HomeMy WebLinkAboutCOM CHECK - 18-00527 - 430 W 2nd S - Providence Square - ClubhouseCOMcheck Software Version 4.1.0.0
Envelope Compliance Certificate
Project Title:
2012 IECC
Project Type:New Construction
Vertical Glazing / Wall Area:15%
Location:Idaho Falls, Idaho
Climate Zone:6b
Construction Site:
corner of S 5th W and W 2nd S
Rexburg, ID 83440
Owner/Agent:
Greg Nelson
3896 East 600 North
Rigby, ID 83442
208-390-3424
greg@sweetwatercompanies.com
Designer/Contractor:
Kristin Porep
NBW Architects, P.A.
990 John Adams Parkway
Idaho Falls, ID 83401
208-522-8779
kp@nbwarchitects.com
Project Information
Energy Code:
Providence Square Clubhouse
High efficiency HVAC. Systems that do not meet the performance requirement will be identified in the mechanical requirements checklist
report.
Additional Efficiency Package(s)
Building Area Floor Area
1-B and A-3 occupancy (Office) : Nonresidential 5070
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Attic Roof with Wood Joists, [Bldg. Use 1 - B and A-3
occupancy]
5070 21.0 38.0 0.017 0.021
Exterior Wall 1: Wood-Framed, 16" o.c., [Bldg. Use 1 - B and A-3
occupancy]
5123 21.0 0.0 0.062 0.051
Window 1: Wood Frame:Fixed, Perf. Specs.: Product ID NA, SHGC
0.28, [Bldg. Use 1 - B and A-3 occupancy] (b)
104 ------0.300 0.360
Window 2: Vinyl/Fiberglass Frame:Operable, Perf. Specs.: Product ID
NA, SHGC 0.28, [Bldg. Use 1 - B and A-3 occupancy] (b)
328 ------0.340 0.430
Window 3: Vinyl/Fiberglass Frame:Fixed, Perf. Specs.: Product ID NA,
SHGC 0.21, [Bldg. Use 1 - B and A-3 occupancy] (b)
184 ------0.340 0.360
Door 1: Glass (> 50% glazing):Nonmetal Frame, Entrance Door, Perf.
Specs.: Product ID NA, SHGC 0.14, [Bldg. Use 1 - B and A-3
occupancy] (b)
143 ------0.330 0.770
Floor 1: Slab-On-Grade:Unheated, Vertical 3 ft., [Bldg. Use 1 - B and A-
3 occupancy] (c)
354 ---14.0 0.486 0.540
(a)Budget U-factors are used for software baseline calculations ONLY, and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
(c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors.
Project Title:
Data filename:
Providence Square Clubhouse
N:\Projects\Other\Providence Square Clubhouse - 17068\50 Bidding\17068 03 PROVIDENCE
SQUARE CLUBHOUSE_COM CHECK.cck
09/20/18Report date:
91 ofPage
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed envelope systems have been
designed to meet the 2012 IECC requirements in COMcheck Version 4.1.0.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Envelope PASSES: Design 1% better than code
Project Title:
Data filename:
Providence Square Clubhouse
N:\Projects\Other\Providence Square Clubhouse - 17068\50 Bidding\17068 03 PROVIDENCE
SQUARE CLUBHOUSE_COM CHECK.cck
09/20/18Report date:
92 ofPage