HomeMy WebLinkAboutMAP & DRAINAGE PLAN - 18-00528 - 859 S Yellowstone Hwy - Dr Coray Office - New BuildingSHEET 1 COVER SHEET SHEET 2 CONSTRUCTION NOTES SHEET 3 GRADING AND DRAINAGE City of Rexburg Date: Connect Engineering Date: APPROVAL SIGNATURES: REXBURG, IDAHO 1150 Hollipark Dr. Idaho Falls, ID 83401 208.681.8590 The Civil Connection INDEX TO PLAN SHEETS DEVELOPMENT DRAWINGS FOR: CORAY MEDICAL CENTER REXBURG, IDAHO STATE MAP VICINITY MAP SITE MAP of1 SHEET NO. 3 PLOT DATE: 10/16/2018 3:46 PM DATE: OCTOBER 10, 2018 ORIGINAL STAMP: BLAKE JOLLEY DATED: 10-10-2018 ON FILE AT: CONNECT ENGINEERING GENERAL NOTES 1. All materials, workmanship, and construction of site improvements shall meet or exceed the work standards and specifications set forth by the CITY OF REXBURG standard specifications and drawings, and and requirements of the Idaho Standards for Public Works Construction, (ISPWC) current edition. 2. All material furnished on or for the project must meet the minimum requirements of the approving agencies or as set forth herein, whichever is more restrictive. 3. The Contractor is cautioned that the location and/or elevation of existing utilities, as shown on these plans, is based on records of the various utility companies and where possible, measurements taken in the field. The Contractor must call the local utility location center at least 48 hours before any excavation to request exact field locations of the utilities. 4. A Pre-Construction Conference shall be held a minimum of three (3) working days prior to start of work. All Contractors, Subcontractors and/or Utility Contractors shall be present. 5. All lot dimensions and easements are to be taken from the Final Plat of the recorded subdivision plat. 6. The Contractor shall maintain all existing drainage and sanitary sewer facilities within the construction area until the drainage improvements are in place and functioning. 7. All Contractors working within the project boundaries are responsible for compliance with all applicable safety laws of any jurisdictional body including but not limited to, barricades, safety devices, control of traffic, excavation, trenching, shoring, and security within and around the construction area. 8. Contractors must furnish proof that all materials installed on this project meet the requirements of Note # 2 above at the request of the agency and/or Engineer. 9. CONNECT ENGINEERING must give approval prior to (a) backfilling trenches for pipe; (b) placing of aggregate base; (c) placing of concrete; (d) placing of asphalt pavement. Work done without such approval shall not relieve the Contractor from the responsibility of performing the work in an acceptable manner. Contract work will not be accepted by the CITY OF REXBURG without the approval of the Project Engineer. 10. Developmental drawings must be submitted to the CITY OF REXBURG Public Works Dept. prior to final approval. 11. Only plan sets marked "Approved for Construction" shall be used by the project contractor(s). Use of any plans on the job without the "Approved of Construction" stamp shall be grounds for the issuance of a stop work order. Contractor must also maintain a set of plans stamped with approval by the Department of Environmental Quality on site. 12. Each Contractor shall be responsible for acquiring any necessary NPDES permits, filing any NOI's or NOT's, and preparing a Storm Water Pollution Prevention Plan (SWPPP) in accordance with the Environmental Protection Agency. Contact the EPA at 208.378.5776 for the required information. Said permit shall be presented to the Engineer at least forty-eight (48) hours prior to the beginning of construction. 13. The Contractor shall be responsible for keeping roadways free and clear of all construction debris and dirt tracked in from the site. 14. All measures possible shall be taken to ensure erosion control with Best Management Practices. 15. Quantities shown are estimates by the Engineer. The Contractor must verify all quantities. If there is a large discrepancy contact the Engineer. 16. All work must meet standards set forth by the American Disabilities Act (ADA) inside public rights of way. 17. Trench backfill Type 2A compaction "Water Settling" will not be an acceptable method of trench backfill compaction. 18. All water valves, blow-offs and manholes will be placed so as not to conflict with any concrete curb, gutter, valley gutter, and sidewalk improvements. 19. CONNECT ENGINEERING and/or Inspector shall make periodic visits to the project location to ensure that the site improvements meet or exceed standards and design as per the approved construction drawings. 20. To receive final acceptance, Contractor must submit copy of field plans complete with construction notes and As-Built information, corrections, changes, etc. 21. Contractor must have ISPWC manual (current edition) on-site during all phases of construction. Failure to do so may result in non-acceptance of the site by DEQ, Engineer, City etc. 22. A copy of the Quality Control Signature sheet (with all applicable signatures) shall be delivered to Connect Engineering prior to the walk-thru. 23. A Right-of-Way Construction Permit from the CITY OF REXBURG Public Works is required for any construction in the road right-of-way not shown on these improvement drawings. 24. Contractors shall provide a one (1) year warranty on all roads from the date of formal acceptance by the CITY OF REXBURG. 25. Lot corners and centerline intersection monuments have been staked as shown on the recorded plat of this subdivision. Should any of these monuments be lost or disturbed during construction Idaho Code 55-1613 requires said monuments will be reestablished by a professional land surveyor at the expense of the agency or person causing the loss or disturbance. ELECTRICAL NOTES 1. All new electrical facilities shall be constructed in accordance with the current Rocky Mountain Power (RMP) Service Policy. Each utility shall be constructed to its own policy. 2. Electrical sectionalizing cabinets and bases (when required) will be provided by RMP but shall be installed by the Developer/Contractor. 3. All primary and secondary conduits shall be provided and installed by the Developer/Contractor. All electrical conduits and 36" radius elbows shall be schedule 40 pvc. 4. The minimum power trench depth shall be 54" below finished grade. (Conduit to be installed 48" below finish grade). Including 6" of sand bedding below and above top of conduits. 5. Primary and secondary conduit depths can be reduced to 18" of cover below finished grade with approval by RMP. Rigid galvanized steel conduit must be provided and installed by the Developer/Contractor in a trench that is less than 48" deep. 6. The Developer/Contractor shall provide all staking and layout of new electrical facilities including power poles. Idaho Falls power shall be responsible for the relocation of poles inside City of Rexburg rights of way. 7. The Contractor shall retain and protect all existing City power poles and electrical facilities during construction except those facilities shown to be relocated or moved per the RMP Power contractors map. 8. Coordinate all electrical construction with RMP. 9. Owner shall bear all costs to relocate or remove existing power poles, light poles, anchor guys, and miscellaneous electrical facilities, except those facilities inside city rights of way. 10. The Owner/Developer shall provide all trenching, conduit and concrete light pole foundations for street illumination along all Public Right of Way as per RMP current service policy. In addition, Owner/Developer shall purchase street light assembly provided and installed by RMP. 11. If applicable, see RMP Electrical site plan for off-site electrical and fiber optic facilities, layout, and installation details. 12. With exception of conduit crossing, contractor shall install curb and gutter prior to power trench and conduit installation. or (with RMP approval) centerline of trench may be staked with cut/fill to bottom of trench at all grade breaks and hubs at 25' intervals and offset stakes at all transformers, switch cabinets, secondary pedestals etc. 13. Contact RMP Builder Service line 1-800-469-3981 CHECK BY DATE SHEETS DRAWN BY JOB NO: REVISIONS DATE: OF SHEET 2 3 BDJBWB CO N S T R U C T I O N N O T E S CO R A Y M E D I C A L C E N T E R 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 6 8 1 . 8 5 9 0 Th e C i v i l C o n n e c t i o n SH E E T N A M E : PR O J E C T : LO C A T I O N : RE X B U R G , I D A H O 2018-021 PLOT DATE: 10/16/2018 3:46 PM OCTOBER 10, 2018 ORIGINAL STAMP: BLAKE JOLLEY DATED: 10-10-2018 ON FILE AT: CONNECT ENGINEERING SITE NOTES: LANDSCAPING INSTALL 4" CONCRETE SIDEWALK PER REXBURG STD DRAWINGS RETAIN AND PROTECT EXISTING CURB AND GUTTER, SIDEWALK, AND ASPHALT WATER RETENTION AREA EXISTING ADA PARKING 3 2 5 1 4 S0 ° 1 0 ' 3 0 " E 47 . 4 8 ' N89° 48' 04"E 120.47' N0 ° 2 4 ' 4 0 " W 14 7 . 0 2 ' S89° 47' 13"W 119.87' S0 ° 1 0 ' 3 9 " E 99 . 5 1 ' 77.83' 87.00' TO FH -6.54% 6.00' 6.00' -8 . 8 1 % -5 . 4 9 % -6 . 7 1 % -1 2 . 1 9 % 4857.88 BSW 4857.78 TBC-EXIST 4857.78 TBC-EXIST 4857.78 BSW 4857.68 TBC-EXIST 4856.84 GB 4857.05 GB 4856.69 GB -5.13% -6.69%-15.70% 48 5 8 -1.67% 4857.19 GB REPAIR OR REPLACE EXISTING DAMAGED CURB. MATCH EXISTING ELEVATIONS AND RADIUS. ELECTRICAL BOXES FIBER OPTIC -4 . 7 9 % -5 . 8 7 % -8.70% -12.70% 4857.14 GB -7.55% -17.76% 48 5 8 48 5 8 4857 48 5 8 1 1 1 1 2 2 3 3 3 3 3 4 4 4 1 3 4 4 4857.95 BSW 58.99' 20.00' -0 . 3 8 % 36.71' 10.00' -5.04% -4.99% -4.99% -12.31% 4857.19 GB -15.06%-6.94% 4857 53.58' 4857.88 BSW-MATCH 4858.09 TSW -0.22% -0 . 3 7 % -0.14% 0. 4 9 % -0 . 8 7 % 4858.09 TSW PROPOSED BUILDING BUILDING TYPE: VB FF= 4858.11' BUILDING SIZE: 4300 SQ FT. BUILDING HEIGHT: 30 FT 4857.94 BSW 3 3 5 5 SURVEY NOTE: This site plan conforms to an actual survey that was performed on the ground by a licensed land surveyor in and for the State of Idaho. It is the owner’s responsibility to construct all structures shown on this site plan in accordance with said survey. CHECK BY DATE SHEETS DRAWN BY JOB NO: REVISIONS DATE: OF SHEET 3 3 BDJBWB CO R A Y M E D I C A L C E N T E R 11 5 0 H o l l i p a r k D r . I d a h o F a l l s , I D 8 3 4 0 1 20 8 . 6 8 1 . 8 5 9 0 Th e C i v i l C o n n e c t i o n SH E E T N A M E : PR O J E C T : LO C A T I O N : RE X B U R G , I D A H O GR A D I N G A N D D R A I N A G E 2018-021 PLOT DATE: 10/16/2018 3:46 PM EXIST. CATCH BASIN PROPOSED CATCH BASIN EXIST. FIRE HYDRANT EXIST. LIGHT POLE EXISTING FRENCH DRAIN EXISTING WATER VALVE EXIST. SANITARY SEWER MANHOLE EXIST. CURB & GUTTER PROPERTY LINE GRADE BREAK SAW CUT STREET RIGHT-OF-WAY (ROW) EASEMENT LINE EXIST. FENCE LINE PROPOSED UNDERGROUND POWER EXIST. STORM WATER LINE EXIST. SANITARY SEWER LINE PROPOSED SANITARY SEWER LINE PROPOSED WATER LINE EXIST. WATERLINE PROPOSED SANITARY SEWER SERVICE PROPOSED WATER SERVICE EXISTING OVERHEAD POWER EXISTING OVERHEAD TELEPHONE EXISTING GAS SERVICE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED LANDSCAPING PROPOSED BUILDINGS EXISTING SIDEWALK TO BE PROTECTED EXISTING ASPHALT TO BE PROTECTED PROPOSED SIDEWALK LEGEND BASIS OF BEARING BENCHMARK CITY OF REXBURG DATUM GENERAL NOTE: 1. ALL PUBLIC IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT CITY OF REXBURG ENGINEERING STANDARD SPECIFICATIONS AND STANDARD DRAWINGS. 2. SEE ARCHITECTURAL PLANS FOR ALL BUILDING DETAILS 3. CONTRACTOR TO COORDINATE MAILBOX POD LOCATIONS WITH THE UNITED STATES POSTAL SERVICE. 4. SANITARY SEWER AND POTABLE WATER LINES INSIDE OF PROPERTY ARE CONSIDERED PRIVATE AND SHOULD BE MAINTAINED AS SUCH. 5. TRASH WILL BE DISPOSED BY USE OF EXISTING FACILITIES THAT ARE TAKEN CARE OF BY THE SUBDIVISION NOT ON SITE. SITE INFORMATION PARCEL ZONING: CBC TOTAL AREA OF PROPERTY: 17665.4 SQ FT (0.4055 acres) NUMBER OF PROPOSED BUILDINGS: 1 1/2" IRON ROD PLS 9869 NORTHING: 751780.35' EASTING: 780382.69' ELEVATION: 4854.76' LANDSCAPING REQUIREMENTS LANDSCAPING REQUIRED: 2649.81 SQ FT TOTAL PROVIDED: 7694.65 SQ FT STROM WATER REQUIREMENTS TOTAL AREA OF NEW DEVELOPMENT: 11301.05 SQ FT TOTAL STORAGE REQUIRED: 1113.5 CU FT TOTAL ON SITE STORAGE: 1593 CU FT STORM WATER TO BE RETAINED ON SITE SITE BENCH MARK ELEVATION:4854.76 UTILITY NOTES: 0101-01 EXISTING UTILITY RETAIN AND PROTECT 0404-01 INSTALL 1" WATER SERVICE AND INTERIOR METER PIT 0504-04 INSTALL 4" SEWER SERVICE @ 2% MIN SLOPE 0404-01 0504-04 0101-01 0101-01 0101-01 0101-01 0101-01 EXISTING UTILITY CONNECTION NOTES: 1. CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES LOCATION AND ELEVATIONS PRIOR TO CONSTRUCTION OF ANY WATER LINES, SANITARY SEWER LINES AND STORM SEWER LINES. 2. CONTRACTOR TO FIELD VERIFY SEWER LINE ELEVATIONS TO ENSURE GRAVITY FLOW FROM PROPOSED BUILDING PRIOR TO BUILDING EXCAVATION. 0101-01 0101-01 OCTOBER 10, 2018 ORIGINAL STAMP: BLAKE JOLLEY DATED: 10-10-2018 ON FILE AT: CONNECT ENGINEERING