Loading...
HomeMy WebLinkAboutAPPLICATION - 16-00569 - The Medicine Shoppe - ShedCITY OF REXBURG America's Family Community PERMIT POLICIES ACKNOWLEDGMENT Building Safety Department City of Rexburg 35 North 1St East Rexburg, Idaho 83440 The City of Rexburg Building Safety Department is determined to provide excellent customer service. In an effort to help you understand the City of Rexburg Permit Policies, listed below are several policies which you are required to know prior to proceeding with your project. o APPROVAL OF CONSTRUCTION. Construction on any project can begin ONLY when you have received a Pink Building Permit from the Building Department. Occupancy of any structure can begin ONLY when you have received an official in tiais Certificate of Occupancy from the Building Department. These documents must be signed b the a es from the City of Rexburg. Any approvals can be verified by calling (208) 372-2167. Even if you hear from ninspectoriatlthat 'you're good to go', ultimately if you do not have a Building Permit or Certificate of Occupancy, the above policies will be enforced. o SCHEDULING INSPECTIONS. Scheduling inspections is the responsibility of the applicant and their contractor. Inspections need to be called into the hotline and not to the inspector. Inspections called in later than 8 AM will be scheduled for the initials following business day. If an inspection is not done, the inspector may require any measures to be taken to allow him to correctly perform the inspection. (Example: If the electrical rough in inspection is not done and the sheetrock has been put up, the inspector may require the sheetrock to be removed in order to perform the electrical rough in inspection.) STAIRWAYS REQUIRED. On jobsites for multi-level buildings the contractor must provide temporary stairs so that workers and inspectors can safely access upper levels of the building. If these stairs are not provided, inspections may ais not be completed. Extenuating circumstances will need to be approved by the Building Department. DIGITAL AS -BUILT PLANS. A Certificate of Occupancy will not be issued without digital copies of the As -Built Plans. It is the Applicant's responsibility to turn in digital copies of the As -Built Plans when the project is completed. No Certificate of initiais Occupancy will be issued without these plans, extenuating circumstances will need to be approved by the Building Department. o OCCUPYING A FINISHED BUILDING. No building may be occupied without receiving a signed Certificate of Occupancy. If a building is occupied without receiving a signed Certificate of Occupancy, citations may be issued and the occupants may Initials be required to vacate. o MAKING KNOWN POLICIES. It is your responsibility to inform anyone on your project of the above policies. All sub- contractors will be held to this standard with no exceptions. The above policies will be enforced to all, regardless if this rials information is passed on to them or not. Applicant's Name (print): ��-plLc �R�t �- Signature"called Date: 8 Inspections must be called in before 8 AM on the day the inspection is requested. InspM 11 be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org 72.2 41 Revised 10/2016 OF gEXB UQC C1 TY o F Building Safety Department RExBuRG City of Rexburg "" America's Family Community 35 North 1St East Rexburg, Idaho 83440 PROPERTY LINES Each site plan that is submitted to the City of Rexburg for the Building Permit process requires that property lines are shown accurately. It is the Developer's responsibility to correctly identify on the site plan the location of these lines in reference to the public right-of-way, other adjoining property lines, the street, other structures and all utility lines. The Developer should find property pins that are still available at the lot in question. If these pins do not exist or have become unrecognizable then a new survey should be performed. Accurate property line information is a must for a timely review. In addition to finding existing property pins, legal descriptions should be checked. The best way to identify property line location is with a land survey. The City of Rexburg has aerial photos and a parcel line layer that can be checked, but they are only a tool and are not guaranteed for accuracy. If you want to request a copy of your lot, see the front counter at the Community Development Department. I have read and understand the above requirements. Si nature Valy--X Printed Name Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician -208 ( ) 372.2341 Revised 10/2016 o� �exaupa U� 7 C1 TY o > Building Safety Department REXBURGBUILDING PERMIT FORM 4 05 City of Rexburg clv Updated 03/2018 America's Family Community 35 North 1st East Rexburg, Idaho 83440 BUILDING APPLICATION Commercial Accessory Structure For Office Use Permit Number: �(p - pr�{(e Zoning: 1. PropeM Owner Name: 11m, o� Address:I(C C&-) City: M�1►.l S`C- Phone: 2. ApplicApt Application Fee Paid: ❑ $100 State: 0' Zip Code: 3li Email: Name: (.a AP_t.J( 2_ (moo r_-�'C ?-TIL3(� Role: (Owner, Tenant, Contractor, etc. >YQ� Address: �6 Z't? ) -Co Phone: — 3 — /(off p City' �!� g`,� State: _ t L5 Zip Code: _S 3`/ NO Email: tea. wJb'fZta�.1-C�1 I�Ci�ra�� Ati �p{� Contact/Rep. Name: lrA LG ��`� 3. General Contractor Under Idaho Building Code, a registered contractor is required to do construction on a commercial property. Name: unt- Awt� Cit i� VG Address: Registration #: Phone: Contact/Rep. Name: City: State Email: Phone: Email: Exp.: _ Zip Code: General Contractor Authorized Signature: A co 0 g / q Date: py fyour state re istration license is required to be on file. If this is t e first time you have done work in the City of Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is an file, plea check with the Permit Technician by calling (208) 372-2341. 4. Project Description Structures less than 200 square feet do not need a building permit Structures 200 square feet or larger need a building permit and must adhere to the setback rules of the zone in which they are built. Address: I lel- l,J • M A , t� - Project Description: • Estimated Total Cost: $_ 5 p{Z•j • Type of structure: • Square Feet of Structure: Z 130 sq ft ❑ Deck ❑ Garage/Car port Shed/Shop ❑ Other: Explain • Check All Included in Scope of Work: ❑ Mechanical Work Cost: $ ❑ Electrical Work Cost: $ t Note: Any contractors involved will need to fill out their respective application. El Plumbing Work Cost: $ Building Permit fees for accessory structures are charged based on square footage and the City's estimated valuation. For details on how fees are calculated, contact the Building Department. There will also be a plan review fee totaling 10% of the building permit fee. APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): -419 C.p wt V-- Signature: i Date: l i7 Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341 O4 gBXBU,QG F� �a CITY o > Building Safety Department U REXBURG BUILDING PERMIT FORM220 City of Rexburg UPd «do3 tote 35 North 1St East America's Family Community Rexburg, Idaho 83440 BUILDING APPLICATION Commercial Electrical For Office Use Permit Number: Electrical Fees Paid ❑ 1. Property Owner Name: Address: Phone: City: State: _ Zip Code: Email: 2. Electrical Contractor Under Idaho Building Code, a registered contractor must do the work for a Commercial Building. Business:= State License #: Address: Exp.: Phone: City: State: _ Zip Code: Email: Contact/Rep. Name: Phone: Email: Electrical Contractor Authorized Signature: A copy ofyour state registration/license is required to be on file. If this is the first timeyou have done work in the Cityof Rexburg, please provide a photo copy ofyour license. Ifyou are unsure ifyour license is on file, please check with the Permit Technician by calling (208) 372-2341. 3. Project Description Address: Description of work: ❑ Project Cost: $ Cost of project: Calculation for inspection fee: If project cost is between $0 to $10,000 then: Cost o ( f project '2%) + $60 If project cost is between $10,001 to $100, 000 then: ((Cost of project - $10, 000) * 1 %) + $260 If project cost isgreater than $100,001 then: Cost o (( ofproject - $100, 000) * �/z%) + $1160 There will also be a plan review fee totaling 10% of the above fee. APPLICANT'S SIGNATURE, CERTIFICATION AND AUTHORIZATION: Under penalty of perjury, I hereby certify that I have read this application and state that the information herein is correct and I swear that any information which may hereafter be given by me in hearings before the Planning and Zoning Commission or the City Council for the City of Rexburg shall be truthful and correct. I agree to comply with all City regulations and State laws relating to the subject matter of this application and hereby authorized representatives of the City to enter upon the above-mentioned property for inspections purposes. NOTE: The building official may revoke a permit on approval issued under the provisions of the 2012 International Code in cases of any false statement or misrepresentation of fact in the application or on the plans on which the permit or approval was based. Permit void if not started within 180 days. Permit void if work stops for 180 days. Applicant's Name (print): Signature: Date: Inspections must be called in before 8 AM on the day the inspection is requested. Inspection requests called in after 8 AM will be scheduled for the next business day. Inspection Hotline - (208) 372.2344 www.rexburg.org Permit Technician - (208) 372.2341