Loading...
HomeMy WebLinkAboutREVIEW PW 7/16/2018 - 18-00034 - 1160 Bond Ave - Dish One Satellite - New BuildingReview Report Current Public Works Review - Site Plan Status: REVISIONS Application Number: 18-00034Permit Details Application Received Date: 01/22/2018 Building - Commercial Application Approved Date: Application Approved Status: ACCEPTED 01/22/2018 1152 Bond Ave Dish One Satellite - New Building Status of Plan Reviews Completed 01/23/2018Plumbing Review REVISIONS 01/23/2018HVAC Review COMPLETED 01/24/2018Electrical Review COMPLETED 01/25/2018Public Works Review - Site Plan REVISIONS 02/22/2018Building Review APPW/COND 02/22/2018Planning and Zoning Review - Site Plan COMPLETED 03/07/2018Plumbing Review COMPLETED 03/08/2018Fire Department Review - Site Plan REVISIONS 03/12/2018Public Works Review - Site Plan REVISIONS 06/12/2018Fire Department Review - Site Plan COMPLETED 07/02/2018Planning and Zoning Review - Site Plan REVISIONS 07/16/2018Public Works Review - Site Plan REVISIONS Permit Review Status Plan Reviews Still in Progress Building Review Planning and Zoning Review - Site Plan Public Works Review - Site Plan DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Checked for linked cases YES Plans are approved for a footing/foundation ONLY permit? YES Miscellaneous Review REVISIONSPlans between trades do not match. *Revisions Response : Street : Sidewalk setback/continuos REVISIONSNo sidewalks on plans. 5 ft sidewalk required along all right of way. Sidewalk on North side of building to be 6 ft or have wheel stops. *Revisions Response : Site Lighting : Photometric layout N/ANo lighting on plans. Sewer: Connection to mainline N/AUsing existing utility stubs. Reviewed By: Joel Gray Review Date: 07/16/2018 Plan Review Details joel.gray@rexburg.org Public Works Review - Site Plan Status: REVISIONS Page 1 of 2 Approval of plans does not constitue approval of variance from code Public Works Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Water : Connection to main line N/AUsing existing utility stub. Stub on East side is likely a 1" line only. Hot tap to be done not a tee inserted on water line on West side for fire hydrant. Miscellaneous Review N/AUtility Easement problem needs to be addressed. Miscellaneous N/ASeveral storm retention notes need to be reviewed for clarity. Perimeter grading to allow no runoff onto adjacent parcels. No utility boxes in right of way?N/A Dumpsters: 1 per 20 Units (non-dorm) or 1 per 50 beds (Dorm)? COMPLETED Storm : Drainage calcs COMPLETED Storm : On-site retention COMPLETED Parking Lot : Drainage COMPLETED Parking Lot: Accessibility/layout Parking lot layout does not meet requirements of Development Code Chapter 5. How are deliveries made? COMPLETED Street : Entrance placement COMPLETED Page 2 of 2 Approval of plans does not constitue approval of variance from code