HomeMy WebLinkAbout310 S 5th W LID 47 Corrected Cost Breakdown
LID 4701-0015 Cost Breakdown for
310 S 5th W, Rexburg, ID
Barbara Greer - Owner
Amount Removal of Excavation/Backfill/
Concrete InstallTotal
ReplacedConcreteCompaction
Sidewalk0$ -
Curb & Gutter38 ft$ 76.00$ 57.00$ 893.00$ 1,026.00
Service Sewer Line$ 1,700.00
Engineering12% of cost$ 327.12
Discount$ (380.10)
Total$ 2,673.02