock behind tubs for fire rated walls and early inspection of fire blocking and fire caulking top and bottom plates in walls. Inspector Comments: 02/15/2018FailQuinton OwensCommercial Framing/Structure Inspection 4th level framing approved to insulate walls. Above items will be re-inspected with insulation Inspector Comments: 02/22/2018PARTPASSQuinton OwensCommercial Insulation Inspection Fourth level only approved for hanging drywall. * Except at concealed cavities next to tubs which are not all approved for cover. * Call for rated ceiling inspection in halls before hanging dropped ceilings. Inspector Comments: 02/23/2018PassTed DyeCommercial Sheetrock/Drywall Inspection 03/01/2018PARTPASSTed DyeCommercial Insulation Inspection 03/01/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection 03/02/2018PARTPASSTed DyeCommercial Insulation Inspection 03/06/2018PARTPASSTed DyeCommercial Insulation Inspection Units that the exterior and the sound insulation was inspected are; Units 3101-3104 Inspector Comments: 03/06/2018PARTPASSTed DyeCommercial Sheetrock/Drywall Inspection Units that had the drywall inspected; 1401-1404Inspector Comments: 03/13/2018PARTPASSTed DyeCommercial Insulation Inspection 03/14/2018PARTPASSTed DyeCommercial Insulation Inspection 4th level rated assemblies above dropped ceiling areas.Inspector Comments: 03/16/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Bearing walls and ceiling in standpipe enclosures shall have fire rated protection.Inspector Comments: 03/16/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection Manager's unit and Office onlyInspector Comments: 03/16/2018PARTPASSQuinton OwensCommercial Insulation Inspection Manager unit and office only.Inspector Comments: Framing in Common room only.Inspector Comments: 03/20/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection PVC pipe at ceiling in exercise room does not provide space for continuous double layer drywall at joist. Fire rating will need to be at fur down ceiling. Inspector Comments: Pre-rock areas on 3rd floor. (Started on 2nd floor (only 2 units hung and taped - inspected for nailing?) Inspector Comments: Page 2 of 5 (Continued) Permit Details Permit Number: 17-00184 The Landing - North Bldg 1 - 26 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:07 am Permit Inspection Summary 03/22/2018FailQuinton OwensCommercial Sheetrock/Drywall Inspection Bath exhaust vent disconnected above bathroom in unit 1203.Inspector Comments: 03/22/2018FailQuinton OwensCommercial Framing/Structure Inspection 1st level framing.Inspector Comments: 03/23/2018FailQuinton OwensCommercial Framing/Structure Inspection Re-inspect 1st floor corrections. Thor called and will request new inspection on Monday. Inspector Comments: 03/26/2018PARTPASSQuinton OwensCommercial Sheetrock/Drywall Inspection Dropped ceilings in 3rd floor apartments are approved for hanging.Inspector Comments: 03/30/2018PARTPASSQuinton OwensCommercial Framing/Structure Inspection ** Approved to insulate** Need re-inspection of remaining items. Inspector Comments: 04/10/2018PassTed DyeCommercial Framing/Structure Inspection Fire caulking and taping completed, on 2nd floor, in each chase.Inspector Comments: 05/02/2018PassTed DyeCommercial Sheetrock/Drywall Inspection All pre rock in halls,Bathrooms and in living area Units 1201-1207 are ok to tape and texture Inspector Comments: 06/12/2018PassTed DyeCommercial Framing/Structure Inspection 07/19/2018PassTed DyeCommercial Building Final Confirm fire rating of transfer grills in hallways in bearing wall.Inspector Comments: 07/31/2018PassTed DyeCommercial Footing Inspection Dumpster pad footings.Inspector Comments: 08/01/2018PassTed DyeFoundation Inspection Page 3 of 5 (Continued) Permit Details Permit Number: 17-00184 The Landing - North Bldg 1 - 26 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:07 am Permit Inspection Summary Electrical Inspection Type 07/21/2017PARTPASSBret StoddardElectrical Underground Inspection 12/13/2017PARTPASSBret StoddardCommercial Electrical Rough-in 01/08/2018PARTPASSBret StoddardResidential Electrical Rough-in 01/16/2018PARTPASSBret StoddardCommercial Electrical Rough-in 01/25/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/06/2018PARTPASSBret StoddardResidential Electrical Rough-in 03/14/2018PassBret StoddardCommercial Electrical Rough-in 03/16/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/16/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/16/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/26/2018FailBret StoddardCOM & MFR Electrical Service Inspection 03/27/2018PARTPASSBret StoddardCommercial Electrical Rough-in 03/28/2018PassBret StoddardCOM & MFR Electrical Service Inspection 03/29/2018PARTPASSBret StoddardCommercial Electrical Rough-in 04/18/2018PassBret StoddardCommercial Electrical Final Inspection 04/23/2018PARTPASSBret StoddardCommercial Electrical Rough-in 05/02/2018PassBret StoddardCommercial Electrical Rough-in 05/29/2018PARTPASSBret StoddardCommercial Electrical Final Inspection 07/16/2018FailBret StoddardCommercial Electrical Final Inspection 07/18/2018PassBret StoddardCommercial Electrical Final Inspection Fire Inspection Type 12/11/2017PassDale PickeringFire Sprinkler Rough-in 12/11/2017PassDale PickeringFire Sprinkler Rough-in 02/06/2018PassDale PickeringFire Sprinkler Rough-in 03/14/2018PassDale PickeringFire Sprinkler Rough-in 06/07/2018PassBret StoddardFire Alarm Final Inspection 06/14/2018FailDale PickeringFire Sprinkler Final Inspection 06/25/2018PassDavid DavisFire Sprinkler Final Inspection 07/25/2018PassDale PickeringFire Department Final Inspection Page 4 of 5 (Continued) Permit Details Permit Number: 17-00184 The Landing - North Bldg 1 - 26 Units 359 W 4th S Multi-Family Residential Permit Status of (Open) as of Report Date: 11/20/2018 8:07 am Permit Inspection Summary Mechanical Inspection Type 12/06/2017PassDon AllenHVAC Rough-in 01/09/2018PARTPASSDon AllenHVAC Rough-in This inspection was meant for building 2, 3rd floor mechanical in dropped ceiling. Inspection was done anyway for vents in ceiling of 3rd floor (the only mech. ready for inspection. Inspector Comments: A hole was found in bathroom exhaust vent in unit 1303Inspector Comments: 01/17/2018PARTPASSQuinton OwensHVAC Rough-in 1307 does not appear ready. Exhaust vent hanging in middle of bedroom.Inspector Comments: 03/16/2018PARTPASSDon AllenHVAC Rough-in 04/24/2018PassDon AllenHVAC Rough-in 07/18/2018PassDon AllenHVAC Final Inspection Plumbing Inspection Type 07/24/2017PassDon AllenPlumbing Underground Inspection Good to cover the plumbing underground according to Brian Hill on 07/20/2017Inspector Comments: 08/02/2017PassDon AllenPlumbing Underground Inspection good to cover the plumbing undergroundInspector Comments: 12/01/2017FailDon AllenPlumbing Rough-in Need to have some of the drains fixed they are back pitched.Inspector Comments: 02/07/2018PassDon AllenPlumbing Rough-in 02/09/2018PassDon AllenPlumbing Rough-in 02/27/2018FailDon AllenPlumbing Rough-in The hard line that runs to the kitchen sink will need to have a main shut off for each unit. need to fix the 3 inch clean out above the tub/shower on the 1st floor. Inspector Comments: 03/01/2018PARTPASSDon AllenPlumbing Rough-in 04/18/2018PARTPASSDon AllenPlumbing Final Inspection 07/18/2018PassDon AllenPlumbing Final Inspection Page 5 of 5