Current Planning and Zoning Review - Site Plan Status: REVISIONS
Application Number: 18-00528Permit Details
Application Received Date: 09/24/2018
Building - Commercial
Application Approved Date:
Application Approved Status: ACCEPTED
09/24/2018
859 S Yellowstone Hwy
Dr Coray Office - New Building
Status of Plan Reviews Completed
09/24/2018Electrical Review REVISIONS
09/26/2018Fire Department Review - Site Plan COMPLETED
09/27/2018Planning and Zoning Review - Site Plan REVISIONS
09/28/2018Public Works Review - Site Plan APPW/COND
10/02/2018Plumbing Review COMPLETED
10/02/2018HVAC Review COMPLETED
10/02/2018Building Review REVISIONS
Permit Review Status
Plan Reviews Still in Progress
Electrical Review
Planning and Zoning Review - Site Plan
Building Review
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Checked for linked cases YES
Parking lot handicapped requirements REVISIONSIdentify one van accessible space.
*Revisions Response :
Internal pedestrian walkways per zone REVISIONSsidewalks next to parking spaces are required to
be 6' wide unless wheel stops are provided.
*Revisions Response :
Fencing/screening (HVAC equipment, dumpsters,
parking, etc)
REVISIONSTrash facilities not shown on plan.
*Revisions Response :
Trash dumpster shown and screened & for
right-hand truck
REVISIONS
*Revisions Response :
Clear site triangle N/A
Show existing and proposed easements N/ADefer to Public Works. The building is being
constructed in a subdivision that was reviewed
previously.
Reviewed By: Val Christensen
Review Date: 09/27/2018
Plan Review Details
val.christensen@rexburg.org
Planning and Zoning Review - Site Plan Status: REVISIONS
Page 1 of 3
Approval of plans does not constitue approval of variance from code
Planning and Zoning Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Lighting Plan N/ADefer to Public Works.
Design standards Committee meeting held N/A
Check conditional use permit N/A
Plans are approved for a footing/foundation
ONLY permit?
N/A
Unloading, loading area N/A
No utility boxes in right of way?N/ADefer to Public Works.
Dumpsters: 1 per 20 Units (non-dorm) or 1 per
50 beds (Dorm)?
N/A
Street profile N/A
Easements N/ADefer to Public Works.
Addressable N/A
Streets labeled COMPLETED
Parking spaces located in close proximity to
buildings
COMPLETED
Sidewalks along right of way access main streets COMPLETED
Snow storage COMPLETED
Open/common spaces functional COMPLETED
Amount of Permeable vs. Non-Permeable Surface COMPLETED
Architectural design standards COMPLETED
Buffering/landscaping requirements COMPLETED
Legal desciption of proposed building site
included
The building is being constructed in a
subdivision that was reviewed previously. The
dimensions of the lot are shown and match
those found in GIS.
COMPLETED
Use is consistent with zoning designation COMPLETED
Compliance with comprehensive plan COMPLETED
Flood plain check COMPLETED
Page 2 of 3
Approval of plans does not constitue approval of variance from code
Planning and Zoning Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Plans are to scale COMPLETED
North arrow & Streets labeled COMPLETED
Building setbacks (front,side,back yards)COMPLETED
Building height COMPLETED
Minimum distance between buildings COMPLETED
Driveway, parking lot dimensions COMPLETED
Parking space number COMPLETED
Parking space sizes COMPLETED
Parking aisle widths COMPLETED
Bldg location, sq ft, dimensions, distance to
property lines & between bldgs
COMPLETED
Page 3 of 3
Approval of plans does not constitue approval of variance from code