HomeMy WebLinkAboutREVIEW REPORT - 18-00220 - 297 E 7th N - Covey Cove - 4 PlexReview
Report
Current Public Works Review - Site Plan Status: REVISIONS
Application Number: 18-00220Permit Details
Application Received Date: 04/30/2018
Multi-Family Residential
Application Approved Date:
Application Approved Status: ACPTW/COND
04/30/2018
Application Approved Date:
Application Approved Status: ACPTW/COND
04/30/2018
297 E 7th N
Covey Cove - 4 Plex
Status of Plan Reviews Completed
05/04/2018Planning and Zoning Review - Site Plan REVISIONS
05/17/2018Public Works Review - Site Plan REVISIONS
05/18/2018Electrical Review REVISIONS
05/21/2018Fire Department Review - Site Plan REVISIONS
05/21/2018Plumbing Review RESUBMIT
05/21/2018HVAC Review COMPLETED
05/22/2018Building Review COMPLETED
06/25/2018Public Works Review - Site Plan REVISIONS
06/26/2018Fire Department Review - Site Plan COMPLETED
06/26/2018Planning and Zoning Review - Site Plan COMPLETED
Permit Review Status
Plan Reviews Still in Progress
Electrical Review
Public Works Review - Site Plan
DESCRIPTION COMMENTS STA TUS
*Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed!
Plans are approved for a footing/foundation
ONLY permit?
YES
Checked for linked cases YES
Miscellaneous Review REVISIONSRight of way will need to be deeded to the city.
*Revisions Response :
Sewer: Line size/slope/type materials REVISIONSPlans need to be submitted to DEQ for
Approval.
*Revisions Response :
Street : Sidewalk setback/continuos REVISIONSSidewalk and street must connect to existing
curb and gutter and sidewalk farther to the
West of development per development
agreement.
*Revisions Response :
Reviewed By: Joel Gray
Review Date: 06/25/2018
Plan Review Details
joel.gray@rexburg.org
Public Works Review - Site Plan Status: REVISIONS
Page 1 of 2
Approval of plans does not constitue approval of variance from code
Public Works Review - Site Plan (Continued)
D ESCRIPTIO N CO MMEN TS STATUS
Water : Connection to main line REVISIONS16" Water already on south side of 7th N. and
should be hot tapped not a tee inserted in
existing water line.
*Revisions Response :
No utility boxes in right of way?N/ANot on plans.
Dumpsters: 1 per 20 Units (non-dorm) or 1 per
50 beds (Dorm)?
COMPLETED
Miscellaneous Review Where is the runoff at the curb in 7th N going?COMPLETED
Sewer: Manhole placement COMPLETED
Sewer: Connection to mainline COMPLETED
Street : Street wdith/cross slove/running slope Coordinate with City for road alignment for 7th
N.
COMPLETED
Street : Entrance placement COMPLETED
Water : Valve placement Curb stop for culinary service to have standard
5" valve box and be supported to not rest on
1.5" pipe.
COMPLETED
Storm : Drainage calcs COMPLETED
Storm : On-site retention COMPLETED
Site Lighting : Photometric layout Site lighting on plans but no details about the
lighting.
COMPLETED
Site Lighting : Pole height COMPLETED
Parking Lot : Drainage COMPLETED
Parking Lot: Accessibility/layout Garbage truck turn around is not acceptable.COMPLETED
Page 2 of 2
Approval of plans does not constitue approval of variance from code