Loading...
HomeMy WebLinkAboutSTRUCTURAL CALCULATIONS - 18-00500 - 36 N Center St - SL01403D/T-Mobile Modification520 South Main Street . Suite 2531 . Akron, Ohio 44311 . 330-572-2100 . Fax 330-572-2101 . www.GPDGroup.com GPD Group, Professional Corporation Phoenix Tower International Todd Rasey 999 Yamato Road, Suite 100 520 South Main Street, Suite 2531 Boca Raton, FL 33431 Akron, OH 44311 (610) 357-8763 (330) 572-2198 trasey@gpdgroup.com GPD# 2018791.ID1000.02 August 15, 2018 RIGOROUS STRUCTURAL ANALYSIS REPORT SITE DESIGNATION: PTI Site Number: PTI Site Name: TMO Site #: TMO Site Name: US-ID-1000 Rexburg SL01403D Rexburg City ANALYSIS CRITERIA: Codes: TIA-222-G & 2015 IBC 115-mph Ultimate (3-second gust) with 0" ice 89-mph Nominal (3-second gust) with 0" ice SITE DATA: 12 North Main Street, Rexburg, ID 83440, Madison County Latitude 43° 49' 37.390" N, Longitude 111° 46' 58.649" W 80' Nello Monopole David Rodriguez, GPD is pleased to submit this Rigorous Structural Analysis Report to determine the structural integrity of the aforementioned tower. The purpose of the analysis is to determine the suitability of the tower with the existing and proposed loading configuration detailed in the analysis report. Analysis Results Tower Stress Level with Proposed Equipment: 47.5% Pass Foundation Ratio with Proposed Equipment: 21.0% Pass We at GPD appreciate the opportunity of providing our continuing professional services to you and Phoenix Tower International. If you have any questions or need further assistance on this or any other projects please do not hesitate to call. Respectfully submitted, Christopher J. Scheks, P.E. Idaho #: 16108 8/15/2018 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 Page 2 of 4 SUMMARY & RESULTS The purpose of this analysis was to verify whether the existing structure is capable of carrying the proposed loading configuration as specified by T-Mobile to Phoenix Tower International. This report was commissioned by David Rodriguez of Phoenix Tower International. This analysis has been performed in accordance with TIA-222-G and the 2015 International Building Code based upon an ultimate 3-second gust wind speed of 115 mph converted to a nominal 3-second gust wind speed of 89 mph per section 1609.3.1 as required for use in the TIA -222-G Standard per Exception #5 of Section 1609.1.1. Exposure Category C and Risk Category II were used in this analysis. The proposed feedlines shall be installed internal to the pole for the analysis results to be considered valid. TOWER SUMMARY AND RESULTS Member Capacity Results Monopole 42.7% Pass Anchor Rods 47.5% Pass Base Plate 33.2% Pass Foundation 21.0% Pass ANALYSIS METHOD tnxTower (Version 8.0.2.1), a commercially available software program, was used to create a three-dimensional model of the tower and calculate primary member stresses for various dead, live, and wind load cases. Selected output from the analysis is included in Appendix B. The following table details the information provided to complete this structural analysis. This analysis is based solely on this information and is being completed without the benefit of a detailed site visit. DOCUMENTS PROVIDED Document Remarks Source Collocation Application PTI T-Mobile Collocation Application, dated 6/15/2018 PTI Tower Design Nello Drawing #: 133760, dated 9/27/2010 T-Mobile Tower Design Calculations Nello Sales Order #: 14368, dated 9/28/2010 T-Mobile Foundation Design Nello Drawing #: 133761, dated 9/28/2010 T-Mobile Geotechnical Report Terracon Project #: 62084032, dated 11/25/2008 T-Mobile Previous Structural Analysis GPD #: 2017791.ID1000.01 Rev. 1, dated 1/23/2017 GPD 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 Page 3 of 4 ASSUMPTIONS This rigorous structural analysis is based on the theoretical capacity of the members and is not a condition assessment of the tower. This analysis is from information supplied, and therefore, its results are based on and are as accurate as that supplied data. GPD has made no independent determination, nor is it required to, of its accuracy. The following assumptions were made for this structural analysis. 1. The tower member sizes and shapes are considered accurate as supplied. The material grade is as per data supplied and/or as assumed and as stated in the materials section. 2. The antenna configuration is as supplied and/or as modeled in the analysis. It is assumed to be complete and accurate. All antennas, mounts, coax and waveguides are assumed to be properly installed and supported as per manufacturer requirements. 3. Some assumptions are made regarding antennas and mount sizes and their projected areas based on best interpretation of data supplied and of best knowledge of antenna type and industry prac tice. 4. All mounts, if applicable, are considered adequate to support the loading. No actual analysis of the mount(s) is performed. This analysis is limited to analyzing the tower only. 5. The soil parameters are as per data supplied or as assumed and stated in the calculations. 6. Foundations are properly designed and constructed to resist the original design loads indicated in the documents provided. 7. The tower and structures have been properly maintained in accordance with TIA Standards and/or with manufacturer’s specifications. 8. All welds and connections are assumed to develop at least the member capacity unless determined otherwise and explicitly stated in this report. 9. All existing loading was obtained from the previous analysis by GPD (Project #: 2017791.ID1000.01 Rev. 1, dated 1/23/2017) and the provided collocation application and is assumed to be accurate. If any of these assumptions are not valid or have been made in error, this analysis may be affected, and GPD should be allowed to review any new information to determine its effect on the structural integrity of the tower. 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 Page 4 of 4 DISCLAIMER OF WARRANTIES GPD has not performed a site visit to the tower to verify the member sizes or antenna/coax loading. If the existing conditions are not as represented on the tower elevation contained in this report, we should be contacted immediately to evaluate the significance of the discrepancy. This is not a condition assessment of the tower or foundation. This report does not replace a full tower inspection. The tower and foundations are assumed to have been properly fabricated, erected, maintained, in good condition, twist free, and plumb. The engineering services rendered by GPD in connection with this Rigorous Structural Analysis are limited to a computer analysis of the tower structure and theoretical capacity of its main structural members. All tower components have been assumed to only resist dead loads when no other loads are applied. No allowance was made for any damaged, bent, missing, loose, or rusted members (above and below ground). No allowance was made for loose bolts or cracked welds. This analysis is limited to the designated maximum wind and seismic conditions per the governing tower standards and code. Wind forces resulting in tower vibrations near the structure’s resonant frequencies were not considered in this analysis and are outside the scope of this analysis. Lateral loading from any dynamic response was not evaluated under a time-domain based fatigue analysis. GPD does not analyze the fabrication of the structure (including welding). It is not possible to have all the very detai led information needed to perform a thorough analysis of every structural sub-component and connection of an existing tower. GPD provides a limited scope of service in that we cannot verify the adequacy of every weld, plate connection detail, etc. The purpose of this report is to assess the feasibility of adding appurtenances usually accompanied by transmission lines to the structure. It is the owner’s responsibility to determine the amount of ice accumulation in excess of the specified code recommended amount, if any, that should be considered in the structural analysis. The attached sketches are a schematic representation of the analyzed tower. If any material is fabricated from these sketches, the contractor shall be responsible for field verifying the existing conditions, proper fit, and clearance in the field. Any mentions of structural modifications are reasonable estimates and should not be used as a precise construction document. Precise modification drawings are obtainable from GPD, but are be yond the scope of this report. Towers are designed to carry gravity, wind, and ice loads. All members, legs, diagonals, struts, and redundant members provide structural stability to the tower with little redundancy. Absence or removal of a member can tr igger catastrophic failure unless a substitute is provided before any removal. Legs carry axial loads and derive their strength from shorter unbraced lengths by the presence of redundant members and their connection to the diagonals with bolts or welds. If the bolts or welds are removed without providing any substitute to the frame, the leg is subjected to a higher unbraced length that immediately reduces its load carrying capacity. If a diagonal is also removed in addition to the connection, the unbraced length of the leg is greatly increased, jeopardizing its load carrying capacity. Failure of one leg can result in a tower collapse because there is no redundancy. Redundant members and diagonals are critical to the stability of the tower. Miscellaneous items such as antenna mounts, etc., have not been designed or detailed as a part of our work. We recommend that material of adequate size and strength be purchased from a reputable tower manufacturer. GPD makes no warranties, expressed and/or implied, in connection with this report and disclaims any liability arising from material, fabrication, and erection of this tower. GPD will not be responsible whatsoever for, or on account of, consequential or incidental damages sustained by any person, firm, or organization as a result of any data or conclusions contained in this report. The maximum liability of GPD pursuant to this report will be limited to the total fee received for preparation of this report. 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 APPENDIX A Tower Analysis Summary Form To w e r A n a l y s i s S u m m a r y F o r m Ge n e r a l I n f o Si t e N a m e Re x b u r g Si t e N u m b e r US - I D - 1 0 0 0 Pr o p o s e d C a r r i e r T- M o b i l e Da t e o f A n a l y s i s Co m p a n y P e r f o r m i n g A n a l y s i s GP D To w e r I n f o D e s c r i p t i o n Da t e De s i g n P a r a m e t e r s An a l y s i s R e s u l t s ( % M a x i m u m U s a g e ) To w e r T y p e ( G , S S T , M P ) Ex i s t i n g / R e s e r v e d + F u t u r e + P r o p o s e d C o n d i t i o n To w e r H e i g h t ( t o p o f s t e e l A G L ) To w e r ( % ) To w e r M a n u f a c t u r e r Lo c a t i o n o f T o w e r ( C o u n t y , S t a t e ) To w e r B a s e ( % ) To w e r M o d e l No m i n a l W i n d S p e e d ( m p h ) Fo u n d a t i o n ( % ) To w e r D e s i g n 9/ 2 7 / 2 0 1 0 Ic e T h i c k n e s s ( i n ) Fo u n d a t i o n D e s i g n 9/ 2 8 / 2 0 1 0 Ri s k C a t e g o r y ( I , I I , I I I ) Ge o t e c h R e p o r t 11 / 2 5 / 2 0 0 8 Ex p o s u r e C a t e g o r y ( B , C , D ) To w e r M a p p i n g To p o g r a p h i c C a t e g o r y ( 1 t o 5 ) T- M o b i l e F u t u r e L o a d i n g I n f o r m a t i o n Pr e v i o u s S t r u c t u r a l A n a l y s i s 1/ 2 3 / 2 0 1 7 Ex i s t i n g A r e a ( i n 2 ) Fo u n d a t i o n M a p p i n g Mo d i f i c a t i o n D e s i g n Fi n a l A r e a ( i n 2 ) Po s t M o d i f i c a t i o n I n s p e c t i o n Fu t u r e A r e a ( i n 2 ) St e e l Y i e l d S t r e n g t h ( k s i ) Mo n o p o l e S h a f t 65 Ba s e P l a t e 50 An c h o r R o d s 75 Ex i s t i n g / R e s e r v e d L o a d i n g An t e n n a Mo u n t Transmission Line An t e n n a O w n e r Mo u n t H e i g h t (f t ) An t e n n a C L (f t ) Qu a n t i t y T y p e M a n u f a c t u r e r M o d e l A z i m u t h Q u a n t i t y M a n u f a c tu r e r T y p e Q u a n t i t y M o d e l S i z e Attachment Int./Ext. T- M o b i l e 7 7 8 0 3 P a n e l E r i c s s o n A I R 2 1 K R C 1 1 8 0 2 3 - 1 _ B 2 A _ B 4 P 30 / 1 7 0 / 2 7 0 3 U n k n o w n 1 2 ' T - A r m s 1 2 U n k n o w n 7 / 8 " I n t e r n a l T- M o b i l e 7 7 8 0 3 P a n e l E r i c s s o n A I R 3 2 K R D 9 0 1 1 4 6 - 1 _ B 6 6 A _ B 2 A 3 0 / 1 7 0 / 2 7 0 on t h e s a m e m o u n t s 3 U n k n o w n H y b r i d I n t e r n a l T- M o b i l e 7 7 8 0 3 P a n e l E r i c s s o n L N X - 6 5 1 5 D S - A 1 M 3 0 / 1 7 0 / 2 7 0 on t h e s a m e m o u n t s T- M o b i l e 7 7 8 0 3 R R U E r i c s s o n R R U S 1 1 B 1 2 on t h e s a m e m o u n t s T- M o b i l e 7 7 8 0 3 R R U E r i c s s o n R R U S 3 2 B 2 on t h e s a m e m o u n t s T- M o b i l e 7 7 8 0 3 T M A C o m m s c o p e T M A T 1 9 2 1 B 7 8 - 2 1 A on t h e s a m e m o u n t s T- M o b i l e 4 5 4 5 1 D i s h U n k n o w n 4 ' M W D i s h w / R a d o m e A s s u m e d 1 Un k n o w n D i s h m o u n t 1 U n k n o w n U n k n o w n I n t e r n a l No t e : ( 3 ) L N X - 6 5 1 5 D S - A 1 M A n t e n n a s a n d ( 3 ) R R U S 1 1 u ni t s s h a l l b e r e m o v e d p r i o r t o i n s t a l l a t i o n o f t h e pr o p o s e d l o a d i n g a n d w e r e n o t c o n s i d e r e d i n t h i s a n al y s i s . A l l o t h e r l o a d i n g s h a l l r e m a i n a s s h o w n . Pr o p o s e d L o a d i n g An t e n n a Mo u n t Transmission Line An t e n n a O w n e r Mo u n t H e i g h t (f t ) An t e n n a C L (f t ) Qu a n t i t y T y p e M a n u f a c t u r e r M o d e l A z i m u t h Q u a n t i t y M a n u f a c tu r e r T y p e Q u a n t i t y M o d e l S i z e Attachment Int./Ext. T- M o b i l e 7 7 8 0 3 P a n e l R F S A P X V A A R R 2 4 _ 4 3 - U - N A 2 0 3 0 / 1 7 0 / 2 7 0 on t h e e x i s t i n g m o u n t s T- M o b i l e 7 7 8 0 3 R R U C o m m s c o p e 4 4 4 9 B 7 1 + B 1 2 on t h e e x i s t i n g m o u n t s T- M o b i l e 7 7 8 0 3 R R U C o m m s c o p e 4 4 1 5 B 6 6 A on t h e e x i s t i n g m o u n t s No t e : T h e p r o p o s e d e q u i p m e n t s h a l l b e i n s t a l l e d i n ad d i t i o n t o t h e e x i s t i n g / r e s e r v e d l o a d i n g a t t h e s a me e l e v a t i o n . Re s e r v e d L o a d i n g An t e n n a Mo u n t Transmission Line An t e n n a O w n e r Mo u n t H e i g h t (f t ) An t e n n a C L (f t ) Qu a n t i t y Az i m u t h Q u a n t i t y M a n u f a c t u r e r T y p e Q u a n t i t y M o d e l S i z e Attachment Int./Ext. T- M o b i l e 7 7 8 0 1 in 2 R e m a i n i n g R e s e r v e d L o a d i n g on t h e e x i s t i n g m o u n t s No t e : T - M o b i l e ' s f i n a l l o a d i n g c o n f i g u r a t i o n u s e s 1 8 , 1 0 2 in 2 o f t h e i r M L A r e s e r v e d l o a d i n g . If y e s , b y h o w m u c h ? ( i n 2 )n/a14,444 22,0003,898 To t a l W i n d A r e a ( i n 2 ) Do e s T - M o b i l e ' s L o a d i n g Ex c e e d 2 2 , 0 0 0 i n 2 ?No18,102 Pr o p o s e d A r e a ( i n 2 )3,659 3, 8 9 8 Au g u s t 1 5 , 2 0 1 8 MP 80 ' Ne l l o C o r p o r a t i o n NT P 4 1 " X 8 0 ' Ne l l o D r a w i n g # : 1 3 3 7 6 0 Ty p e n/ a n/ a Th e i n f o r m a t i o n c o n t a i n e d i n t h i s s u m m a r y r e p o r t i s n o t t o b e u s e d i n d e p e n d e n t l y f r o m t h e P E st a m p e d t o w e r a n a l y s i s . De s i g n C o d e U s e d TI A - 2 2 2 - G & 2 0 1 5 I B C Ma d i s o n , I D 42.7% 89 ( 3 - s e c o n d g u s t ) 0 Yes21.0% Fo u n d a t i o n A d e q u a t e ? 47.5% 1 Ne l l o D r a w i n g # : 1 3 3 7 6 1 Te r r a c o n P r o j e c t # : 6 2 0 8 4 0 3 2 n/ a II C n/ a GP D # : 2 0 1 7 7 9 1 . I D 1 0 0 0 . 0 1 R e v . 1 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 APPENDIX B tnxTower Output File ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 1 of 4 GPD 520 South Main Street Suite 2531 Project 2018791.ID1000.02 Date 16:05:35 08/15/18 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by TR Tower Input Data The tower is a monopole. This tower is designed using the TIA-222-G standard. The following design criteria apply: Tower is located in Madison County, Idaho. Basic wind speed of 89 mph. Structure Class II. Exposure Category C. Topographic Category 1. Crest Height 0.00 ft. Deflections calculated using a wind speed of 60 mph. A non-linear (P-delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1. Local bending stresses due to climbing loads, feed line supports, and appurtenance mounts are not considered. Feed Line/Linear Appurtenances - Entered As Round Or Flat Description Sector Component Type Placement ft Total Number Number Per Row Start/End Position Width or Diameter in Perimeter in Weight plf Climbing Pegs B Surface Ar (CaAa) 80.00 - 8.00 1 1 0.000 0.000 0.1500 0.31 Feed Line/Linear Appurtenances - Entered As Area Description Face or Leg Allow Shield Component Type Placement ft Total Number CAAA ft2/ft Weight plf Safety Line (3/8'') B No CaAa (Out Of Face) 80.00 - 8.00 1 No Ice 0.04 0.22 ** LDF5-50A (7/8 FOAM) C No Inside Pole 77.00 - 3.00 12 No Ice 0.00 0.33 Hybrid Cable C No Inside Pole 77.00 - 3.00 3 No Ice 0.00 0.82 LDF5-50A (7/8 FOAM) A No Inside Pole 45.00 - 3.00 1 No Ice 0.00 0.33 Discrete Tower Loads Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K 6' Lightning Rod C From Leg 0.00 0.00 3.00 0.0000 80.00 No Ice 0.45 0.45 0.01 *** ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 2 of 4 GPD 520 South Main Street Suite 2531 Project 2018791.ID1000.02 Date 16:05:35 08/15/18 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by TR Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K Sabre 12' T-Arm C10-113-021 (3) C None 0.0000 77.00 No Ice 11.59 11.59 0.77 AIR 21 w/ Mount Pipe A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.37 5.78 0.11 AIR 21 w/ Mount Pipe B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.37 5.78 0.11 AIR 21 w/ Mount Pipe C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.37 5.78 0.11 AIR 32 w/ Mount Pipe A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.63 6.31 0.14 AIR 32 w/ Mount Pipe B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.63 6.31 0.14 AIR 32 w/ Mount Pipe C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 6.63 6.31 0.14 APXVAARR24_43-U-NA20 w/ Mount Pipe A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 20.24 10.79 0.16 APXVAARR24_43-U-NA20 w/ Mount Pipe B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 20.24 10.79 0.16 APXVAARR24_43-U-NA20 w/ Mount Pipe C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 20.24 10.79 0.16 RRUS 32 B2 A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 2.73 1.67 0.05 RRUS 32 B2 B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 2.73 1.67 0.05 RRUS 32 B2 C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 2.73 1.67 0.05 RRUS 4449 B71+B12 A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.65 1.16 0.07 RRUS 4449 B71+B12 B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.65 1.16 0.07 RRUS 4449 B71+B12 C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.65 1.16 0.07 RRUS 4415 B66A A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.64 0.68 0.04 RRUS 4415 B66A B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.64 0.68 0.04 RRUS 4415 B66A C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 1.64 0.68 0.04 TMAT1921B78-21A A From 4.00 0.0000 77.00 No Ice 0.66 0.31 0.02 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 3 of 4 GPD 520 South Main Street Suite 2531 Project 2018791.ID1000.02 Date 16:05:35 08/15/18 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by TR Description Face or Leg Offset Type Offsets: Horz Lateral Vert ft ft ft Azimuth Adjustment ° Placement ft CAAA Front ft2 CAAA Side ft2 Weight K Centroid-Le g 0.00 3.00 TMAT1921B78-21A B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 0.66 0.31 0.02 TMAT1921B78-21A C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 0.66 0.31 0.02 TMO Reserved A From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 18.04 15.02 0.17 TMO Reserved B From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 18.04 15.02 0.17 TMO Reserved C From Centroid-Le g 4.00 0.00 3.00 0.0000 77.00 No Ice 18.04 15.02 0.17 *** Dish Mount C From Face 0.50 0.00 0.00 0.0000 45.00 No Ice 2.92 0.01 0.04 Dishes Description Face or Leg Dish Type Offset Type Offsets: Horz Lateral Vert ft Azimuth Adjustment ° 3 dB Beam Width ° Elevation ft Outside Diameter ft Aperture Area ft2 Weight K 4' MW C Paraboloid w/Radome From Face 1.00 0.00 0.00 0.0000 45.00 4.00 No Ice 12.57 0.05 Critical Deflections and Radius of Curvature - Service Wind Elevation ft Appurtenance Gov. Load Comb. Deflection in Tilt ° Twist ° Radius of Curvature ft 80.00 6' Lightning Rod 26 4.373 0.4475 0.0008 59664 77.00 Sabre 12' T-Arm C10-113-021 (3) 26 4.101 0.4339 0.0007 59664 45.00 4' MW 26 1.483 0.2808 0.0005 8523 ttnnxxTToowweerr Job US-ID-1000 Rexburg Page 4 of 4 GPD 520 South Main Street Suite 2531 Project 2018791.ID1000.02 Date 16:05:35 08/15/18 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Client Phoenix Tower International Designed by TR Section Capacity Table Section No. Elevation ft Component Type Size Critical Element P K øPallow K % Capacity Pass Fail L1 80 - 27 Pole TP36.5417x25.95x0.1875 1 -7.61 1216.98 42.7 Pass L2 27 - 0 Pole TP41.375x35.2174x0.25 2 -12.33 2032.69 42.1 Pass Summary Pole (L1) 42.7 Pass RATING = 42.7 Pass 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 APPENDIX C Tower Elevation Drawing GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2018791.ID1000.02 Client: Phoenix Tower International Drawn by: TR App'd: Code: TIA-222-G Date: 08/15/18 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\02 2018791 ID1000 02 PTI TMO SA\Rev 0\tnx\US-ID-1000.eri Dwg No. E-1 80.0 ft 27.0 ft 0.0 ft REACTIONS - 89 mph WIND TORQUE 1 kip-ft 12 K SHEAR 713 kip-ft MOMENT 12 K AXIAL ARE FACTORED ALL REACTIONS S e c t i o n 1 2 L e n g t h ( f t ) 53 . 0 0 31 . 7 5 N u m b e r o f S i d e s 18 18 T h i c k n e s s ( i n ) 0. 1 8 7 5 0. 2 5 0 0 S o c k e t L e n g t h ( f t ) 4. 7 5 T o p D i a ( i n ) 25 . 9 5 0 0 35 . 2 1 7 4 B o t D i a ( i n ) 36 . 5 4 1 7 41 . 3 7 5 0 G r a d e A5 7 2 - 6 5 W e i g h t ( K ) 3. 3 3. 3 6. 6 6' Lightning Rod 80 Sabre 12' T-Arm C10-113-021 (3) 77 AIR 21 w/ Mount Pipe 77 AIR 21 w/ Mount Pipe 77 AIR 21 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 RRUS 32 B2 77 RRUS 32 B2 77 RRUS 32 B2 77 RRUS 4449 B71+B12 77 RRUS 4449 B71+B12 77 RRUS 4449 B71+B12 77 RRUS 4415 B66A 77 RRUS 4415 B66A 77 RRUS 4415 B66A 77 TMAT1921B78-21A 77 TMAT1921B78-21A 77 TMAT1921B78-21A 77 TMO Reserved 77 TMO Reserved 77 TMO Reserved 77 Dish Mount 45 4' MW 45DESIGNED APPURTENANCE LOADING TYPE TYPEELEVATION ELEVATION 6' Lightning Rod 80 Sabre 12' T-Arm C10-113-021 (3) 77 AIR 21 w/ Mount Pipe 77 AIR 21 w/ Mount Pipe 77 AIR 21 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 AIR 32 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 APXVAARR24_43-U-NA20 w/ Mount Pipe 77 RRUS 32 B2 77 RRUS 32 B2 77 RRUS 32 B2 77 RRUS 4449 B71+B12 77 RRUS 4449 B71+B12 77 RRUS 4449 B71+B12 77 RRUS 4415 B66A 77 RRUS 4415 B66A 77 RRUS 4415 B66A 77 TMAT1921B78-21A 77 TMAT1921B78-21A 77 TMAT1921B78-21A 77 TMO Reserved 77 TMO Reserved 77 TMO Reserved 77 Dish Mount 45 4' MW 45 MATERIAL STRENGTH GRADE GRADEFy FyFu Fu A572-65 65 ksi 80 ksi TOWER DESIGN NOTES 1. Tower is located in Madison County, Idaho. 2. Tower designed for Exposure C to the TIA-222-G Standard. 3. Tower designed for a 89 mph basic wind in accordance with the TIA-222-G Standard. 4. Deflections are based upon a 60 mph wind. 5. Tower Structure Class II. 6. Topographic Category 1 with Crest Height of 0.00 ft 7. TOWER RATING: 42.7% GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2018791.ID1000.02 Client: Phoenix Tower International Drawn by: TR App'd: Code: TIA-222-G Date: 08/15/18 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\02 2018791 ID1000 02 PTI TMO SA\Rev 0\tnx\US-ID-1000.eri Dwg No. E-7 Feed Line Distribution Chart 0' - 80' Round Flat App In Face App Out Face Truss Leg Face A 27.00 0.00 80.00 El e v a t i o n ( f t ) LD F 5 - 5 0 A ( 7 / 8 F O A M ) Face B 8.008.00 3.00 77.00 3.00 77.00 3.00 45.00 Cl i m b i n g P e g s Sa f e t y L i n e ( 3 / 8 " ) Face C 27.00 0.00 80.00 8.008.00 3.00 77.00 3.00 77.00 3.00 45.00 (1 2 ) L D F 5 - 5 0 A ( 7 / 8 F O A M ) (3 ) H y b r i d C a b l e GPD 520 South Main Street Suite 2531 Akron, Ohio 44311 Phone: (330) 572-2100 FAX: (330) 572-2101 Job: US-ID-1000 Rexburg Project: 2018791.ID1000.02 Client: Phoenix Tower International Drawn by: TR App'd: Code: TIA-222-G Date: 08/15/18 Scale: NTS Path: T:\PTI\US-ID-1000 (SL01403D)\02 2018791 ID1000 02 PTI TMO SA\Rev 0\tnx\US-ID-1000.eri Dwg No. E-7 Feed Line Plan Round Flat App In Face App Out Face (12) LDF5-50A (7/8 FOAM) (3) Hybrid Cable LDF5-50A (7/8 FOAM) 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 APPENDIX D Anchor Rod & Base Plate Analysis Anchor Rod and Base Plate Stresses, TIA-222-G-1 Overturning Moment =713.00 k*ft Axial Force =12.00 k Shear Force =12.00 k 105.0% Location =External Number of Rods = 6 Plate Strength (Fy) = 50 ksi φ =0.8 φ =0.9 Rod Ultimate Strength (Fu) =100 ksi Outside Diameter = 54.5 in Base Plate Detail Type* = d Plate Thickness = 2.25 in Rod Circle = 48.5 in wcalc = 25.31 in Rod Diameter = 2.25 in wmax = 22.50 in Net Tensile Area = 3.25 in2 w = 22.50 in Max Tension on Rod = 115.48 kips Z = 28.48 in3 Max Compression on Rod = 119.48 kips Mu =425.65 k-in Pu =119.48 kips Mn =1281.45 k-in Vu =2.00 kips BP Capacity = 33.2% OK η =0.50 Pu + Vu / =123.48 Rnt =260.00 kips Pole Diameter = 41.375 in Anchor Rod Capacity =47.5%OK Number of Sides =18 Thickness = 0.25 in Pole Yield Strength =65 ksi Configuration = None Thickness = 1 in Width = 3 in Notch = 0.75 in Height = 9 in Stiffener Strength (Fy) =50 ksi Clear Spacing b/w Stiffeners= 10 in Weld Info. Known? = Yes Vertical Weld Size = 0.375 in Horiz. Weld Type = Both Groove Angle = 45 deg Groove Size = 0.375 in Fillet Size = 0.3125 in Weld Strength = 70 ksi Stiffener Vertical Force = #VALUE!kips Vert. Weld Capacity = #VALUE! kips Horiz. Weld Capacity = #VALUE! kips Stiffener Capacity =#VALUE!kips Controlling Capacity =#VALUE!### GPD Round Base Plate Stress (Rev G) - V1.09 Stiffeners US-ID-1000 Rexburg 2018791.ID1000.02 Anchor Rods Base Plate Pole (Section 4.9.9, TIA-222-G-1) *This analysis assumes the clear distance from the top of the concrete to the bottom of the leveling nut is less than the diameter of the anchor rod. Notify GPD Group immediately if existing field conditions do not meet this assumption. Acceptable Stress Ratio = 80 Ft. Monopole - Structural Evaluation PTI Site #: US-ID-1000 8/15/2018 APPENDIX E Foundation Analysis Caisson Analysis Mu =713.00 k-ft Mr =4515.67 k-ft FS =6.33 Capacity = 21.0% Pass 15.00 ft φMn =5347.48 k-ft 5.00 ft Mu =791.75 k-ft Min ρ =0.00500 Provided ρ =0.01007 OK 713.00 k-ft Capacity = 14.8% Pass 12.00 k 12.00 k 6 ft 24 ft 0.5 ft # 9 41 # 4 ft 4 ksi 60 ksi 3 in Layer Soil Type Thickness g,g,g,g, pcf Cu, psf φ Kp Top of Layer Bot. of Layer Layer 1 Sand 5 110 0 1.00 0.00 5.00 Layer 2 Sand 2 115 31 3.12 5.00 7.00 Layer 3 Sand 8 115 35 3.69 7.00 15.00 Layer 4 Sand 16.5 125 35 3.69 15.00 31.50 Layer 5 0.00 31.50 31.50 Layer 6 0.00 31.50 31.50 Layer 7 0.00 31.50 31.50 Layer 8 0.00 31.50 31.50 Layer 9 0.00 31.50 31.50 Layer 10 0.00 31.50 31.50 GPD Caisson Analysis - V1.00 Soil Info Clear Cover = General Soil Modified?No Shear, V Reinforcing Summary Soil Summary (Req. FS=1.33) US-ID-1000 Rexburg 2018791.ID1000.02 Max Stress Ratio 1.05 Code Seismic Design Category General Info ACI 318-11Concrete Code TIA-222-G D fy = Reactions Pier Information fc' = Ground Water Pier Diameter Pier Length Below Grade Moment, M Axial, P Soil Depth to Neglect Vertical Bar Quantity Tie Size Distance Above Grade Vertical Bar Size Reinforcing Known?Yes V P M HG D Diameter