HomeMy WebLinkAbout2018-03-29_Thomson Farms PUD Re-submittal1.ALL WORK SHALL CONFORM TO CITY OF REXBURG CITY STANDARDS & SPECIFICATIONS. 2.CALL DIGLINE AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. 3.FOUND MONUMENT AT THE SOUTHEAST QUARTER OF SECTION 17, T6N, R40E, BOISE BASE AND MERIDIAN. ELEV. = 4875.15 N YELLOWSTONE HWY REXBURG,IDAHO INDEX OF DRAWINGS 1-1 PLAT 1-2 PLAT C-001 GENERAL NOTES C-100 OVERALL SITE PLAN C-101 SITE PLAN C-102 SITE PLAN C-103 SITE PLAN C-104 SITE PLAN C-105 SITE PLAN C-106 SITE PLAN C-107 SITE PLAN C-200 OVERALL GRADING AND DRAINAGE PLAN C-201 GRADING AND DRAINAGE PLAN C-202 GRADING AND DRAINAGE PLAN C-203 GRADING AND DRAINAGE PLAN C-204 GRADING AND DRAINAGE PLAN C-205 GRADING AND DRAINAGE PLAN C-206 GRADING AND DRAINAGE PLAN C-207 GRADING AND DRAINAGE PLAN C-300 OVERALL UTILITY PLAN C-301 UTILITY PLAN C-302 UTILITY PLAN C-303 UTILITY PLAN C-304 UTILITY PLAN C-305 UTILITY PLAN C-306 UTILITY PLAN C-307 UTILITY PLAN LP-COVER LANDSCAPE PLAN LP-1.1 LANDSCAPE PLAN LP-1.2 LANDSCAPE PLAN LP-1.3 LANDSCAPE PLAN LP-1.4 LANDSCAPE PLAN LP-1.5 LANDSCAPE PLAN LP-1.6 LANDSCAPE PLAN LP-1.7 LANDSCAPE PLAN LP-1.8 LANDSCAPE PLAN LP-1.9 LANDSCAPE PLAN LP-1.10 LANDSCAPE PLAN LP-1.11 LANDSCAPE PLAN LP-1.12 LANDSCAPE PLAN LP-1.13 LANDSCAPE PLAN LP-COVER LANDSCAPE PLAN LP-1.14 LANDSCAPE PLAN LP-1.15 LANDSCAPE PLAN LP-1.16 LANDSCAPE PLAN LP-1.17 LANDSCAPE PLAN LP-1.18 LANDSCAPE PLAN LP-COVER LANDSCAPE PLAN LP-1.19 LANDSCAPE PLAN LP-1.20 LANDSCAPE PLAN LP-1.21 LANDSCAPE PLAN LP-1.22 LANDSCAPE PLAN LP-2.5 LANDSCAPE PLAN IR-COVER IRR. PERFORMANCE SPEC IR-5.1 IRRIGATION PERFORMANCE IR-5.2 IRRIGATION PERFORMANCE GENERAL NOTES ENGINEER: THOMSON FARMS PUD FOR REV I E W NOT FOR C O N S T R U C T I O N VICINITY MAP DATE PRINTED March 28, 2018 DEVELOPER: NOTICE TO CONTRACTOR UTILITY DISCLAIMER THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND / OR ELEVATIONS OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS OF THE U.S. DEPARTMENT OF LABOR AND THE STATE OF UTAH DEPARTMENT OF INDUSTRIAL RELATIONS CONSTRUCTION SAFETY ORDERS." THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS AND SUBCONTRACTORS COMPLIANCE WITH SAID REGULATIONS AND ORDERS. CONTRACTOR FURTHER AGREES TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB-SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE CIVIL ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER. NOTICE TO DEVELOPER/CONTRACTOR UNAPPROVED DRAWINGS REPRESENT WORK IN PROGRESS, ARE SUBJECT TO CHANGE, AND DO NOT CONSTITUTE A FINISHED ENGINEERING PRODUCT. ANY WORK UNDERTAKEN BY DEVELOPER OR CONTRACTOR BEFORE PLANS ARE APPROVED IS UNDERTAKEN AT THE SOLE RISK OF THE DEVELOPER, INCLUDING BUT NOT LIMITED TO BIDS, ESTIMATION, FINANCING, BONDING, SITE CLEARING, GRADING, INFRASTRUCTURE CONSTRUCTION, ETC. REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 CONTACT EMAIL NO SCALE E N S I G N THE STANDARD IN ENGINEERING SALT LAKE CITY 45 W. 10000 S., Suite 500 Sandy, UT. 84070 Phone: 801.255.0529 Fax: 801.255.4449 WWW.ENSIGNENG.COM LAYTON Phone:801.547.1100 TOOELE Phone: 435.843.3590 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.590.0187 COLORADO SPRINGS Phone: 719.476.0119 2N D S T E YE L L O W S T O N E H W Y MAIN STREET REXBURG 20 SITE CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R TH O M S O N F A R M S P U D FO R R E V I E W - Ma r c h 2 8 , 2 0 1 8 E N S I G N OL D U . S . H I G H W A Y 1 9 1 STEGELMEIER LN UN I O N P A C I F I C R A I L R O A D S 0 ° 0 8 ' 0 8 " E 1 0 6 6 . 0 6 ' NORTH 1066.06'SOUTH 1066.06'EAST 1066.06'WEST 1066.06' S 2 3 ° 5 6 ' 2 8 " W 4 6 9 . 6 2 ' NORTH 469.62'SOUTH 469.62'EAST 469.62'WEST 469.62' S 89°47'25" W 1231.80'NORTH 1231.80'SOUTH 1231.80'EAST 1231.80'WEST 1231.80' N 0 ° 3 1 ' 5 5 " W 1 8 4 . 5 7 ' NORTH 184.57'SOUTH 184.57'EAST 184.57'WEST 184.57' N 3 0 ° 0 8 ' 0 4 " E 1 5 5 1 . 6 8 ' NORTH 1551.68'SOUTH 1551.68'EAST 1551.68'WEST 1551.68' S 89°34'34" W 1364.91' NORTH 1364.91'SOUTH 1364.91'EAST 1364.91'WEST 1364.91' 26 3 . 5 8 ' C3 20.93' 416.31' S 89°27'37" W 437.23' NORTH 437.23'SOUTH 437.23'EAST 437.23'WEST 437.23' CENTER QUARTER CORNER OF SECTION 17, T 6 N, R 40 E, BOISE MERIDIAN, FOUND 3" BRASS MONUMENT ON REBAR, MARKED FORSGREN LS 3020 %$ 6 , 6  2 )  % ( $ 5 , 1 *     6   ƒ       (              NORTH 2645.98'SOUTH 2645.98'EAST 2645.98'WEST 2645.98' 15 7 9 . 9 2 ' S 0°08'11" E 31.66' NORTH31.66'SOUTH31.66'EAST31.66'WEST31.66' BARQUS LLC BARQUS LLC AM Y M C D O U G A L L BA R Q U S L L C AM Y M C D O U G A L L LO R E N L ST E G E L M E I E R F A M I L Y PARADISE NURSERY AND POND, LLC R & S PETERSON COMMERCIAL PROPERTIES, LLC R & S PETERSON COMMERCIAL PROPERTIES, LLC RIT A J A N E & G E R A L D J E P P E S E N MO O D Y C R E E K R A N C H , L L C LOT 101 608,619 sq.ft. 13.972 acres LOT 401 700,165 sq.ft. 16.074 acres 39. 5 0 ' 39. 5 0 ' 39. 5 0 ' 39. 5 0 ' 39 . 5 0 ' 39 . 5 0 ' 55. 0 0 ' 55. 0 0 ' 68 . 0 0 ' 68 . 0 0 ' 68 . 0 0 ' 68 . 0 0 ' 6ƒ : NORTH 224.23'SOUTH 224.23'EAST 224.23'WEST 224.23' 6  ƒ       (             NORTH 301.08'SOUTH 301.08'EAST 301.08'WEST 301.08' 26 3 . 5 8 ' 37. 5 0 ' C1 182.73' 182.73' C4 26 3 . 5 8 ' 1  ƒ       (          NORTH 195.32'SOUTH 195.32'EAST 195.32'WEST 195.32' 182.73' 82 2 . 8 7 ' 52 8 . 3 9 ' 916.86' 39 . 5 0 ' 39 . 5 0 ' (PUBLIC STREET) HA R V E S T R O A D (P U B L I C S T R E E T ) THO M S O N F A R M S R O A D (PUB L I C S T R E E T ) (P U B L I C S T R E E T ) 6ƒ : NORTH 409.93'SOUTH 409.93'EAST 409.93'WEST 409.93' 49,608 sq.ft. 1.139 acres OPEN SPACE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE POINT OF BEGINNING C5 C 6 1  ƒ       (          NORTH 130.93'SOUTH 130.93'EAST 130.93'WEST 130.93' 398 . 8 4 ' 680 . 0 7 ' C55 C56 1ƒ : 23.04' NORTH23.04'SOUTH23.04'EAST23.04'WEST23.04' THOMSON FARMS PUD LOCATED IN THE SOUTHEAST QUARTER OF SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE BASE & MERIDIAN CITY OF REXBURG, MADISON COUNTY, IDAHO DATE DOUGLAS J. KINSMAN P.L.S. 14344 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.100 100 50 100 200 APPROVED THIS DAY OF , 20 , BY THE CITY ATTORNEY'S APPROVAL REXBURG CITY ATTORNEY REXBURG CITY ATTORNEY BOUNDARY DESCRIPTION FEE$MADISON COUNTY RECORDER STATE OF IDAHO, COUNTY OF MADISON, RECORDED AND FILED AT THE DATE: TIME: BOOK: PAGE: RECORDED # REQUEST OF : MADISON COUNTY RECORDERCITY MAYOR APPROVAL PRESENTED TO THE MAYOR AND REXBURG CITY COUNCIL THIS DAY OF A.D.,20 , AT WHICH TIME THIS SUBDIVISION WAS APPROVED AND ACCEPTED. ATTEST: CLERK MAYOR SURVEYOR'S CERTIFICATE I, do hereby certify that I am a Licensed Land Surveyor, and that I hold certificate No. as prescribed under laws of the State of Utah. I further certify that by authority of the Owners, I have made a survey of the tract of land shown on this plat and described below, and have subdivided said tract of land into lots and streets, hereafter to be known as , and that the same has been correctly surveyed and staked on the ground as shown on this plat. I further certify that all lots meet frontage width and area re-quirements of the applicable zoning ordinances. DOUGLAS J. KINSMAN 14344 THOMSON FARM PUD PROJECT NUMBER : DRAWN BY : CHECKED BY : MANAGER : DATE : SHEET 7835 1 OF 2 JKF JWJ KFW }S.S.STATE OF IDAHO County of On the day of A.D., 20 , , personally appeared before me, the undersigned Notary Public, in and for said County of in the State of Idaho, who after being duly sworn, acknowledged to me that He/She is the , of a Limited Liability Company and that He/She signed the Owner's Dedication freely and voluntarily for and in behalf of said Limited Liability Company for the purposes therein mentioned and acknowledged to me that said Corporation executed the same. MY COMMISSION EXPIRES: , RESIDING IN COUNTY. NOTARY PUBLIC LIMITED LIABILITY COMPANY ACKNOWLEDGMENT Madison }S.S.STATE OF IDAHO County of On the day of A.D., 20 , , personally appeared before me, the undersigned Notary Public, in and for said County of in the State of Idaho, who after being duly sworn, acknowledged to me that He/She is the , of and that He/She signed the Owner's Dedication freely and voluntarily for and in behalf of said Corporation by authority of a resolution of its Board of Directors for the purposes therein mentioned and acknowledged to me that said Corporation executed the same. MY COMMISSION EXPIRES: , RESIDING IN COUNTY. NOTARY PUBLIC CORPORATE ACKNOWLEDGMENT Madison APPROVED THIS DAY OF , 20 , BY THE CITY ENGINEER APPROVAL REXBURG CITY ENGINEER. REXBURG CITY ENGINEER SALT LAKE CITY 45 W. 10000 S., Suite 500 Sandy, UT. 84070 Phone: 801.255.0529 Fax: 801.255.4449 WWW.ENSIGNENG.COM LAYTON Phone:801.547.1100 TOOELE Phone: 435.843.3590 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 E N S I G N NOT TO SCALE VICINITY MAP OWNER'S DEDICATION Known all men by these presents that I / we, the undersigned owner (s) of the hereon described tract of land, hereby set apart and subdivide the same into lots and street as shown on this plat and said plat and do hereby dedicate, grant and convey to Rexburg City, Utah: (1) all those parts or portions of said tract of land designated as streets, the same to be used as public thoroughfares forever; (2) those certain public utility and drainage easements as shown hereon, the same to be used for the installation, maintenance, and operation of public utility service lines and drainage. In witness whereof I / we have hereunto set our hand (s) this day of A.D., 20 . . By: . By: THOMSON FARM PUD THOMSON FARM PUDSOUTH QUARTER OF SECTION 17, T6 N, R40 E, BOISE MERIDIAN, FOUND 3" BRASS MONUMENT ON REBAR, WITH RING AND LID, MARKED FORSGREN LS 3020 SOUTHWEST CORNER OF SECTION 17, T6 N, R40 E, BOISE MERIDIAN, FOUND 1.5" ALUMINUM CAP IN INTERSECTION-FLUSH WITH ASPHALT 6ƒ : 2003 T6N R40E S 18 S 19 817 510 L S 8 7 9 7 T6N 17 1/4 20 R40E S E C T I O N C O R NER M O N U M E N TC I T Y O F REX B U R G D O N O T DIST U R B 1 9 9 5 F O R S G R E N A S S O C L S 3 0 2 0 LOCATED IN THE SOUTHEAST QUARTER OF SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE BASE & MERIDIAN CITY OF REXBURG, MADISON COUNTY, IDAHO N 2 N D S T E N Y E L L O W S T O N E H W Y MAIN STREET SITE 20 T6N SEC 17 C 1/4 R40E S E C T I O N C O R NER M O N U M E N TC I T Y O F REX B U R G D O N O T DIST U R B 1 9 9 5 F O R S G R E N A S S O C L S 3 0 2 0 DEVELOPER REXBURG DEVELOPMENT 160 WEST CANYON ESTATE DRIVE ALPINE, UTAH 84004 A parcel of land, situate in the Southwest Quarter of Section 17, Township 6 North, Range 40 East, Boise Base and Meridian, and in Rexburg City, Madison County, Idaho, more particularly described as follows: Beginning at the Center Quarter Corner of Section 17, Township 6 North, Range 40 East, Boise Base and Meridian, and running: WKHQFH6RXWKƒ ´(DVWIHHWDORQJWKH4XDUWHU6HFWLRQOLQH WKHQFH6RXWKƒ ´:HVWIHHWWRDIRXQGUHEDUDQGFDSPDUNHG/6 WKHQFH6RXWKƒ ´:HVWIHHWIROORZLQJFORVHO\DZLUHIHQFHOLQHWRDQRWKHUIRXQGUHEDUDQGFDSVRPDUNHG WKHQFH1RUWKƒ ´:HVWIHHWWRDQRWKHUIRXQGUHEDUDQGFDSVRPDUNHG WKHQFH6RXWKƒ ´:HVWIHHWWRDSRZHUSROHZLWKDQRWKHUIRXQGUHEDUVRPDUNHGVHWQH[WWRLWWRDSRLQW approximately 19.72 feet West of the found rebar set with the Paradise Pond survey, to the Easterly right-of-way line of Old Highway 191; WKHQFH1RUWKƒ ´(DVWIHHWDORQJVDLG(DVWHUO\OLQHWRWKHVRXWKOLQHRIWKHSURSHUW\VXUYH\HGDQGPRQXPHQWHGE\ Thompson Engineering, the found rebar set by Cardon being located 5.02 feet further along said right-of-way line; WKHQFH1RUWKƒ ´(DVWIHHWDORQJVDLGOLQHVXUYH\HGE\7KRPSVRQ(QJLQHHULQJWRDIRXQGUHEDUDQGFDSPDUNHG LS 1027, on the Quarter Section line; WKHQFH6RXWKƒ ´(DVWIHHWDORQJVDLG4XDUWHU6HFWLRQOLQHWRWKH3RLQWRI%HJLQQLQJ Parcel contains: 2,624,485 square feet, or 60.25 acres. NOTE: FOR TOWNHOUSE AREA AND SINGLE FAMILY LOT AREA SEE SHEET 2 (PHASE 1) (PHASE 4) (PHASE 2) (PHASE 3) PRELIMINARY PLAT LEGEND ENSIGN ENG. LAND SURV. EXISTING STREET MONUMENT PROPOSED STREET MONUMENT SECTION CORNER BOUNDARY LINE SECTION LINE CENTER LINE EASEMENT LINE SET 5/8" REBAR WITH YELLOW PLASTIC CAP, OR NAIL STAMPED "ENSIGN ENG. & LAND SURV." LOT 304 8,172 sq.ft. 0.188 acres LOT 305 8,183 sq.ft. 0.188 acres LOT 303 8,005 sq.ft. 0.184 acres LOT 310 8,695 sq.ft. 0.200 acres LOT 302 8,004 sq.ft. 0.184 acres LOT 301 8,165 sq.ft. 0.187 acres LOT 307 12,346 sq.ft. 0.283 acres LOT 308 12,681 sq.ft. 0.291 acres LOT 309 9,974 sq.ft. 0.229 acres LOT 311 8,423 sq.ft. 0.193 acres LOT 306 8,091 sq.ft. 0.186 acres LOT 320 8,256 sq.ft. 0.190 acres LOT 327 8,224 sq.ft. 0.189 acres LOT 326 8,048 sq.ft. 0.185 acres LOT 325 8,047 sq.ft. 0.185 acres LOT 321 8,080 sq.ft. 0.185 acres LOT 322 8,080 sq.ft. 0.185 acres LOT 324 8,236 sq.ft. 0.189 acres LOT 323 8,270 sq.ft. 0.190 acres LOT 317 8,062 sq.ft. 0.185 acres LOT 314 15,535 sq.ft. 0.357 acres LOT 318 8,054 sq.ft. 0.185 acres LOT 315 9,402 sq.ft. 0.216 acres LOT 319 8,145 sq.ft. 0.187 acres LOT 316 8,064 sq.ft. 0.185 acres LOT 312 10,158 sq.ft. 0.233 acres LOT 313 18,832 sq.ft. 0.432 acres 83 . 0 0 ' 81 . 9 3 ' 82 . 0 0 ' 82 . 0 0 ' 10 8 . 7 4 ' 94 . 4 3 ' 134. 3 1 ' 158. 9 4 ' 80.4 5 ' 95.9 2 ' 81 . 8 6 ' 80 . 0 0 ' 80 . 0 0 ' 82 . 0 0 ' 74 . 5 0 ' 80 . 0 0 ' 80 . 0 0 ' 74 . 3 6 ' 93.08'93.50' 92.92'72.89' 84 . 0 0 ' 10 0 . 5 4 ' 75 . 7 5 ' 74 . 3 6 ' 80 . 0 0 ' 80 . 0 0 ' 74 . 5 0 ' 76 . 5 0 ' 35 . 3 1 ' 36 . 2 0 ' 74 . 5 0 ' 85.08' 82.57' 74 . 5 0 ' 80 . 0 0 ' 80 . 0 0 ' 74 . 3 6 ' 75 . 5 0 ' 81 . 9 3 ' 82 . 0 0 ' 82 . 0 0 ' 45 . 5 1 ' N 0°13'28" W 98.28'NORTH 98.28'SOUTH 98.28'EAST 98.28'WEST 98.28' N 0°13'28" W 98.30'NORTH 98.30'SOUTH 98.30'EAST 98.30'WEST 98.30' N 0°13'28" W 98.33'NORTH 98.33'SOUTH 98.33'EAST 98.33'WEST 98.33' N 0°13'28" W 98.35'NORTH 98.35'SOUTH 98.35'EAST 98.35'WEST 98.35' S 10°13'09" E 8 6 . 1 2 ' NORTH 86.12'SOUTH 86.12'EAST 86.12'WEST 86.12' S 8 7 ° 0 3 ' 0 1 " E 1 2 4 . 9 6 ' NORTH 124.96'SOUTH 124.96'EAST 124.96'WEST 124.96' N 4 0 ° 2 5 ' 3 5 " E 1 3 8 . 7 8 ' NORTH 138.78'SOUTH 138.78'EAST 138.78'WEST 138.78' S 0°13'28" E 101.00'NORTH 101.00'SOUTH 101.00'EAST 101.00'WEST 101.00' S 0°13'28" E 101.00'NORTH 101.00'SOUTH 101.00'EAST 101.00'WEST 101.00'S 0°13'28" E 100.61'NORTH 100.61'SOUTH 100.61'EAST 100.61'WEST 100.61' S 0°13'28" E 100.41'NORTH 100.41'SOUTH 100.41'EAST 100.41'WEST 100.41' N 11°13'05" W 8 9 . 3 7 ' NORTH 89.37'SOUTH 89.37'EAST 89.37'WEST 89.37' S 6 5 ° 4 3 ' 5 4 " E 1 0 0 . 2 2 ' NORTH 100.22'SOUTH 100.22'EAST 100.22'WEST 100.22' N 5 7 ° 3 5 ' 0 4 " E 1 5 5 . 7 8 ' NORTH 155.78'SOUTH 155.78'EAST 155.78'WEST 155.78' S 5°36'32" W 86.3 5 ' NORTH 86.35'SOUTH 86.35'EAST 86.35'WEST 86.35' S 0°13'28" E 100.09'NORTH 100.09'SOUTH 100.09'EAST 100.09'WEST 100.09' S 0°13'28" E 100.06'NORTH 100.06'SOUTH 100.06'EAST 100.06'WEST 100.06' S 0°13'28" E 100.05'NORTH 100.05'SOUTH 100.05'EAST 100.05'WEST 100.05' S 0°13'28" E 100.04'NORTH 100.04'SOUTH 100.04'EAST 100.04'WEST 100.04' S 0°13'28" E 101.00'NORTH 101.00'SOUTH 101.00'EAST 101.00'WEST 101.00' S 0°13'28" E 100.60'NORTH 100.60'SOUTH 100.60'EAST 100.60'WEST 100.60' S 0°13'28" E 100.59'NORTH 100.59'SOUTH 100.59'EAST 100.59'WEST 100.59' S 8 9 ° 4 6 ' 3 2 " W 1 5 0 . 2 9 ' NORTH 150.29'SOUTH 150.29'EAST 150.29'WEST 150.29' 11 0 . 0 0 ' T- 2 0 0 9 T- 2 0 0 1 T- 2 0 0 5 T- 2 0 0 2 T- 2 0 1 9 T- 2 0 2 3 T- 2 0 2 6 T- 2 0 1 8 T- 2 0 0 3 T- 2 0 0 7 T- 2 0 0 6 T- 2 0 0 8 T- 2 0 0 4 T- 2 0 2 0 T- 2 0 2 1 T- 2 0 2 5 T- 2 0 2 2 T- 2 0 2 4 T-2011 T-2012 T-2013 T-2010T-2014 T-2015 T-2017 T-2016 T- 2 0 3 2 T- 2 0 3 4 T- 2 0 3 3 T- 2 0 3 5 T- 2 0 2 9 T- 2 0 2 8 T- 2 0 2 7 T- 2 0 3 1 T- 2 0 3 0 T-2040 T-2039 T-2038 T-2037 T-2036 T-2041 T-2042 T-2046 T-2045 T-2044 T-2043 T-2048 T-2047 T-2049 T-2052 T-2051 T-2055 T-2054 T-2053 T-2056 T-2050 T-2058 T-2059 T-2057 T-2060 T-2108 T-2111 T- 2 1 1 3 T- 2 1 1 6 T- 2 1 2 0 T- 2 1 1 2 T-2104 T-2107 T-2110 T-2109 T- 2 1 1 4 T- 2 1 1 5 T- 2 1 1 8 T- 2 1 1 7 T- 2 1 1 9 T-2106 T-2105 T-2095 T- 2 1 0 2 T- 2 0 9 9 T-2103 T- 2 1 0 1 T- 2 1 0 0 T- 2 0 9 7 T- 2 0 9 8 T- 2 0 9 6 T-2086T-2094 T- 2 0 9 2 T- 2 0 9 1 T- 2 0 8 8 T- 2 0 8 9 T- 2 0 8 7 T- 2 0 9 3 T- 2 0 9 0 T-2082 T-2084 T-2083 T-2085 T-2079 T-2081 T-2080 T-2075 T-2078 T-2077 T-2072 T-2076 T-2074 T-2073T-2070 T-2069 T-2065 T-2071 T-2062 T-2067 T-2066 T-2068 T-2063 T-2061 T-2064 23,335 sq.ft. 0.536 acres CLUBHOUSE C1 7 C 1 8 C 2 9 C28C40 C3 9 C3 0 C 3 1 C 3 8 C 3 7 C36 C35 C 3 4 C3 3 C3 2 C26 C2 5 C24 C 2 3 C2 2 C2 1 C 2 7 C 2 0 C1 9 34.00'34.00'34.00'34.00' 34.00'34.00' 34 . 0 0 ' 34 . 0 0 ' 34.00'34.00' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 1 ' 34.00' 34.00' S 3 8 ° 4 7 ' 5 5 " W 48 . 1 4 ' NORTH48.14'SOUTH48.14'EAST48.14'WEST48.14' S 6°59'15" E 47.70' NORTH47.70'SOUTH47.70'EAST47.70'WEST47.70' 34.00'34.00' N 3 8 ° 3 5 ' 0 5 " E 47 . 7 7 ' NORTH47.77'SOUTH47.77'EAST47.77'WEST47.77' N 39 ° 3 8 ' 3 1 " W 48.4 7 ' NORTH48.47'SOUTH48.47'EAST48.47'WEST48.47' 34 . 0 0 ' 34 . 0 0 ' 39.50' 39.50' 25 . 0 0 ' 39.50' 39.50' 25 . 0 0 ' 25.00'25.00' 25 . 0 0 ' 25 . 0 0 ' 25.00'25.00' 25 . 0 0 ' 25 . 0 0 ' 25 . 0 0 ' 25 . 0 0 ' 25.00'25.00' 25 . 0 0 ' 25 . 0 0 ' 25.00'25.00' 25 . 0 0 ' 25 . 0 0 ' 25.00'25.00'25.00'25.00'39.50'39.50' N 0°13'47" W 260.00'NORTH 260.00'SOUTH 260.00'EAST 260.00'WEST 260.00' N 0°13'47" W 355.40'NORTH 355.40'SOUTH 355.40'EAST 355.40'WEST 355.40' S 0°14'10" E 333.98'NORTH 333.98'SOUTH 333.98'EAST 333.98'WEST 333.98' S 0°13'28" E 269.57'NORTH 269.57'SOUTH 269.57'EAST 269.57'WEST 269.57'S 0°13'28" E 173.58'NORTH 173.58'SOUTH 173.58'EAST 173.58'WEST 173.58' N 8 9 ° 4 6 ' 5 8 " E 1 9 2 . 5 4 ' NORTH 192.54'SOUTH 192.54'EAST 192.54'WEST 192.54' S 8 9 ° 4 6 ' 5 8 " W 3 9 1 . 8 6 ' NORTH 391.86'SOUTH 391.86'EAST 391.86'WEST 391.86' N 8 9 ° 4 6 ' 3 2 " E 3 9 1 . 8 6 ' NORTH 391.86'SOUTH 391.86'EAST 391.86'WEST 391.86' N 8 9 ° 4 6 ' 3 2 " E 3 9 0 . 3 2 ' NORTH 390.32'SOUTH 390.32'EAST 390.32'WEST 390.32' N 8 9 ° 4 6 ' 3 2 " E 3 6 8 . 2 1 ' NORTH 368.21'SOUTH 368.21'EAST 368.21'WEST 368.21' C2 25.00'25.00'25.00'25.00' S 8 9 ° 4 6 ' 2 8 " W 6 0 . 9 9 ' NORTH 60.99'SOUTH 60.99'EAST 60.99'WEST 60.99' N 8 9 ° 4 6 ' 2 8 " E 6 1 . 0 4 ' NORTH 61.04'SOUTH 61.04'EAST 61.04'WEST 61.04' S 8 9 ° 4 6 ' 2 8 " W 3 9 0 . 2 0 ' NORTH 390.20'SOUTH 390.20'EAST 390.20'WEST 390.20' N 8 9 ° 4 6 ' 2 8 " E 3 9 0 . 2 5 ' NORTH 390.25'SOUTH 390.25'EAST 390.25'WEST 390.25' 62.26'165.81'41.51'41.49'85.08'7.50'39.50'47.01'251.97'35.01' 35 . 0 0 ' 25 . 9 9 ' 77.88'242.51'35.00'35.00'190.01'34.99' 26 . 0 1 ' 35 . 0 0 ' 78.12'242.28' 44 . 0 0 ' 31 1 . 2 4 ' 34 . 9 6 ' 44 . 0 0 ' 31 1 . 2 6 ' 34 . 9 9 ' 10.00'186.86'41.20' 42 . 2 0 ' 30 8 . 1 6 ' 41 . 5 0 ' 35 0 . 3 6 ' 41 . 5 0 ' 41 . 4 5 ' 14 . 9 7 ' N 8 9 ° 4 6 ' 3 2 " E 5 6 . 4 1 ' NORTH 56.41'SOUTH 56.41'EAST 56.41'WEST 56.41' 40 . 3 4 ' 11 0 . 6 9 ' 41 . 5 1 ' 41 . 4 9 ' 30 8 . 8 7 ' 41 . 4 9 ' 41 . 9 2 ' 30 8 . 4 5 ' 242.52' 242.28' C50 C 5 1 26 . 0 1 ' C47 C48 25 . 9 9 ' 25 . 9 9 ' C 4 6 C4545.00' N 89°46'13" E 15.00' NORTH15.00'SOUTH15.00'EAST15.00'WEST15.00' N 0°13'47" W 100.00'NORTH 100.00'SOUTH 100.00'EAST 100.00'WEST 100.00' S 89°46'13" W 15.00' NORTH15.00'SOUTH15.00'EAST15.00'WEST15.00' 45.00'C4 9 26 . 0 1 ' C52 190.00'C 4 4 31 1 . 2 6 ' 31 1 . 2 6 ' 31 1 . 2 4 ' 31 1 . 2 3 ' C9 C 1 0 90.76'C11 C 1 2 C43 251.98' 251.98'C 4 2 31 6 . 1 9 ' C13 39.50'39.50' 41 . 5 0 ' 32 5 . 1 6 ' 30 . 9 5 ' 33 5 . 7 2 ' 1.54' 32 . 5 1 ' 42 . 4 6 ' 41 . 5 0 ' 30 6 . 3 6 ' 31 6 . 1 9 ' 144,769 sq.ft. 3.323 acres OPEN SPACE C41 33 5 . 8 4 ' 72 . 0 0 ' 28.24'79.34' 34 . 0 0 ' 34 . 0 0 ' 39.50'39.50' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 34 . 0 0 ' 68.00' 68.00' 68.00' 68.00' S 0°13'28" E 132.24'NORTH 132.24'SOUTH 132.24'EAST 132.24'WEST 132.24'S 0°13'28" E 269.62'NORTH 269.62'SOUTH 269.62'EAST 269.62'WEST 269.62'S 0°13'28" E 173.53'NORTH 173.53'SOUTH 173.53'EAST 173.53'WEST 173.53' 34 . 0 0 ' 34 . 0 0 ' 47.00'85.03'41.49'41.51'186.62'41.49'41.50'90.74' 41 . 6 2 ' 47.00' 41 . 5 0 ' 34 . 0 0 ' 34 . 0 0 ' 77.85'241.20'35.00'34.51'190.49'35.00'35.00'251.98' S 0°13'28" E 354.05'NORTH 354.05'SOUTH 354.05'EAST 354.05'WEST 354.05' S 0°13'28" E 593.98'NORTH 593.98'SOUTH 593.98'EAST 593.98'WEST 593.98'S 0°13'28" E 593.98'NORTH 593.98'SOUTH 593.98'EAST 593.98'WEST 593.98' 69,476 sq.ft. 1.595 acres OPEN SPACE 52,206 sq.ft. 1.198 acres OPEN SPACE 275.89'78.15' 822.87' 241.20' C15 528.39' C 1 6 85.05' 843.17' 16 0 . 6 6 ' 90 . 0 0 ' 74 . 5 0 ' 74 . 3 6 ' 80 . 0 0 ' 80 . 0 0 ' C 1 4 ST E G E L M E I E R L N 822.87'528.39' 39.50'39.50' (P U B L I C S T R E E T ) AS P E N S T R E E T (P R I V A T E S T R E E T ) PI N E S T R E E T (P R I V A T E S T R E E T ) WH E A T G R A S S R O A D TH O M S O N F A R M S R O A D (P U B L I C S T R E E T ) BA R L E Y R O A D FIR STREET (PRIVATE STREET) HARVEST ROAD (PUBLIC STREET) MAZE ROAD (P U B L I C S T R E E T ) (P U B L I C S T R E E T ) (PUBLIC STREET) (PRIVATE DRIVEWAY) (P R I V A T E D R I V E W A Y ) (PRIVATE DRIVEWAY) (PRIVATE DRIVEWAY) (PRIVATE DRIVEWAY) (PRIVATE DRIVEWAY) (PRIVATE DRIVEWAY) (P R I V A T E D R I V E W A Y ) BIRCH LOOP (PRIVATE STREET) HARVEST ROAD (PUBLIC STREET) C7 C 8 N 8 9 ° 3 4 ' 3 4 " E 3 1 1 . 2 1 ' NORTH 311.21'SOUTH 311.21'EAST 311.21'WEST 311.21' C54 C 5 3 N 8 9 ° 3 4 ' 3 4 " E 3 3 4 . 7 9 ' NORTH 334.79'SOUTH 334.79'EAST 334.79'WEST 334.79' 35 . 0 3 ' 35 . 1 9 ' 49,608 sq.ft. 1.139 acres OPEN SPACE 36.31' 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE 10' PUE10' PUE 10' PUE 10' PUE CURVE TABLE CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 RADIUS 1000.00' 130.00' 1039.49' 960.50' 15.50' 15.50' 10.00' 10.00' 10.00' 10.00' 10.00' 10.00' LENGTH 529.86' 408.41' 550.79' 508.93' 24.35' 24.35' 15.74' 15.67' 15.71' 15.71' 15.71' 15.71' DELTA 30°21'32" 180°00'00" 30°21'32" 30°21'32" 90°00'00" 90°00'00" 90°11'58" 89°48'02" 90°00'03" 89°59'57" 90°00'03" 89°59'57" BEARING S75°02'42"E N0°13'32"W S75°02'43"E S75°02'42"E S75°08'04"W S14°51'56"E N45°19'27"W S44°40'33"W S45°13'30"E S44°46'30"W S45°13'30"E S44°46'30"W CHORD 523.69' 260.00' 544.37' 503.00' 21.92' 21.92' 14.17' 14.12' 14.14' 14.14' 14.14' 14.14' CURVE TABLE CURVE C13 C14 C15 C16 C17 C18 C19 C20 C21 C22 C23 C24 RADIUS 7.50' 7.50' 7.50' 7.50' 7.50' 7.50' 7.50' 7.50' 15.00' 48.00' 48.00' 48.00' LENGTH 11.90' 11.78' 11.78' 11.78' 11.78' 11.78' 11.78' 11.78' 10.30' 41.34' 64.37' 35.26' DELTA 90°53'34" 90°00'00" 90°00'00" 90°00'00" 89°59'33" 90°00'27" 90°00'00" 90°00'00" 39°21'20" 49°21'01" 76°49'52" 42°04'59" BEARING S45°40'15"E N44°46'32"E N45°13'28"W S44°46'32"W S45°13'15"E S44°46'45"W S45°13'28"E S44°46'32"W N70°32'48"W S75°32'39"E N41°21'55"E N18°05'31"W CHORD 10.69' 10.61' 10.61' 10.61' 10.61' 10.61' 10.61' 10.61' 10.10' 40.08' 59.65' 34.47' CURVE TABLE CURVE C25 C26 C27 C28 C29 C30 C31 C32 C33 C34 C35 C36 RADIUS 48.00' 15.00' 7.50' 7.50' 7.50' 7.50' 7.50' 15.00' 48.00' 48.00' 48.00' 48.00' LENGTH 48.56' 25.36' 11.78' 11.78' 11.78' 11.78' 11.78' 10.02' 41.29' 45.67' 43.85' 47.18' DELTA 57°57'47" 96°52'18" 90°00'00" 89°59'33" 90°00'27" 89°59'33" 90°00'27" 38°17'12" 49°17'15" 54°30'49" 52°20'23" 56°19'11" BEARING N68°06'53"W S48°39'38"E N44°46'32"E N45°13'15"W N44°46'45"E S45°13'15"E S44°46'45"W N71°04'26"W S76°34'27"E N51°31'31"E N1°54'05"W N56°13'52"W CHORD 46.51' 22.45' 10.61' 10.61' 10.61' 10.61' 10.61' 9.84' 40.03' 43.97' 42.34' 45.31' CURVE TABLE CURVE C37 C38 C39 C40 C41 C42 C43 C44 C45 C46 C47 C48 RADIUS 48.00' 15.00' 7.50' 10.00' 7.50' 7.50' 10.00' 10.00' 10.00' 10.00' 155.00' 105.00' LENGTH 38.05' 10.36' 11.78' 15.71' 11.78' 11.78' 15.71' 15.71' 15.71' 15.71' 486.95' 329.87' DELTA 45°24'55" 39°35'21" 90°00'00" 90°00'00" 89°59'41" 90°00'19" 89°59'45" 90°00'15" 89°59'45" 90°00'15" 180°00'00" 180°00'00" BEARING S72°54'05"W N69°59'18"E S44°46'32"W N45°13'28"W S45°13'38"E N44°46'22"E N45°13'39"W N44°46'21"E S45°13'39"E S44°46'21"W N0°13'32"W N0°13'32"W CHORD 37.06' 10.16' 10.61' 14.14' 10.61' 10.61' 14.14' 14.14' 14.14' 14.14' 310.00' 210.00' CURVE TABLE CURVE C49 C50 C51 C52 C53 C54 C55 C56 RADIUS 10.00' 10.00' 10.00' 10.00' 10.00' 10.00' 203.50' 15.50' LENGTH 15.71' 15.71' 15.71' 15.71' 15.67' 15.74' 108.86' 24.35' DELTA 90°00'15" 89°59'45" 90°00'15" 89°59'45" 89°48'21" 90°11'39" 30°39'00" 90°00'00" BEARING S44°46'21"W S45°13'39"E N44°46'21"E N45°13'39"W S44°40'23"W N45°19'37"W S75°11'27"E S75°08'04"W CHORD 14.14' 14.14' 14.14' 14.14' 14.12' 14.17' 107.57' 21.92' 1,862 SF 1,226 SF 26.68'5.50' 8.32' 45 . 0 4 ' 13.50' 5.46' 2.50' 2.00' 10.90' 2.00' 8.10' 56 . 0 0 ' 21.50' 56 . 0 0 ' 56 . 0 4 ' 8.17' 1.96' 10.83'2.00' 2.50' THOMSON FARMS PUD LOCATED IN THE SOUTHEAST QUARTER OF SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE BASE & MERIDIAN CITY OF REXBURG, MADISON COUNTY, IDAHO HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.50 50 25 50 100 FEE$MADISON COUNTY RECORDER STATE OF IDAHO, COUNTY OF MADISON, RECORDED AND FILED AT THE DATE: TIME: BOOK: PAGE: RECORDED # REQUEST OF : MADISON COUNTY RECORDER PROJECT NUMBER : DRAWN BY : CHECKED BY : MANAGER : DATE : SHEET 7835 2 OF 2 JKF JWJ KFW SALT LAKE CITY 45 W. 10000 S., Suite 500 Sandy, UT. 84070 Phone: 801.255.0529 Fax: 801.255.4449 WWW.ENSIGNENG.COM LAYTON Phone:801.547.1100 TOOELE Phone: 435.843.3590 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 E N S I G N DEVELOPER REXBURG DEVELOPMENT 160 W. CANYON ESTATE DRIVE ALPINE, UTAH 84004 LEGEND ENSIGN ENG. LAND SURV. EXISTING STREET MONUMENT PROPOSED STREET MONUMENT SECTION CORNER BOUNDARY LINE SECTION LINE CENTER LINE EASEMENT LINE THOMSON FARM PUD LOCATED IN THE SOUTHEAST QUARTER OF SECTION 17, TOWNSHIP 6 NORTH, RANGE 40 EAST, BOISE BASE & MERIDIAN CITY OF REXBURG, MADISON COUNTY, IDAHO TOWNHOMES INTERIOR LOT CORNER LOT 5. 0 0 ' SI D E S E T B A C K 5. 0 0 ' SI D E S E T B A C K 15.00' FRONT SETBACK 20.00' REAR SETBACK 15.00' FRONT SETBACK 20.00' REAR SETBACK 5. 0 0 ' SI D E S E T B A C K 14 . 0 0 ' S I D E S E T B A C K FA C I N G S T R E E T TYPICAL BUILDING SETBACKS FRONT: 20' TO GARAGE, 15' TO HOUSE REAR: 20' COVERED PATIO/DECK: 15' SIDE YARD: 5' CORNER SIDE: 14' SET 5/8" REBAR WITH YELLOW PLASTIC CAP, OR NAIL STAMPED "ENSIGN ENG. & LAND SURV." NOTE: MAY CONTAIN ABBREVIATIONS THAT ARE NOT USED IN THIS PLAN SET. ABBREVIATIONS UNLESS OTHERWISE SHOWN ON THESE PLANS ALL WORK IS TO BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE IDAHO STANDARDS FOR PUBLIC WORKS (I.S.P.W.C.) CONSTRUCTION AND THE CITY OF REXBURG'S REVISIONS. 1.PIPE MATERIAL FOR THIS PROJECT SHALL BE: DUCTILE IRON CLASS 50 SANITARY SEWER SDR 35 PVC 2.MINIMUM COVER OVER WATER LINES IS 5 FEET, UNLESS OTHERWISE SPECIFIED ON THESE PLANS. 3.ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. IN CASE OF CONFLICT THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATION MAY BE MADE PRIOR TO THE START OF WORK. 4.ELEVATIONS SHOWN ARE TO FINISHED SURFACE OR PIPE INVERT UNLESS OTHERWISE NOTED. 5.THE CONTRACTOR SHALL RETAIN AND PROTECT OR REMOVE AND REPLACE ALL LANDSCAPING, TREES, UTILITIES, DITCHES, CULVERTS, FENCES, MAILBOXES, SIGNS LIGHT POLES, HEADGATES, AND ALL OTHER MISCELLANEOUS ITEMS. ANY DAMAGE DONE BY THE CONTRACTOR SHALL BE REPAIRED AT HIS EXPENSE. 6.GENERAL LOCATIONS AND SIZES OF UTILITIES ARE SHOWN ON THE PLANS. THEY ARE TO BE USED FOR GENERAL INFORMATION ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE APPROPRIATE UTILITY COMPANIES WHEN CONSTRUCTION MIGHT INTERFERE WITH NORMAL OPERATION OF ANY UTILITIES. IT SHALL ALSO BE THE CONTRACTORS RESPONSIBILITY TO HAVE THE APPROPRIATE UTILITY COMPANY FIELD-LOCATE ANY UTILITY INSTALLATIONS WHICH MIGHT BE AFFECTED BY CONSTRUCTION PRIOR TO BEGINNING WORK IN THAT AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING SERVICE OF EXISTING UTILITIES AND FOR RESTORING ANY UTILITIES DAMAGED DUE TO CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER. 7.THERE SHALL BE A 10 FEET MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN ALL WATER LINES AND SEWER LINES EXCEPT WHERE WATER AND SEWER LINES CROSS AT APPROXIMATELY RIGHT ANGLES, WHERE A MINIMUM OF 1.5 FEET OF VERTICAL SEPARATION SHALL BE MAINTAINED. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING SOURCES FOR GRANULAR MATERIAL. DISPOSAL SITES, AND ANY ADDITIONAL MATERIALS THAT MAY BE NECESSARY FOR PROPER CONSTRUCTION OF THIS PROJECT. 9.IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAKE ARRANGEMENTS FOR WATER REQUIRED FOR TESTING, COMPACTION AND DUST CONTROL MEASURES. A WATER METER WILL BE PROVIDED BY THE CITY AT NO CHARGE. 10.WHERE WORK IS PERFORMED ON EASEMENTS, THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO ELIMINATE ANY ADVERSE EFFECTS ON THE ADJACENT PROPERTY. 11.THE CONTRACTOR SHALL PROVIDE ALL TRAFFIC CONTROL MEASURES IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 12.ALL TRENCH BACKFILL COMPACTION SHALL BE TYPE A-1 UNLESS OTHERWISE SPECIFIED ON PLANS. 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMING WITH OSHA REQUIREMENTS DURING CONSTRUCTION FOR TRENCH EXCAVATION, CONFINED SPACE AND OTHER SAFETY STANDARDS REQUIRED DURING CONSTRUCTION. 14.CONTRACTOR SHALL PROVIDE ANY REQUIRED GROUND WATER DEWATERING TO CONSTRUCT THIS PROJECT. WATER LEVEL SHALL BE MAINTAINED ONE FOOT BELOW THE BOTTOM OF THE TRENCH. 15.DISTANCES SHOWN ALONG PIPELINES ARE HORIZONTAL DISTANCES AND NOT PIPE LENGTH. 16.ALL WATER LINES ARE TO BE LOCATED AS SHOWN ON THE PLANS UNLESS RELOCATED IN THE FIELD BY THE ENGINEER TO AVOID UNFORESEEN UTILITY INTERFERENCE. 17.MINIMUM CLEARANCE BETWEEN NEW PIPELINES, EXISTING UTILITIES, AND STRUCTURES (EXCEPT SEWERS) SHALL BE TWO FEET HORIZONTALLY. 18.THERE ARE OTHER EXISTING FACILITIES WITHIN THE CONSTRUCTION CORRIDOR THAT ARE NOT SHOWN ON THE PLANS. THESE MAY INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING: MAILBOXES, STREET SIGNS, ETC. CONTRACTOR SHALL RETAIN AND PROTECT WHEN POSSIBLE AND REPLACE INKIND OTHERWISE. THIS WORK WILL BE INCIDENTAL TO OTHER BID ITEMS. 19.ALL CONTRACTORS WORKING WITHIN THE PROJECT BOUNDARIES ARE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BARRICADES, SAFETY DEVICES AND CONTROL OF TRAFFIC WITHIN AND AROUND THE CONSTRUCTION AREA. 20.WORK SUBJECT TO APPROVAL BY ANY POLITICAL AGENCY MUST BE APPROVED PRIOR TO: BACKFILLING TRENCHES FOR PIPE, PLACING OF AGGREGATE BASE, PLACING OF CONCRETE, AND PLACING OF ASPHALT PAVING. WORK DONE WITHOUT SUCH APPROVAL DOES NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF PERFORMING THE WORK IN AN ACCEPTABLE MANNER. 21.THE CONTRACTOR SHALL KEEP ON SITE AT ALL TIMES A COPY OF THE APPROVED CONSTRUCTION PLANS ON WHICH IS RECORDED THE ACTUAL LOCATIONS OF THE CONSTRUCTED PIPE LINE AND ANY OTHER UTILITIES ENCOUNTERED. THE CONTRACTOR SHALL PROVIDE THESE LOCATIONS TO THE DESIGN ENGINEER FOR USE IN THE PRODUCTION OF RECORD DRAWINGS PRIOR TO FINAL APPROVAL OF THE PIPE LINE INSTALLATION. 22.PLACE ALL VALVES AND MANHOLES SO THAT THEY DO NOT CONFLICT WITH ANY CONCRETE CURB AND GUTTER, OR SIDEWALK IMPROVEMENTS. 23.THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT TWO (2) WORKING DAYS BEFORE INITIAL CONSTRUCTION BEGINS AND SHALL ALSO REQUEST INSPECTION OF WATER LINES AND APPURTENANCES TWENTY FOUR (24) HOURS IN ADVANCE OF BACKFILLING. 24.SURFACE REPAIR NOT CALLED OUT ON THE PLANS SHALL BE REPLACED IN-KIND AND BE INCIDENTAL TO THE OTHER BID ITEMS. 25.TRACER WIRE (#12 BLUE) IS REQUIRED ON ALL NEW WATERLINES CONSTRUCTED WITHIN THE CITY. 1.EXISTING UTILITY INFORMATION SHOWN IS FOR INFORMATIONAL PURPOSES ONLY. IT IS DERIVED FROM ON-SITE SURVEY AND MAY NOT BE LOCATED CORRECTLY AND IS NOT ALL INCLUSIVE. CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES WITHIN THE PROJECT LIMITS BEFORE BEGINNING DEMOLITION/CONSTRUCTION. 2.THERE MAY BE BURIED UTILITIES WITHIN THE LIMITS OF DISTURBANCE THAT ARE NOT SHOWN ON THE PLANS DUE TO LACK OF MAPPING OR RECORD INFORMATION. CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN UNEXPECTED UTILITIES ARE DISCOVERED. 3.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR LOCATING AND PROTECTING FROM DAMAGE ALL EXISTING UTILITIES AND IMPROVEMENTS WHETHER OR NOT SHOWN ON THESE PLANS. THE FACILITIES AND IMPROVEMENTS ARE BELIEVED TO BE CORRECTLY SHOWN BUT THE CONTRACTOR IS REQUIRED TO SATISFY HIMSELF AS TO THE COMPLETENESS AND ACCURACY OF THE LOCATIONS. ANY CONTRACTOR PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELF WITH THE SITE AND SHALL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY, OR INDIRECTLY, FROM HIS OPERATIONS, WHETHER OR NOT SAID FACILITIES ARE SHOWN ON THESE PLANS. 1.TRAFFIC CONTROL AND STRIPING TO CONFORM TO THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D.). 2.BARRICADING AND DETOURING SHALL BE IN CONFORMANCE WITH THE REQUIREMENTS OF THE CURRENT M.U.T.C.D. 3.NO STREET SHALL BE CLOSED TO TRAFFIC WITHOUT WRITTEN PERMISSION FROM THE APPROPRIATE AGENCY, EXCEPT WHEN DIRECTED BY LAW ENFORCEMENT OR FIRE OFFICIALS. 4.THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PROVIDE FOR SMOOTH TRAFFIC FLOW AND SAFETY. ACCESS SHALL BE MAINTAINED FOR ALL PROPERTIES ADJACENT TO THE WORK. 5.DETOURING OPERATIONS FOR A PERIOD OF SIX CONSECUTIVE CALENDAR DAYS, OR MORE, REQUIRE THE INSTALLATION OF TEMPORARY STREET STRIPING AND REMOVAL OF INTERFERING STRIPING BY SANDBLASTING. THE DETOURING STRIPING PLAN OR CONSTRUCTION TRAFFIC CONTROL PLAN MUST BE SUBMITTED TO THE CITY TRAFFIC ENGINEER FOR REVIEW AND APPROVAL. 6.ALL TRAFFIC CONTROL DEVICES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AT THE END OF THE WORK TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 7.TRAFFIC CONTROL DEVICES (TCDs) SHALL REMAIN VISIBLE AND OPERATIONAL AT ALL TIMES. 8.ALL PERMANENT TRAFFIC CONTROL DEVICES CALLED FOR HEREON SHALL BE IN PLACE AND IN FINAL POSITION PRIOR TO ALLOWING ANY PUBLIC TRAFFIC ONTO THE PORTIONS OF THE ROAD(S) BEING IMPROVED HEREUNDER, REGARDLESS OF THE STATUS OF COMPLETION OF PAVING OR OTHER OFF-SITE IMPROVEMENTS CALLED FOR BY THESE PLANS. 9.THE CONTRACTOR SHALL PROVIDE BARRICADES, SIGNS, FLASHERS, OTHER EQUIPMENT AND FLAG PERSONS NECESSARY TO INSURE THE SAFETY OF WORKERS AND VISITORS. TRAFFIC CONTROL AND SAFETY NOTES GRADING AND DRAINAGE NOTES 1.SITE GRADING SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL RELATED ADDENDUMS. 2.THE CONTRACTOR SHALL STRIP AND CLEAR THE TOPSOIL, MAJOR ROOTS AND ORGANIC MATERIAL FROM ALL PROPOSED BUILDING AND PAVEMENT AREAS PRIOR TO SITE GRADING. (THE TOPSOIL MAY BE STOCKPILED FOR LATER USE IN LANDSCAPED AREAS.) 3.THE CONTRACTOR SHALL REMOVE ALL ORGANIC MATERIAL AND OTHER DELETERIOUS MATERIALS PRIOR TO PLACING GRADING FILL OR BASE COURSE. THE AREA SHOULD BE PROOF-ROLLED TO IDENTIFY ANY SOFT AREAS. WHERE SOFT AREAS ARE ENCOUNTERED, THE CONTRACTOR SHALL REMOVE THE SOIL AND REPLACE WITH COMPACTED FILL. 4.ALL DEBRIS PILES AND BERMS SHOULD BE REMOVED AND HAULED AWAY FROM SITE OR USED AS GENERAL FILL IN LANDSCAPED AREAS. 5.THE CONTRACTOR SHALL CONSTRUCT THE BUILDING PAD TO THESE DESIGN PLANS AS PART OF THE SITE GRADING CONTRACT, AND STRICTLY ADHERE TO THE SITE PREPARATION AND GRADING REQUIREMENTS OUTLINED IN THE GEOTECHNICAL REPORT. 6.THE CONTRACTOR SHALL GRADE THE PROJECT SITE TO PROVIDE A SMOOTH TRANSITION BETWEEN NEW AND EXISTING ASPHALT, CURB AND GUTTER, AND ADJOINING SITE IMPROVEMENTS. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE AND DEBRIS ON ADJACENT STREETS WHEN EQUIPMENT IS TRAVELING THOSE STREETS. 8.THE CONTRACTOR SHALL BE FAMILIAR WITH ALL CONDITIONS AND RECOMMENDATIONS OUTLINED IN THE GEOTECHNICAL REPORT AND TAKE ALL NECESSARY PRECAUTIONS AND RECOMMENDED PROCEDURES TO ASSURE SOUND GRADING PRACTICES. 9.THE CONTRACTOR SHALL TAKE APPROPRIATE GRADING MEASURES TO DIRECT STORM SURFACE RUNOFF TOWARDS CATCH BASINS. 10.THE LOCATIONS OF UNDERGROUND FACILITIES SHOWN ON THESE PLANS ARE BASED ON ON-SITE SURVEY. IT SHALL BE THE CONTRACTORS' FULL RESPONSIBILITY TO CONTACT THE VARIOUS UTILITY COMPANIES TO LOCATE THEIR FACILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR DAMAGE AND REPAIR TO THESE FACILITIES CAUSED BY HIS WORK FORCE. 11.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL NECESSARY CUTS AND FILLS WITHIN THE LIMITS OF THIS PROJECT AND THE RELATED OFF-SITE WORK, SO AS TO GENERATE THE DESIRED SUBGRADE, FINISH GRADES, AND SLOPES SHOWN. 12.THE CONTRACTOR IS WARNED THAT AN EARTHWORK BALANCE WAS NOT NECESSARILY THE INTENT OF THIS PROJECT. ANY ADDITIONAL MATERIAL REQUIRED OR LEFTOVER MATERIAL FOLLOWING EARTHWORK OPERATIONS BECOMES THE RESPONSIBILITY OF THE CONTRACTOR. 13.THE GRADING CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE OWNER TO PROVIDE FOR THE REQUIREMENTS OF THE PROJECT STORM WATER POLLUTION PREVENTION PLAN (SWPPP) AND ASSOCIATED PERMIT. ALL CONTRACTOR ACTIVITIES 1 ACRE OR MORE IN SIZE ARE REQUIRED TO PROVIDE A STORM WATER POLLUTION PREVENTION PLAN. 14.ALL CUT AND FILL SLOPES SHALL BE PROTECTED UNTIL EFFECTIVE EROSION CONTROL HAS BEEN ESTABLISHED. 15.THE USE OF POTABLE WATER WITHOUT A SPECIAL PERMIT FOR BUILDING OR CONSTRUCTION PURPOSES INCLUDING CONSOLIDATION OF BACKFILL OR DUST CONTROL IS PROHIBITED. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR CONSTRUCTION WATER FROM GOVERNING AGENCY. 16.THE CONTRACTOR SHALL MAINTAIN THE STREETS, SIDEWALKS, AND ALL OTHER PUBLIC RIGHT-OF-WAYS IN A CLEAN, SAFE AND USABLE CONDITION. ALL SPILLS OF SOIL, ROCK OR CONSTRUCTION DEBRIS SHALL BE PROMPTLY REMOVED FROM THE PUBLICLY-OWNED PROPERTY DURING CONSTRUCTION AND UPON COMPLETION OF THE PROJECT. ALL ADJACENT PROPERTY, PRIVATE OR PUBLIC, SHALL BE MAINTAINED IN A CLEAN, SAFE, AND USABLE CONDITION. UTILITY NOTES 1.ALL CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THESE CONTRACT DOCUMENTS, CITY AND STATE REQUIREMENTS AND THE MOST RECENT EDITIONS OF THE FOLLOWING: THE INTERNATIONAL PLUMBING CODE, IDAHO, DRINKING WATER REGULATIONS, ISPWC STANDARD SPECIFICATION (2015 EDITION). THE CONTRACTOR IS REQUIRED TO ADHERE TO ALL OF THE ABOVE-MENTIONED DOCUMENTS UNLESS OTHERWISE NOTED AND APPROVED BY THE ENGINEER. 2.CONTRACTOR SHALL COORDINATE LOCATION OF NEW "DRY UTILITIES" WITH THE APPROPRIATE UTILITY COMPANY, INCLUDING BUT NOT LIMITED TO: TELEPHONE & INTERNET SERVICE, GAS SERVICE, CABLE, AND POWER. 3.EXISTING UTILITIES HAVE BEEN SHOWN ON THE PLANS BASED ON ON-SITE SURVEY. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR SHALL NOTIFY DIGLINE AT 1-800-662-4111 48 HOURS IN ADVANCE OF PERFORMING ANY EXCAVATION WORK. THE CONTRACTOR SHALL RECORD THE DIGLINE ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF DIGLINE. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT. 4.CARE SHOULD BE TAKEN IN ALL EXCAVATIONS DUE TO POSSIBLE EXISTENCE OF UNRECORDED UTILITY LINES. EXCAVATION REQUIRED WITHIN PROXIMITY OF EXISTING UTILITY LINES SHALL BE DONE BY HAND. CONTRACTOR SHALL REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT CONTRACTOR'S EXPENSE. 5.TRENCH BACKFILL MATERIAL AND COMPACTION TESTS ARE TO BE TAKEN PER ISPWC STANDARD SPECIFICATION (2015 EDITION) SECTION 306 - TRENCH BACKFILL, OR AS REQUIRED BY THE GEOTECHNICAL REPORT IF NATIVE MATERIALS ARE USED. NO NATIVE MATERIALS ARE ALLOWED IN THE PIPE ZONE. THE MAXIMUM LIFT FOR BACKFILLING EXCAVATIONS IS 8-INCHES. 6.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONFORMING TO LOCAL AND FEDERAL CODES GOVERNING SHORING AND BRACING OF EXCAVATIONS AND TRENCHES AND FOR THE PROTECTION OF WORKERS. 7.THE CONTRACTOR IS REQUIRED TO KEEP ALL CONSTRUCTION ACTIVITIES WITHIN THE APPROVED PROJECT LIMITS. THIS INCLUDES, BUT IS NOT LIMITED TO VEHICLE AND EQUIPMENT STAGING, MATERIAL STORAGE AND LIMITS OF TRENCH EXCAVATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN PERMISSION AND/OR EASEMENTS FROM THE APPROPRIATE GOVERNING ENTITY AND/OR INDIVIDUAL PROPERTY OWNER(S) FOR WORK OR STAGING OUTSIDE OF THE PROJECT LIMITS. 8.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE, CAUSED BY ANY CONDITION INCLUDING SETTLEMENT, TO EXISTING UTILITIES FROM WORK PERFORMED AT OR NEAR EXISTING UTILITIES. THE CONTRACTOR SHALL TAKE ALL MEASURES NECESSARY TO PROTECT ALL EXISTING PUBLIC AND PRIVATE ROADWAY AND UTILITY FACILITIES. DAMAGE TO EXISTING FACILITIES CAUSED BY THE CONTRACTOR MUST BE REPAIRED BY THE CONTRACTOR AT HIS/HER EXPENSE TO THE SATISFACTION OF THE OWNER OF SAID FACILITIES. 9.ALL WATER LINE AND SEWER LINE INSTALLATION AND TESTING TO BE IN ACCORDANCE WITH LOCAL GOVERNING ACENCY'S STANDARDS AND SPECIFICATIONS. 10.ALL MANHOLES, HYDRANTS, VALVES, CLEANOUT BOXES, CATCH BASINS, METERS, ETC. MUST BE RAISED OR LOWERED TO FINAL GRADE PER ISPWC (2015 EDITION) STANDARDS AND INSPECTOR REQUIREMENTS. CONCRETE COLLARS MUST BE CONSTRUCTED ON ALL MANHOLES, CLEANOUT BOXES, CATCH BASINS, AND VALVES PER APWA STANDARDS. ALL MANHOLE, CATCH BASIN, OR CLEANOUT BOX CONNECTIONS MUST BE MADE WITH THE PIPE CUT FLUSH WITH THE INSIDE OF THE BOX AND GROUTED OR SEALED. 11.CONTRACTOR SHALL NOT ALLOW ANY GROUNDWATER OR DEBRIS TO ENTER THE NEW OR EXISTING PIPE DURING CONSTRUCTION. 12.SILT AND DEBRIS ARE TO BE CLEANED OUT OF ALL STORM DRAIN BOXES. CATCH BASINS ARE TO BE MAINTAINED IN A CLEANED CONDITION AS NEEDED UNTIL AFTER THE FINAL BOND RELEASE INSPECTION. 13.CONTRACTOR SHALL CLEAN ASPHALT, TAR OR OTHER ADHESIVES OFF OF ALL MANHOLE LIDS AND INLET GRATES TO ALLOW ACCESS. 14.EACH TRENCH SHALL BE EXCAVATED SO THAT THE PIPE CAN BE LAID TO THE ALIGNMENT AND GRADE AS REQUIRED. THE TRENCH WALL SHALL BE SO BRACED THAT THE WORKMEN MAY WORK SAFELY AND EFFICIENTLY. ALL TRENCHES SHALL BE DRAINED SO THE PIPE LAYING MAY TAKE PLACE IN DEWATERED CONDITIONS. 15.CONTRACTOR SHALL PROVIDE AND MAINTAIN AT ALL TIMES AMPLE MEANS AND DEVICES WITH WHICH TO REMOVE PROMPTLY AND TO PROPERLY DISPOSE OF ALL WATER ENTERING THE TRENCH EXCAVATION. 16.ALL SEWER LINES AND SEWER SERVICES SHALL HAVE A MINIMUM SEPARATION OF 10 FEET, CENTER TO CENTER, FROM THE WATER LINES. IF A 10 FOOT SEPARATION CAN NOT BE MAINTAINED, THE SEWER LINE AND WATER LINE SHALL BE LAID IN SEPARATE TRENCHES AND THERE SHALL BE A MINIMUM 18" VERTICAL SEPARATION BETWEEN THE PIPES. 17.CONTRACTOR SHALL INSTALL THRUST BLOCKING AT ALL WATERLINE ANGLE POINTS AND TEES. 18.ALL UNDERGROUND UTILITIES SHALL BE IN PLACE PRIOR TO INSTALLATION OF CURB, GUTTER, SIDEWALK AND STREET PAVING. 19.CONTRACTOR SHALL INSTALL MAGNETIC LOCATING TAPE CONTINUOUSLY OVER ALL NONMETALLIC PIPE. GENERAL NOTES DEMOLITION NOTES APWA AMERICAN PUBLIC WORKS ASSOCIATION AR ACCESSIBLE ROUTE ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS AWWA AMERICAN WATER WORKS ASSOCIATION BOS BOTTOM OF STEP BVC BEGIN VERTICAL CURVE C CURVE CB CATCH BASIN CF CURB FACE OR CUBIC FEET CL CENTER LINE CO CLEAN OUT COMM COMMUNICATION CONC CONCRETE CONT CONTINUOUS DIA DIAMETER DIP DUCTILE IRON PIPE ELEC ELECTRICAL ELEV ELEVATION EOA EDGE OF ASPHALT EVC END OF VERTICAL CURVE EW EACH WAY EXIST EXISTING FF FINISH FLOOR FG FINISH GRADE FH FIRE HYDRANT FL FLOW LINE OR FLANGE GB GRADE BREAK GF GARAGE FLOOR GV GATE VALVE HC HANDICAP HP HIGH POINT IRR IRRIGATION ISPWC IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION K RATE OF VERTICAL CURVATURE LD LAND DRAIN LF LINEAR FEET LP LOW POINT MH MANHOLE MJ MECHANICAL JOINT NG NATURAL GROUND NIC NOT IN CONTRACT NO NUMBER OC ON CENTER OCEW ON CENTER EACH WAY OHP OVERHEAD POWER PC POINT OF CURVATURE OR PRESSURE CLASS PCC POINT OF COMPOUND CURVATURE PI POINT OF INTERSECTION PIV POST INDICATOR VALVE PL PROPERTY LINE PRC POINT OF REVERSE CURVATURE PRO PROPOSED PT POINT OF TANGENCY PVC POINT OF VERTICAL CURVATURE PVI POINT OF VERTICAL INTERSECTION PVT POINT OF VERTICAL TANGENCY R RADIUS RD ROOF DRAIN ROW RIGHT OF WAY S SLOPE SAN SWR SANITARY SEWER SD STORM DRAIN SEC SECONDARY SS SANITARY SEWER STA STATION SW SIDEWALK SWL SECONDARY WATER LINE TBC TOP BACK OF CURB TOG TOP OF GRATE TOA TOP OF ASPHALT TOC TOP OF CONCRETE TOF TOP OF FOUNDATION TOW TOP OF WALL TOS TOP OF STEP TYP TYPICAL VC VERTICAL CURVE WIV WALL INDICATOR VALVE WL WATER LINE CO CO GV E TR G IRR W T E SECTION CORNER EXISTING MONUMENT PROPOSED MONUMENT EXISTING REBAR AND CAP SET ENSIGN REBAR AND CAP EXISTING WATER METER PROPOSED WATER METER EXISTING WATER MANHOLE PROPOSED WATER MANHOLE EXISTING WATER BOX EXISTING WATER VALVE PROPOSED WATER VALVE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE DEPARTMENT CONNECTION EXISTING SECONDARY WATER VALVE PROPOSED SECONDARY WATER VALVE EXISTING IRRIGATION BOX EXISTING IRRIGATION VALVE PROPOSED IRRIGATION VALVE EXISTING SANITARY SEWER MANHOLE PROPOSED SANITARY SEWER MANHOLE EXISTING SANITARY CLEAN OUT EXISTING STORM DRAIN CLEAN OUT BOX PROPOSED STORM DRAIN CLEAN OUT BOX EXISTING STORM DRAIN INLET BOX EXISTING STORM DRAIN CATCH BASIN PROPOSED STORM DRAIN CATCH BASIN EXISTING STORM DRAIN COMBO BOX PROPOSED STORM DRAIN COMBO BOX EXISTING STORM DRAIN CLEAN OUT EXISTING STORM DRAIN CULVERT PROPOSED STORM DRAIN CULVERT TEMPORARY SAG INLET PROTECTION TEMPORARY IN-LINE INLET PROTECTION ROOF DRAIN EXISTING ELECTRICAL MANHOLE EXISTING ELECTRICAL BOX EXISTING TRANSFORMER EXISTING UTILITY POLE EXISTING LIGHT PROPOSED LIGHT EXISTING GAS METER EXISTING GAS MANHOLE EXISTING GAS VALVE EXISTING TELEPHONE MANHOLE EXISTING TELEPHONE BOX EXISTING TRAFFIC SIGNAL BOX EXISTING CABLE BOX EXISTING BOLLARD PROPOSED BOLLARD EXISTING SIGN PROPOSED SIGN EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION EXISTING FLOW DIRECTION EXISTING TREE DENSE VEGETATION EXISTING EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT EXISTING STRIPING PROPOSED STRIPING EXISTING FENCE PROPOSED FENCE EXISTING FLOW LINE PROPOSED FLOW LINE GRADE BREAK EXISTING STORM DRAIN LINE PROPOSED STORM DRAIN LINE ROOF DRAIN LINE CATCHMENTS HIGHWATER LINE EXISTING SANITARY SEWER PROPOSED SANITARY SEWER LINE PROPOSED SAN. SWR. SERVICE LINE EXISTING LAND DRAIN LINE PROPOSED LAND DRAIN LINE PROPOSED LAND DRAIN SERVICE LINE EXISTING CULINARY WATER LINE PROPOSED CULINARY WATER LINE PROPOSED CULINARY WATER SERVICE LINE EXISTING SECONDARY WATER LINE PROPOSED SECONDARY WATER LINE PROPOSED SEC. WATER SERVICE LINE EXISTING IRRIGATION LINE PROPOSED IRRIGATION LINE EXISTING OVERHEAD POWER LINE EXISTING ELECTRICAL LINE EXISTING GAS LINE EXISTING TELEPHONE LINE ACCESSIBLE ROUTE SAW CUT LINE STRAW WATTLE TEMPORARY BERM TEMPORARY SILT FENCE LIMITS OF DISTURBANCE EXISTING WALL PROPOSED WALL EXISTING CONTOURS PROPOSED CONTOURS BUILDABLE AREA WITHIN SETBACKS PUBLIC DRAINAGE EASEMENT EXISTING ASPHALT TO BE REMOVED PROPOSED ASPHALT EXISTING CURB AND GUTTER PROPOSED CURB AND GUTTER PROPOSED REVERSE PAN CURB AND GUTTER TRANSITION TO REVERSE PAN CURB CONCRETE TO BE REMOVED EXISTING CONCRETE PROPOSED CONCRETE BUILDING TO BE REMOVED EXISTING BUILDING PROPOSED BUILDING WV S D x X IRR swv WM WM W H Y D H Y D D D D S IRR swv WV W sd SD XXXX.XX TBC XXXX. X X TBC ss sw SS SW W IRR irr w SS W W SW ld LD LOD SF LEGEND TRAFFIC e g t HWL FR CABLE ohp LD NOTE: MAY CONTAIN SYMBOLS THAT ARE NOT USED IN THIS PLAN SET. RD D AR CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R C-001 GENERAL NOTES GWO NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW STEGELMEIER LN. ASPEN STREET PINE STREET BI R C H L O O P FI R S T R E E T HA R V E S T R O A D THOMSON FARMS ROAD WHEATGRASS ROAD BARLEY ROAD HA R V E S T R O A D MA Z E R O A D TH O M S O N F A R M S R O A D RETENTION AREA RETENTION AREA RETENTION AREA x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D LOT 324 LOT 323 LOT 317 LOT 314LOT 318 LOT 304 LOT 320 LOT 315LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 THE ORCHARD AT THOMSON FARMS (300 DWELLING UNITS) THE GROVE AT THOMSON FARMS (120 DWELLING UNITS) THE FIELDS AT THOMSON FARMS (27 DWELLING UNITS) 79. 0 ' 7 9 . 0 ' 68.0' 5 0 . 0 ' 50.0' 5 0 . 0 ' 7 9 . 0 ' 68.0' 6 8 . 0 ' 68.0' 6 8 . 0 ' 50.0' 2 C-100 3 C-100 1 C-100 2 C-100 CLUBHOUSE POOL & HOT TUB BUILDING 1 TYPE-A (30 UNITS) BUILDING 2 TYPE-A (30 UNITS) BUILDING 3 TYPE-B (20 UNITS) BUILDING 9 TYPE-A (30 UNITS) BUILDING 10 TYPE-A (30 UNITS) BUILDING 11 TYPE-A (30 UNITS) BUILDING 4 TYPE-B (20 UNITS) BUILDING 8 TYPE-A (30 UNITS) BUILDING 7 TYPE-A (30 UNITS) BUILDING 6 TYPE-A (30 UNITS) BUILDING 5 TYPE-B (20 UNITS) CLUBHOUSE T-2019 T-2023 T-2026 T-2018 T-2003 T-2007 T-2006 T-2008 T-2004 T-2020 T-2021 T-2025 T-2022 T-2024 T-2011 T-2012T-2009 T-2001 T-2005 T-2002 T-2013T-2010 T-2014 T-2015 T-2017T-2016 T-2075 T-2032 T-2034 T-2033 T-2035 T-2029 T-2108 T-2111 T-2113 T-2116 T-2120 T-2112 T-2104 T-2046 T-2045 T-2044 T-2043T-2048 T-2047T-2049 T-2052T-2051 T-2055T-2054T-2053T-2050 T-2058T-2059 T-2057T-2060 T-2063T-2061 T-2064 T-2070 T-2069 T-2065T-2071 T-2062 T-2067 T-2066T-2068 T-2093 T-2090 T-2086 T-2094 T-2092 T-2091 T-2088 T-2089 T-2087 T-2078T-2077T-2072 T-2076T-2074T-2073 T-2079T-2082T-2084 T-2083 T-2081 T-2080T-2085 T-2095 T-2102 T-2099 T-2103 T-2028 T-2027 T-2031 T-2030 T-2040T-2039T-2038T-2037T-2036 T-2041 T-2042 T-2107 T-2101 T-2100 T-2097 T-2098 T-2096 T-2110T-2109 T-2114 T-2115 T-2118 T-2117 T-2119 T-2106 T-2105 SCALE:2 NONE 68' ROAD CROSS SECTION SCALE:1 NONE 79' ROAD CROSS SECTION 2.50' 5.00'7.00' 27.50' 12.00' SIDEWALK LANDSCAPING CL PL 2.0%2.0% TRAVEL LANE PL 10.00' 79.00' PUBLIC UTILITY & DRAINAGE EASEMENT SEE KEYED NOTE 15, SHEET C-101 AND GEOTECHNICAL REPORT FOR PAVEMENT SECTION SEWER MAIN WATER MAIN 9.00'12.50'12.00' 2.50' 5.00'7.00' 27.50' 12.00' SIDEWALK LANDSCAPING 2.0% TRAVEL LANE 10.00' PUBLIC UTILITY & DRAINAGE EASEMENT 9.00'12.50' PARKINGPARKINGTURN LANE 2.50' 5.00'7.00' 22.00' 12.00' SIDEWALK LANDSCAPING CL PL 2.0%2.0% TRAVEL LANE PL 10.00' 68.00' PUBLIC UTILITY & DRAINAGE EASEMENT SEE KEYED NOTE 15, SHEET C-101 AND GEOTECHNICAL REPORT FOR PAVEMENT SECTION 9.00'13.00' 2.50' 5.00'7.00' 22.00' 12.00' SIDEWALK LANDSCAPING 2.0% TRAVEL LANE 10.00' PUBLIC UTILITY & DRAINAGE EASEMENT 9.00'13.00' PARKINGPARKING SCALE:3 NONE 50' ROAD CROSS SECTION 2.50'5.00'5.00' 12.50' 12.50' CURB GUTTER SIDEWALK PLANTERS CL PL 2.0%2.0% TRAVEL LANE PL 10.00' 50.00' PUBLIC UTILITY & DRAINAGE EASEMENT 2.50'5.00'5.00' 12.50' 12.50' CURB GUTTER SIDEWALK PLANTERS TRAVEL LANE 10.00' PUBLIC UTILITY & DRAINAGE EASEMENT 2.0% CURB AND GUTTER STORM DRAIN INFILTRATION CHAMBERS WHERE SHOWN ON GRADING AND DRAINAGE PLANS GAS LINE COMM.POWER COMM. POWER WATER MAIN COMM. POWER SEWER MAIN STORM DRAIN INFILTRATION CHAMBERS WHERE SHOWN ON GRADING AND DRAINAGE PLANS GAS LINE COMM.POWER CURB AND GUTTER SEE KEYED NOTE 1, SHEET C-101 AND GEOTECHNICAL REPORT FOR PAVEMENT SECTION 2N D S T E YE L L O W S T O N E H W Y MAIN STREET REXBURG 20 C-100 OVERALL SITE PLAN JFK JFKBCA 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.100 100 50 100 200 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN LEGAL DESCRIPTION PARCEL NO. RPRXBCA0174803 A parcel of land, situate in the Southwest Quarter of Section 17, Township 6 North, Range 40 East, Boise Base and Meridian, and in Rexburg, Madison County, Idaho, more particularly described as follows: Beginning at the Center Quarter Corner of Section 17, Township 6 North, Range 40 East, Boise Base and Meridian, and running: thence South 0°08'08” East 1066.06 feet along the Quarter Section line; thence South 23°56'28” West 469.62 feet to a found rebar and cap marked LS 1027; thence South 89°47'25” West 1516.97 feet, following closely a wire fence line, to another found rebar and cap so marked; thence North 0°31'55” West 184.57 feet to another found rebar and cap so marked; thence South 89°27'37” West 437.23 feet to a power pole, with another found rebar, so marked, set next to it, to a point approximately 19.72 feet West of the found rebar set with the Paradise Pond survey, to the Easterly right-of-way line of Old Highway 191; thence North 30°08'04” East 1551.68 feet along said Easterly line to the south line of the property surveyed and monumented by Thompson Engineering, the found rebar set by Cardon being located 5.02 feet further along said right-of-way line; thence North 89°34'34” East 1364.91 feet along said line surveyed by Thompson Engineering, to a found rebar and cap marked LS 1027, on the Quarter Section line; thence South 0°08'08” East 31.69 feet along said Quarter Section line, to the Point of Beginning. Parcel contains: 2,624,485 square feet, or 60.25 acres VICINITY MAP 1" = 5000' SITE CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R x x x x x x x x x x x x x w w w w w w w w w BARQUS LLC LOREN L STEGELMEIER FAMILY AMY MCDOUGALL AMY MCDOUGALL BARQUS LLC THOMAS H GOE STEGELMEIER LN. BUILDING 1 TYPE-A (30 UNITS) BUILDING 2 TYPE-A (30 UNITS)BUILDING 3 TYPE-B (20 UNITS) OL D U . S . H I G H W A Y 1 9 1 111 1 14 15 15 8 6 4 5 4 4 4 4 6 6 13 UN I O N P A C I F I C R A I L R O A D 8 8 5' WIDE 8 4 8 68.0' PUBLIC ROW EXISTING EDGE OF GRAVEL ROAD 2 C-100 EXISTING FENCE EXISTING ROW LINE EX I S T I N G A S P H A L T T R A I L EX I S T I N G E D G E O F A S P H A L T 14. 0 ' 12. 5 ' 88. 0 ' 20. 5 ' PR O P O S E D R O W / P R O P E R T Y L I N E EX I S T I N G R O W / P R O P E R T Y L I N E PROPERTY LINE EX I S T I N G A S P H A L T T R A I L FUTURE CURB AND SIDEWALK (BY OTHERS) FUTURE IMPROVEMENTS (BY OTHERS) EXISTING GRAVEL ROAD TO BE REMOVED WEST OF THIS POINT 12. 0 ' 12. 0 ' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-101 SITE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-102 SEE DRAWING C-102 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. 8.ALL SIDEWALKS ARE TO BE INSTALLED PER ISPWC SECTION 700 AND STANDARD DRAWING SD-709. IF SIDEWALKS ARE WITHIN CITY OF REXBURG RIGHT OF WAY STANDARD SPECIFICATIONS AND STANDARD DRAWINGS SHALL BE UTILIZED. SIMILARLY IF ANY ROADWAYS ARE WITHIN THE CITY OR STATE RIGHT OF WAY THEIR RESPECTIVE SPECIFICATIONS AND DRAWINGS SHALL BE USED. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 SE E D R A W I N G C - 1 0 4 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R x x x x x x x HA R V E S T R O A D TH O M S O N F A R M S R O A D CLUBHOUSE POOL & HOT TUB BUILDING 2 TYPE-A (30 UNITS) BUILDING 9 TYPE-A (30 UNITS) BUILDING 10 TYPE-A (30 UNITS) BUILDING 11 TYPE-A (30 UNITS)BUILDING 4 TYPE-B (20 UNITS) BUILDING 8 TYPE-A (30 UNITS) BUILDING 7 TYPE-A (30 UNITS) BUILDING 6 TYPE-A (30 UNITS) BUILDING 5 TYPE-B (20 UNITS) BUILDING 3 TYPE-B (20 UNITS) RETENTION AREA OL D U . S . H I G H W A Y 1 9 1 1 1 1 1 1 1 1 1 1 1 14 14 14 1 3 10 4 8 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 6 13 13 13 UN I O N P A C I F I C R A I L R O A D 4 13 6 5 5 8 1 1 8 6 6 6 6 4 11 11 8 5 6 11 4 3 5 4 5 4 4 8 13 13 8 6 4 5 5' WIDE 13 13 79. 0 ' 7 9 . 0 ' 68.0' 13 13 68.0' EXISTING ROW LINE EX I S T I N G A S P H A L T T R A I L EX I S T I N G E D G E O F A S P H A L T PR O P O S E D R O W / P R O P E R T Y L I N E EX I S T I N G R O W / P R O P E R T Y L I N E 84. 0 ' 6 13 EXISTING FENCE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 7835 C-102 TH O M S E N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B E R G , I D A H O SITE PLAN REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 JFK JFKBCA 3/28/18 DATE: 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-103 SEE DRAWING C-103 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 SE E D R A W I N G C - 1 0 5 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-101 SEE DRAWING C-101 SE E D R A W I N G C - 1 0 7 SE E D R A W I N G C - 1 0 7 SE E D R A W I N G C - 1 0 5 R & S PETERSON COMMERCIAL PROPERTIES, LLC FF=4874.70 FF=4874.70 FF=4875.05 FF=4875.50 HA R V E S T R O A D RETENTION AREA 1 1 1 1 1 1 1 1 4 4 4 13 13 1 1 8 8 8 8 8 10 4 5 4 5 4 68.0' PROPERTY LINEPROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-103 SITE PLAN JFK JFKBCA 3/28/18 DATE: 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 SE E D R A W I N G C - 1 0 6 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-102 SEE DRAWING C-102 SE E D R A W I N G C - 1 0 7 SE E D R A W I N G C - 1 0 7 SE E D R A W I N G C - 1 0 6 10 STALLS 10 STALLS 5 S T A L L S 5 S T A L L S 15 15 1 33 3 3 4 4 6 6 134 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 5 5 3 6 5 STEGELMEIER LN. T-2001 T-2002 T-2031 T-2030 T-2040T-2039T-2038T-2037T-2036 T-2041 T-2042 T-2005 T-2014 T-2015 T-2017T-2016 T-2019 T-2023 T-2018 T-2003 T-2007 T-2006 T-2004 T-2020 T-2021 T-2022 T-2024 T-2032 T-2034 T-2033 T-2035 T-2029 T-2046 T-2045 T-2044 T-2043T-2048 T-2047T-2049 1 8 . 0 ' 50.0' 2 4 . 7 ' 25.0' 2 0 . 0 ' 3 0 . 0 ' 3 C-100 EXISTING GRAVEL ROAD PROPERTY LINE PR O P E R T Y L I N E FUTURE IMPROVEMENTS (BY OTHERS) 6 8 . 0 ' 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-104 SITE PLAN JFK JFKBCA 3/28/18 DATE: 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-105 SEE DRAWING C-105 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIMINARY PUD SUBMITTAL 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 SE E D R A W I N G C - 1 0 1 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R ASPEN STREET PINE STREET BI R C H L O O P FI R S T R E E T THOMSON FARMS ROAD 4 S T A L L S CLUBHOUSE 10 S T A L L S 4 S T A L L S 5 S T A L L S 5 S T A L L S 10 STALLS 10 STALLS RETENTION AREA 1 1 1 1 1 1 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 3 3 3 6 6 6 6 6 13 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 5 5 5 5 55 3 5 6 13 4 5 6 5 T-2075 T-2052T-2051 T-2055T-2054T-2053T-2050 T-2058T-2059 T-2057T-2060 T-2009 T-2013T-2010 T-2028 T-2027T-2026 T-2008 T-2025 T-2011 T-2012 T-2063T-2061 T-2064 T-2070 T-2069 T-2065T-2071 T-2062 T-2067 T-2066T-2068 T-2093 T-2090 T-2086 T-2094 T-2092 T-2091 T-2088 T-2089 T-2087 T-2078T-2077T-2072 T-2076T-2074T-2073 T-2108 T-2111 T-2113 T-2116 T-2120 T-2112 T-2104T-2107 T-2101 T-2100 T-2097 T-2098 T-2096 T-2110T-2109 T-2114 T-2115 T-2118 T-2117 T-2119 T-2106 T-2105 T-2079T-2082T-2084 T-2083 T-2081 T-2080T-2085 T-2095 T-2102 T-2099 T-2103 12 12 12 12 12 1212 12 4 2 4 . 9 ' 7 9 . 0 ' 50.0' 15.0'19.9' 2 5 . 0 ' 3 0 . 6 ' 2 0 . 0 ' 3 0 . 0 ' 24.2' 50.0' 5 0 . 0 ' 3 C-100 3 C-100 PR O P E R T Y L I N E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-105 SITE PLAN JFK JFKBCA 3/28/18 DATE: 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-106 SEE DRAWING C-106 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-104 SEE DRAWING C-104 SE E D R A W I N G C - 1 0 2 SE E D R A W I N G C - 1 0 2 x x x x x x x x x x x x x x x x x x x x x x x x x x WHEATGRASS ROAD BARLEY ROAD MA Z E R O A D 1 1 1 1 1 1 4 4 4 4 4 4 4 6 6 6 6 13 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312 LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 LOT 324 LOT 317 LOT 314 LOT 318 LOT 304 LOT 320 5 5 5 5 5 5 LOT 315 LOT 323 13 13 13 6 8 . 0 ' 6 8 . 0 ' 68.0' 2 C-100 PROPERTY LINE PR O P E R T Y L I N E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-106 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-104 SEE DRAWING C-104 SE E D R A W I N G C - 1 0 3 SE E D R A W I N G C - 1 0 3 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D 4 6 4 8 5 4 1 1 1 1 1 5' WIDE EXISTING FENCE EXI S T I N G A S P H A L T T R A I L EX. E D G E O F A S P H A L T EXISTING ROW LINE EXI S T I N G R O W / P R O P E R T Y L I N E 84. 0 ' PR O P O S E D R O W / P R O P E R T Y L I N E EOA 12. 0 ' 14. 0 ' 12. 0 ' 12. 0 ' PR O P E R T Y L I N E PA R A D I S E N U R S E R Y A N D P O N D , L L C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HEAVY TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. LIGHT TRAFFIC ASPHALT PAVEMENT: 3” - PG 58-28, 4" THICK 3/4" CRUSHED AGGREGATE BASE, 8" UNCRUSHED AGGREGATE BASE OVERLYING MIRAFI 160N GEOTEXTILE FABRIC. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. CONCRETE PAVEMENT: 6” THICK CONCRETE WITH 6” UNTREATED BASE COURSE PER GEOTECHNICAL REPORT. 5' WIDE PORTLAND CEMENT CONCRETE SIDEWALK PER THE CITY OF REXBURG STANDARDS. LANDSCAPE STRIP. 30” CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 30” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” COLLECTION CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. 24” REVERSE PAN CURB AND GUTTER PER THE CITY OF REXBURG STANDARDS. TRANSITION BETWEEN 30" CURB AND GUTTER AND 24" CURB AND GUTTER. 4' WATERWAY PER THE CITY OF REXBURG STANDARDS. OPEN DRIVEWAY APPROACH PER APWA STANDARD PLAN NO. 225 AND SPECIFICATIONS. HANDICAP ACCESS RAMP PER THE CITY OF REXBURG STANDARDS. TRASH ENCLOSURE PER THE CITY OF REXBURG STANDARDS. HEAVY TRAFFIC ASPHALT PAVEMENT: 2 1/2” - PG 58-28, 3 1/2" THICK 3/4" CRUSHED AGGREGATE BASE, 12" UNCRUSHED AGGREGATE BASE WITH MIRAFI 160N GEOTEXTILE FABRIC BELOW AND UP SIDES. SEE ADDITIONAL REQUIREMENT AS OUTLINED IN THE PROJECT GEOTECHNICAL REPORT PREPARED BY HLE, INC. AND DATED 11-22-2017. 15 C-107 SITE PLAN 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.SEE LANDSCAPE/ARCHITECTURAL PLANS FOR CONCRETE MATERIAL, COLOR, FINISH, AND SCORE PATTERNS THROUGHOUT SITE. 4.ALL PAVEMENT MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE M.U.T.C.D. (MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES). 5.ALL SURFACE IMPROVEMENTS DISTURBED BY CONSTRUCTION SHALL BE RESTORED OR REPLACED, INCLUDING TREES AND DECORATIVE SHRUBS, SOD, FENCES, WALLS AND STRUCTURES, WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN ON THE CONTRACT DOCUMENTS. 6.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE OR ASPHALT. 7.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S5' KEYMAP NOT TO SCALE C-102 C-101 C-103 C-105 C-104 C-106 C- 1 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-103 SEE DRAWING C-102 FF=4875.10 FF=4874.90 FF=4875.90 FF=4875.30 FF=4875.80 FF=4875.80 FF=4876.75 FF=4876.83 FF=4876.64 FF=4876.93 FF=4875.88 FF=4876.45 FF=4876.80 FF=4877.30 FF=4878.24 FF=4878.24 FF=4876.65 FF=4876.65 FF=4877.57 FF=4876.25 FF=4877.92 FF=4877.57 FF=4878.85 FF=4876.35 FF=4874.70 FF=4874.70 FF=4877.30 FF=4876.60 FF=4876.50 FF=4876.60 FF=4875.40 FF=4876.90 FF=4876.09 FF=4878.85 FF=4875.05 FF=4875.50 FF=4875.50 FF=4876.90 FF=4876.93FF=4876.75 FF=4875.90 FF=4877.00 0.6%0.7% 1.0 % 0.6 % 0.6 % 0.7 % 0.6 % 0.6% 1.0% 0.6% 0.5 % 0.6%0.5% 0.6% 0.5 % 0.5 % 0.6 % 0.6%0.5% 0.6 % 0. 6 % 0. 6 % 0.6% 0. 6 % 0. 8 % 0. 6 % 0. 6 % 0. 5 % 0. 6 % 0. 6 % 0.6%0.6%0.6%0.6% 0. 6 % 0. 6 % 0.6%0.6%0.6%0.5%0.3%1.3%4875 4875 48 7 5 48 7 5 4875 48 7 5 4 8 7 5 48 7 5 48 7 5 487 5 487 5 4 8 7 5 4 8 7 5 4875 48 7 5 4875 4 8 7 5 4875 48 7 5 4 8 7 5 48 7 5 4875 4875 4875 48754874 4 8 7 4 48 7 4 4 8 7 5 48 7 4 48744874 4874 4874 4874 4 8 7 4 48 7 4 4874 48 7 4 48 7 3 48 7 4 48 7 4 48 7 4 48 7 2 48 7 3 4 8 7 3 4874 48754875 0.6% 0.6%0.6% 0.7% 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 6 % 48 7 6 48 7 7 48 7 8 4876 4877 4878 4870487148724873 487 4 4874 48 7 6 48 7 7 4 8 7 5 48 7 7 4878 487648774878 4 8 7 5 4 8 7 6 48 7 7 4 8 7 5 48 7 6 4876 4875 4873 4874 4875 4 8 7 4 487 5 48 7 6 4875 4875 4876 4876 4875 48 7 3 48 7 4 487 3 4 8 7 4 4 8 7 4 4 8 7 4 48 7 2 4 8 7 2 48 7 3 4 8 7 3 4872 4867 4868 487 5 4874 48 7 3 48 7 4 4 8 7 4 0.6%0.6% 1. 4 % 1. 1 % 0. 6 % 0. 6 % 0.6% 0.6% ??? 0.4%0.6% 0.5% 0. 3 % 1. 8 % 0. 6 % ?? ? 1. 1 % ?? ? 0.7% ??? 48 7 5 4876 48774878 48 7 4 48 7 5 48 7 6 48 7 7 4 8 7 5 48 7 6 4 8 7 6 4875 48754874 4 8 7 5 4 8 7 6 4 8 7 6 4877 4876 48744874 48 7 7 4 8 7 7 4877 4 8 7 6 487 6 4 8 7 6 48 7 6 48 7 5 48 7 6 48 7 7 4875 48 7 5 48754 8 7 5 4874 4875 4875 4874 48 7 4 4875 4876 48 7 5 48 7 6 48 7 5 4874 4 8 7 4 4874 4 8 7 4 4 8 7 6 48774877 48764876 4876 4875 4875 4 8 7 5 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x 4876 48 7 6 48 7 0 48 7 6 4 8 7 6 487 5 4 8 7 4 4 8 7 2 4 8 7 3 4 8 7 4 48 7 3 48 7 4 4 8 7 4 487 4 4 8 7 4 4874 487 3 48 7 4 4 8 7 4 4874 4 8 7 5 4874 48 7 5 4 8 7 4 4873 4876 RETENTION AREA RETENTION RETENTION BARQUS LLC BARQUS LLC AM Y M C D O U G A L L BA R Q U S L L C AM Y M C D O U G A L L LO R E N L ST E G E L M E I E R F A M I L Y THOMAS H GOE PARADISE NURSERY AND POND, LLC R & S PETERSON COMMERCIAL PROPERTIES, LLC R & S PETERSON COMMERCIAL PROPERTIES, LLC RIT A J A N E & G E R A L D J E P P E S E N MO O D Y C R E E K R A N C H , L L C STEGELMEIER LN. UN I O N P A C I F I C R A I L R O A D LOT 324 LOT 323 LOT 317 LOT 314LOT 318 LOT 304 LOT 320 LOT 315LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 4 8 7 3 4874 D D DD D D D D D 4875 4875 4875 48 7 5 4 8 7 5 4 8 7 4 48 7 4 48 7 5 487 6 487 5 48 7 5 48 7 4 48 7 4 4 8 7 5 48 7 6 48 7 6 48 7 7 48 7 7 48 7 5 4875 48 7 6 48 7 5 48 7 5 48 7 5 4 8 7 5 48 7 5 48 7 5 4873 4 8 7 4 4 8 7 0 48 7 1 4 8 7 2 4870 48 7 0 4 8 7 1 4 8 7 2 4872 48 7 2 4873 48 7 3 487 3 487 3 487 5 48 7 4 487 4 487 4 487 5 48 7 4 487 6 4875 48 7 5 48 7 4 4872 4873 4872 48 7 3 4876 4875 48 7 5 48 7 7 48 7 6 D D D D D D D D D S D S D S D SD SD SD D D D D SD SD SD SD SD SD SD SD S D S D SD SD S D FI R S T S T R E E T BI R C H L O O P PINE STREET ASPEN STREET THOMSON FARMS ROAD 4875 WHEATGRASS ROAD BARLEY ROAD MA Z E R O A D 0. 6 % HA R V E S T R O A D AREA AREA HA R V E S T S T R E E T THO M S O N F A R M S R O A D STEGELMEIER LN. OL D U . S . H I G H W A Y 1 9 1 4872 4873 0 . 5 % OL D U . S . H I G H W A Y 1 9 1 ??? EXISTING DRAINAGE DITCH EXISTING DRAINAGE DITCH EXISTING DRAINAGE DITCH 48 7 5 EXISTING DRAINAGE DITCH EXISTING DRAINAGE DITCH EXISTING DRAINAGE DITCH D D D D DD D D D D SD SD SD SD SD SD S D SD SD SD SD SD S D SD SD SD S D S D 12345 6 7 8 9 21 22 20 19 18 17 16 1415 10 11 13 4869 4869 4867 4868 4870 D D D D D 23 24 25 12 12 D 12 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.100 100 50 100 200 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R C-200 OVERALL GRADING AND DRAINAGE PLAN GWO 3/28/18 H Y D WV WV BARQUS LLC LOREN L STEGELMEIER FAMILY AMY MCDOUGALL AMY MCDOUGALL BARQUS LLC THOMAS H GOE FF=4875.90 FF=4876.60 FF=4876.90 BUILDING 1 TYPE-A (30 UNITS) BUILDING 2 TYPE-A (30 UNITS)BUILDING 3 TYPE-B (20 UNITS) x x x x x x x x x x x x x OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D EXIST. FIRE HYDRANT D SDSDSD SD SD SD SD SD INSTALL SDCB #281 TOG=4873.42 FL(IN-E)=4870.26 FL(OUT-W)=4870.26 INSTALL SDCB #282 TOG=4873.48 FL(OUT-W)=4871.12 FL(IN-S)=4871.12 INSTALL SDCB #284 TOG=4874.45 FL(OUT-N)=4871.34 INSTALL SDCB #276 TOG=4873.46 FL(OUT-W)=4870.35 IN S T A L L 1 2 " H P S T O R M S D 28 0 . 1 1 L . F . @ 1 . 6 1 % S L O P E INSTALL 12" HP STORM SD 104.38 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 41.00 L.F. @ 1.00% SLOPE INSTALL 12" HP STORM SD 46.68 L.F. @ 0.50% SLOPE 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0.7% 0.7% 1.0 % 0.5 % 1.2%0.2%0.6% 8 8 4 8 7 5 48 7 6 48 7 5 48 7 5 4875 4 8 7 5 4 8 7 5 48 7 5 4875 4875 48 7 5 4 8 7 5 4874 487 5 48 7 6 487 5 48 7 4 487 4 48 7 4 48 7 6 48 7 5 487 5 48 7 4 487 6 48 7 6 4874 48 7 4 48 7 4 4 8 7 5 48 7 4 4 8 7 5 48 7 5 48 7 5 4 8 7 5 4875 48 7 5 4 8 7 5 4 8 7 4 4876 48 7 5 4874 4 8 7 4 48 7 6 48 7 5 487 5 487448 7 4 4876 48 7 5 INSTALL SDCB #280 TOG=4873.14 FL(IN-E)=4870.02 FL(OUT-S)=4870.02 INSTALL 12" HP STORM SD 172.67 L.F. @ 0.50% SLOPE INSTALL 4' SDMH #288 RIM=4874.57 FL(IN-SW)=4869.06 FL(IN-NW)=4870.04 FL(OUT-SE)=4869.06 INSTALL 12" HP STORM SD 44.12 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 288.13 L.F. @ 1.24% SLOPE INSTALL SDCB #241 TOG=4873.44 FL(OUT-SE)=4870.32 INSTALL 12" HP STORM SD 55.00 L.F. @ 0.50% SLOPE INSTALL SDCB #277 RIM=4873.46 FL(IN-E)=4869.94 FL(OUT-W)=4869.94 STEGELMEIER LN.D D SDSDSDSD INSTALL SDCB #326 TOG=4875.14 FL(OUT-SW)=4872.10 INSTALL 4' SDMH #327 RIM=4875.63 FL(IN-NE)=4872.08 FL(OUT-SE)=4868.65 INSTALL SDCB #325 TOG=4873.50 FL(OUT-E)=4870.44 INSTALL SDCB #323 TOG=4873.81 FL(IN-E)=4870.68 FL(OUT-S)=4869.47 FL(IN-W)=4869.47 INSTALL 4' SDMH #324 RIM=4874.31 FL(IN-N)=4869.44 FL(OUT-W)=4867.33 INSTALL 12" HP STORM SD 194.21 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 88.00 L.F. @ 0.50% SLOPE INSTALL SDCB #317 TOG=4874.73 FL(IN-NE)=4871.33 FL(OUT-SW)=4871.33 INSTALL SDCB #318 TOG=4874.92 FL(OUT-SW)=4871.81 INSTALL SDCB #316 TOG=4873.59 FL(IN-NE)=4871.02 FL(OUT-SE)=4871.02 SD SD 8 D 8 INSTALL 4' SDMH #275 RIM=4873.96 FL(OUT-S)=4866.96 FL(IN-E)=4869.89 INSTALL 12" HP STORM SD 96.47 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 62.31 L.F. @ 0.50% SLOPE SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-201 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-202 SEE DRAWING C-202 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 SE E D R A W I N G C - 2 0 4 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES x x x x x x x FF=4875.10 FF=4874.90 FF=4875.30 FF=4875.80 FF=4875.80 FF=4876.35 FF=4876.60 FF=4876.50 FF=4875.40 FF=4876.90 FF=4875.90 FF=4877.00 HA R V E S T R O A D TH O M S O N F A R M S R O A D CLUBHOUSE POOL & HOT TUB BUILDING 2 TYPE-A (30 UNITS) BUILDING 9 TYPE-A (30 UNITS) BUILDING 10 TYPE-A (30 UNITS) BUILDING 11 TYPE-A (30 UNITS)BUILDING 4 TYPE-B (20 UNITS) BUILDING 8 TYPE-A (30 UNITS) BUILDING 7 TYPE-A (30 UNITS) BUILDING 6 TYPE-A (30 UNITS) BUILDING 5 TYPE-B (20 UNITS) BUILDING 3 TYPE-B (20 UNITS) RETENTION AREA OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D D D D D D D SD SD SD D D D D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D SD SDSD SD SD SD INSTALL 4' SDMH #232 RIM=4875.44 FL(IN-NE)=4870.16 FL(OUT-NW)=4868.48 INSTALL SDCB #222 TOG=4874.94 FL(OUT-SW)=4870.18 FL(IN-NW)=4870.18 INSTALL 4' SDMH #230 RIM=4874.86 FL(IN-N)=4870.86 FL(OUT-W)=4867.84 INSTALL 4' SDMH #231 RIM=4874.63 FL(IN-NE)=4870.68 FL(OUT-NW)=4867.65 INSTALL SDCB #229 TOG=4874.32 FL(OUT-S)=4871.15 INSTALL SDCB #239 TOG=4873.39 FL(IN-W)=4870.14 FL(OUT-E)=4869.32 FL(IN-S)=4869.32 INSTALL SDCB #200 TOG=4874.14 FL(OUT-SW)=4870.97 INSTALL SDCB #201 TOG=4874.14 FL(IN-NE)=4870.71 FL(OUT-SW)=4870.71 INSTALL SDCB #243 TOG=4874.16 FL(OUT-NE)=4870.94 INSTALL SDCB #240 TOG=4873.38 FL(OUT-W)=4868.90 FL(IN-NE)=4868.90 INSTALL 4' SDMH #228 RIM=4874.05 FL(IN-N)=4870.10 FL(OUT-W)=4867.07 INSTALL SDCB #203 TOG=4873.55 FL(OUT-S)=4870.39 INSTALL SDCB #204 TOG=4873.55 FL(IN-N)=4870.13 FL(OUT-S)=4870.13 INSTALL SDCB #238 TOG=4873.68 FL(OUT-E)=4870.43 INSTALL 4' SDMH #227 RIM=4873.48 FL(IN-N)=4869.54 FL(OUT-E)=4866.50 FL(OUT-W)=4866.50 INSTALL SDCB #206 TOG=4872.98 FL(IN-N)=4869.56 FL(OUT-S)=4869.56 INSTALL SDCB #205 TOG=4872.98 FL(OUT-S)=4869.82 INSTALL SDCB #242 TOG=4872.93 FL(OUT-SE)=4869.82 INSTALL SDCB #202 TOG=4872.06 FL(OUT-S)=4870.89 FL(IN-N)=4870.89 INSTALL SDCB #221 TOG=4873.25 FL(OUT-E)=4870.12 INSTALL 5' SDMH W/ GRATE #283 TOG=4868.31 FL(IN-N)=4865.50 FL(IN-NW)=4865.50 FL(IN-E)=4865.50 FL(IN-S)=4865.50 INSTALL 5' SDMH W/ GRATE #290 TOG=4868.31 FL(IN-S)=4865.50 FL(OUT-N)=4865.50 INSTALL 4' SDMH #298 RIM=4875.20 FL(IN-SW)=4869.58 FL(OUT-NE)=4869.58 FL(IN-NW)=4870.19 INSTALL SDCB #292 TOG=4874.37 FL(IN-E)=4869.98 FL(OUT-N)=4869.98 FL(IN-S)=4871.15 INSTALL SDCB #285 TOG=4874.18 FL(OUT-W)=4869.78 FL(IN-S)=4869.78 INSTALL SDCB #297 TOG=4874.32 FL(OUT-SE)=4870.49 INSTALL SDCB #294 TOG=4874.37 FL(OUT-N)=4871.26 INSTALL 4' SDMH #289 RIM=4873.85 FL(IN-E)=4868.59 FL(IN-W)=4868.91 FL(OUT-N)=4868.59 INSTALL 4' SDMH #287 RIM=4874.07 FL(IN-SW)=4870.66 FL(OUT-NE)=4870.66 FL(IN-NW)=4869.54 INSTALL SDCB #293 TOG=4873.82 FL(OUT-N)=4870.71 INSTALL SDCB #291 TOG=4873.81 FL(OUT-W)=4870.60 FL(IN-S)=4870.60 INSTALL SDCB #266 RIM=4873.20 FL(IN-E)=4869.68 FL(OUT-W)=4869.68 INSTALL SDCB #286 TOG=4872.67 FL(OUT-SW)=4869.56 INSTALL SDCB #295 TOG=4873.24 FL(IN-W)=4869.98 FL(OUT-N)=4869.98 INSTALL SDCB #265 TOG=4873.20 FL(OUT-W)=4870.09 INSTALL SDCB #274 RIM=4872.98 FL(IN-E)=4869.45 FL(OUT-W)=4869.45 INSTALL SDCB #273 TOG=4872.98 FL(OUT-W)=4869.86 INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 28.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 52.12 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 58.70 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 51.89 L.F. @ 0.60% SLOPE INSTALL 12" HP STORM SD 41.05 L.F. @ 1.00% SLOPE INSTALL 12" HP STORM SD 41.00 L.F. @ 1.00% SLOPE INSTALL 12" HP STORM SD 55.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 216.33 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 55.00 L.F. @ 0.50% SLOPE INS T A L L 1 2 " H P S T O R M S D 288 . 1 3 L . F . @ 1 . 2 4 % S L O P E INSTALL 1 2 " H P S T O R M S D 197.96 L. F . @ 2 . 1 6 % S L O P E INSTA L L 1 2 " H P S T O R M S D 82.93 L . F . @ 0 . 5 0 % S L O P E INST A L L 1 2 " H P S T O R M S D 131.2 6 L . F . @ 0 . 5 0 % S L O P E I N S T A L L 1 5 " H P S T O R M S D 3 0 4 . 2 3 L . F . @ 1 . 0 2 % S L O P E IN S T A L L 1 2 " P E R F O R A T E D H P S T O R M S D 10 0 . 0 0 L . F . @ 0 . 0 0 % S L O P E INSTALL 12" HP STORM SD 122.76 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 40.99 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 23.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 22.00 L.F. @ 0.50% SLOPE IN S T A L L 1 2 " H P S T O R M S D 13 1 . 3 9 L . F . @ 0 . 5 0 % S L O P E IN S T A L L 1 2 " H P S T O R M S D 10 4 . 3 8 L . F . @ 0 . 5 0 % S L O P E IN S T A L L 1 2 " H P S T O R M S D 53. 6 9 L . F . @ 0 . 5 7 % S L O P E IN S T A L L 1 2 " H P S T O R M S D 28 0 . 1 1 L . F . @ 1 . 6 1 % S L O P E 8 7 7 8 8 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 6 % 0. 8 % 0. 6 % 0.6 % 0.6 % 0.6 % 0.6% 0.6% 0.6% 0.6 % 0.5 % 0.3 % 0.6 % 3.2 % 1.4 % 487 5 48 7 4 48 7 4 48 7 4 48 7 5 487 5 48 7 4 487 4 487 4 487 4 4 8 7 3 4873 48 7 3 48 7 3 48 7 3 48 7 3 4 8 7 3 4875 4875 4 8 7 4 4875 4875 4875 4875 4874 4874 4874 48764876 4874 48 7 5 48 7 6 487 5 48 7 5 487 5 487 5 48 7 4 487 4 487 5 48 7 5 487 5 48 7 4 487 5 487 4 48 7 5 4875 4875 4 8 7 5 487 5 48 7 4 48 7 6 487 5 4875 48 7 4 4874 4875 48 7 4 4874 4875 487 5 48 7 5 48 7 4 4875 4 8 7 5 4876 487 5 4875 4 8 7 5 4875 4 8 7 6 487 5 48 7 4 487 6 4869 4869 4 8 6 9 4876 48754875 48 7 5 4 8 7 5 48 7 5 48 7 4 4 8 7 5 48 7 4 4 8 7 4 4 8 7 4 4 8 7 4 48 7 5 487 3 4873 4874 4874 4 8 7 4 48 7 3 48 7 5 48 7 4 48 7 5 48 7 5 48 7 4 4 8 7 4 4875 4874 4874 4875 4874 4874 487 4 4875 4 8 7 5 4 8 7 5 487 4 SD SD SD SD S D S D S D SD 48 7 0 48 7 5 48 7 1 48 7 2 48 7 3 48 7 4 RETENTION AREA STORAGE REQ'D = 41,864 C.F. STORAGE PROV. = 42,851 C.F. 25-YR HIGH WATER = 4873.00 INSTALL SDCB #312 TOG=4874.84 FL(OUT-NE)=4871.68 INSTALL SDCB #313 TOG=4874.64 FL(IN-NE)=4870.60 FL(OUT-SE)=4870.60 FL(IN-SW)=4871.17 INSTALL SDCB #314 TOG=4874.64 FL(IN-NE)=4871.05 FL(OUT-SW)=4871.05 INSTALL SDCB #315 TOG=4874.42 FL(OUT-SW)=4871.49 INSTALL SDCB #337 TOG=4875.23 FL(IN-E)=4872.06 FL(OUT-SW)=4872.06 INSTALL SDCB #336 TOG=4875.44 FL(OUT-W)=4872.22 INSTALL SDCB #310 TOG=4873.74 FL(OUT-SE)=4871.09 FL(IN-NE)=4871.09 INSTALL SDCB #311 TOG=4874.47 FL(OUT-SW)=4871.35 INSTALL 12" HP STORM SD 32.80 L.F. @ 0.50% SLOPE IN S T A L L 1 2 " H P S T O R M S D 18 1 . 0 0 L . F . @ 0 . 5 0 % S L O P E 8 7 8 IN S T A L L 1 2 " H P S T O R M S D 22 2 . 7 0 L . F . @ 0 . 5 0 % S L O P E INSTALL 15" HP STORM S D 85.73 L.F. @ 0.50% SLO P E INSTALL 2'X2' SDCB #346 TOG=4873.63 FL(IN-SE)=4870.36 FL(OUT-W)=4870.36 EXISTING DITCH EXISTING DITCH EXISTING DITCH SD INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE D D SD SD SD D D 8 8 7 7 INSTALL 4' SDMH #362 RIM=4873.47 FL(IN-E)=4869.42 FL(OUT-N)=4866.44 INSTALL 4' SDMH #361 RIM=4873.69 FL(IN-E)=4869.65 FL(OUT-N)=4866.69 INSTALL 12" HP STORM SD 17.63 L.F. @ 0.43% SLOPE INSTALL 4' SDMH #358 TOG=4874.86 FL(IN-NW)=4870.52 FL(OUT-NE)=4867.96 8 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-202 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-203 SEE DRAWING C-203 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 SE E D R A W I N G C - 2 0 5 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-201 SEE DRAWING C-201 SE E D R A W I N G C - 2 0 7 SE E D R A W I N G C - 2 0 7 SE E D R A W I N G C - 2 0 5 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES R & S PETERSON COMMERCIAL PROPERTIES, LLC FF=4874.70 FF=4874.70 FF=4875.05 FF=4875.50 HA R V E S T R O A D RETENTION AREA x x x x x x x x x x x x x x x x x x x x x x S D SD INSTALL 12" HP STORM SD 87.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 41.55 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 42.04 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 43.25 L.F. @ 0.50% SLOPE INSTALL SDCB #233 TOG=4872.47 FL(OUT-S)=4869.30 INSTALL SDCB #207 TOG=4872.01 FL(OUT-W)=4868.86 FL(IN-N)=4868.86 INSTALL SDCB #208 RIM=4872.05 FL(IN-E)=4868.66 FL(OUT-NW)=4868.66 INSTALL SDCB #209 RIM=4871.94 FL(OUT-SW)=4868.58 FL(IN-E)=4868.58 FL(OUT-S)=4868.80 INSTALL SDCB #211 RIM=4871.80 FL(IN-N)=4867.12 FL(IN-E)=4868.51 FL(OUT-NW)=4867.12 INSTALL SDCB #212 TOG=4871.89 FL(OUT-W)=4868.72 INSTALL SDCB #210 TOG=4871.96 FL(OUT-W)=4868.80 INSTALL 12" HP STORM SD 74.00 L.F. @ 2.27% SLOPE 0. 6 % 0. 6 % 0. 6 % 0. 6 % 487 2 48 7 2 48 7 3 48 7 3 48 7 3 4873 48 7 3 48 7 3 4 8 7 3 4871 4871 48 7 1 4871 48724872 4871 4871 4872 487 2 4871 48 7 1 4872 4 8 7 1 4 8 7 2 4872 4 8 7 3 4 8 7 2 48 7 2 4873 4874 4874 4874 48 7 3 4 8 7 4 48 7 3 48 7 4 487 4 4870 48684869 4871487248734874 48 7 5 48 7 4 4875 48 7 3 4873 4874 4874 4874 D D D SDSDSD SD SD S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD S D SD SD S D S D S D S D S D SD SD SD SD SD RETENTION AREA STORAGE REQ'D = 54,159 C.F. STORAGE PROV. = 59,328 C.F. 25-YR HIGH WATER = 4870.00 INSTALL SDCB #356 TOG=4872.40 FL(OUT-SE)=4869.31 INSTALL 4' SDMH #349 RIM=4873.13 FL(OUT-W)=4865.42 FL(IN-NW)=4869.18 INSTALL 12" HP STORM SD 25.91 L.F. @ 0.50% SLOPE INSTA L L 1 5 " H P S T O R M S D 111.83 L . F . @ 2 . 0 6 % S L O P E INSTALL 5' SDMH W/ GRATE #299 TOG=4866.65 FL(IN-E)=4863.11 FL(OUT-W)=4863.11 INSTALL 5' SDMH W/ GRATE #300 TOG=4866.65 FL(IN-E)=4863.11 FL(IN-W)=4863.11 FL(IN-N)=4863.11 INSTALL 12" PERFORATED HP STORM SD 180.00 L.F. @ 0.00% SLOPE INSTALL 18" HP STORM SD 65.94 L.F. @ 7.97% SLOPE INSTALL SDCB #355 TOG=4873.79 FL(IN-N)=4868.37 FL(OUT-S)=4868.37 IN S T A L L 1 8 " H P S T O R M S D 12 8 . 2 6 L . F . @ 0 . 5 0 % S L O P E INSTALL SDCB #335 TOG=4872.19 FL(IN-W)=4863.83 FL(OUT-E)=4863.83 INSTALL 2 4 " H P S T O R M S D 145.17 L. F . @ 0 . 5 0 % S L O P E INSTALL 24" HP STORM SD 454.33 L.F. @ 0.50% SLOPE INSTALL SDCB #334 TOG=4871.88 FL(IN-N)=4866.11 FL(OUT-E)=4866.11 IN S T A L L 2 4 " H P S T O R M S D 18 4 . 6 8 L . F . @ 0 . 5 0 % S L O P E INSTALL 4' SDMH #333 RIM=4874.19 FL(IN-W)=4867.03 FL(OUT-S)=4867.03INSTALL 24" HP STORM SD 173.72 L.F. @ 0.50% SLOPE 4867 4867 EXISTING DITCH INSTALL 4' SDMH #354 RIM=4873.04 FL(IN-NW)=4869.01 FL(OUT-S)=4869.01 INSTALL 18" HP STORM SD 41.72 L.F. @ 0.50% SLOPE INSTALL SDCB #350 TOG=4872.12 FL(IN-NW)=4869.22 FL(OUT-SE)=4869.22 IN S T A L L 1 2 " H P S T O R M S D 26 8 . 9 2 L . F . @ 0 . 5 0 % S L O P E INSTALL SDCB #352 TOG=4873.68 FL(OUT-SE)=4870.56 EXISTING DITCH EXISTING DITCH INS T A L L 1 2 " H P S T O R M S D 128 . 3 2 L . F . @ 0 . 5 0 % S L O P E INSTALL 2'X2' SDCB #351 TOG=4873.65 FL(OUT-NW)=4871.00 INSTALL SDCB #347 TOG=4873.44 FL(IN-NE)=4868.99 FL(OUT-SW)=4868.99 INSTALL 18" HP STORM SD 13.02 L.F. @ 0.50% SLOPE INSTALL SDCB #344 TOG=4874.13 FL(IN-NW)=4869.24 FL(IN-SE)=4869.05 FL(OUT-SW)=4869.05 INSTALL 18" HP STORM SD 31.33 L.F. @ 0.50% SLOPE INSTALL SDCB #341 TOG=4873.55 FL(IN-NE)=4869.21 FL(OUT-NW)=4869.21 FL(IN-SE)=4869.21 INSTALL 12" HP STORM SD 71.20 L.F. @ 0.50% SLOPE INSTALL 18" HP STORM SD 144.50 L.F. @ 0.50% SLOPE INSTALL SDCB #348 TOG=4872.44 FL(OUT-NW)=4869.56 INSTALL 18" HP STORM SD 41.01 L.F. @ 0.50% SLOPE D D INSTALL 4' SDMH #370 RIM=4871.90 FL(IN-SE)=4867.09 FL(OUT-S)=4864.99 8 8 INSTALL 4' SDMH #369 RIM=4872.55 FL(IN-SE)=4868.63 FL(OUT-S)=4864.99 FL(OUT-N)=4864.99 D SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-203 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 SE E D R A W I N G C - 2 0 6 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-202 SEE DRAWING C-202 SE E D R A W I N G C - 2 0 7 SE E D R A W I N G C - 2 0 7 SE E D R A W I N G C - 2 0 6 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES BARQUS LLC STEGELMEIER LN. x x x x x x x x g g g g D S D S D S D INSTALL SDCB #250 TOG=4873.64 FL(OUT-W)=4870.48 INSTALL 12" HP STORM SD 23.50 L.F. @ 0.50% SLOPE INSTALL SD COMBO #244 RIM=4873.65 FL(OUT-S)=4870.36 FL(IN-E)=4870.36 IN S T A L L 1 2 " H P S T O R M S D 2 4 0 . 2 4 L . F . @ 0 . 5 0 % S L O P E FF=4878.24 FF=4878.24 FF=4877.30FF=4876.93 FF=4876.83 FF=4876.75 4875 48 7 5 48 7 6 48 7 7 48 7 7 4875 4876 4 8 7 5 48 7 5 48 7 5 48 7 5 48 7 5 4 8 7 5 4 8 7 5 2032 2034 2033 2035 2029 2031 2030 2001 2005 2002 2014 2015 20172016 2019 2023 2018 2003 2007 2006 2004 2020 2021 2022 2024 20402039203820372036 2041 2042 2046 2045 2044 2043204820472049 0. 6 % 0. 6 % 0. 6 % 1.1%0.6% 0.5% 0. 5 % 0. 7 % 1. 3 % 0.6%0.6%0.6%8 4876 4877 4878 4 8 7 7 48 7 8 48 7 7 4878 48 7 6 48 7 7 48 7 8 48 7 5 4 8 7 4 48 7 4 48 7 6 48 7 7 4 8 7 5 4 8 7 6 4875 4 8 7 6 4 8 7 6 4877 4875 4876 4 8 7 6 4 8 7 6 48 7 5 48 7 4 48 7 6 4875 D SD EXISTING DITCH INSTALL SDCB #319 TOG=4874.21 FL(OUT-W)=4871.10 INSTALL 12" HP STORM SD 74.00 L.F. @ 0.50% SLOPE INSTALL 4' SDMH #321 RIM=4874.37 FL(IN-N)=4870.70 FL(OUT-W)=4867.39 INSTALL SDCB #320 TOG=4873.87 FL(IN-E)=4870.73 FL(OUT-S)=4870.73 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-204 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-205 SEE DRAWING C-205 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIMINARY PUD SUBMITTAL S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 SE E D R A W I N G C - 2 0 1 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES x x x x x x x x x x x x x x x x FF=4876.64 FF=4875.88 FF=4876.45 FF=4876.80 FF=4876.65 FF=4876.65 FF=4877.57 FF=4876.25 FF=4877.92 FF=4877.57 FF=4878.85 FF=4877.30 FF=4876.09 FF=4878.85 FF=4876.93FF=4876.75 ASPEN STREET PINE STREET BI R C H L O O P FI R S T R E E T THOMSON FARMS ROAD RETENTION AREA MO O D Y C R E E K R A N C H , L L C (P U B L I C S T R E E T ) DDD D D D D D D D S D SD S D S D S D S D S D S D S D S D S D S D SD SD SD SDSD SD SD SD SD SD SD SD S D SD SD SD SD 8 8 8 8 INSTALL SDCB #213 TOG=4875.08 FL(OUT-S)=4871.92 INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE INSTALL SDCB #214 TOG=4875.08 FL(IN-N)=4871.66 FL(OUT-S)=4871.66 INSTALL 4' SDMH #223 RIM=4875.58 FL(IN-N)=4871.63 FL(OUT-W)=4868.61 INSTALL 4' SDMH #224 RIM=4875.40 FL(IN-N)=4871.40 FL(OUT-E)=4868.47 INSTALL SDCB #215 TOG=4874.91 FL(OUT-S)=4871.43 FL(IN-N)=4871.43 INSTALL 12" HP STORM SD 52.78 L.F. @ 0.50% SLOPE INSTALL SDCB #218 TOG=4874.85 FL(OUT-S)=4871.69 INSTALL 4' SDMH #225 RIM=4874.98 FL(IN-N)=4871.03 FL(OUT-W)=4868.02 INSTALL SDCB #216 TOG=4874.48 FL(OUT-S)=4871.06 FL(IN-N)=4871.06 INSTALL SDCB #219 TOG=4874.48 FL(OUT-S)=4871.32 INSTALL 12" HP STORM SD 52.04 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 23.50 L.F. @ 0.50% SLOPEINSTALL SD COMBO #247 RIM=4874.07 FL(OUT-N)=4870.77 FL(IN-E)=4870.77 IN S T A L L 1 2 " H P S T O R M S D 24 7 . 4 8 L . F . @ 0 . 5 0 % S L O P E INSTALL 12" HP STORM SD 102.47 L.F. @ 0.50% SLOPE INSTALL 15" HP STORM SD 105.04 L.F. @ 1.23% SLOPEINSTALL 12" HP STORM SD 103.04 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 90.53 L.F. @ 0.50% SLOPE IN S T A L L 1 5 " H P S T O R M S D 74 . 0 0 L . F . @ 0 . 5 0 % S L O P E IN S T A L L 1 8 " H P S T O R M S D 18 6 . 0 0 L . F . @ 0 . 5 0 % S L O P E INSTALL 15" HP STO R M S D 132.35 L.F. @ 0.50% S L O P E INSTA L L 1 8 " H P S T O R M S D 113.95 L . F . @ 2 . 0 4 % S L O P E IN S T A L L 1 2 " H P S T O R M S D 10 1 . 9 4 L . F . @ 0 . 7 2 % S L O P E INSTAL L 1 2 " H P S T O R M S D 89.37 L. F . @ 1 . 1 4 % S L O P E INSTALL 15" HP STORM SD 23.50 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 23.50 L.F. @ 0.50% SLOPE INSTALL SDCB #254 TOG=4874.25 FL(OUT-W)=4871.08 FL(IN-E)=4871.08 INSTALL SDCB #253 TOG=4874.25 FL(OUT-W)=4871.08 INSTALL SDCB #260 TOG=4875.85 FL(IN-NE)=4872.37 FL(OUT-W)=4872.37 FL(IN-S)=4872.37 INSTALL SDCB #259 TOG=4876.04 FL(OUT-SW)=4872.88 INSTALL SDCB #256 TOG=4875.12 FL(OUT-W)=4871.96 INSTALL SDCB #257 TOG=4874.53 FL(IN-E)=4871.73 FL(OUT-SW)=4871.73 FL(IN-NW)=4871.73 INSTALL SDCB #258 TOG=4874.53 FL(IN-NE)=4871.59 FL(OUT-W)=4871.59 INSTALL SDCB #252 TOG=4874.63 FL(OUT-W)=4870.93 FL(IN-E)=4870.93INSTALL SD COMBO #246 RIM=4874.64 FL(IN-N)=4868.79 FL(IN-S)=4868.24 FL(IN-E)=4870.81 FL(OUT-W)=4868.24 INSTALL SDCB #251 TOG=4874.63 FL(OUT-W)=4871.47 INSTALL SDCB #267 TOG=4875.69 FL(OUT-E)=4872.52 INSTALL SDCB #268 TOG=4874.80 FL(OUT-W)=4871.63 INSTALL SDCB #271 TOG=4873.78 FL(IN-E)=4870.61 FL(OUT-S)=4870.61 INSTALL SDCB #272 RIM=4873.78 FL(IN-N)=4870.49 FL(OUT-SE)=4866.64 INSTALL 12" HP STORM SD 27.00 L.F. @ 0.44% SLOPE INSTALL 15" HP STORM SD 23.50 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 74.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 34.95 L.F. @ 0.67% SLOPE INSTALL 15" HP STORM SD 27.00 L.F. @ 0.50% SLOPE 48 7 5 4 8 7 5 48 7 5 48 7 5 48 7 5 48 7 5 48 7 5 48 7 5 48 7 4 4874 4 8 7 4 4 8 7 4 48 7 5 4875 4875 4875 48 7 5 48 7 5 4 8 7 5 48 7 5 48 7 5 4876 4877 4878 4876 4876 4876 4876 4875 4875 4875 4875 4875 48 7 5 48 7 6 4 8 7 5 4 8 7 6 48 7 7 4 8 7 5 48 7 5 48 7 6 48 7 7 4875 4876 4875 4874 4874 4 8 7 5 4 8 7 6 48 7 0 4870 4869 4871 4872 4873 4 8 7 4 4874 4875 4874 4876 4876 4876 4 8 7 6 4875 4875 4876 4874 48 7 5 4 8 7 4 48 7 6 4874 487 4 4 8 7 4 48764875 4878 4 8 7 8 48 7 7 4 8 7 7 48 7 8 4877 4877 48 7 6 4876 48 7 6 48 7 7 4 8 7 6 4 8 7 6 4 8 7 6 4 8 7 7 4 8 7 5 48 7 5 4 8 7 6 4 8 7 7 48 7 5 4 8 7 5 48 7 5 4 8 7 5 48 7 6 4 8 7 5 48 7 5 487 6 4876 4876 48 7 5 48 7 6 4876 4875 48 7 6 4875 4876 4 8 7 6 4874 4874 4875 48 7 6 48 7 5 48 7 5 48 7 5 4876 48 7 6 4874 0.6% 0.6% 0. 6 % 0. 6 % 0.6%0.6% 2.2% 0.6%0.2% 0.6% 0.5% 0.6%0.0%0.5% 0.6% 0. 6 % 0. 6 % 1. 5 % 0. 6 % 0. 6 % 0.6% 0. 6 % 0.6% ?? ? ?? ? ?? ? 0. 7 % 0. 8 % 0. 7 % 0. 7 % INSTALL 12" HP STORM SD 23.47 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 103.08 L.F. @ 1.00% SLOPE INSTALL 12" HP STORM SD 52.00 L.F. @ 0.50% SLOPE INSTALL SDCB #220 TOG=4873.76 FL(OUT-S)=4870.59 INSTALL SDCB #217 TOG=4873.76 FL(OUT-S)=4870.33 FL(IN-N)=4870.33 INSTALL 4' SDMH #226 RIM=4874.25 FL(IN-N)=4870.30 FL(OUT-E)=4867.31 4 8 7 5 4 8 7 4 4 8 7 6 0.6% INSTALL SDCB #255 TOG=4874.06 FL(OUT-W)=4870.89 S D S D S D S D RETENTION AREA STORAGE REQ'D = 35,790 C.F. STORAGE PROV. = 42,314 C.F. 25-YR HIGH WATER = 4873.00 INSTALL 5' SDMH W/ GRATE #278 TOG=4868.88 FL(IN-NW)=4865.91 FL(OUT-E)=4865.91 FL(IN-SW)=4865.91 INSTALL 12" PERFORATED HP STORM SD 150.00 L.F. @ 0.00% SLOPE INSTALL 5' SDMH W/ GRATE #279 TOG=4868.88 FL(IN-E)=4865.91 FL(IN-W)=4865.91 INSTALL SDCB #301 TOG=4875.24 FL(OUT-SE)=4872.12 INSTALL 12" HP STORM SD 78.71 L.F. @ 0.50% SLOPE INSTALL SDCB #262 TOG=4873.66 FL(OUT-W)=4870.06 INSTALL SDCB #261 TOG=4874.55 FL(OUT-E)=4871.38 INSTALL 12" HP STORM SD 187.10 L.F. @ 1.91% SLOPE INSTALL SDCB #264 TOG=4872.64 FL(IN-S)=4869.49 FL(OUT-NE)=4869.49 INSTALL 12" HP STORM SD 23.50 L.F. @ 0.50% SLOPE INSTALL SD COMBO #263 TOG=4872.77 FL(IN-E)=4869.61 FL(OUT-N)=4869.61 EXISTING DITCH EXISTING DITCH INSTALL SD COMBO #248 RIM=4874.25 FL(IN-S)=4869.54 FL(OUT-N)=4869.54 FL(IN-E)=4870.96 FL(IN-W)=4870.86 INSTALL SD COMBO #249 RIM=4874.25 FL(IN-S)=4869.17 FL(OUT-N)=4869.17 FL(IN-E)=4870.96 INSTALL 12" HP STORM SD 240.24 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 166.29 L.F. @ 0.87% SLOPE INSTALL SDCB #302 RIM=4876.93 FL(OUT-N)=4873.82 8 INSTALL SD COMBO #245 RIM=4874.64 FL(IN-N)=4869.16 FL(OUT-S)=4869.16 FL(IN-E)=4871.35 FL(IN-W)=4871.49 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-205 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-206 SEE DRAWING C-206 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-204 SEE DRAWING C-204 SE E D R A W I N G C - 2 0 2 SE E D R A W I N G C - 2 0 2 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR APWA STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES R & S PETERSON COMMERCIAL PROPERTIES, LLC RIT A J A N E & G E R A L D J E P P E S E N WHEATGRASS ROAD BARLEY ROAD MA Z E R O A D LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312 LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 LOT 324 LOT 317 LOT 314 LOT 318 LOT 304 LOT 320 LOT 315 LOT 323 D D S D INSTALL 4' SDMH #269 RIM=4873.29 FL(IN-NE)=4869.29 FL(OUT-N)=4866.26 INSTALL SDCB #237 TOG=4872.74 FL(IN-E)=4869.32 FL(OUT-SW)=4869.32 INSTALL SDCB #236 TOG=4872.70 FL(OUT-W)=4869.53 INSTALL 4' SDMH #270 RIM=4872.46 FL(IN-E)=4868.51 FL(OUT-N)=4865.51 FL(OUT-S)=4865.51 INSTALL SDCB #234 TOG=4871.91 FL(OUT-W)=4868.75 INSTALL SDCB #235 TOG=4871.91 FL(IN-E)=4868.54 FL(OUT-W)=4868.54 TO INFILTRATOR FL(IN-S)=4866.24 INSTALL 12" HP STORM SD 42.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 41.50 L.F. @ 0.50% SLOPEINSTALL 12" HP STORM SD 6.40 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 4.00 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 4.00 L.F. @ 0.50% SLOPE 4872 48 7 3 4 8 7 4 4873 4874 8 7 8 7 4875 4872 4873 4874 4873 4873 4872 487 3 4 8 7 3 4 8 7 4 4 8 7 5 4875 4874 48 7 3 48 7 3 4 8 7 4 4 8 7 4 4 8 7 2 4 8 7 2 48 7 3 4872 4871 487 3 4 8 7 3 487 4 4 8 7 4 4874 4873 4873 4 8 7 3 48 7 3 48 7 3 48 7 2 48 7 2 48 7 3 4 8 7 2 4873 4872 4872 4872 487 1 48 7 1 48 7 1 48724872 48 7 2 48 7 3 48 7 5 48 7 5 48 7 5 48 7 5 48 7 5 48 7 5 48 7 548 7 5 48 7 5 48 7 5 48 7 5 48 7 5 0.6%0.6% 0.6%0.6% 0. 6 % 0. 6 % 1. 4 % EXISTING DITCH EXISTING DITCH 8 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-206 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-205 SEE DRAWING C-205 SE E D R A W I N G C - 2 0 3 SE E D R A W I N G C - 2 0 3 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x P A R A D I S E N U R S E R Y A N D P O N D , L L C OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D FF=4875.50 FF=4877.00 48 7 2 4872 48 7 3 48 7 3 48 7 0 4 8 7 1 4872 4873 4873 48 7 5 487 4 487 3 48 7 3 487 4 48 7 3 487 3 487 4 48 7 4 48 7 3 487 3 4 8 7 3 487 4 48 7 4 48 7 3 48 7 3 487 3 48 7 2 487 3 4873 48 7 5 4 8 7 3 487 4 4875 4 8 7 5 487 5 48 7 5 48 7 4 487 4 D D S D S D S D SD SD SD S D S D S D S D S D SD SD S D S D S D S D S D SD SD SD SD INSTALL SDCB #304 TOG=4873.20 FL(OUT-NE)=4870.00 INSTALL 12" CLASS III RCP-SD 74.48 L.F. @ 0.50% SLOPE INSTALL SDCB #305 TOG=4873.41 FL(IN-NE)=4869.63 FL(OUT-SE)=4869.63 FL(IN-SW)=4869.63 INSTALL 12" CLASS III RCP-SD 81.41 L.F. @ 0.50% SLOPE INSTALL SDCB #306 TOG=4873.41 FL(OUT-SW)=4870.03 INSTALL 12" CLASS III RCP-SD 22.62 L.F. @ 0.50% SLOPE INSTALL SDCB #329 TOG=4874.15 FL(OUT-SE)=4869.61 INSTALL SDCB #307 TOG=4873.33 FL(OUT-NE)=4870.00 INSTALL SDCB #342 TOG=4873.96 FL(OUT-S)=-0.51 INSTALL SDCB #343 TOG=4874.36 FL(IN-N)=4873.24 FL(OUT-SE)=4873.24 INSTALL SDCB #338 TOG=4874.71 FL(IN-NE)=4871.30 FL(OUT-SE)=4871.30 INSTALL SDCB #308 TOG=4873.55 FL(OUT-SE)=4869.36 FL(IN-SW)=4869.36 INSTALL 12" HP STORM SD 222.70 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 166.33 L.F. @ 2.40% SLOPE 8 INSTALL SDCB #332 TOG=4873.57 FL(OUT-SE)=4872.46 IN S T A L L 1 2 " H P S T O R M S D 1 6 9 . 9 5 L . F . @ 0 . 5 0 % S L O P E INSTALL SDCB #331 TOG=4873.12 FL(IN-NE)=4867.90 FL(IN-NW)=4871.61 FL(OUT-E)=4867.90 INSTALL 24" HP STORM SD 176.37 L.F. @ 0.50% SLOPE INSTALL SDCB #330 TOG=4874.17 FL(IN-NW)=4868.78 FL(OUT-SW)=4868.78 FL(IN-NE)=4868.78 INSTALL 12" HP STORM SD 29.73 L.F. @ 16392.21% SLOPE INSTALL 12" CLASS III RCP-SD 17.62 L.F. @ 0.50% SLOPE INSTALL 4' SDMH #359 RIM=4874.30 FL(IN-NW)=4869.27 FL(OUT-NE)=4867.48 INSTALL 12" CLASS III RCP-SD 128.63 L.F. @ 0.50% SLOPE 8 INSTALL 4' SDMH #360 RIM=4874.14 FL(IN-NW)=4869.51 FL(OUT-NE)=4866.95 4874 48 7 4 INSTALL 24" HP STORM SD 173.72 L.F. @ 0.50% SLOPE INSTALL 18" HP STORM SD 41.01 L.F. @ 0.50% SLOPE INSTALL 12" HP STORM SD 152.01 L.F. @ 0.50% SLOPE 0.5 % 1.1 % 0.5 % 0.1 % 7 7 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: HP STORM - STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. RCP CLIII STORM DRAIN LINE OR APPROVED EQUAL. INSTALLATION AND TRENCHING PER REXBURG STANDARDS. LENGTH AND SLOPE PER PLAN. CATCH BASIN PER ISPWC STANDARD DRAWING SD-601 AND SPECIFICATIONS. COMBINATION INLET/CLEANOUT BOX PER APWA STANDARD PLAN NO. 316 AND SPECIFICATIONS. STORM DRAIN MANHOLE PER ISPWC STANDARD DRAWING SD-612 AND SPECIFICATIONS. 2'x2' CATCH BASIN. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4'Ø ACCESS MANHOLE FOR UNDERGROUND RETENTION CHAMBER SYSTEM WITH SLOTTED COVER AND PER REXBURG STANDARDS UNDERGROUND RETENTION CHAMBER SYSTEM: INSTALL PER REXBURG STANDARDS.. CONTRACTOR TO MAINTAIN A MINIMUM OF 4' OF COVER ABOVE TOP OF EACH CHAMBER, FOR ENTIRE CHAMBER SYSTEM. DAYLIGHT TO EXISTING GROUND WITH MAXIMUM 3:1 SLOPE. 1 2 3 4 5 6 7 8 9 C-207 GRADING AND DRAINAGE PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL S5' KEYMAP NOT TO SCALE C-202 C-201 C-203 C-205 C-204 C-206 C- 2 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-203 SEE DRAWING C-202 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.ALL IMPROVEMENTS MUST COMPLY WITH ADA STANDARDS AND RECOMMENDATIONS. 3.ALL WORK SHALL COMPLY WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER POSSIBLY INCLUDING, BUT NOT LIMITED TO, REMOVAL OF UNCONSOLIDATED FILL, ORGANICS, AND DEBRIS, PLACEMENT OF SUBSURFACE DRAIN LINES AND GEOTEXTILE, AND OVEREXCAVATION OF UNSUITABLE BEARING MATERIALS AND PLACEMENT OF ACCEPTABLE FILL MATERIAL. 4.THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SOIL CONDITIONS. 5.ELEVATIONS HAVE BEEN TRUNCATED FOR CLARITY. XX.XX REPRESENTS AN ELEVATION OF 48XX.XX ON THESE PLANS. 6.LANDSCAPED AREAS REQUIRE SUBGRADE TO BE MAINTAINED AT A SPECIFIC ELEVATION BELOW FINISHED GRADE AND REQUIRE SUBGRADE TO BE PROPERLY PREPARED AND SCARIFIED. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION. 7.SLOPE ALL LANDSCAPED AREAS AWAY FROM BUILDING FOUNDATIONS TOWARD CURB AND GUTTER OR STORM DRAIN INLETS. 8.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 9.ALL STORM DRAIN INFRASTRUCTURE TO BE INSTALLED PER GOVERNING AGENCY OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 10.ENSURE MINIMUM COVER OVER ALL STORM DRAIN PIPES PER MANUFACTURER'S RECOMMENDATIONS. NOTIFY ENGINEER IF MINIMUM COVER CANNOT BE ATTAINED. 11.ALL FACILITIES WITH DOWNSPOUTS/ROOF DRAINS SHALL BE CONNECTED TO THE STORM DRAIN SYSTEM. SEE MECHANICAL/PLUMBING PLANS FOR DOWNSPOUT/ROOF DRAIN LOCATIONS AND SIZES. ALL ROOF DRAINS TO HAVE MINIMUM 1% SLOPE. 12.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 13.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING CONCRETE, ASPHALT, OR STORM DRAIN STRUCTURES OR PIPES. 14.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S D S D S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD S D G G G G G G G G G G G G G WV WVWV WV WV W V WV G G G G G G GV G G WV WV WV WV H Y D WV WV BARQUS LLC BARQUS LLC THOMAS H GOE MO O D Y C R E E K R A N C H , L L C R & S PETERSON COMMERCIAL PROPERTIES, LLC RIT A J A N E & G E R A L D J E P P E S E N R & S PETERSON COMMERCIAL PROPERTIES, LLC PARADISE NURSERY AND POND, LLC STEGELMEIER LN. ASPEN STREET PINE STREET BI R C H L O O P FI R S T R E E T HA R V E S T R O A D THOMSON FARMS ROAD WHEATGRASS ROAD BARLEY ROAD HA R V E S T R O A D MA Z E R O A D TH O M S O N F A R M S R O A D RETENTION AREA RETENTION AREA RETENTION AREA WV WV WV WV WVWVWV W V WV WV WV WV WV WV WV W V W V WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV WV W V H Y D WV WV W V W V W V WV WV WV WV W V W V H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D H Y D GGGG G G G G G G G G G G G G G G G G G G G GGGG G G G G G G GGGG G G G G G G G G G G WV W V W V H Y D WV WVWVWV H Y D W V H Y D WV H Y D H Y D WV H Y D H YD H Y D WV WV H Y D WV WV WV LOREN L STEGELMEIER FAMILY AMY MCDOUGALL BARQUS LLC w w w w w w w w w w w w OL D U . S . H I G H W A Y 1 9 1 STEGELMEIER LN. UN I O N P A C I F I C R A I L R O A D BA S I S O F B E A R I N G S 0 ° 0 8 ' 0 8 " E 2 6 4 5 . 9 8 ' NORTH 2645.98'SOUTH 2645.98'EAST 2645.98'WEST 2645.98' LOT 324 LOT 323 LOT 317 LOT 314LOT 318 LOT 304 LOT 320 LOT 315LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS S S S ss ss ss ss ss ss ss ss ss ss ssss SSSSSSSSSSSS SS SS SS SS ssss S S S S SS S S SS SS SS SS S S SS SS SS SSSSSS S S S S S S SSSSSSSS SSSS SS SS S S S S SS S S S S SSSS SS SS SSSS S S S S D D DD D D D D D S S S S S S S S SS SSSS SS S S SS D D D D D D D D D D D INSTALL 4' SSMH #116 INSTALL 4' SSMH #115 INSTALL 4' SSMH #114 INSTALL 5' SSMH #113 INSTALL 5' SSMH #112 INSTALL 5' SSMH #128 INSTALL 4' SSMH #129 INSTALL 4' SSMH #130 INSTALL 4' SSMH #131 INSTALL 4' SSMH #132 INSTALL 5' SSMH #133 INSTALL 4' SSMH #135 INSTALL 4' SSMH #139 INSTALL 4' SSMH #138 INSTALL 5' SSMH #136 EXIST. SSMH #105EX INSTALL 4' SSMH #137 INSTALL 5' SSMH #140 EXIST. SSMH #106EX INSTALL 5' SSMH #144 INSTALL 5' SSMH #151 INSTALL 4' SSMH #154 INSTALL 4' SSMH #152 INSTALL 4' SSMH #153 INSTALL 4' SSMH #145 INSTALL 4' SSMH #143 INSTALL 4' SSMH #150 INSTALL 4' SSMH #127 INSTALL 4' SSMH #126 INSTALL 5' SSMH #147 INSTALL 4' SSMH #148 INSTALL 5' SSMH #149 INSTALL 4' SSMH #123 INSTALL 5' SSMH #122INSTALL 5' SSMH #117 INSTALL 4' SSMH #146 INSTALL 4' SSMH #125 INSTALL 5' SSMH #118 INSTALL 4' SSMH #119 INSTALL 4' SSMH #120 INSTALL 4' SSMH #121 INSTALL 4' SSMH #111 INSTALL 4' SSMH #109 INSTALL 4' SSMH #108 INSTALL 5' SSMH #107 EXIST. SSMH #100EX EXIST. SSMH #104EX INSTALL 4' SSMH #142INSTALL 4' SSMH #141 INSTALL 4' SSMH #134 EXIST. SSMH #103EX 8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR.8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR.8" SAN. SWR.8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR. 8" SAN. S W R . 8" SAN. SWR. 8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR. 8" S A N . S W R . 10" SAN. SWR. 10" SAN. SWR.10" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR. 8" S A N . S W R . 8" S A N . S W R . 8" SAN. SWR. 8" SAN. SWR. 8" S A N . S W R . 8" SAN. SWR.8" SAN. SWR. 8" S A N . S W R . INSTALL 4' SSMH #110 8" S A N . S W R . EX I S T 1 2 " S A N . S W R . EX I S T 1 2 " S A N . S W R . 12" S A N . S W R . EX I S T 1 2 " S A N . S W R . 8" S A N . S W R . 8" S A N . S W R . 8" S A N . S W R . 8" S A N . S W R . 8" SAN. SW R . 8" S A N . S W R . 8" S A N . S W R . 12" S A N . S W R . 12" S A N . S W R . 12" SAN. SWR . 12" SAN. SWR. 8" S A N . S W R . EX I S T 1 2 " S A N . S W R . D D D D D D 8" SAN. SWR. INSTALL 4' SSMH #124 D D D D D D DD D D D D SD SD SD SD SD SD S D SD SD SD SD SD S D SDSD SD S D S D D D D D D D C-300 OVERALL UTILITY PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.100 100 50 100 200 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R x x x x x x x x x x x x x w w w w w w w w w SDSDSD SD SD SD SD SD G G G G G W W W W W W W W W W WV W W W W WVWV W W W W W W W W W W W W W W WWWW WV W V WV G G GV H Y D WV WV BARQUS LLC LOREN L STEGELMEIER FAMILY AMY MCDOUGALL AMY MCDOUGALL BARQUS LLC THOMAS H GOE FF=4875.90 FF=4876.60 FF=4876.90 BUILDING 1 TYPE-A (30 UNITS) BUILDING 2 TYPE-A (30 UNITS)BUILDING 3 TYPE-B (20 UNITS) W W W V WV WV WV W V W V H Y D HY D G G GGGGGGGGGG G G OL D U . S . H I G H W A Y 1 9 1 STEGELMEIER LN. UN I O N P A C I F I C R A I L R O A D S S S S S S ss ss ss ss ss ssssssssssssss ssssssssssss S S S S S S S S S S S S S S SSSS S S SS SS SS SS EX I S T . 1 2 " S A N S W R 40 2 . 9 3 L . F . @ 0 . 2 4 % S L O P E EXIST. SSMH #104EX RIM=4875.04 FL(OUT-SW)=4862.72 FL(IN-E)=4862.72 EXIST. 8" SAN SWR 369.01 L.F. @ 0.68% SLOPE EXIST. SSMH #105EX RIM=4875.74 FL(IN-E)=4865.24 FL(OUT-W)=4865.24 FL(IN-S)=4865.74 EXIST. 8" SAN SWR 309.21 L.F. @ 0.36% SLOPE INSTALL 5' SSMH #140 RIM=4874.94 FL(IN-E)=4866.37 FL(OUT-W)=4866.37 FL(IN-S)=4866.87 INSTALL 8" SDR-35 PVC-SAN SWR 91.20 L.F. @ 0.40% SLOPE INSTALL 5' SSMH #136 RIM=4874.10 FL(IN-E)=4866.15 FL(OUT-N)=4866.10 FL(IN-W)=4866.15 INSTALL 8" SDR-35 PVC-SAN SWR 207.73 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 125.47 L.F. @ 0.40% SLOPE INSTALL 4' SSMH #137 RIM=4875.07 FL(OUT-E)=4866.99 INSTALL 4' SSMH #138 RIM=4874.32 FL(IN-S)=4866.71 FL(OUT-W)=4866.66 IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 18 5 . 2 9 L . F . @ 0 . 4 0 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 34 1 . 8 1 L . F . @ 0 . 4 0 % S L O P E EXIST. FIRE HYDRANT D 7 INSTALL 10" CLASS 50 DI WATER LINEINSTALL 8" CLASS 50 DI WATER LINE IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E 7 INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINEINSTALL 10" CLASS 50 DI WATER LINE 12 12 IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E EX I S T 1 2 " W A T E R L I N E 12 INSTALL 10" CLASS 50 DI WATER LINE 12 12 D D SDSDSDSD SD SD D SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-301 UTILITY PLAN 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-302 SEE DRAWING C-302 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 SE E D R A W I N G C - 3 0 4 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D SD SDSD SD SD SD x x x x x x x w w w w w w w w w w G G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WV FF=4875.10 FF=4874.90 FF=4875.30 FF=4875.80 FF=4875.80 FF=4876.35 FF=4876.60 FF=4876.50 FF=4875.40 FF=4876.90 FF=4875.90 FF=4877.00 HA R V E S T R O A D TH O M S O N F A R M S R O A D CLUBHOUSE POOL & HOT TUB BUILDING 2 TYPE-A (30 UNITS) BUILDING 9 TYPE-A (30 UNITS) BUILDING 10 TYPE-A (30 UNITS) BUILDING 11 TYPE-A (30 UNITS)BUILDING 4 TYPE-B (20 UNITS) BUILDING 8 TYPE-A (30 UNITS) BUILDING 7 TYPE-A (30 UNITS) BUILDING 6 TYPE-A (30 UNITS) BUILDING 5 TYPE-B (20 UNITS) BUILDING 3 TYPE-B (20 UNITS) RETENTION AREA WV WV WV WV WV WV WV WV WV WV WV WV W V W V H Y D H Y D H Y D H Y D H Y D H Y D H Y D G G G G G G G G G G G G G G G G G G G G G G G G G G G G GG G G G G G G G G G G G G G G G G G G G G W V W W WV H Y D WV H Y D HY D H Y D WV WV H Y D W W W W W W W W W WV WV WV OL D U . S . H I G H W A Y 1 9 1 52,206 sq.ft. 1.198 acres OPEN SPACE UN I O N P A C I F I C R A I L R O A D D D D D D D S S S S S S S S S S S S S S S S S ss ss ss ss ss ss ss SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S SS S S S S S S SS SS SS SS S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S SS S S S S S S S S S S S S INSTALL 5' SSMH #113 RIM=4875.34 FL(IN-SE)=4862.02 FL(OUT-NW)=4861.97 FL(IN-NE)=4862.82 INSTALL 4' SSMH #114 RIM=4874.99 FL(IN-SE)=4862.56 FL(OUT-NW)=4862.51 INSTALL 4' SSMH #141 RIM=4874.94 FL(OUT-N)=4868.24 FL(IN-E)=4868.29 INSTALL 4' SSMH #129 RIM=4874.90 FL(OUT-SW)=4864.64 INSTALL 4' SSMH #130 RIM=4874.90 FL(OUT-NW)=4864.58 FL(IN-SE)=4864.63 INSTALL 4' SSMH #115 RIM=4874.64 FL(IN-E)=4863.17 FL(OUT-NW)=4863.12 INSTALL 4' SSMH #139 RIM=4874.51 FL(OUT-N)=4867.45 INSTALL 4' SSMH #116 RIM=4874.23 FL(IN-E)=4863.82 FL(OUT-W)=4863.77 INSTALL 4' SSMH #146 RIM=4873.80 FL(OUT-S)=4866.45 FL(IN-E)=4866.50 INSTALL 5' SSMH #117 RIM=4874.08 FL(IN-E)=4865.11 FL(OUT-W)=4864.31 FL(IN-S)=4865.11 FL(IN-N)=4865.11 INSTALL 5' SSMH #128 RIM=4874.07 FL(IN-NE)=4863.68 FL(IN-SE)=4863.68 FL(OUT-SW)=4863.63 EXIST. SSMH #103EX RIM=4874.02 FL(IN-NE)=4861.74 FL(OUT-SW)=4861.74 INSTALL 4' SSMH #134 RIM=4873.87 FL(OUT-N)=4867.09 INSTALL 4' SSMH #132 RIM=4873.84 FL(IN-E)=4866.17 FL(OUT-W)=4866.12 INSTALL 4' SSMH #135 RIM=4873.78 FL(OUT-S)=4867.38 INSTALL 4' SSMH #131 RIM=4873.68 FL(IN-E)=4865.49 FL(OUT-NW)=4865.44 INSTALL 5' SSMH #133 RIM=4873.16 FL(IN-N)=4866.62 FL(OUT-W)=4866.57 FL(IN-S)=4866.62 EX I S T . 1 2 " S A N S W R 40 2 . 9 3 L . F . @ 0 . 2 4 % S L O P E EX I S T . 1 2 " S A N S W R 316 . 7 8 L . F . @ 0 . 1 8 % S L O P E INSTALL 12" SDR-35 PVC-SAN SWR 224.23 L.F. @ 0.22% SLOPE INSTALL 12" S D R - 3 5 P V C - S A N S W R 274.03 L.F. @ 0 . 2 2 % S L O P E INS T A L L 1 2 " S D R - 3 5 P V C - S A N S W R 254. 2 8 L . F . @ 0 . 2 2 % S L O P E IN S T A L L 1 2 " S D R - 3 5 P V C - S A N S W R 22 4 . 0 8 L . F . @ 0 . 2 2 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 341.81 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 245.71 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 18 4 . 8 1 L . F . @ 0 . 4 1 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 99.79 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 158.70 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 11 8 . 4 6 L . F . @ 0 . 3 9 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 241 . 3 3 L . F . @ 0 . 4 0 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 22 7 . 1 4 L . F . @ 0 . 4 0 % S L O P E INS T A L L 8 " S D R - 3 5 P V C - S A N S W R 201. 0 1 L . F . @ 0 . 4 0 % S L O P E IN S T A L L 1 2 " S D R - 3 5 P V C - S A N S W R 13 8 . 7 6 L . F . @ 0 . 2 2 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 201 . 5 0 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 171.15 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 33 3 . 9 8 L . F . @ 0 . 4 0 % S L O P E D D D D D D 7 INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE 12 12 INSTALL 10" CLASS 50 DI WATER LINE 12 12 7 7 INSTALL 8" CLASS 50 DI WATER LINE 12 12 12 12 12 7 7 7 INS T A L L 8 " C L A S S 5 0 D I W A T E R L I N E INSTALL 8" C L A S S 5 0 D I W A T E R L I N E 7 INSTALL 12" CLASS 50 DI WATER LINE INSTALL 12" CLASS 50 DI WATER LINE INSTALL 12" CLASS 50 DI WATER LINE INSTALL 12" CLASS 50 DI WATER LINE RELOCATE EXIST FIRE HYDRANT EX I S T 1 2 " W A T E R L I N E EX I S T 1 2 " W A T E R L I N E 7 12 12 7 INSTALL 10" CLASS 50 DI WATER LINE INSTALL 12" CLASS 50 DI WATER LINE IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E 12 12 IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E INSTALL 8" CLASS 50 DI WATER LINE IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E 12 7 D D SD SD SD SD S D S D S D SD SD SD SD SD 12 D D SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-302 UTILITY PLAN 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-303 SEE DRAWING C-303 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 SE E D R A W I N G C - 3 0 5 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-301 SEE DRAWING C-301 SE E D R A W I N G C - 3 0 7 SE E D R A W I N G C - 3 0 7 SE E D R A W I N G C - 3 0 5 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES S D SD D D SDSDSD D D D SD SD S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD S D SD SD S D S D S D S D S D SD SD SD SD SD G G G G G G G G G G W W W W W W W W W W WWWWWWWWWWWWWWWW W W W W W W W R & S PETERSON COMMERCIAL PROPERTIES, LLC FF=4874.70 FF=4874.70 FF=4875.05 FF=4875.50 HA R V E S T R O A D RETENTION AREA WV WV WV WV WV WV W V W V W V W V H Y D G G WV W V H Y D W W W W W WVWVWV H Y D W V H Y D WV S S S S S SS S S S S S S S S S S S S S S SS SS SS SS SS SSSSSSSSSSSS INSTALL 4' SSMH #109 RIM=4874.13 FL(IN-E)=4863.22 FL(OUT-NW)=4863.17 INSTALL 5' SSMH #118 RIM=4872.71 FL(IN-S)=4865.84 FL(OUT-N)=4865.79 FL(IN-E)=4865.84 INSTALL 4' SSMH #120 RIM=4872.19 FL(IN-E)=4867.00 FL(OUT-N)=4866.95 INSTALL 4' SSMH #110 RIM=4873.51 FL(IN-E)=4864.57 FL(OUT-W)=4864.52 INSTALL 4' SSMH #108 RIM=4873.43 FL(IN-SE)=4862.29 FL(OUT-NW)=4862.24 INSTALL 8" SDR-35 PVC-SAN SWR 460.45 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 27 7 . 1 9 L . F . @ 0 . 4 0 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 17 1 . 1 5 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 594.21 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 22 1 . 3 6 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 313.76 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 325.49 L.F. @ 0.40% SLOPE 12 7 INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINE 7 INSTALL 10" CLASS 50 DI WATER LINE IN S T A L L 1 0 " C L A S S 5 0 D I W A T E R L I N E 7 IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E 7 IN S T A L L 1 0 " C L A S S 5 0 D I W A T E R L I N E 12 12 INSTALL 10" CLASS 50 DI WATER LINE INSTALL 10" CLASS 50 DI WATER LINE SSSSSSSSSSSSS 13 D D D SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-303 UTILITY PLAN 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 SE E D R A W I N G C - 3 0 6 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-302 SEE DRAWING C-302 SE E D R A W I N G C - 3 0 7 SE E D R A W I N G C - 3 0 7 SE E D R A W I N G C - 3 0 6 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES W W W W W W W W W W W W W WV W W W W WVWV W W W W G G G G G G G G G G G G G G G G G G G BARQUS LLC WV WV WV WV WV W V W V H Y D H Y D H Y D G LOREN L STEGELMEIER FAMILY BARQUS LLC 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E STEGELMEIER LN.S S S S S S S S S S SSSSSSSSSSSS EXIST. SSMH #106EX RIM=4875.69 FL(OUT-W)=4866.56 FL(IN-E)=4866.61 INSTALL 5' SSMH #144 RIM=4874.47 FL(OUT-W)=4867.96 FL(IN-S)=4868.01 FL(IN-E)=4868.01 EXIST. 8" SAN SWR 52.74 L.F. @ 0.36% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 31 4 . 4 0 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 337.93 L.F. @ 0.40% SLOPE D S D S D S D S S S S SSSSSSSSSSSSSS SSSSSS S S S S INSTALL 5' SSMH #151 RIM=4875.42 FL(IN-E)=4868.69 FL(OUT-W)=4868.64 FL(IN-S)=4868.69 IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 13 0 . 2 5 L . F . @ 0 . 4 0 % S L O P E INSTALL 4' SSMH #152 RIM=4876.67 FL(IN-E)=4869.27 FL(OUT-N)=4869.22 INSTALL 8" SDR-35 PVC-SAN SWR 178.50 L.F. @ 0.40% SLOPE INSTALL 4' SSMH #153 RIM=4877.87 FL(OUT-W)=4869.98 INSTALL 8" SDR-35 PVC-SAN SWR 209.87 L.F. @ 0.40% SLOPE INSTALL 4' SSMH #154 RIM=4876.68 FL(OUT-W)=4869.53 INSTALL 8" SDR-35 PVC-SAN SWR 158.09 L.F. @ 0.40% SLOPE 7 7 INSTALL 10" CLASS 50 DI WATER LINEINSTALL 10" CLASS 50 DI WATER LINE IN S T A L L 8 " C L A S S 5 0 D I W A T E R L I N E 1212 12 12 2031 2030 20402039203820372036 2041 2042 2046 2045 2044 204320482047 2049 2001 2005 2002 2014 2015 20172016 2019 2023 2018 2003 2007 2006 2004 2020 2021 2022 2024 2032 2034 2033 2035 2029 FF=4876.75 FF=4876.83 FF=4876.93 FF=4877.30 FF=4878.24 FF=4878.24 D SD 13 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-304 UTILITY PLAN GWO 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-305 SEE DRAWING C-305 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIMINARY PUD SUBMITTAL S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 SE E D R A W I N G C - 3 0 1 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR APWA STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES x x x x x x x x x x x x x x x x W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWW W W W W W W W W W W W W W W WV G G W W WV WV WV WV FF=4876.64 FF=4875.88 FF=4876.45 FF=4876.80 FF=4876.65 FF=4876.65 FF=4877.57 FF=4876.25 FF=4877.92 FF=4877.57 FF=4878.85 FF=4877.30 FF=4876.09 FF=4878.85 FF=4876.93FF=4876.75 ASPEN STREET PINE STREET BI R C H L O O P FI R S T R E E T THOMSON FARMS ROAD RETENTION AREA W WV WV WV WV WV WV WV WV WV WV WV WV WV H Y D H Y D HY D HY D GGGGGGGGG G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G (P U B L I C S T R E E T ) 49,608 sq.ft. 1.139 acres OPEN SPACE 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E DDD D D D D D D D S D SD S D S D S D S D S D S D S D S D S D S D SD SD SD SDSD SD SD SD SD SD SD S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SSSSSSSS S S S S S S S S S S SSSSSSSS S S S S SS SS SSSSSSSS S S S S S S S S SSSS S S S S SSSSSSSS INSTALL 4' SSMH #148 RIM=4878.47 FL(OUT-W)=4868.70 INSTALL 5' SSMH #147 RIM=4877.31 FL(IN-N)=4867.80 FL(OUT-S)=4867.75 FL(IN-E)=4867.80 INSTALL 4' SSMH #123 RIM=4876.23 FL(OUT-W)=4867.33 INSTALL 4' SSMH #150 RIM=4876.14 FL(OUT-W)=4870.72 INSTALL 5' SSMH #149 RIM=4875.90 FL(IN-E)=4866.62 FL(OUT-W)=4866.57 FL(IN-N)=4867.24 INSTALL 4' SSMH #126 RIM=4875.63 FL(IN-E)=4868.74 FL(OUT-S)=4868.69 INSTALL 4' SSMH #142 RIM=4875.32 FL(OUT-W)=4869.27 INSTALL 4' SSMH #145 RIM=4875.28 FL(OUT-N)=4869.27 FL(IN-E)=4869.32 INSTALL 5' SSMH #122 RIM=4875.22 FL(IN-E)=4866.25 FL(OUT-W)=4866.20 FL(IN-N)=4866.87 INSTALL 4' SSMH #143 RIM=4875.04 FL(OUT-W)=4869.78 FL(IN-E)=4869.83 INSTALL 4' SSMH #124 RIM=4874.61 FL(OUT-S)=4867.95 INSTALL 4' SSMH #125 RIM=4874.18 FL(OUT-W)=4867.48 INSTALL 4' SSMH #127 RIM=4873.16 FL(OUT-W)=4869.63 INSTALL 10" SDR-35 PVC-SAN SWR 255.68 L.F. @ 0.28% SLOPEINSTALL 10" SDR-35 PVC-SAN SWR 390.32 L.F. @ 0.28% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 245.71 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 223.54 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 27 1 . 4 6 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 245.73 L.F. @ 0.40% SLOPE INSTALL 8 " S D R - 3 5 P V C - S A N S W R 116.04 L. F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 221.82 L.F. @ 0.40% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 22 1 . 5 7 L . F . @ 0 . 4 0 % S L O P E INSTALL 10" SDR-35 PVC-SAN SWR 112.60 L.F. @ 0.28% SLOPE IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 12 9 . 0 7 L . F . @ 0 . 4 0 % S L O P E INSTALL 8" SDR-35 PVC-SAN SWR 223.90 L.F. @ 0.40% SLOPE DD SD S D SD SD SD SD S D S D S D S D 12 12 12 12 12 12 12 12 12 7 7INSTALL 12" CLASS 50 DI WATER LINE INSTALL 12" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE 13 SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-305 UTILITY PLAN BCA 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN SEE DRAWING C-306 SEE DRAWING C-306 NO.DATE REVISION BY 1 3 5 7 2 4 6 8 FOR REVIEW S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-304 SEE DRAWING C-304 SE E D R A W I N G C - 3 0 2 SE E D R A W I N G C - 3 0 2 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR ISPWC STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES x x x x x x x x x x x x x x x x x x x x x x x x x x W W W W W W W W W W W W W W W W WWWWWWWWW WWWWWWWWWWW R & S PETERSON COMMERCIAL PROPERTIES, LLC RIT A J A N E & G E R A L D J E P P E S E N WHEATGRASS ROAD BARLEY ROAD MA Z E R O A D WV WV WV WV WV WV WV WV WV WV W V H Y D WV W V W V W V H Y D HY D H Y D HY D G G G G G G G G G G G G G G G G G G G GGGGGGGGG BA S I S O F B E A R I N G S 0 ° 0 8 ' 0 8 " E 2 6 4 5 . 9 8 ' NORTH 2645.98'SOUTH 2645.98'EAST 2645.98'WEST 2645.98' 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E 1 0 ' P U E LOT 319 LOT 305 LOT 327 LOT 326 LOT 325 LOT 303 LOT 310 LOT 302LOT 301 LOT 307 LOT 308 LOT 309 LOT 316 LOT 312 LOT 321 LOT 322 LOT 311 LOT 306 LOT 313 LOT 324 LOT 317 LOT 314 LOT 318 LOT 304 LOT 320 LOT 315 LOT 323 D D S D S SSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSS INSTALL 4' SSMH #119 RIM=4875.19 FL(OUT-W)=4868.22 INSTALL 4' SSMH #121 RIM=4873.80 FL(OUT-W)=4868.85 INSTALL 8" SDR-35 PVC-SAN SWR 460.45 L.F. @ 0.40% SLOPE INSTALL 8" SDR-35 PVC-SAN SWR 594.21 L.F. @ 0.40% SLOPE 7 7 7 7 INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINEINSTALL 8" CLASS 50 DI WATER LINE INSTALL 8" CLASS 50 DI WATER LINE SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-306 UTILITY PLAN BCA 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-304 SEE DRAWING C-304 SE E D R A W I N G C - 3 0 3 SE E D R A W I N G C - 3 0 3 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR APWA STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES 12 12 12 12 EXIST. TELEPHONE BOX EXIST. TELEPHONE BOX EXIST. TELEPHONE BOX x x x x x x x x x x x x x x x x x x x x x x x x o h p oh p oh p oh p oh p oh p oh p ohp oh p oh p oh p ohp oh p ohp ohp oh p ohp ohp oh p x x x x x x x x x x x x w w w w w w w w w w w w w w P A R A D I S E N U R S E R Y A N D P O N D , L L C H Y D H Y D OL D U . S . H I G H W A Y 1 9 1 UN I O N P A C I F I C R A I L R O A D FF=4875.50 FF=4877.00 S S S S S ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss S S ss S S S S S S S S S S S S EXIST. SSMH #102EX RIM=4874.11 FL(IN-NE)=4861.01 FL(OUT-SW)=4861.01 INSTALL 5' SSMH #112 RIM=4873.67 FL(IN-NE)=4861.16 FL(OUT-SW)=4861.16 FL(IN-SE)=4861.66 EXIST. SSMH #101EX RIM=4873.37 FL(IN-NE)=4860.04 FL(OUT-SW)=4860.04 EXIST. SSMH #100EX RIM=4872.82 FL(IN-NE)=4859.12 INSTALL 5' SSMH #107 RIM=4861.70 FL(IN-NE)=4860.18 FL(OUT-SW)=4860.18 FL(IN-SE)=4860.98 EXI S T . 1 2 " S A N S W R 34 0 . 3 6 L . F . @ 0 . 2 4 % S L O P E EXI S T . 1 2 " S A N S W R 40 3 . 7 4 L . F . @ 0 . 2 3 % S L O P E EXI S T . 1 2 " S A N S W R 80. 6 5 L . F . @ 0 . 1 8 % S L O P E INSTALL 12" SDR-35 PVC-SAN SWR 138.76 L.F. @ 0.22% SLOPE EX I S T . 1 2 " S A N S W R 57. 5 9 L . F . @ 0 . 2 4 % S L O P E IN S T A L L 8 " S D R - 3 5 P V C - S A N S W R 313 . 7 6 L . F . @ 0 . 4 0 % S L O P E EXI S T . 1 2 " W A T E R L I N E EXI S T . 1 2 " W A T E R L I N E RELOCATE EXIST FIRE HYDRANT IN S T A L L 1 0 " C L A S S 5 0 D I W A T E R L I N E D D S D S D S D SD SD SD S D S D S D S D S D SD SD S D S D S D S D S D SD SD SD SD SCOPE OF WORK: PROVIDE, INSTALL AND/OR CONSTRUCT THE FOLLOWING PER THE SPECIFICATIONS GIVEN OR REFERENCED, THE DETAILS NOTED, AND/OR AS SHOWN ON THE CONSTRUCTION DRAWINGS: SDR-35 PVC SANITARY SEWER LATERAL, INCLUDING CLEANOUTS AT MAXIMUM 100-FOOT SPACING. INSTALLATION AND TRENCHING PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. LENGTH AND SLOPE PER PLAN. SANITARY SEWER CLEANOUT PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. CONNECT TO EXISTING SEWER MAIN PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. ABANDON EXISTING SANITARY SEWER LATERAL IN PLACE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 20' WIDE SANITARY SEWER EASEMENT. 4" CULINARY WATER METER AND CONCRETE VAULT PER PER REXBURG STANDARDS. FIRE HYDRANT ASSEMBLY COMPLETE PER ISPWC STANDARD DRAWING SD-404. COMBINATION AIR VACUUM VALVE ASSEMBLY PER REXBURG STANDARDS. 15' WIDE WATER LINE EASEMENT. POINT OF CONNECTION FOR IRRIGATION CONTRACTOR. SEE MECHANICAL PLANS FOR CONTINUATION. INSTALL GAS LINE PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS AND PER REXBURG STANDARDS. ENSURE (1) FULL PIPE LENGTH IS INSTALLED BEYOND VALVE. STUB, CAP AND MARK FOR FUTURE CONNECTION. 7 8 9 10 11 12 1 2 3 4 5 6 13 C-307 UTILITY PLAN 3/28/18 HORIZONTAL GRAPHIC SCALE 0 ( IN FEET ) HORZ: 1 inch = ft.40 40 20 40 80 LOCATED IN THE SOUTH QUARTER OF SECTION 17 TOWNSHIP 6 NORTH , RANGE 40 EAST BOISE BASE AND MERIDIAN NO.DATE REVISION BY 1 3 5 7 2 4 6 8 PRELIM MASTER PLAN SUBMITTAL S5' KEYMAP NOT TO SCALE C-302 C-301 C-303 C-305 C-304 C-306 C- 3 0 7 CHECKED BYDRAWN BY PROJECT NUMBER FOR: PROJECT MANAGER PRINT DATE PHONE: CONTACT: TOOELE 169 N. Main Street, Unit 1 Tooele, UT. 84074 Phone: 435.843.3590 SALT LAKE CITY Phone: 801.255.0529 LAYTON Phone: 801.547.1100 CEDAR CITY Phone: 435.865.1453 RICHFIELD Phone: 435.896.2983 WWW.ENSIGNENG.COM E N S I G N THE STANDARD IN ENGINEERING 7835 TH O M S O N F A R M S P U D N Y E L L O W S T O N E H W Y RE X B U R G , I D A H O REXBURG DEVELOPMENT 160 W CANYON ESTATE DR ALPINE, UT 84004 PAUL BRINGHURST (385) 321-1403 JKF JKFBCA 3/28/18 DATE: 3/28/18 CALL DIGLINE @ 811 AT LEAST 48 HOURS PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION.Know what's below. before you dig.Call R SEE DRAWING C-303 SEE DRAWING C-302 1.ALL WORK TO COMPLY WITH THE GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 2.EXISTING UNDERGROUND UTILITIES AND IMPROVEMENTS ARE SHOWN IN THEIR APPROXIMATE LOCATIONS BASED UPON RECORD INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. LOCATIONS MAY NOT HAVE BEEN VERIFIED IN THE FIELD AND NO GUARANTEE IS MADE AS TO THE ACCURACY OR COMPLETENESS OF THE INFORMATION SHOWN. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND LOCATION OF THE UTILITIES SHOWN ON THESE PLANS OR INDICATED IN THE FIELD BY LOCATING SERVICES. ANY ADDITIONAL COSTS INCURRED AS A RESULT OF THE CONTRACTOR'S FAILURE TO VERIFY THE LOCATIONS OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF CONSTRUCTION IN THEIR VICINITY SHALL BE BORNE BY THE CONTRACTOR AND ASSUMED INCLUDED IN THE CONTRACT. THE CONTRACTOR IS TO VERIFY ALL CONNECTION POINTS WITH THE EXISTING UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE CAUSED TO THE EXISTING UTILITIES AND UTILITY STRUCTURES THAT ARE TO REMAIN. IF CONFLICTS WITH EXISTING UTILITIES OCCUR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO CONSTRUCTION TO DETERMINE IF ANY FIELD ADJUSTMENTS SHOULD BE MADE. 3.ALL SANITARY SEWER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS. 4.ALL WATER INFRASTRUCTURE TO BE INSTALLED PER REXBURG STANDARDS OR APWA STANDARD PLANS AND SPECIFICATIONS. 6.DEFLECT OR LOOP ALL WATERLINES TO AVOID CONFLICTS WITH OTHER UTILITIES PER GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 7.PROJECT SHALL COMPLY WITH ALL IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION DRINKING WATER RULES AND REGULATIONS INCLUDING, BUT NOT LIMITED TO, THOSE PERTAINING TO BACKFLOW PROTECTION AND CROSS CONNECTION PREVENTION. 8.THE CONTRACTOR IS TO COORDINATE ALL UTILITIES WITH MECHANICAL/PLUMBING PLANS. 9.NOTIFY ENGINEER OF ANY DISCREPANCIES IN DESIGN OR STAKING BEFORE PLACING UTILITY STRUCTURES OR PIPES. 10.THE CONTRACTOR SHALL ADJUST TO GRADE ALL EXISTING UTILITIES AS NEEDED PER LOCAL GOVERNING AGENCY'S STANDARDS AND SPECIFICATIONS. 11.THE CONTRACTOR IS TO PROTECT AND PRESERVE ALL EXISTING IMPROVEMENTS, UTILITIES, AND SIGNS, ETC. UNLESS OTHERWISE NOTED ON THESE PLANS. GENERAL NOTES SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 7 9 . 0 ' 6 8 . 0 ' 50.0' 5 0 . 0 ' 6 8 . 0 ' 68.0' 68.0' 68.0' 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79. 0 ' SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SSSS SSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSS SSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSS SSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SS SSSS SSSSSSSSSS SSSSSSSSSS SSSSSSSSSS SSSS SSSSSS SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS BARQUS LLC PARADISE NURSERY AND POND, LLC RIT A J A N E & G E R A L D J E P P E S E N SSSS SS SS SS SS SS SSSS SSSS SSSS SS SSSS SS SS SS SS SS SSSSSS SSSSSS SS SSSS SS SS SS SS SS SSSSSSSSSSSS SS SSSS SS SS SS SS SS SSSS SSSSSSSS SS SSSS SS SS SS SS SS SSSSSS SSSS SS SS SSSS SS SS SS SS SS SSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 5 0 . 0 ' 50.0' 6 8 . 0 ' WV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WVWV S5' S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW WW WWWWWWW WWWWWWWWWWWW WWWWW WWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWW W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW W W W WW WW WW W W WWW WW WW W W W WWWW WW W W WWW WW WW W W WWW WW WW W W WW W WW WW W W WWW WW WW W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W S S S S S S S S S S WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV S S WV D D D D D D S S S D DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD DSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSD SDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSD SDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD YE L L O W S T O N E H W Y CL U B H O U S E PO O L VILLAGE SUITES PAVILION TYPE A TYPE A TYPE ATYPE A TYPE A TYPE A TYPE A TYPE A TOT LOT TYPE B TYPE B TYPE B CLUBHOUSE TOWNS MONUMENT SIGN 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S CA'B CA'B CA'BCA'B JH'B JH'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S PO'S PO'S RF'R RF'R RF'R JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H PP'G PP'G PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G PN'APN'A PN'APN'A ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'MZS'M PG'P PG'P M'S M'S QR'F QR'F PN'APN'AZS'M ZS'M ZS'MZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'FCA'FCA'F MS'AMS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'AMS'AMS'AMS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'G RF'G RF'GRF'GRF'GRF'GRF'G FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO CO CO CO CO CO CO CO FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'AFA'A FA'A FA'A FA'AFA'A FA'AFA'A CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCO CO CO COCO COCO CO CO FA'AFA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPA PN'APN'A PN'APN'A PN PNPN PN PN PN PN PN PN PNPN PNPN PN PN PN PN PN PN PN PN PN PN PN PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'APN'A PN'APN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A SJ SJ SJ SJ SJ SJ SJ SJ SJ SJSJ SJ SJ SJ SJSJ ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E MS'A MS'AMS'AMS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'LSB'LSB'L MS'A MS'A MS'A MS'A MS'AMS'A PN'A PN'A SB'L SB'L SB'L SB'LSB'LSB'L R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SJSJ AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'E AP'E AP'E AP'E AP'E AP'E AP'E ZS ZS ZS ZS ZS ZS ZS ZS PA PA PA PA PA PA PA PA PA PA PA PA SJ SJ SJSJ ZS ZS ZS ZS SJ ZS ZS ZS ZS PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P PN PN PN PN PN PN PN PNPN PN PNPNPNPN PN PNPN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN ZS ZS ZS ZS ZS ZS PN PN PN PN CPCP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'PAT'P AT'PAT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M AT'P AT'P AT'P AT'PAT'PAT'P AT'PAT'P PN'A PN'A PN'APN'APN'APN'APN'APN'A R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW MS'A MS'A MS'AMS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SB'L SB'L SB'L SB'L SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'FCA'F CA'F CA'FCA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'GRF'GRF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BJH'BJH'BJH'BJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'AMS'A MS'A MS'A CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'CBT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'LSB'L SB'LSB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'KCS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K SB'L SB'L CS'K CS'K CS'K CS'KCS'K CS'KCS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'B CA'B CA'B CA'B CA'B CA'B CA'BCA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW SB'LSB'L SB'L SB'L SB'LSB'LSB'L PN'A PN'A SB'LSB'LSB'L SB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L PN'A PN'A PN'A PN'A MS'A MS'AMS'A MS'A MS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A SB'LSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'L SB'LSB'L SB'L PN'A PN'A MS'AMS'A MS'A MS'AMS'A MS'AMS'AMS'A MS'A MS'AMS'A MS'A PN'A PN'A PN'A PN'A PN'A PN'A QR'F QR'F PN'A PN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'FCA'F CA'F CA'F QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'APN'A SB'LSB'L SB'LSB'L PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'LSB'L SB'LSB'LSB'L CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'H PV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW CA'FCA'FCA'F CA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'F CA'FCA'FBT'C BT'CBT'CPG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'GPV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW SB'LSB'LSB'L SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'GPN'A PN'A SB'LSB'LSB'L SB'L PN'A PN'A PN'A PN'A SB'L SB'L SB'LSB'L CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LB H'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F PN'APN'A PN'APN'A PP'G PP'GPP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'KCS'KCS'KCS'K MS'D PF'G PF'GPF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'BJH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB ZS'M ZS'M ZS'M ZS'M M'SM'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A BT'C BT'C PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NW R'NW R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LBH'LB H'LB H'LB RF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'K CS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'HPV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'GPP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'BJH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'KCS'K CS'K CS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'GH'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F BT'C BT'CBT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NWR'NW R'NW JH'B PP'G R'NW R'NWR'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H PV'H PV'H PV'H BT'CBT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B BT'CBT'C BT'C BT'CBT'C BT'C BT'C BT'CBT'C BT'C BT'C JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'LSB'L SB'L SB'L SB'LSB'L SB'L SB'L B'GM B'GM B'GM B'GM CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F CA'FCA'F PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 2 TYPE 2 TYPE 3 TYPE 3 LP-COVER PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION DEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =150' 600'300'150'75'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N LANDSCAPE ARCHITECT / PLANNER 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS PART 1 - GENERAL 1.1 SUMMARY A. This section includes landscape procedures for the Project including all labor, materials, and installation necessary, but not limited to, the following: 1. Soil Amendments 2. Fine Grading 3. Cultivation 4. Landscape Edging 5. Turf Planting 6. Furnish and Installing Plant 7. Maintenance 8. Mowing 9. Weeding 1.2 SITE CONDITIONS A.Examination: Before submitting a Bid, each Contractor shall carefully examine the Contract Documents; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the Bid the cost of all items required by the Contract Documents are at a variance with the applicable laws, building codes, rules, regulations, or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the Project Representative and the necessary changes shall be accomplished by Addendum. B. Protection: Contractor to conduct the Work in such a manner to protect all existing underground utilities or structures. Contractor to repair or replace any damaged utility or structure using identical materials to match existing at no expense to the Owner. C. Irrigation System: Do not begin planting until the irrigation system is completely installed, is adjusted for full coverage and is completely operational. 1.3 PERMITS A.Blue Stake/ Dig Line: When digging is required, “Blue Stake” or “Dig Line” the work site and identify the approximate location of all known underground utilities or structures. 1.4 PLANT DELIVERY, QUALITY, AND AVAILABILITY A.Unauthorized substitutions will not be accepted. If proof is submitted that specific plants or plant sizes are unobtainable, written substitution requests will be considered for the nearest equivalent plant or size. All substitution requests must be made in writing and preferably before the bid due date. 1.5 FINAL INSPECTION A. All plants will be inspected at the time of Final Inspection prior to receiving a Landscape Substantial Completion for conformance to specified planting procedures, and for general appearance and vitality. Any plant not approved by the Project Representative will be rejected and replaced immediately. 1.6 LANDSCAPE SUBSTANTIAL COMPLETION A. A Substantial Completion Certificate will only be issued by the Project Representative for “landscape and irrigation” in their entirety. Substantial Completion will not be proportioned to be designated areas of a project. 1.7 MAINTENANCE A.Plant Material: The Contractor is responsible to maintain all planted materials in a healthy and growing condition for 30 days after receiving a Landscape Substantial Completion at which time the Guarantee period commences. This maintenance is to include mowing, weeding, cultivating, fertilizing, monitoring water schedules, controlling insects and diseases, re-guying and staking, and all other operations of care necessary for the promotion of root growth and plant life so that all plants are in a condition satisfactory at the end of the guarantee period. The Contractor shall be held responsible for failure to monitor watering operations and shall replace any and all plant material that is lost due to improper application of water. 1.8 GUARANTEE A.Guarantee: A guarantee period of one year shall begin from end of maintenance period and final acceptance for trees, shrubs, and ground covers. All plants shall grow and be healthy for the guarantee period and trees shall live and grow in acceptable upright position. Any plant not alive, in poor health, or in poor condition at the end of the guarantee period will be replaced immediately. Any plant will only need to be replaced once during the guarantee period. Contractor to provide documentation showing where each plant to be replaced is located. Any outside factors, such as vandalism or lack of maintenance on the part of the Owner, shall not be part of the guarantee PART II - PRODUCTS 2.1 LANDSCAPE MATERIALS A. Tree Staking: All trees shall be staked for one year warranty period. All trees not plumb shall be replaced. Staked trees shall use vinyl tree ties and tree stakes two (2) inch by two (2) by eight (8) foot common pine stakes used as shown on the details. B. Tree Wrap: Tree wrap is not to be used. C. Mulch: See Plans. All planter beds to receive a minimum 4” layer for trees, shrubs, and perennials and 1” for groundcovers. D. Weed Barrier: DeWitt 5 oz. weed barrier fabric. Manufactured by DeWitt Company, dewittcompany.com or approved equal. E. Tree, Shrub, and Grass Backfill Mixture; Backfill mixture to be 50% native soil and 50% topsoil, thoroughly mixed together prior to placement. F. Topsoil: Required for turf areas, planter beds and Backfill Mixture. Acceptable topsoil shall meet the following standards: a. PH: 5.5-7.5 b. EC (electrical conductivity): < 2.0 mmhos per centimeter c. SAR (sodium absorption ration): < 3.0 d. % OM (percent organic matter): >1% e. Texture (particle size per USDA soil classification): Sand <70%; Clay < 30%; Silt < 70%, Stone fragments (gravel or any soil particle greater than two (2) mm in size) < 5% by volume. G.Turf Sod: All sod shall be 18 month old as specified on plans (or approved equal) that has been cut fresh the morning of installation. Only sod that has been grown on a commercial sod farm shall be used. Only use sod from a single source. H.Landscape Edging: Headers and Edging six (6) inches by four (4) inches extruded concrete curb made up of the following materials: a. Washed mortar sand free of organic material. b. Portland Cement (see concrete spec. below for type) c. Reinforced fiber - Specifically produced for compatibility with aggressive alkaline environment of Portland cement-based composites. d. Only potable water for mixing. PART III - EXECUTION 3.1 GRADING A. Topsoil Preparation: Grade planting areas according to the grading plan. Eliminate uneven areas and low spots. Provide for proper grading and drainage. B. Topsoil Placement: Slope surfaced away from building at two (2) percent slope with no pockets of standing water. Establish finish grades of one (1) inches for planters below grade of adjacent paved surfaced. Provide neat, smooth, and uniform finish grades. Remove surplus sub-soil and topsoil from the site. C. Compaction: compaction under hard surface areas (asphalt paths and concrete surfaces) shall be ninety-five (95) percent. Compaction under planting areas shall be between eighty-five (85) and ninety (90) percent. 3.2 TURF GRADING A. The surface on which the sod is to be laid shall be firm and free from footprints, depressions, or undulations of any kind. The surface shall be free of all materials larger than 1/2” in diameter. B. The finish grade of the topsoil adjacent to all sidewalks, mow-strips, etc. prior to the laying of sod, shall be set such that the crown of the grass shall be at the same level as the adjacent concrete or hard surface. No exceptions. 3.3 PLANTING OPERATIONS A.Review the exact locations of all trees and shrubs with the Project Representative for approval prior to the digging of any holes. Prepare all holes according to the details on the drawings. B. Water plants immediately upon arrival at the site. Maintain in moist condition until planted. C. Before planting, locate all underground utilities prior to digging. Do not place plants on or near utility lines. D. The tree planting hole should be the same depth as the root ball, and three times the diameter of the root ball. E. Trees must be placed on undisturbed soil at the bottom of the planting hole. F. The tree hole depth shall be determined so that the tree may be set slightly high of finish grade, 1” to 2” above the base of the trunk flare, using the top of the root ball as a guide. G.Plant immediately after removal of container for container plants. H. Set tree on soil and remove all burlap, wire baskets, twine, wrappings, etc. before beginning and backfilling operations. Do not use planting stock if the ball is cracked or broken before or during planting operation. I. Apply vitamin B-1 root stimulator at the rate of one (1) tablespoon per gallon. J. Upon completion of backfilling operation, thoroughly water tree to completely settle the soil and fill any voids that may have occurred. Use a watering hose, not the area irrigation system. If additional prepared topsoil mixture needs to be added. It should be a courser mix as required to establish finish grade as indicated on the drawings. K. The amount of pruning shall be limited to the minimum necessary to remove dead or injured twigs and branches. All cuts, scars, and bruises shall be properly treated according to the direction of the Project Representative. Proper pruning techniques shall be used. Do not leave stubs and do not cut the leader branch. Improper pruning shall be cause for rejection of the plant material. L. Prepare a watering circle of 2' diameter around the trunk. For conifers, extend the watering well to the drip line of the tree canopy. Place mulch around the planted trees. 3.4 TURF - SOD LAYING A. Top Soil Amendments: Prior to laying sod, commercial fertilizer shall be applied and incorporated into the upper four (4) inches of the topsoil at a rate of four pounds of nitrogen per one thousand (1,000) square feet. Adjust fertilization mixture and rate of application as needed to meet recommendations given by topsoil analysis. Include other amendments as required. B. Fertilization: Three weeks after sod placement fertilize the turf at a rate of ½ pound of nitrogen per 1000 square feet. Use fertilizer specified above. Adjust fertilization mixture and rates to meet recommendations given by topsoil analysis. C. Sod Availability and Condition: The Contractor shall satisfy himself as to the existing conditions prior to any construction. The Contractor shall be fully responsible for furnishing and lay all sod required on the plans. He shall furnish new sod as specified above and lay it so as too completely satisfy the intent and meaning of the plans and specification at no extra cost to the owner. In the case of plans and specification at no extra cost to the owner. In the case of any discrepancy in the amount of sod to be removed or amount to be used, it shall be the Contractor's responsibility to report such to the Project Representative prior to commencing the work. D. Sod Laying: The surface upon which the new sod to be laid will be prepared as specified above. Areas where sod is to be laid shall be cut trimmed, or shaped to receive full width sod (minimum twelve (12) inches). No partial strip or pieces will be accepted. E. Sod shall be tamped lightly as each piece is set to insure that good contact is made between edges and also the ground. Sod laid on any sloped areas shall be anchored with wooden dowels or other materials which are accepted by the grass sod industry. F. Apply water directly after laying sod. Rainfall is not acceptable. G.Watering of the sod shall be the complete responsibility of the Contractor by whatever means necessary to establish the sod in an acceptable manner to the end of the Maintenance period. If an irrigation system is in place on the site, but for whatever reason, water is not available in the system. It is the responsibility of the Contractor to water the sod by whatever means, until the sod is accepted by the Project Representative. H.Protection of the newly laid sod shall be the complete responsibility of the Contractor. The Contractor shall provide acceptable visual barriers, to include barricades set appropriate distances with strings or tapes between barriers, as an indication of new work. The Contractor is to restore any damaged areas caused by others (including vehicular traffic), erosion, etc, until such time as the lawn is accepted by the Owner. I. All sod that has not been laid within 24 hours shall be deemed unacceptable and will be removed from the site. 3.5 WEED BARRIER A.Cut a slit or x at each plant location no larger than necessary to install plant. B. Overlap rows of fabric min. 6” C. Stable fabric edges and overlaps to ground. END OF SECTION LANDSCAPE PLAN SPECIFICATIONS NO. REVISION DATE 1 2 3 4 5 6 7 02-12-2017 ID17008 ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 LP1.1 LP1.2 LP1.4 LP1.3 LP1.5 LP1.6 PLAYGROUND EQUIPMENT LP1.3 PlaySense® (5-12 years) Max Fall Height: 82 inches SITE MATERIALS SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' PRELIMINARY CODE 5.10.90. LANDSCAPING PER UNIT. THE INTENT IS TO HAVE A VARIETY OF PLANT MATERIALS TO GIVE COLOR AND TEXTURE; TO DIRECT TRAFFIC; TO FRAME VIEWS; AND TO SCREEN UNDESIRABLE VIEWS. a.MINIMUM. A MINIMUM OF THREE (3), ONE AND ONE-HALF (1½”) INCH CALIPER DECIDUOUS TREES OR FOUR (4') FEET TALL EVERGREEN TREES, AND FOUR (4) SHRUBS SHALL BE PLANTED FOR EACH LOT IN A PUD SUBDIVISION, AS WELL AS BUILDING FOUNDATION PLANTING OF APPROPRIATE SHRUBS, FLOWERS, OR GROUND COVERS. b.DESIGN THEME. LANDSCAPING IN THE PARK STRIP IN THE STREET RIGHT-OF-WAY SHALL HAVE A UNIFIED DESIGN THEME IN PUD SUBDIVISIONS. MULTIPLE FAMILY PUD'S SHALL PROVIDE A MINIMUM OF ONE (1) DECIDUOUS OR EVERGREEN TREE PER TWO (2) UNITS, AND TWO (2) SHRUBS PER UNIT. c.LANDSCAPE PLAN. APPLICANT MAY PROVIDE A LANDSCAPE PLAN THAT VARIES FROM THESE REQUIREMENTS TO THE PLANNING AND ZONING COMMISSION FOR APPROVAL AS MEETING THE “SPIRIT” OF THE REQUIREMENTS. d.DECIDUOUS TREES. THE PLACEMENT AND TYPES OF DECIDUOUS TREES SHALL TAKE INTO CONSIDERATION USE OF THE TREES FOR SUMMER COOLING AND WINTER SOLAR ACCESS. e.EVERGREEN TREES. EVERGREEN TREES SHOULD BE USED AS WINDBREAKS, SCREENING, AND ACCENT PLANTINGS. f. WATER CONSERVATION. THE MAJORITY OF NEW PLANT MATERIAL USED FOR LANDSCAPING THE DEVELOPMENT SHOULD BE WATER CONSERVING PLANTS. THE LANDSCAPING DESIGN SHALL LOCATE PLANT MATERIALS IN SIMILAR WATER USAGE DEMAND ZONES TO INSURE PROPER IRRIGATION COVERAGE AND REDUCE WASTEFUL IRRIGATION COVERAGE AND REDUCE WASTEFUL WATERING. NATIVE PLANTS ARE PREFERRED. SITE REQUIREMENT CALCULATIONS LANDSCAPE REQUIREMENTS REQ'D:PROVIDED: RE-LANDSCAPED AREA 100% STREET TREE BOULEVARD: 1 TREE /50 LINEAR FT. 31 EACH SIDE 31/SIDE YELLOWSTONE HIGHWAY - BERM WITH TREES FOR DESIGN INTENT 56 BUILDING TREE/SHRUB CALCULATIONS TYPE A 15 / 60 16 TYPE B 10 / 40 16 TYPE 1 2 / 8 6 TYPE 2 3 / 12 6 TYPE 3 4 / 14 6 SINGLE FAMILY LOTS 1 STREET TREE/LOT LINE TRASH ENCLOSURES: SCREENING WALL WITH VEGETATION TO SCREEN STRUCTURE LANDSCAPE POINTS SHADE TREES. AREAS WITH FIVE (5) OR MORE UNCOVERED PARKING STALLS ARE DESIGNED TO INCLUDE MINIMUM TWO (2”) INCH CALIPER TREES LOCATED IN SUCH A MANNER AS TO SHADE FIFTY (50%) PERCENT OF THE PARKING AREA UPON MATURATION OF THE TREES EXTRA TREES. DESIGN AND PLANTING MORE THAN THE MINIMUM NUMBER OF TREES, SHRUBS, AND PERENNIALS PER DWELLING UNIT IN THE DEVELOPMENT. (UP TO 20 POINTS) SOFTEN FENCE APPEARANCE. AREAS WHICH ARE TO BE SCREENED USE A SOLID NON-SEE-THROUGH WOOD OR MASONRY FENCE AND LANDSCAPING WHICH ACTS TO SOFTEN THE APPEARANCE OF THE FENCE. LANDSCAPING MAY BE VINES, SHRUBS, OR TREES. (UP TO 15 POINTS) DESIGNED PLAN. OPEN GREEN SPACE IS DESIGNED (NOT LEFT OVER SPACE BETWEEN BUILDINGS) AND FLOWS UNINTERRUPTED THROUGH THE ENTIRE DEVELOPMENT LINKING DWELLINGS AND RECREATION AMENITIES. (UP TO 25 POINTS) MULTIPLE USE. STORM WATER DETENTION FACILITIES ARE DESIGNED AND USED FOR MULTIPLE PURPOSES WHICH BLEND WITH THE OVERALL THEME OF THE OPEN SPACE DESIGN I.E., SHAPE OF THE AREA IS FREE FLOWING, THE GRADING AND LANDSCAPING ARE CARRIED OUT IN SUCH A MANNER THAT THE USE AS A DETENTION POND IS NOT DISCERNIBLE. (UP TO 20 POINTS) NATIVE PLANTS. NATIVE PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 15 POINTS) DROUGHT TOLERANT PLANTS. DROUGHT TOLERANT PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 10 POINTS) S S SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S SDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD HO U S E 40' CLEAR VIEW AREA ZS AT'P AT'P AT'P PA PA ZS ZS PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN CP CP CP CP CP CACA'F JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A BT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L CS'K CS'KCS'K CS'K CS'K CS'KCS'KCS'K PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'FCA'F PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S B'GM B'GM B'GM B'GM B'GM B'GM CA'F CA'FCA'F CS'KCS'KCS'K MS'D PF'G PF'G MS'D MS'D JH'B JH'B PF'G H'LBH'LBH'LB H'LB H'LB ZS'M ZS'M QR'F QR'F PN'A PN'A PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.1 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =20' 80'40'20'10'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS BARQUS LLC S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW S S S D DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SDSDSDSDSDSDSDSDSDSDSD DSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D TYPE A TYPE A TYPE B 40' CLEA VIEW ARE FA'A FA'A FA'A FA'A ZS ZS ZS ZS ZS ZS ZS ZS AT'P AT'P AT'P AT'P ZS ZS ZS PA PA PA ZS ZS PN'A PN'A PN'APN'APN'APN'APN'APN'A CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'G RF'GRF'G RF'G RF'GRF'G RF'G RF'G RF'G RF'G JH'B JH'B JH'B JH'B JH'B JH'B JH'BJH'BJH'BJH'BJH'B B SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D MS'D MS'D MS'D H'LB H'LB H'LB H'LB H'LB H'LB H'LB H'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F BT'C BT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB RF'G RF'G RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'GRF'G RF'G ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F PN'APN'A PN'APN'A PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F BT'C BT'C CS'KCS'KCS'K CS'K MS'D PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'GH'LBH'LB H'LB H'LB ZS'M ZS'M M'SM'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A BT'C BT'C PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.2 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S 68.0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS WWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S SS SS SS SS S S D D SDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD S D SD SD SD SD SD SD SD SD SD SD SD SD SD SSDSDSDSDSDSDSDSDSDSDSD D SDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD S D SD SD SD S D S D SD SD SD SD SD SD SD S D SD SD SD SD S D SD SD SD S D S D SD SD SD SD SD SD SD S D SD SD SD S D S D SD SD SD SD SD SD SD S D SD SD SD SD S D SD SD SD S D S D SD SD SD SD SD SD SD S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD VILLAGE SUITES PAVILION TYPE ATYPE A TOT LOT TYPE BPP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S CA'B CA'B CA'BCA'B JH'B JH'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S PO'S PO'S RF'R RF'R RF'R JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H PP'G PP'G PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D MS'D MS'D MS'D MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB H'LBH'LB H'LB H'LB H'LB H'LB H'LB H'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'GRF'G RF'G PN'APN'A PN'APN'A ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A PA PA PAPA PN'APN'A PN'APN'A AT'P AT'P AT'P AT'P AT'P ZS ZS ZS PA PA PA PA PA PA SJ SJ SJ PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'AMS'A MS'A MS'A CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K SB'L SB'L CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CA'B CA'B CA'B CA'B CA'B CA'B PO'S PO'S B'GMB'GMB'GMB'GMB'GMB'GM PF'GPF'G PN'APN'A ZS'M ZS'M R'NWR'NW PO'S PO'S B'GMB'GMB'GMB'GMB'GMB'GM JH'B JH'B ZS'MZS'M PN'APN'A PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW 'NWR'NWR'NW JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C K CS'K CS'K CS'K CS'K MS'D PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B H'LB H'LB H'LB PF'GH'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.3 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES GRAPHIC SCALE: 1" =20' 80'40'20'10'0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S SS SS SS S S SS S S S S SS SS S S S S SS SS SS S S SS S S SS SS SS SS SS SS SS S S S S SS S S SS SS SS S S SS S S SS SS SS SS SS SS S S SS S S S S SS SS SS SS SS SS SS SS SS SS S S SS SS S S SS S S SS SS SS SS SS SS SS S S S S SS SS SS S S SS SS S S SS SS SS SS SS S S SS SS SS S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S NE H W Y CL U B H O U S PO O L V S TYPE A TYPE A MONUMENT SIGN EAR REA AT'P AT'P AT'P AT'P AT'P AT'P AP'E AP'E AP'E ZS ZS ZS PA PA SJ SJ ZS ZS ZS ZS PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K PV'H PV'H PV'H PV'H PV'H PV'H BT'CBT'C CA'F CA'F CA'F CA'F CA'F CA'F PP'G R'NW R'NW R'NW B'GM B'GM CS'K PF'G PF'G PF'G H'LB H'LB H'LB H'LB ZS'M QR'F PP'G PP'G PP'G PP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S PO'S RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LB H'LB RF'G RF'G RF'G RF'G RF'G RF'G ZS'M ZS'M ZS'M M'S M'S M'S QR'F QR'F QR'F PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S B'GM B'GM B'GM B'GM B'GM B'GM PV'H CA'F CA'F CA'F CS'K CS'K CS'K PF'G PF'G JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G ZS'M ZS'M M'S QR'F Q PN'A PN'A PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.4 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES GRAPHIC SCALE: 1" =20' 80'40'20'10'0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S SS SS S S SS SS S S S S SS S S S S S S SS SS SS S S S S 79. 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W D SD SD SD SD SD SD SD SD S D SD S D SD SD SD SD SD S D SD S D S D SD SD S D S D S D SD SD TYPE A 40' CLEA VIEW ARE AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E PN PN FA'A AT'P ZS'M ZS'M ZS'M ZS'M ZS'M BT'C BT'CBT'CBT'C C BT'C BT'C BT'C SB'LSB'L SB'L SB'L CS PP'G PP'G PP'G PP'G PP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G R'NW R'NW R'NW PO'S PO'S JH'B JH'B RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM CA'F CA'F CA'F CAF CA'F CA'F BT'C BT'C MS'D MS'D MS'D MS'D MS'D MS'D JH'B JH'B RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G ZS'M M'S M'S QR'F QR'F PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B CA'F CA'F CA'F CS'K CS'K PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.5 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =20' 80'40'20'10'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS S S S S S S SS S S S S S S SS SS SS S S S S S S S S S S SS S S S S S S S S S S S S S S SS SS S S S S S S S S SS S S SS S S S S S S S S S S S S S S SS S S SS S S S S S S SS S S SS S S SS SS S S S S S S SS S S SS SS S S S S SS SS SS S S S S SS SS S S S S S S SS SS SS S S S S S S S S S S SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD S SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD S D SD SD SD SD S D S D SD SD S D SD SD S D SD S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD S D SD SD S D SD SD SD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D SD SD SD SD SD SD SD SD SD SD SD S D SD S D S D SD S D SD S D S D S D S D S D S D SD SD SD SD SD SD TYPE A TYPE B 40' CLEAR VIEW AREA 40' CLEA VIEW AR R'NWR'NW PO'S PO'S PO'S PO'S B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PF'G PF'G PF'G PF'G PF'G PF'G JH'B JH'B PN'APN'A ZS'MZS'M ZS'M ZS'M FA'A FA'A FA'A PN'APN'A AT'P AT'P AT'P AT'P AT'P AT'P AT'P P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D MS'D MS'D MS'D H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'P M'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'HPV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PF'G PFGHLBH'LBH'LB PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.6 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =20' 80'40'20'10'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 36 5 GAL. MODERATE PF'G POTENTILLA FRUITICOSA GOLDFINGER POTENTILLA 84 5 GAL HIGH 'GOLDFINGER' PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 44 5 GAL HIGH'SUMMER WINE' R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 96 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 33 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 177 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 91 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 98 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 128 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 132 5 GAL. MODERATEBOXWOOD GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 21 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 95 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 62 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 29 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 16 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 5 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 18 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 11 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 15 2" CAL. LOW'AUTUMN PURPLE' PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE M'P MALUS X 'PRAIRIFIRE' PRAIRIFIRE CRABAPPLE 12 2" CAL. LOW ZS'M ZELKOVA SERRATA JAPANESE 56 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 32 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 32 2" CAL. LOWOAK AT'P ACER TRUNCATUM X PACIFIC 24 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 75 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 54 6'-8' TALL LOWSPRUCE10 TREE 3 4 25 TREE 7 3 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES H'LB HEMEROCALLIS X LITTLE BUSINESS DAYLILY 110 1 GAL HIGH'LITTLE BUSINESS' RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 113 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 7 9 . 0 ' 6 8 . 0 ' 50.0' 5 0 . 0 ' 6 8 . 0 ' 68.0' 68.0' 68.0' 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79. 0 ' SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SSSS SSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSS SSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSS SSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SS SSSS SSSSSSSSSS SSSSSSSSSS SSSSSSSSSS SSSS SSSSSS SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS BARQUS LLC PARADISE NURSERY AND POND, LLC RIT A J A N E & G E R A L D J E P P E S E N SSSS SS SS SS SS SS SSSS SSSS SSSS SS SSSS SS SS SS SS SS SSSSSS SSSSSS SS SSSS SS SS SS SS SS SSSSSSSSSSSS SS SSSS SS SS SS SS SS SSSS SSSSSSSS SS SSSS SS SS SS SS SS SSSSSS SSSS SS SS SSSS SS SS SS SS SS SSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 5 0 . 0 ' 50.0' 6 8 . 0 ' WV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WVWV S5' S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW WW WWWWWWW WWWWWWWWWWWW WWWWW WWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWW W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW W W W WW WW WW W W WWW WW WW W W W WWWW WW W W WWW WW WW W W WWW WW WW W W WW W WW WW W W WWW WW WW W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W S S S S S S S S S S WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV S S WV D D D D D D S S S D DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD DSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSD SDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSD SDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD YE L L O W S T O N E H W Y CL U B H O U S E PO O L VILLAGE SUITES PAVILION TYPE A TYPE A TYPE ATYPE A TYPE A TYPE A TYPE A TYPE A TOT LOT TYPE B TYPE B TYPE B CLUBHOUSE TOWNS MONUMENT SIGN 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S CA'B CA'B CA'BCA'B JH'B JH'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S PO'S PO'S RF'R RF'R RF'R JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H PP'G PP'G PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G PN'APN'A PN'APN'A ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'MZS'M PG'P PG'P M'S M'S QR'F QR'F PN'APN'AZS'M ZS'M ZS'MZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'FCA'FCA'F MS'AMS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'AMS'AMS'AMS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'G RF'G RF'GRF'GRF'GRF'GRF'G FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO CO CO CO CO CO CO CO FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'AFA'A FA'A FA'A FA'AFA'A FA'AFA'A CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCO CO CO COCO COCO CO CO FA'AFA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPA PN'APN'A PN'APN'A PN PNPN PN PN PN PN PN PN PNPN PNPN PN PN PN PN PN PN PN PN PN PN PN PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'APN'A PN'APN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A SJ SJ SJ SJ SJ SJ SJ SJ SJ SJSJ SJ SJ SJ SJSJ ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E MS'A MS'AMS'AMS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'LSB'LSB'L MS'A MS'A MS'A MS'A MS'AMS'A PN'A PN'A SB'L SB'L SB'L SB'LSB'LSB'L R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SJSJ AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'E AP'E AP'E AP'E AP'E AP'E AP'E ZS ZS ZS ZS ZS ZS ZS ZS PA PA PA PA PA PA PA PA PA PA PA PA SJ SJ SJSJ ZS ZS ZS ZS SJ ZS ZS ZS ZS PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P PN PN PN PN PN PN PN PNPN PN PNPNPNPN PN PNPN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN ZS ZS ZS ZS ZS ZS PN PN PN PN CPCP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'PAT'P AT'PAT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M AT'P AT'P AT'P AT'PAT'PAT'P AT'PAT'P PN'A PN'A PN'APN'APN'APN'APN'APN'A R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW MS'A MS'A MS'AMS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SB'L SB'L SB'L SB'L SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'FCA'F CA'F CA'FCA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'GRF'GRF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BJH'BJH'BJH'BJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'AMS'A MS'A MS'A CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'CBT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'LSB'L SB'LSB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'KCS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K SB'L SB'L CS'K CS'K CS'K CS'KCS'K CS'KCS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'B CA'B CA'B CA'B CA'B CA'B CA'BCA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW SB'LSB'L SB'L SB'L SB'LSB'LSB'L PN'A PN'A SB'LSB'LSB'L SB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L PN'A PN'A PN'A PN'A MS'A MS'AMS'A MS'A MS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A SB'LSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'L SB'LSB'L SB'L PN'A PN'A MS'AMS'A MS'A MS'AMS'A MS'AMS'AMS'A MS'A MS'AMS'A MS'A PN'A PN'A PN'A PN'A PN'A PN'A QR'F QR'F PN'A PN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'FCA'F CA'F CA'F QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'APN'A SB'LSB'L SB'LSB'L PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'LSB'L SB'LSB'LSB'L CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'H PV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW CA'FCA'FCA'F CA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'F CA'FCA'FBT'C BT'CBT'CPG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'GPV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW SB'LSB'LSB'L SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'GPN'A PN'A SB'LSB'LSB'L SB'L PN'A PN'A PN'A PN'A SB'L SB'L SB'LSB'L CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LB H'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F PN'APN'A PN'APN'A PP'G PP'GPP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'KCS'KCS'KCS'K MS'D PF'G PF'GPF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'BJH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB ZS'M ZS'M ZS'M ZS'M M'SM'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A BT'C BT'C PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NW R'NW R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LBH'LB H'LB H'LB RF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'K CS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'HPV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'GPP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'BJH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'KCS'K CS'K CS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'GH'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F BT'C BT'CBT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NWR'NW R'NW JH'B PP'G R'NW R'NWR'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H PV'H PV'H PV'H BT'CBT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B BT'CBT'C BT'C BT'CBT'C BT'C BT'C BT'CBT'C BT'C BT'C JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'LSB'L SB'L SB'L SB'LSB'L SB'L SB'L B'GM B'GM B'GM B'GM CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F CA'FCA'F PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 2 TYPE 2 TYPE 3 TYPE 3 LP-COVER PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION DEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =150' 600'300'150'75'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N LANDSCAPE ARCHITECT / PLANNER 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS PART 1 - GENERAL 1.1 SUMMARY A. This section includes landscape procedures for the Project including all labor, materials, and installation necessary, but not limited to, the following: 1. Soil Amendments 2. Fine Grading 3. Cultivation 4. Landscape Edging 5. Turf Planting 6. Furnish and Installing Plant 7. Maintenance 8. Mowing 9. Weeding 1.2 SITE CONDITIONS A.Examination: Before submitting a Bid, each Contractor shall carefully examine the Contract Documents; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the Bid the cost of all items required by the Contract Documents are at a variance with the applicable laws, building codes, rules, regulations, or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the Project Representative and the necessary changes shall be accomplished by Addendum. B. Protection: Contractor to conduct the Work in such a manner to protect all existing underground utilities or structures. Contractor to repair or replace any damaged utility or structure using identical materials to match existing at no expense to the Owner. C. Irrigation System: Do not begin planting until the irrigation system is completely installed, is adjusted for full coverage and is completely operational. 1.3 PERMITS A.Blue Stake/ Dig Line: When digging is required, “Blue Stake” or “Dig Line” the work site and identify the approximate location of all known underground utilities or structures. 1.4 PLANT DELIVERY, QUALITY, AND AVAILABILITY A.Unauthorized substitutions will not be accepted. If proof is submitted that specific plants or plant sizes are unobtainable, written substitution requests will be considered for the nearest equivalent plant or size. All substitution requests must be made in writing and preferably before the bid due date. 1.5 FINAL INSPECTION A. All plants will be inspected at the time of Final Inspection prior to receiving a Landscape Substantial Completion for conformance to specified planting procedures, and for general appearance and vitality. Any plant not approved by the Project Representative will be rejected and replaced immediately. 1.6 LANDSCAPE SUBSTANTIAL COMPLETION A. A Substantial Completion Certificate will only be issued by the Project Representative for “landscape and irrigation” in their entirety. Substantial Completion will not be proportioned to be designated areas of a project. 1.7 MAINTENANCE A.Plant Material: The Contractor is responsible to maintain all planted materials in a healthy and growing condition for 30 days after receiving a Landscape Substantial Completion at which time the Guarantee period commences. This maintenance is to include mowing, weeding, cultivating, fertilizing, monitoring water schedules, controlling insects and diseases, re-guying and staking, and all other operations of care necessary for the promotion of root growth and plant life so that all plants are in a condition satisfactory at the end of the guarantee period. The Contractor shall be held responsible for failure to monitor watering operations and shall replace any and all plant material that is lost due to improper application of water. 1.8 GUARANTEE A.Guarantee: A guarantee period of one year shall begin from end of maintenance period and final acceptance for trees, shrubs, and ground covers. All plants shall grow and be healthy for the guarantee period and trees shall live and grow in acceptable upright position. Any plant not alive, in poor health, or in poor condition at the end of the guarantee period will be replaced immediately. Any plant will only need to be replaced once during the guarantee period. Contractor to provide documentation showing where each plant to be replaced is located. Any outside factors, such as vandalism or lack of maintenance on the part of the Owner, shall not be part of the guarantee PART II - PRODUCTS 2.1 LANDSCAPE MATERIALS A. Tree Staking: All trees shall be staked for one year warranty period. All trees not plumb shall be replaced. Staked trees shall use vinyl tree ties and tree stakes two (2) inch by two (2) by eight (8) foot common pine stakes used as shown on the details. B. Tree Wrap: Tree wrap is not to be used. C. Mulch: See Plans. All planter beds to receive a minimum 4” layer for trees, shrubs, and perennials and 1” for groundcovers. D. Weed Barrier: DeWitt 5 oz. weed barrier fabric. Manufactured by DeWitt Company, dewittcompany.com or approved equal. E. Tree, Shrub, and Grass Backfill Mixture; Backfill mixture to be 50% native soil and 50% topsoil, thoroughly mixed together prior to placement. F. Topsoil: Required for turf areas, planter beds and Backfill Mixture. Acceptable topsoil shall meet the following standards: a. PH: 5.5-7.5 b. EC (electrical conductivity): < 2.0 mmhos per centimeter c. SAR (sodium absorption ration): < 3.0 d. % OM (percent organic matter): >1% e. Texture (particle size per USDA soil classification): Sand <70%; Clay < 30%; Silt < 70%, Stone fragments (gravel or any soil particle greater than two (2) mm in size) < 5% by volume. G.Turf Sod: All sod shall be 18 month old as specified on plans (or approved equal) that has been cut fresh the morning of installation. Only sod that has been grown on a commercial sod farm shall be used. Only use sod from a single source. H.Landscape Edging: Headers and Edging six (6) inches by four (4) inches extruded concrete curb made up of the following materials: a. Washed mortar sand free of organic material. b. Portland Cement (see concrete spec. below for type) c. Reinforced fiber - Specifically produced for compatibility with aggressive alkaline environment of Portland cement-based composites. d. Only potable water for mixing. PART III - EXECUTION 3.1 GRADING A. Topsoil Preparation: Grade planting areas according to the grading plan. Eliminate uneven areas and low spots. Provide for proper grading and drainage. B. Topsoil Placement: Slope surfaced away from building at two (2) percent slope with no pockets of standing water. Establish finish grades of one (1) inches for planters below grade of adjacent paved surfaced. Provide neat, smooth, and uniform finish grades. Remove surplus sub-soil and topsoil from the site. C. Compaction: compaction under hard surface areas (asphalt paths and concrete surfaces) shall be ninety-five (95) percent. Compaction under planting areas shall be between eighty-five (85) and ninety (90) percent. 3.2 TURF GRADING A. The surface on which the sod is to be laid shall be firm and free from footprints, depressions, or undulations of any kind. The surface shall be free of all materials larger than 1/2” in diameter. B. The finish grade of the topsoil adjacent to all sidewalks, mow-strips, etc. prior to the laying of sod, shall be set such that the crown of the grass shall be at the same level as the adjacent concrete or hard surface. No exceptions. 3.3 PLANTING OPERATIONS A.Review the exact locations of all trees and shrubs with the Project Representative for approval prior to the digging of any holes. Prepare all holes according to the details on the drawings. B. Water plants immediately upon arrival at the site. Maintain in moist condition until planted. C. Before planting, locate all underground utilities prior to digging. Do not place plants on or near utility lines. D. The tree planting hole should be the same depth as the root ball, and three times the diameter of the root ball. E. Trees must be placed on undisturbed soil at the bottom of the planting hole. F. The tree hole depth shall be determined so that the tree may be set slightly high of finish grade, 1” to 2” above the base of the trunk flare, using the top of the root ball as a guide. G.Plant immediately after removal of container for container plants. H. Set tree on soil and remove all burlap, wire baskets, twine, wrappings, etc. before beginning and backfilling operations. Do not use planting stock if the ball is cracked or broken before or during planting operation. I. Apply vitamin B-1 root stimulator at the rate of one (1) tablespoon per gallon. J. Upon completion of backfilling operation, thoroughly water tree to completely settle the soil and fill any voids that may have occurred. Use a watering hose, not the area irrigation system. If additional prepared topsoil mixture needs to be added. It should be a courser mix as required to establish finish grade as indicated on the drawings. K. The amount of pruning shall be limited to the minimum necessary to remove dead or injured twigs and branches. All cuts, scars, and bruises shall be properly treated according to the direction of the Project Representative. Proper pruning techniques shall be used. Do not leave stubs and do not cut the leader branch. Improper pruning shall be cause for rejection of the plant material. L. Prepare a watering circle of 2' diameter around the trunk. For conifers, extend the watering well to the drip line of the tree canopy. Place mulch around the planted trees. 3.4 TURF - SOD LAYING A. Top Soil Amendments: Prior to laying sod, commercial fertilizer shall be applied and incorporated into the upper four (4) inches of the topsoil at a rate of four pounds of nitrogen per one thousand (1,000) square feet. Adjust fertilization mixture and rate of application as needed to meet recommendations given by topsoil analysis. Include other amendments as required. B. Fertilization: Three weeks after sod placement fertilize the turf at a rate of ½ pound of nitrogen per 1000 square feet. Use fertilizer specified above. Adjust fertilization mixture and rates to meet recommendations given by topsoil analysis. C. Sod Availability and Condition: The Contractor shall satisfy himself as to the existing conditions prior to any construction. The Contractor shall be fully responsible for furnishing and lay all sod required on the plans. He shall furnish new sod as specified above and lay it so as too completely satisfy the intent and meaning of the plans and specification at no extra cost to the owner. In the case of plans and specification at no extra cost to the owner. In the case of any discrepancy in the amount of sod to be removed or amount to be used, it shall be the Contractor's responsibility to report such to the Project Representative prior to commencing the work. D. Sod Laying: The surface upon which the new sod to be laid will be prepared as specified above. Areas where sod is to be laid shall be cut trimmed, or shaped to receive full width sod (minimum twelve (12) inches). No partial strip or pieces will be accepted. E. Sod shall be tamped lightly as each piece is set to insure that good contact is made between edges and also the ground. Sod laid on any sloped areas shall be anchored with wooden dowels or other materials which are accepted by the grass sod industry. F. Apply water directly after laying sod. Rainfall is not acceptable. G.Watering of the sod shall be the complete responsibility of the Contractor by whatever means necessary to establish the sod in an acceptable manner to the end of the Maintenance period. If an irrigation system is in place on the site, but for whatever reason, water is not available in the system. It is the responsibility of the Contractor to water the sod by whatever means, until the sod is accepted by the Project Representative. H.Protection of the newly laid sod shall be the complete responsibility of the Contractor. The Contractor shall provide acceptable visual barriers, to include barricades set appropriate distances with strings or tapes between barriers, as an indication of new work. The Contractor is to restore any damaged areas caused by others (including vehicular traffic), erosion, etc, until such time as the lawn is accepted by the Owner. I. All sod that has not been laid within 24 hours shall be deemed unacceptable and will be removed from the site. 3.5 WEED BARRIER A.Cut a slit or x at each plant location no larger than necessary to install plant. B. Overlap rows of fabric min. 6” C. Stable fabric edges and overlaps to ground. END OF SECTION LANDSCAPE PLAN SPECIFICATIONS NO. REVISION DATE 1 2 3 4 5 6 7 02-12-2017 ID17008 ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 LP1.7 LP1.8 LP1.9 LP1.10 LP1.11 LP1.12 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' PRELIMINARY CODE 5.10.90. LANDSCAPING PER UNIT. THE INTENT IS TO HAVE A VARIETY OF PLANT MATERIALS TO GIVE COLOR AND TEXTURE; TO DIRECT TRAFFIC; TO FRAME VIEWS; AND TO SCREEN UNDESIRABLE VIEWS. a.MINIMUM. A MINIMUM OF THREE (3), ONE AND ONE-HALF (1½”) INCH CALIPER DECIDUOUS TREES OR FOUR (4') FEET TALL EVERGREEN TREES, AND FOUR (4) SHRUBS SHALL BE PLANTED FOR EACH LOT IN A PUD SUBDIVISION, AS WELL AS BUILDING FOUNDATION PLANTING OF APPROPRIATE SHRUBS, FLOWERS, OR GROUND COVERS. b.DESIGN THEME. LANDSCAPING IN THE PARK STRIP IN THE STREET RIGHT-OF-WAY SHALL HAVE A UNIFIED DESIGN THEME IN PUD SUBDIVISIONS. MULTIPLE FAMILY PUD'S SHALL PROVIDE A MINIMUM OF ONE (1) DECIDUOUS OR EVERGREEN TREE PER TWO (2) UNITS, AND TWO (2) SHRUBS PER UNIT. c.LANDSCAPE PLAN. APPLICANT MAY PROVIDE A LANDSCAPE PLAN THAT VARIES FROM THESE REQUIREMENTS TO THE PLANNING AND ZONING COMMISSION FOR APPROVAL AS MEETING THE “SPIRIT” OF THE REQUIREMENTS. d.DECIDUOUS TREES. THE PLACEMENT AND TYPES OF DECIDUOUS TREES SHALL TAKE INTO CONSIDERATION USE OF THE TREES FOR SUMMER COOLING AND WINTER SOLAR ACCESS. e.EVERGREEN TREES. EVERGREEN TREES SHOULD BE USED AS WINDBREAKS, SCREENING, AND ACCENT PLANTINGS. f. WATER CONSERVATION. THE MAJORITY OF NEW PLANT MATERIAL USED FOR LANDSCAPING THE DEVELOPMENT SHOULD BE WATER CONSERVING PLANTS. THE LANDSCAPING DESIGN SHALL LOCATE PLANT MATERIALS IN SIMILAR WATER USAGE DEMAND ZONES TO INSURE PROPER IRRIGATION COVERAGE AND REDUCE WASTEFUL IRRIGATION COVERAGE AND REDUCE WASTEFUL WATERING. NATIVE PLANTS ARE PREFERRED. SITE REQUIREMENT CALCULATIONS LANDSCAPE REQUIREMENTS REQ'D:PROVIDED: RE-LANDSCAPED AREA 100% STREET TREE BOULEVARD: 1 TREE /50 LINEAR FT. 31 EACH SIDE 31/SIDE YELLOWSTONE HIGHWAY - BERM WITH TREES FOR DESIGN INTENT 56 BUILDING TREE/SHRUB CALCULATIONS TYPE A 15 / 60 16 TYPE B 10 / 40 16 TYPE 1 2 / 8 6 TYPE 2 3 / 12 6 TYPE 3 4 / 14 6 SINGLE FAMILY LOTS 1 STREET TREE/LOT LINE TRASH ENCLOSURES: SCREENING WALL WITH VEGETATION TO SCREEN STRUCTURE LANDSCAPE POINTS SHADE TREES. AREAS WITH FIVE (5) OR MORE UNCOVERED PARKING STALLS ARE DESIGNED TO INCLUDE MINIMUM TWO (2”) INCH CALIPER TREES LOCATED IN SUCH A MANNER AS TO SHADE FIFTY (50%) PERCENT OF THE PARKING AREA UPON MATURATION OF THE TREES EXTRA TREES. DESIGN AND PLANTING MORE THAN THE MINIMUM NUMBER OF TREES, SHRUBS, AND PERENNIALS PER DWELLING UNIT IN THE DEVELOPMENT. (UP TO 20 POINTS) SOFTEN FENCE APPEARANCE. AREAS WHICH ARE TO BE SCREENED USE A SOLID NON-SEE-THROUGH WOOD OR MASONRY FENCE AND LANDSCAPING WHICH ACTS TO SOFTEN THE APPEARANCE OF THE FENCE. LANDSCAPING MAY BE VINES, SHRUBS, OR TREES. (UP TO 15 POINTS) DESIGNED PLAN. OPEN GREEN SPACE IS DESIGNED (NOT LEFT OVER SPACE BETWEEN BUILDINGS) AND FLOWS UNINTERRUPTED THROUGH THE ENTIRE DEVELOPMENT LINKING DWELLINGS AND RECREATION AMENITIES. (UP TO 25 POINTS) MULTIPLE USE. STORM WATER DETENTION FACILITIES ARE DESIGNED AND USED FOR MULTIPLE PURPOSES WHICH BLEND WITH THE OVERALL THEME OF THE OPEN SPACE DESIGN I.E., SHAPE OF THE AREA IS FREE FLOWING, THE GRADING AND LANDSCAPING ARE CARRIED OUT IN SUCH A MANNER THAT THE USE AS A DETENTION POND IS NOT DISCERNIBLE. (UP TO 20 POINTS) NATIVE PLANTS. NATIVE PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 15 POINTS) DROUGHT TOLERANT PLANTS. DROUGHT TOLERANT PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 10 POINTS) S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 5 0 . 0 6 8 . 0 ' WV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WVWV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWW S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA PG'P PG'P M'S M'S QR'F QR'F PN'APN'AZS'M ZS'M ZS'MZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'FCA'F MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'AMS'A SB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G RF'G SB'L SB'L SB'L SB'L RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'GRF'G FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO CO CO PN'APN'A PN'APN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS ZS ZS SJSJ PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW R'NW R'NWR'NW QR'F QR'F PN'A PN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B TYPE 3 TYPE 3 TYPE 1 TYPE 1 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.7 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 40' CLEAR VIEW AREA FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A SJ SJ SJ SJ ZS ZS ZS ZS ZS MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'L SB'L MS'A MS'A MS'A MS'A MS'AMS'A PN'A PN'A SB'L SB'L SB'L SB'LSB'LSB'L PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'FCA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW TYPE 3 TYPE 3 TYPE 3 TYPE 2 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.8 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S S S 50.0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 50.0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS CLUBHOUSE CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO FA'AA A A'A FA'AA'A PA PA PA PA PA PA PA PA PN PN PN PN PN PN PN PN PN'A PN'A SJ SJ SJ SJ MS'A MS'A MS'A MS'A MS'A MS'A SB'L SB'L SB'L SB'L R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SB'L SB'L SB'L SB'L SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'F CA'F CA'F CA'F CA'F PN'A PN'A MS'A MS'A MS'A MS'A MS'A MS'A SB'L SB'L SB'L SB'L ZS'M JH'B CA'B PP'G PV'H PV'H PV'H ZS'M JH'B CA'B PP'G PV'H PV'H PV'H R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'FBT'C BT'CBT'CPG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW ZS'M JH'B CA'B PP'GPV'H PV'H PV'H ZS'M JH'B CA'B PP'G PV'H PV'H PV'H CA'F CA'F CA'F CA'F TYPE 1 TYPE 1 TYPE 2 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.10 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S 50.0' 5 0 . 0 ' 68.0' 5 0 . 0 ' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV S SDSDSDSDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D S D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D TOWNS CO CO CO CO CO FA'A FA'A FA'A CO CO CO COCO COCO CO CO FA'A FA'A FA'A FA'A PA PA PA PA PA PA PA PA PA PA PN PNPN PN PN PN PN PN PN PNPN PNPN PN PN PN SJ SJSJ SJ SJ SJ MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.10 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S 5 0 . 0 ' SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S WV D S S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D D S D S D S D S D S D S D S D S D S D S D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD 40' CLEAR VIEW AREA FA'A FA'A FA'A FA'A CO CO COCO CO CO CO FA'A FA'A FA'A FA'A SJSJ AP'E AP'E AP'E AP'E AP'E AP'E PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW R'NW R'NWR'NW SB'L SB'L SB'L SB'L SB'L SB'L SB'L PN'A PN'A SB'LSB'L SB'L SB'L RF'G RF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G RF'G SB'L SB'L PN'A PN'A MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A PN'A PN'A PN'A PN'A PN'A PN'A QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'AMS'A PN'APN'A MS'A MS'A MS'A MS'A MS'AMS'A PN'APN'A SB'LSB'LSB'L SB'L SB'L SB'L SB'L RF'GRF'G RF'GRF'G RF'G RF'GRF'G RF'GRF'G RF'GPN'A PN'A SB'LSB'L SB'L SB'L PN'A PN'ACA'FCA'F CA'F CA'F CA'FCA'F CA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'FCA'F TYPE 3 TYPE 3 TYPE 1 TYPE 1 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.11 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W CO FA'A FA'A FA'A FA'A AP'E AP'E AP'E AP'E AP'EAP'E PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW MS'A MS'A MS'A SB'L SB'L PN'A PN'A MS'A MS'A MS'A MS'A MS'A MS'A PN'A PN'A MS'A MS'A MS'A MS'A MS'A MS'A SB'L SB'L SB'L SB'L PN'A PN'A SB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L PN'A PN'A MS'A MS'A MS'A MS'A MS'AMS'A PN'APN'A SB'L SB'L SB'LSB'L PN'A PN'A MS'A MS'A MS'A MS'A MS'A MS'A SB'L SB'LSB'L SB'L SB'L SB'L CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'GPV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW BT'C BT'CBT'C BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'H PV'H PV'H R'NW R'NW R'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NW R'NW PN'A PN'A SB'L SB'L SB'LSB'L CA'F CA'F CA'F CA'F TYPE 3 TYPE 2 TYPE 3 TYPE 3 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.13 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SITE MATERIALS (TOTALS FOR WHOLE SITE) SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 28 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 176 2 GAL HIGH BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 188 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 124 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 113 1 GAL MODERATE 'LIMEMOUND' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES MS'A MISCANTHUS SINENSIS ADAGIO MAIDEN 156 1 GAL LOW'ADAGIO' GRASS MS'D MISCANTHUS SINENSIS DWARF VARIEGATED 72 1 GAL. LOW'DIXIELAND' MAIDEN GRASS PV'H PANICUM VIRGATUM SWITCH GRASS 168 1 GAL MODERATE'HEAVY METAL' ZS ZELKOVA SERRATA JAPANESE 11 2" CAL LOWZELKOVA CO CERCIS OCCIDENTALIS COMMON HACKBERRY 34 2" CAL. LOW AP'E ACER PLATANOIDES EMERALD QUEEN 12 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PA PLATANUS X ACERIFOLIA LONDON PLANE TREE 18 2" CAL. LOW SJ SOPHORA JAPONICA JAPANESE PAGODA 18 2" CAL. MODERATETREE PN PINUS NIGRA AUSTRIAN PINE 24 6'-8' TALL LOW FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 33 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 34 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' M'S MALUS X 'SPRING SNOW' SPRING SNOW 28 2" CAL. LOWCRABAPPL QR'F QUERCUS ROBUR 'FASTIGIATA' COLUMNAR ENGLISH 8 2" CAL. LOWOAK PN'A PINUS NIGRA ARNOLD SENTINEL 76 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 28 6'-8' TALL LOWSPRUCE PG'P PICEA GLAUCA 'PENDULA' WEEPING WHITE 28 6'-8' TALL LOWSPRUCE 25 TREE 7 4 PERENNIAL LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES RF'G RUDBECKIA FULGIDATA BLACK EYED SUSAN 40 1 GAL. LOWSULLIVANTII 'GOLDSTRUM' GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 7 9 . 0 ' 6 8 . 0 ' 50.0' 5 0 . 0 ' 6 8 . 0 ' 68.0' 68.0' 68.0' 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79. 0 ' SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SSSS SSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSS SSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSS SSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SS SSSS SSSSSSSSSS SSSSSSSSSS SSSSSSSSSS SSSS SSSSSS SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS BARQUS LLC PARADISE NURSERY AND POND, LLC RIT A J A N E & G E R A L D J E P P E S E N SSSS SS SS SS SS SS SSSS SSSS SSSS SS SSSS SS SS SS SS SS SSSSSS SSSSSS SS SSSS SS SS SS SS SS SSSSSSSSSSSS SS SSSS SS SS SS SS SS SSSS SSSSSSSS SS SSSS SS SS SS SS SS SSSSSS SSSS SS SS SSSS SS SS SS SS SS SSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 5 0 . 0 ' 50.0' 6 8 . 0 ' WV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WVWV S5' S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW WW WWWWWWW WWWWWWWWWWWW WWWWW WWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWW W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW W W W WW WW WW W W WWW WW WW W W W WWWW WW W W WWW WW WW W W WWW WW WW W W WW W WW WW W W WWW WW WW W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W S S S S S S S S S S WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV S S WV D D D D D D S S S D DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD DSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSD SDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSD SDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD YE L L O W S T O N E H W Y CL U B H O U S E PO O L VILLAGE SUITES PAVILION TYPE A TYPE A TYPE ATYPE A TYPE A TYPE A TYPE A TYPE A TOT LOT TYPE B TYPE B TYPE B CLUBHOUSE TOWNS MONUMENT SIGN 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S CA'B CA'B CA'BCA'B JH'B JH'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S PO'S PO'S RF'R RF'R RF'R JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H PP'G PP'G PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G PN'APN'A PN'APN'A ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'MZS'M PG'P PG'P M'S M'S QR'F QR'F PN'APN'AZS'M ZS'M ZS'MZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'FCA'FCA'F MS'AMS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'AMS'AMS'AMS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'G RF'G RF'GRF'GRF'GRF'GRF'G FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO CO CO CO CO CO CO CO FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'AFA'A FA'A FA'A FA'AFA'A FA'AFA'A CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCO CO CO COCO COCO CO CO FA'AFA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPA PN'APN'A PN'APN'A PN PNPN PN PN PN PN PN PN PNPN PNPN PN PN PN PN PN PN PN PN PN PN PN PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'APN'A PN'APN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A SJ SJ SJ SJ SJ SJ SJ SJ SJ SJSJ SJ SJ SJ SJSJ ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E MS'A MS'AMS'AMS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'LSB'LSB'L MS'A MS'A MS'A MS'A MS'AMS'A PN'A PN'A SB'L SB'L SB'L SB'LSB'LSB'L R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SJSJ AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'E AP'E AP'E AP'E AP'E AP'E AP'E ZS ZS ZS ZS ZS ZS ZS ZS PA PA PA PA PA PA PA PA PA PA PA PA SJ SJ SJSJ ZS ZS ZS ZS SJ ZS ZS ZS ZS PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P PN PN PN PN PN PN PN PNPN PN PNPNPNPN PN PNPN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN ZS ZS ZS ZS ZS ZS PN PN PN PN CPCP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'PAT'P AT'PAT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M AT'P AT'P AT'P AT'PAT'PAT'P AT'PAT'P PN'A PN'A PN'APN'APN'APN'APN'APN'A R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW MS'A MS'A MS'AMS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SB'L SB'L SB'L SB'L SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'FCA'F CA'F CA'FCA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'GRF'GRF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BJH'BJH'BJH'BJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'AMS'A MS'A MS'A CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'CBT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'LSB'L SB'LSB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'KCS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K SB'L SB'L CS'K CS'K CS'K CS'KCS'K CS'KCS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'B CA'B CA'B CA'B CA'B CA'B CA'BCA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW SB'LSB'L SB'L SB'L SB'LSB'LSB'L PN'A PN'A SB'LSB'LSB'L SB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L PN'A PN'A PN'A PN'A MS'A MS'AMS'A MS'A MS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A SB'LSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'L SB'LSB'L SB'L PN'A PN'A MS'AMS'A MS'A MS'AMS'A MS'AMS'AMS'A MS'A MS'AMS'A MS'A PN'A PN'A PN'A PN'A PN'A PN'A QR'F QR'F PN'A PN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'FCA'F CA'F CA'F QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'APN'A SB'LSB'L SB'LSB'L PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'LSB'L SB'LSB'LSB'L CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'H PV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW CA'FCA'FCA'F CA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'F CA'FCA'FBT'C BT'CBT'CPG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'GPV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW SB'LSB'LSB'L SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'GPN'A PN'A SB'LSB'LSB'L SB'L PN'A PN'A PN'A PN'A SB'L SB'L SB'LSB'L CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LB H'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F PN'APN'A PN'APN'A PP'G PP'GPP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'KCS'KCS'KCS'K MS'D PF'G PF'GPF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'BJH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB ZS'M ZS'M ZS'M ZS'M M'SM'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A BT'C BT'C PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NW R'NW R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LBH'LB H'LB H'LB RF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'K CS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'HPV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'GPP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'BJH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'KCS'K CS'K CS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'GH'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F BT'C BT'CBT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NWR'NW R'NW JH'B PP'G R'NW R'NWR'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H PV'H PV'H PV'H BT'CBT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B BT'CBT'C BT'C BT'CBT'C BT'C BT'C BT'CBT'C BT'C BT'C JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'LSB'L SB'L SB'L SB'LSB'L SB'L SB'L B'GM B'GM B'GM B'GM CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F CA'FCA'F PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 2 TYPE 2 TYPE 3 TYPE 3 LP-COVER PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION DEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =150' 600'300'150'75'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N LANDSCAPE ARCHITECT / PLANNER 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS PART 1 - GENERAL 1.1 SUMMARY A. This section includes landscape procedures for the Project including all labor, materials, and installation necessary, but not limited to, the following: 1. Soil Amendments 2. Fine Grading 3. Cultivation 4. Landscape Edging 5. Turf Planting 6. Furnish and Installing Plant 7. Maintenance 8. Mowing 9. Weeding 1.2 SITE CONDITIONS A.Examination: Before submitting a Bid, each Contractor shall carefully examine the Contract Documents; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the Bid the cost of all items required by the Contract Documents are at a variance with the applicable laws, building codes, rules, regulations, or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the Project Representative and the necessary changes shall be accomplished by Addendum. B. Protection: Contractor to conduct the Work in such a manner to protect all existing underground utilities or structures. Contractor to repair or replace any damaged utility or structure using identical materials to match existing at no expense to the Owner. C. Irrigation System: Do not begin planting until the irrigation system is completely installed, is adjusted for full coverage and is completely operational. 1.3 PERMITS A.Blue Stake/ Dig Line: When digging is required, “Blue Stake” or “Dig Line” the work site and identify the approximate location of all known underground utilities or structures. 1.4 PLANT DELIVERY, QUALITY, AND AVAILABILITY A.Unauthorized substitutions will not be accepted. If proof is submitted that specific plants or plant sizes are unobtainable, written substitution requests will be considered for the nearest equivalent plant or size. All substitution requests must be made in writing and preferably before the bid due date. 1.5 FINAL INSPECTION A. All plants will be inspected at the time of Final Inspection prior to receiving a Landscape Substantial Completion for conformance to specified planting procedures, and for general appearance and vitality. Any plant not approved by the Project Representative will be rejected and replaced immediately. 1.6 LANDSCAPE SUBSTANTIAL COMPLETION A. A Substantial Completion Certificate will only be issued by the Project Representative for “landscape and irrigation” in their entirety. Substantial Completion will not be proportioned to be designated areas of a project. 1.7 MAINTENANCE A.Plant Material: The Contractor is responsible to maintain all planted materials in a healthy and growing condition for 30 days after receiving a Landscape Substantial Completion at which time the Guarantee period commences. This maintenance is to include mowing, weeding, cultivating, fertilizing, monitoring water schedules, controlling insects and diseases, re-guying and staking, and all other operations of care necessary for the promotion of root growth and plant life so that all plants are in a condition satisfactory at the end of the guarantee period. The Contractor shall be held responsible for failure to monitor watering operations and shall replace any and all plant material that is lost due to improper application of water. 1.8 GUARANTEE A.Guarantee: A guarantee period of one year shall begin from end of maintenance period and final acceptance for trees, shrubs, and ground covers. All plants shall grow and be healthy for the guarantee period and trees shall live and grow in acceptable upright position. Any plant not alive, in poor health, or in poor condition at the end of the guarantee period will be replaced immediately. Any plant will only need to be replaced once during the guarantee period. Contractor to provide documentation showing where each plant to be replaced is located. Any outside factors, such as vandalism or lack of maintenance on the part of the Owner, shall not be part of the guarantee PART II - PRODUCTS 2.1 LANDSCAPE MATERIALS A. Tree Staking: All trees shall be staked for one year warranty period. All trees not plumb shall be replaced. Staked trees shall use vinyl tree ties and tree stakes two (2) inch by two (2) by eight (8) foot common pine stakes used as shown on the details. B. Tree Wrap: Tree wrap is not to be used. C. Mulch: See Plans. All planter beds to receive a minimum 4” layer for trees, shrubs, and perennials and 1” for groundcovers. D. Weed Barrier: DeWitt 5 oz. weed barrier fabric. Manufactured by DeWitt Company, dewittcompany.com or approved equal. E. Tree, Shrub, and Grass Backfill Mixture; Backfill mixture to be 50% native soil and 50% topsoil, thoroughly mixed together prior to placement. F. Topsoil: Required for turf areas, planter beds and Backfill Mixture. Acceptable topsoil shall meet the following standards: a. PH: 5.5-7.5 b. EC (electrical conductivity): < 2.0 mmhos per centimeter c. SAR (sodium absorption ration): < 3.0 d. % OM (percent organic matter): >1% e. Texture (particle size per USDA soil classification): Sand <70%; Clay < 30%; Silt < 70%, Stone fragments (gravel or any soil particle greater than two (2) mm in size) < 5% by volume. G.Turf Sod: All sod shall be 18 month old as specified on plans (or approved equal) that has been cut fresh the morning of installation. Only sod that has been grown on a commercial sod farm shall be used. Only use sod from a single source. H.Landscape Edging: Headers and Edging six (6) inches by four (4) inches extruded concrete curb made up of the following materials: a. Washed mortar sand free of organic material. b. Portland Cement (see concrete spec. below for type) c. Reinforced fiber - Specifically produced for compatibility with aggressive alkaline environment of Portland cement-based composites. d. Only potable water for mixing. PART III - EXECUTION 3.1 GRADING A. Topsoil Preparation: Grade planting areas according to the grading plan. Eliminate uneven areas and low spots. Provide for proper grading and drainage. B. Topsoil Placement: Slope surfaced away from building at two (2) percent slope with no pockets of standing water. Establish finish grades of one (1) inches for planters below grade of adjacent paved surfaced. Provide neat, smooth, and uniform finish grades. Remove surplus sub-soil and topsoil from the site. C. Compaction: compaction under hard surface areas (asphalt paths and concrete surfaces) shall be ninety-five (95) percent. Compaction under planting areas shall be between eighty-five (85) and ninety (90) percent. 3.2 TURF GRADING A. The surface on which the sod is to be laid shall be firm and free from footprints, depressions, or undulations of any kind. The surface shall be free of all materials larger than 1/2” in diameter. B. The finish grade of the topsoil adjacent to all sidewalks, mow-strips, etc. prior to the laying of sod, shall be set such that the crown of the grass shall be at the same level as the adjacent concrete or hard surface. No exceptions. 3.3 PLANTING OPERATIONS A.Review the exact locations of all trees and shrubs with the Project Representative for approval prior to the digging of any holes. Prepare all holes according to the details on the drawings. B. Water plants immediately upon arrival at the site. Maintain in moist condition until planted. C. Before planting, locate all underground utilities prior to digging. Do not place plants on or near utility lines. D. The tree planting hole should be the same depth as the root ball, and three times the diameter of the root ball. E. Trees must be placed on undisturbed soil at the bottom of the planting hole. F. The tree hole depth shall be determined so that the tree may be set slightly high of finish grade, 1” to 2” above the base of the trunk flare, using the top of the root ball as a guide. G.Plant immediately after removal of container for container plants. H. Set tree on soil and remove all burlap, wire baskets, twine, wrappings, etc. before beginning and backfilling operations. Do not use planting stock if the ball is cracked or broken before or during planting operation. I. Apply vitamin B-1 root stimulator at the rate of one (1) tablespoon per gallon. J. Upon completion of backfilling operation, thoroughly water tree to completely settle the soil and fill any voids that may have occurred. Use a watering hose, not the area irrigation system. If additional prepared topsoil mixture needs to be added. It should be a courser mix as required to establish finish grade as indicated on the drawings. K. The amount of pruning shall be limited to the minimum necessary to remove dead or injured twigs and branches. All cuts, scars, and bruises shall be properly treated according to the direction of the Project Representative. Proper pruning techniques shall be used. Do not leave stubs and do not cut the leader branch. Improper pruning shall be cause for rejection of the plant material. L. Prepare a watering circle of 2' diameter around the trunk. For conifers, extend the watering well to the drip line of the tree canopy. Place mulch around the planted trees. 3.4 TURF - SOD LAYING A. Top Soil Amendments: Prior to laying sod, commercial fertilizer shall be applied and incorporated into the upper four (4) inches of the topsoil at a rate of four pounds of nitrogen per one thousand (1,000) square feet. Adjust fertilization mixture and rate of application as needed to meet recommendations given by topsoil analysis. Include other amendments as required. B. Fertilization: Three weeks after sod placement fertilize the turf at a rate of ½ pound of nitrogen per 1000 square feet. Use fertilizer specified above. Adjust fertilization mixture and rates to meet recommendations given by topsoil analysis. C. Sod Availability and Condition: The Contractor shall satisfy himself as to the existing conditions prior to any construction. The Contractor shall be fully responsible for furnishing and lay all sod required on the plans. He shall furnish new sod as specified above and lay it so as too completely satisfy the intent and meaning of the plans and specification at no extra cost to the owner. In the case of plans and specification at no extra cost to the owner. In the case of any discrepancy in the amount of sod to be removed or amount to be used, it shall be the Contractor's responsibility to report such to the Project Representative prior to commencing the work. D. Sod Laying: The surface upon which the new sod to be laid will be prepared as specified above. Areas where sod is to be laid shall be cut trimmed, or shaped to receive full width sod (minimum twelve (12) inches). No partial strip or pieces will be accepted. E. Sod shall be tamped lightly as each piece is set to insure that good contact is made between edges and also the ground. Sod laid on any sloped areas shall be anchored with wooden dowels or other materials which are accepted by the grass sod industry. F. Apply water directly after laying sod. Rainfall is not acceptable. G.Watering of the sod shall be the complete responsibility of the Contractor by whatever means necessary to establish the sod in an acceptable manner to the end of the Maintenance period. If an irrigation system is in place on the site, but for whatever reason, water is not available in the system. It is the responsibility of the Contractor to water the sod by whatever means, until the sod is accepted by the Project Representative. H.Protection of the newly laid sod shall be the complete responsibility of the Contractor. The Contractor shall provide acceptable visual barriers, to include barricades set appropriate distances with strings or tapes between barriers, as an indication of new work. The Contractor is to restore any damaged areas caused by others (including vehicular traffic), erosion, etc, until such time as the lawn is accepted by the Owner. I. All sod that has not been laid within 24 hours shall be deemed unacceptable and will be removed from the site. 3.5 WEED BARRIER A.Cut a slit or x at each plant location no larger than necessary to install plant. B. Overlap rows of fabric min. 6” C. Stable fabric edges and overlaps to ground. END OF SECTION LANDSCAPE PLAN SPECIFICATIONS NO. REVISION DATE 1 2 3 4 5 6 7 02-12-2017 ID17008 ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 LP1.13 LP1.16 LP1.14 LP1.15 LP1.17 LP1.18 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 49 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 145 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 157 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) PRELIMINARY CODE 5.10.90. LANDSCAPING PER UNIT. THE INTENT IS TO HAVE A VARIETY OF PLANT MATERIALS TO GIVE COLOR AND TEXTURE; TO DIRECT TRAFFIC; TO FRAME VIEWS; AND TO SCREEN UNDESIRABLE VIEWS. a.MINIMUM. A MINIMUM OF THREE (3), ONE AND ONE-HALF (1½”) INCH CALIPER DECIDUOUS TREES OR FOUR (4') FEET TALL EVERGREEN TREES, AND FOUR (4) SHRUBS SHALL BE PLANTED FOR EACH LOT IN A PUD SUBDIVISION, AS WELL AS BUILDING FOUNDATION PLANTING OF APPROPRIATE SHRUBS, FLOWERS, OR GROUND COVERS. b.DESIGN THEME. LANDSCAPING IN THE PARK STRIP IN THE STREET RIGHT-OF-WAY SHALL HAVE A UNIFIED DESIGN THEME IN PUD SUBDIVISIONS. MULTIPLE FAMILY PUD'S SHALL PROVIDE A MINIMUM OF ONE (1) DECIDUOUS OR EVERGREEN TREE PER TWO (2) UNITS, AND TWO (2) SHRUBS PER UNIT. c.LANDSCAPE PLAN. APPLICANT MAY PROVIDE A LANDSCAPE PLAN THAT VARIES FROM THESE REQUIREMENTS TO THE PLANNING AND ZONING COMMISSION FOR APPROVAL AS MEETING THE “SPIRIT” OF THE REQUIREMENTS. d.DECIDUOUS TREES. THE PLACEMENT AND TYPES OF DECIDUOUS TREES SHALL TAKE INTO CONSIDERATION USE OF THE TREES FOR SUMMER COOLING AND WINTER SOLAR ACCESS. e.EVERGREEN TREES. EVERGREEN TREES SHOULD BE USED AS WINDBREAKS, SCREENING, AND ACCENT PLANTINGS. f. WATER CONSERVATION. THE MAJORITY OF NEW PLANT MATERIAL USED FOR LANDSCAPING THE DEVELOPMENT SHOULD BE WATER CONSERVING PLANTS. THE LANDSCAPING DESIGN SHALL LOCATE PLANT MATERIALS IN SIMILAR WATER USAGE DEMAND ZONES TO INSURE PROPER IRRIGATION COVERAGE AND REDUCE WASTEFUL IRRIGATION COVERAGE AND REDUCE WASTEFUL WATERING. NATIVE PLANTS ARE PREFERRED. SITE REQUIREMENT CALCULATIONS LANDSCAPE REQUIREMENTS REQ'D:PROVIDED: RE-LANDSCAPED AREA 100% STREET TREE BOULEVARD: 1 TREE /50 LINEAR FT. 31 EACH SIDE 31/SIDE YELLOWSTONE HIGHWAY - BERM WITH TREES FOR DESIGN INTENT 56 BUILDING TREE/SHRUB CALCULATIONS TYPE A 15 / 60 16 TYPE B 10 / 40 16 TYPE 1 2 / 8 6 TYPE 2 3 / 12 6 TYPE 3 4 / 14 6 SINGLE FAMILY LOTS 1 STREET TREE/LOT LINE TRASH ENCLOSURES: SCREENING WALL WITH VEGETATION TO SCREEN STRUCTURE LANDSCAPE POINTS SHADE TREES. AREAS WITH FIVE (5) OR MORE UNCOVERED PARKING STALLS ARE DESIGNED TO INCLUDE MINIMUM TWO (2”) INCH CALIPER TREES LOCATED IN SUCH A MANNER AS TO SHADE FIFTY (50%) PERCENT OF THE PARKING AREA UPON MATURATION OF THE TREES EXTRA TREES. DESIGN AND PLANTING MORE THAN THE MINIMUM NUMBER OF TREES, SHRUBS, AND PERENNIALS PER DWELLING UNIT IN THE DEVELOPMENT. (UP TO 20 POINTS) SOFTEN FENCE APPEARANCE. AREAS WHICH ARE TO BE SCREENED USE A SOLID NON-SEE-THROUGH WOOD OR MASONRY FENCE AND LANDSCAPING WHICH ACTS TO SOFTEN THE APPEARANCE OF THE FENCE. LANDSCAPING MAY BE VINES, SHRUBS, OR TREES. (UP TO 15 POINTS) DESIGNED PLAN. OPEN GREEN SPACE IS DESIGNED (NOT LEFT OVER SPACE BETWEEN BUILDINGS) AND FLOWS UNINTERRUPTED THROUGH THE ENTIRE DEVELOPMENT LINKING DWELLINGS AND RECREATION AMENITIES. (UP TO 25 POINTS) MULTIPLE USE. STORM WATER DETENTION FACILITIES ARE DESIGNED AND USED FOR MULTIPLE PURPOSES WHICH BLEND WITH THE OVERALL THEME OF THE OPEN SPACE DESIGN I.E., SHAPE OF THE AREA IS FREE FLOWING, THE GRADING AND LANDSCAPING ARE CARRIED OUT IN SUCH A MANNER THAT THE USE AS A DETENTION POND IS NOT DISCERNIBLE. (UP TO 20 POINTS) NATIVE PLANTS. NATIVE PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 15 POINTS) DROUGHT TOLERANT PLANTS. DROUGHT TOLERANT PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 10 POINTS) W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W YE L L O AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP AT'P FA'AFA'A FA'A FA'A FA'A AT'P AT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B BT'C BT'CBT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PP'G PP'G R JH'B JH'B RF'R RF'R RF'R CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C MS'D MS'D MS'D MS'D MS'D MS'D RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G M'S M'S QR'F QR'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'K CS'K CS'K CS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.13 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS S S SS SS S S S S S S S S SS S S SS SS S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79. SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W D D SD SD SD SD SD SD S D S D S D S D SD SD SD S D S D SD SD SD SD S D SD SD S D SD SD SD SD SD S D SD SD SD S D S D 40' CLEA VIEW AR AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E P PN PN PN PN PN PN PN PN FA'A FA'A FA'A FA'A FA'A F FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P AT'P AT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M SB'LSB'L SB'L SB'L CA'B CA'B CA'B CA'B CA'B CA'B PP'G R'NW R'NW R'NW B'GM B'GM B'GM CA'F CA'F CA'F MS'D MS'D MS'D JH'B JH'B ZS'M QR'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R K CS'K CS'K CS'K SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L B'GM B'GM B'GM B'GM CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV CA'F CA'F CA'F CA'F PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.14 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S S D D D DS D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD SD SD S D SD SD SD SD SD S D SD S D SD S D S D SD 40' CLEA VIEW AR 40 C L E VIEW AR FA'A FA'A FA'A FA'A AP'EAP'EAP'EAP'EAP'E AP'E AP'E AP'E AP'E PN PN PN PN ZS ZS ZS ZS ZS ZS FA'A FA'A FA'A FA'A AT'PAT'P CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F SB'LSB'L SB'L SB'L B'GM B'GM PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.15 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 68.0 S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW FA'A FA'A FA'A FA'A FA'A FA'A PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP FA'A FA'A FA'AFA'A AT'PAT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'MZS'M ZS'M ZS'MAT'P AT'P AT'P AT'PAT'PAT'P AT'PAT'P B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F CA'FCA'F PV'H PV'H PV'H PV'H PV'H PV'H PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.16 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PN PN PN PN PNPN PN PNPN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP CP FA'A FA'A FA'A FA'A FA'A FA FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P CA'BCA'B CA'B CA'B CA'B CA'B PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F PV'H PV'H PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.17 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PN PN PN PN PN PN PN PN CP CP CP CP AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P PNPNPN PN PNPN CPCP CP CP CP ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M JH'B JH'B JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'K CS'K CS'K CS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H BT'C BT'C PV'H BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H PV'H PV'H PV'H BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BPV'H PV'H PV'H JH'B JH'B JH'B CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'H PV'H PV'H PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.18 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES SHRUB LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'B CORNUS ALBA 'BAILHALO' IVORY HALO DOGWOOD 12 5 GAL. MODERATE R'NW ROSA X 'NEARLY WILD' NEARLY WILD ROSE 18 2 GAL HIGH RF'R RHAMNUS FRANGULA FINE LINE BUCKTHORN 12 5 GAL. HIGH'RON WILLIAMS CS'K CORNUS SERICEA 'KELSEYI KELSEY'S DWARF 14 5 GAL. MODERATERED-OSIER DOGWOOD BT'C BERBERIS THUNBERGII CRIMSON PYGMY DWARF 51 1 GAL. LOW'CRIMSON PYGMY' JAPANESE BARBERRY JH'B JUNIPERUS HORIZONTALIS BLUE CHIP JUNIPER 69 1 GAL LOW'BLUE CHIP' SB'L SPIREA X BUMALDA LIMEMOUND SPIREA 55 1 GAL MODERATE 'LIMEMOUND' B'GM BUXUS X 'GREEN MOUNTAIN' GREEN MOUNTAIN 8 5 GAL. MODERATEBOXWOOD PO'S PHYSOCARPUS OPULUS SUMMER WINE NINE BARK 2 5 GAL HIGH'SUMMER WINE' GRASSES LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES CA'F CALAMAGROSTIS A. 'FOERSTER' FOERSTER FEATHER 55 1 GAL HIGHGRASS PV'H PANICUM VIRGATUM SWITCH GRASS 131 1 GAL MODERATE'HEAVY METAL' TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 6 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 19 2" CAL. MODERATE'EMERALD QUEEN' MAPLE PN PINUS NIGRA AUSTRIAN PINE 72 6'-8' TALL LOW CP CRATAEGUS PHAENOPYRUM WASHINGTON 29 2" CAL LOWHAWTHORN FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 41 2" CAL. LOW'AUTUMN PURPLE' ZS'M ZELKOVA SERRATA JAPANESE 30 2" CAL LOW'MUSASHINO' ZELKOVA 'MUSASHINO' AT'P ACER TRUNCATUM X PACIFIC 32 2" CAL. LOWPLATANOIDES 'WARRENRED' SUNSET MAPLE PN'A PINUS NIGRA ARNOLD SENTINEL 6 2" CAL. LOW'ARNOLD SENTINEL' AUSTRIAN BLACK PINE PP'G PICEA PUNGENS 'GLAUCA' COLORADO BLUE 8 6'-8' TALL LOWSPRUCE 25 TREE 7 2 20 TREE 7 1 SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 7 9 . 0 ' 6 8 . 0 ' 50.0' 5 0 . 0 ' 6 8 . 0 ' 68.0' 68.0' 68.0' 7 9 . 0 ' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 79. 0 ' SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SSSS SSSS SS SS SSSS SS SS SS SS SS SS SS SSSSSS SSSSSS SS SS SSSS SS SS SS SS SS SS SSSSSS SSSSSSSS SS SSSSSS SS SS SS SS SS SS SSSS SS SSSS SSSSSSSSSS SSSSSSSSSS SSSSSSSSSS SSSS SSSSSS SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS BARQUS LLC PARADISE NURSERY AND POND, LLC RIT A J A N E & G E R A L D J E P P E S E N SSSS SS SS SS SS SS SSSS SSSS SSSS SS SSSS SS SS SS SS SS SSSSSS SSSSSS SS SSSS SS SS SS SS SS SSSSSSSSSSSS SS SSSS SS SS SS SS SS SSSS SSSSSSSS SS SSSS SS SS SS SS SS SSSSSS SSSS SS SS SSSS SS SS SS SS SS SSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD 5 0 . 0 ' 50.0' 6 8 . 0 ' WV W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WVWV S5' S S S W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWW WW WWWWWWW WWWWWWWWWWWW WWWWW WWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWW W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WW WW WW W W W WW WW WW W W WWW WW WW W W W WWWW WW W W WWW WW WW W W WWW WW WW W W WW W WW WW W W WWW WW WW W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WW W W W W W W W S S S S S S S S S S WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W WV S S WV D D D D D D S S S D DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD DSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD D SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSD SDSD SDSDSDSDSDSDSDSD SDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD D SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSD SDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD YE L L O W S T O N E H W Y CL U B H O U S E PO O L VILLAGE SUITES PAVILION TYPE A TYPE A TYPE ATYPE A TYPE A TYPE A TYPE A TYPE A TOT LOT TYPE B TYPE B TYPE B CLUBHOUSE TOWNS MONUMENT SIGN 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA 40' CLEAR VIEW AREA PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S CA'B CA'B CA'BCA'B JH'B JH'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S PO'S PO'S RF'R RF'R RF'R JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H PP'G PP'G PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G PN'APN'A PN'APN'A ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'MZS'M PG'P PG'P M'S M'S QR'F QR'F PN'APN'AZS'M ZS'M ZS'MZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'FCA'FCA'FCA'F MS'AMS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'AMS'AMS'AMS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'G RF'G RF'GRF'GRF'GRF'GRF'G FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A CO CO CO CO CO CO CO CO CO FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'AFA'A FA'A FA'A FA'AFA'A FA'AFA'A CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCO CO CO COCO COCO CO CO FA'AFA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PAPA PN'APN'A PN'APN'A PN PNPN PN PN PN PN PN PN PNPN PNPN PN PN PN PN PN PN PN PN PN PN PN PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'APN'A PN'APN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A SJ SJ SJ SJ SJ SJ SJ SJ SJ SJSJ SJ SJ SJ SJSJ ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS ZS AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E MS'A MS'AMS'AMS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A SB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'LSB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'LSB'LSB'L MS'A MS'A MS'A MS'A MS'AMS'A PN'A PN'A SB'L SB'L SB'L SB'LSB'LSB'L R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F MS'A MS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'AMS'A MS'A MS'A MS'A MS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SJSJ AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'EAP'E AP'E AP'E AP'E AP'E AP'E AP'E ZS ZS ZS ZS ZS ZS ZS ZS PA PA PA PA PA PA PA PA PA PA PA PA SJ SJ SJSJ ZS ZS ZS ZS SJ ZS ZS ZS ZS PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P PN PN PN PN PN PN PN PNPN PN PNPNPNPN PN PNPN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN PN ZS ZS ZS ZS ZS ZS PN PN PN PN CPCP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A FA'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A PN'A ZS ZS ZS ZS FA'A FA'A FA'A FA'A AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'P AT'PAT'P AT'PAT'P ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M ZS'M AT'P AT'P AT'P AT'PAT'PAT'P AT'PAT'P PN'A PN'A PN'APN'APN'APN'APN'APN'A R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NWR'NW R'NW R'NW MS'A MS'A MS'AMS'A JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B SB'L SB'L SB'L SB'L SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C CA'F CA'FCA'F CA'F CA'FCA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F SB'L SB'L SB'L SB'L SB'L SB'L SB'L RF'G RF'GRF'GRF'G RF'G RF'GRF'G RF'GRF'G RF'GRF'G JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BJH'BJH'BJH'BJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'A MS'AMS'AMS'A MS'A MS'A CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'CBT'CBT'CBT'C BT'C BT'C BT'C BT'C BT'C BT'C SB'LSB'L SB'LSB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'LSB'LSB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'LSB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'LSB'L SB'L SB'L SB'L SB'L SB'L SB'L SB'LSB'L SB'L SB'L SB'L CS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'KCS'K CS'K CS'K CS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K SB'L SB'L CS'K CS'K CS'K CS'KCS'K CS'KCS'KCS'KCS'K CS'KCS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C BT'C BT'C BT'C BT'CBT'C BT'C BT'C BT'C BT'C BT'C CA'FCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'B CA'B CA'B CA'B CA'B CA'B CA'BCA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B CA'B PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'SZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'BJH'BJH'B JH'BJH'BJH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW PG'P PG'P M'S M'S ZS'M ZS'M CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW JH'B JH'B JH'B JH'B JH'B JH'B CA'B CA'B PP'G PP'G PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H PV'H PV'HPV'H R'NW R'NW R'NW R'NW R'NWR'NW SB'LSB'L SB'L SB'L SB'LSB'LSB'L PN'A PN'A SB'LSB'LSB'L SB'L RF'G RF'G RF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'G SB'L SB'L PN'A PN'A PN'A PN'A MS'A MS'AMS'A MS'A MS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'L SB'L SB'L PN'A PN'A SB'LSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'L SB'LSB'L SB'L PN'A PN'A MS'AMS'A MS'A MS'AMS'A MS'AMS'AMS'A MS'A MS'AMS'A MS'A PN'A PN'A PN'A PN'A PN'A PN'A QR'F QR'F PN'A PN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NW R'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B CA'FCA'F CA'F CA'F QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'F CA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B QR'F QR'F PN'APN'A ZS'MZS'M CA'F CA'FCA'F CA'FCA'FCA'FCA'F R'NWR'NWR'NW R'NW R'NWR'NWR'NW R'NW BT'CBT'CBT'C BT'CBT'CBT'C BT'C BT'CBT'C JH'B JH'B JH'B JH'B JH'B JH'B MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'A MS'AMS'A MS'A MS'AMS'A PN'APN'A MS'AMS'AMS'A MS'A MS'AMS'A PN'APN'A SB'LSB'L SB'LSB'L PN'A PN'A MS'A MS'AMS'A MS'AMS'AMS'A SB'L SB'LSB'L SB'LSB'LSB'L CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'H PV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW R'NW R'NWR'NW R'NW R'NW R'NWCA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW CA'FCA'FCA'F CA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'F CA'F CA'FCA'FBT'C BT'CBT'CPG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NW R'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'F CA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'GPV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NW R'NW BT'C BT'CBT'C BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'H PV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW CA'FCA'FCA'FCA'F CA'F CA'FCA'F BT'C BT'CBT'CBT'C BT'CBT'C CA'F CA'FCA'F BT'C BT'CBT'C PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW PG'P M'S ZS'M JH'B JH'B JH'B CA'B PP'G PV'HPV'H PV'H PV'HPV'H PV'H R'NWR'NWR'NW SB'LSB'LSB'L SB'L SB'L SB'LSB'L RF'GRF'GRF'GRF'GRF'G RF'GRF'GRF'GRF'GRF'GPN'A PN'A SB'LSB'LSB'L SB'L PN'A PN'A PN'A PN'A SB'L SB'L SB'LSB'L CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'FCA'F CA'F CA'FCA'FCA'FCA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'C BT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LBH'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M CA'B CA'B CA'BCA'B RF'R RF'R RF'R PO'S PO'S PO'S PO'S JH'B JH'B B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PP'G PP'G PV'H PV'H PV'H PV'H CA'F CA'FCA'F CA'F CA'F CA'F BT'CBT'C BT'C BT'C BT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G PF'G MS'DMS'DMS'DMS'D MS'DMS'DMS'DMS'D H'LBH'LB H'LB H'LB H'LB H'LB H'LBH'LB H'LB H'LB CA'B CA'B RF'GRF'G RF'G RF'G RF'GRF'G PN'APN'A PN'APN'A M'P M'PM'P M'P ZS'M ZS'M ZS'MZS'M ZS'M ZS'M ZS'M ZS'M PP'G PP'G PP'G PP'GPP'G PP'G R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GMB'GMB'GM B'GMB'GMB'GM B'GMB'GMB'GMB'GMB'GMB'GM PV'H PV'H PV'H PV'H CA'FCA'F CA'F CA'FCA'F CA'F BT'CBT'C BT'C BT'CBT'C BT'C CS'K CS'K CS'K CS'K CS'K CS'K MS'D PF'G PF'G PF'GPF'G MS'DMS'D MS'DMS'DMS'D JH'B JH'B JH'B JH'B H'LBH'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LB H'LB H'LBH'LB RF'G RF'G RF'GRF'GRF'G RF'G RF'GRF'GRF'G RF'GRF'G RF'G ZS'M ZS'M ZS'MZS'M M'S M'S M'S M'S QR'F QR'F QR'FQR'F PN'APN'A PN'APN'A PP'G PP'GPP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'KCS'KCS'KCS'K MS'D PF'G PF'GPF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'BJH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB ZS'M ZS'M ZS'M ZS'M M'SM'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A BT'C BT'C PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NW R'NW R'NW R'NW R'NW R'NW R'NWR'NW R'NW R'NW R'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LB PF'G PF'G H'LB H'LBH'LB H'LB H'LB RF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'K CS'K CS'K CS'KCS'K CS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LBH'LB H'LB H'LB PF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'G PP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'B JH'B PO'S PO'S RF'RRF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'H PV'HPV'H PV'H CA'F CA'F CA'F CA'F CA'FCA'F BT'C BT'C CS'KCS'KCS'K CS'KCS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'G H'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'GRF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A PP'GPP'G PP'G PP'G PP'G PP'G R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW R'NWR'NWR'NW PO'S PO'S JH'BJH'B PO'S PO'S RF'R RF'R RF'R B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM B'GM PV'HPV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F BT'C BT'C CS'KCS'KCS'K CS'K CS'KCS'K MS'D PF'G PF'G PF'G PF'G MS'D MS'D MS'D MS'D MS'D JH'B JH'B JH'B JH'B H'LB H'LB H'LB H'LB H'LBPF'G PF'GH'LBH'LBH'LB H'LB H'LB RF'GRF'GRF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'G RF'GRF'G ZS'M ZS'M ZS'M ZS'M M'S M'S M'S M'S QR'F QR'F QR'F QR'F PN'A PN'A PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A AT'P SB'L SB'LSB'L CS'K CS'K CS'K PN'A PN'A CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F CA'FCA'FCA'FCA'FCA'F BT'C BT'CBT'C BT'C BT'C BT'C BT'C R'NW R'NW R'NW R'NW R'NW R'NW PP'G PP'G PP'G PP'G PN'A PN'A PO'S B'GM B'GM B'GM PO'S B'GM JH'B JH'B PP'G R'NWR'NW R'NW JH'B PP'G R'NW R'NWR'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L PP'G R'NW R'NW R'NW JH'B PP'G R'NW R'NW R'NW JH'B RF'R RF'R RF'R RF'R RF'R RF'R SB'L SB'L CS'KCS'K CS'KCS'K SB'L SB'L BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H BT'C BT'C BT'C BT'C BT'C BT'C BT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H BT'C BT'C PV'H PV'H PV'H PV'H BT'CBT'C BT'C PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B BT'CBT'C BT'C BT'CBT'C BT'C BT'C BT'CBT'C BT'C BT'C JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H JH'B JH'B JH'BPV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H JH'B JH'B JH'B SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'HJH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'B JH'BSB'L SB'LSB'LSB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L SB'L SB'LSB'L PV'H PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'L SB'LSB'L PV'H PV'H SB'LSB'L SB'L SB'L SB'LSB'L SB'L SB'L B'GM B'GM B'GM B'GM CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'F CA'F CA'F CA'FCA'F CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'K CS'KCS'K CS'K CS'K CS'K PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'FCA'F CA'FCA'F PV'H PV'H PV'H PV'H PV'H PV'H PV'HPV'H PV'H PV'H PV'H PV'H CA'F CA'F CA'F CA'F CA'F CA'F CA'F CA'F TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 3 TYPE 3 TYPE 3 TYPE 3 TYPE 1 TYPE 1 TYPE 2 TYPE 2 TYPE 3 TYPE 3 LP-COVER PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION DEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP GRAPHIC SCALE: 1" =150' 600'300'150'75'0' PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N LANDSCAPE ARCHITECT / PLANNER 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS PART 1 - GENERAL 1.1 SUMMARY A. This section includes landscape procedures for the Project including all labor, materials, and installation necessary, but not limited to, the following: 1. Soil Amendments 2. Fine Grading 3. Cultivation 4. Landscape Edging 5. Turf Planting 6. Furnish and Installing Plant 7. Maintenance 8. Mowing 9. Weeding 1.2 SITE CONDITIONS A.Examination: Before submitting a Bid, each Contractor shall carefully examine the Contract Documents; shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the Bid the cost of all items required by the Contract Documents are at a variance with the applicable laws, building codes, rules, regulations, or contain obvious erroneous or uncoordinated information, the Contractor shall promptly notify the Project Representative and the necessary changes shall be accomplished by Addendum. B. Protection: Contractor to conduct the Work in such a manner to protect all existing underground utilities or structures. Contractor to repair or replace any damaged utility or structure using identical materials to match existing at no expense to the Owner. C. Irrigation System: Do not begin planting until the irrigation system is completely installed, is adjusted for full coverage and is completely operational. 1.3 PERMITS A.Blue Stake/ Dig Line: When digging is required, “Blue Stake” or “Dig Line” the work site and identify the approximate location of all known underground utilities or structures. 1.4 PLANT DELIVERY, QUALITY, AND AVAILABILITY A.Unauthorized substitutions will not be accepted. If proof is submitted that specific plants or plant sizes are unobtainable, written substitution requests will be considered for the nearest equivalent plant or size. All substitution requests must be made in writing and preferably before the bid due date. 1.5 FINAL INSPECTION A. All plants will be inspected at the time of Final Inspection prior to receiving a Landscape Substantial Completion for conformance to specified planting procedures, and for general appearance and vitality. Any plant not approved by the Project Representative will be rejected and replaced immediately. 1.6 LANDSCAPE SUBSTANTIAL COMPLETION A. A Substantial Completion Certificate will only be issued by the Project Representative for “landscape and irrigation” in their entirety. Substantial Completion will not be proportioned to be designated areas of a project. 1.7 MAINTENANCE A.Plant Material: The Contractor is responsible to maintain all planted materials in a healthy and growing condition for 30 days after receiving a Landscape Substantial Completion at which time the Guarantee period commences. This maintenance is to include mowing, weeding, cultivating, fertilizing, monitoring water schedules, controlling insects and diseases, re-guying and staking, and all other operations of care necessary for the promotion of root growth and plant life so that all plants are in a condition satisfactory at the end of the guarantee period. The Contractor shall be held responsible for failure to monitor watering operations and shall replace any and all plant material that is lost due to improper application of water. 1.8 GUARANTEE A.Guarantee: A guarantee period of one year shall begin from end of maintenance period and final acceptance for trees, shrubs, and ground covers. All plants shall grow and be healthy for the guarantee period and trees shall live and grow in acceptable upright position. Any plant not alive, in poor health, or in poor condition at the end of the guarantee period will be replaced immediately. Any plant will only need to be replaced once during the guarantee period. Contractor to provide documentation showing where each plant to be replaced is located. Any outside factors, such as vandalism or lack of maintenance on the part of the Owner, shall not be part of the guarantee PART II - PRODUCTS 2.1 LANDSCAPE MATERIALS A. Tree Staking: All trees shall be staked for one year warranty period. All trees not plumb shall be replaced. Staked trees shall use vinyl tree ties and tree stakes two (2) inch by two (2) by eight (8) foot common pine stakes used as shown on the details. B. Tree Wrap: Tree wrap is not to be used. C. Mulch: See Plans. All planter beds to receive a minimum 4” layer for trees, shrubs, and perennials and 1” for groundcovers. D. Weed Barrier: DeWitt 5 oz. weed barrier fabric. Manufactured by DeWitt Company, dewittcompany.com or approved equal. E. Tree, Shrub, and Grass Backfill Mixture; Backfill mixture to be 50% native soil and 50% topsoil, thoroughly mixed together prior to placement. F. Topsoil: Required for turf areas, planter beds and Backfill Mixture. Acceptable topsoil shall meet the following standards: a. PH: 5.5-7.5 b. EC (electrical conductivity): < 2.0 mmhos per centimeter c. SAR (sodium absorption ration): < 3.0 d. % OM (percent organic matter): >1% e. Texture (particle size per USDA soil classification): Sand <70%; Clay < 30%; Silt < 70%, Stone fragments (gravel or any soil particle greater than two (2) mm in size) < 5% by volume. G.Turf Sod: All sod shall be 18 month old as specified on plans (or approved equal) that has been cut fresh the morning of installation. Only sod that has been grown on a commercial sod farm shall be used. Only use sod from a single source. H.Landscape Edging: Headers and Edging six (6) inches by four (4) inches extruded concrete curb made up of the following materials: a. Washed mortar sand free of organic material. b. Portland Cement (see concrete spec. below for type) c. Reinforced fiber - Specifically produced for compatibility with aggressive alkaline environment of Portland cement-based composites. d. Only potable water for mixing. PART III - EXECUTION 3.1 GRADING A. Topsoil Preparation: Grade planting areas according to the grading plan. Eliminate uneven areas and low spots. Provide for proper grading and drainage. B. Topsoil Placement: Slope surfaced away from building at two (2) percent slope with no pockets of standing water. Establish finish grades of one (1) inches for planters below grade of adjacent paved surfaced. Provide neat, smooth, and uniform finish grades. Remove surplus sub-soil and topsoil from the site. C. Compaction: compaction under hard surface areas (asphalt paths and concrete surfaces) shall be ninety-five (95) percent. Compaction under planting areas shall be between eighty-five (85) and ninety (90) percent. 3.2 TURF GRADING A. The surface on which the sod is to be laid shall be firm and free from footprints, depressions, or undulations of any kind. The surface shall be free of all materials larger than 1/2” in diameter. B. The finish grade of the topsoil adjacent to all sidewalks, mow-strips, etc. prior to the laying of sod, shall be set such that the crown of the grass shall be at the same level as the adjacent concrete or hard surface. No exceptions. 3.3 PLANTING OPERATIONS A.Review the exact locations of all trees and shrubs with the Project Representative for approval prior to the digging of any holes. Prepare all holes according to the details on the drawings. B. Water plants immediately upon arrival at the site. Maintain in moist condition until planted. C. Before planting, locate all underground utilities prior to digging. Do not place plants on or near utility lines. D. The tree planting hole should be the same depth as the root ball, and three times the diameter of the root ball. E. Trees must be placed on undisturbed soil at the bottom of the planting hole. F. The tree hole depth shall be determined so that the tree may be set slightly high of finish grade, 1” to 2” above the base of the trunk flare, using the top of the root ball as a guide. G.Plant immediately after removal of container for container plants. H. Set tree on soil and remove all burlap, wire baskets, twine, wrappings, etc. before beginning and backfilling operations. Do not use planting stock if the ball is cracked or broken before or during planting operation. I. Apply vitamin B-1 root stimulator at the rate of one (1) tablespoon per gallon. J. Upon completion of backfilling operation, thoroughly water tree to completely settle the soil and fill any voids that may have occurred. Use a watering hose, not the area irrigation system. If additional prepared topsoil mixture needs to be added. It should be a courser mix as required to establish finish grade as indicated on the drawings. K. The amount of pruning shall be limited to the minimum necessary to remove dead or injured twigs and branches. All cuts, scars, and bruises shall be properly treated according to the direction of the Project Representative. Proper pruning techniques shall be used. Do not leave stubs and do not cut the leader branch. Improper pruning shall be cause for rejection of the plant material. L. Prepare a watering circle of 2' diameter around the trunk. For conifers, extend the watering well to the drip line of the tree canopy. Place mulch around the planted trees. 3.4 TURF - SOD LAYING A. Top Soil Amendments: Prior to laying sod, commercial fertilizer shall be applied and incorporated into the upper four (4) inches of the topsoil at a rate of four pounds of nitrogen per one thousand (1,000) square feet. Adjust fertilization mixture and rate of application as needed to meet recommendations given by topsoil analysis. Include other amendments as required. B. Fertilization: Three weeks after sod placement fertilize the turf at a rate of ½ pound of nitrogen per 1000 square feet. Use fertilizer specified above. Adjust fertilization mixture and rates to meet recommendations given by topsoil analysis. C. Sod Availability and Condition: The Contractor shall satisfy himself as to the existing conditions prior to any construction. The Contractor shall be fully responsible for furnishing and lay all sod required on the plans. He shall furnish new sod as specified above and lay it so as too completely satisfy the intent and meaning of the plans and specification at no extra cost to the owner. In the case of plans and specification at no extra cost to the owner. In the case of any discrepancy in the amount of sod to be removed or amount to be used, it shall be the Contractor's responsibility to report such to the Project Representative prior to commencing the work. D. Sod Laying: The surface upon which the new sod to be laid will be prepared as specified above. Areas where sod is to be laid shall be cut trimmed, or shaped to receive full width sod (minimum twelve (12) inches). No partial strip or pieces will be accepted. E. Sod shall be tamped lightly as each piece is set to insure that good contact is made between edges and also the ground. Sod laid on any sloped areas shall be anchored with wooden dowels or other materials which are accepted by the grass sod industry. F. Apply water directly after laying sod. Rainfall is not acceptable. G.Watering of the sod shall be the complete responsibility of the Contractor by whatever means necessary to establish the sod in an acceptable manner to the end of the Maintenance period. If an irrigation system is in place on the site, but for whatever reason, water is not available in the system. It is the responsibility of the Contractor to water the sod by whatever means, until the sod is accepted by the Project Representative. H.Protection of the newly laid sod shall be the complete responsibility of the Contractor. The Contractor shall provide acceptable visual barriers, to include barricades set appropriate distances with strings or tapes between barriers, as an indication of new work. The Contractor is to restore any damaged areas caused by others (including vehicular traffic), erosion, etc, until such time as the lawn is accepted by the Owner. I. All sod that has not been laid within 24 hours shall be deemed unacceptable and will be removed from the site. 3.5 WEED BARRIER A.Cut a slit or x at each plant location no larger than necessary to install plant. B. Overlap rows of fabric min. 6” C. Stable fabric edges and overlaps to ground. END OF SECTION LANDSCAPE PLAN SPECIFICATIONS NO. REVISION DATE 1 2 3 4 5 6 7 02-12-2017 ID17008 ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 LP1.19 LP1.20 LP1.22 LP1.21 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 16 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 25 2" CAL. MODERATE'EMERALD QUEEN' MAPLE FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 18 2" CAL. LOW'AUTUMN PURPLE' SITE MATERIALS (TOTALS FOR WHOLE SITE) PRELIMINARY CODE 5.10.90. LANDSCAPING PER UNIT. THE INTENT IS TO HAVE A VARIETY OF PLANT MATERIALS TO GIVE COLOR AND TEXTURE; TO DIRECT TRAFFIC; TO FRAME VIEWS; AND TO SCREEN UNDESIRABLE VIEWS. a.MINIMUM. A MINIMUM OF THREE (3), ONE AND ONE-HALF (1½”) INCH CALIPER DECIDUOUS TREES OR FOUR (4') FEET TALL EVERGREEN TREES, AND FOUR (4) SHRUBS SHALL BE PLANTED FOR EACH LOT IN A PUD SUBDIVISION, AS WELL AS BUILDING FOUNDATION PLANTING OF APPROPRIATE SHRUBS, FLOWERS, OR GROUND COVERS. b.DESIGN THEME. LANDSCAPING IN THE PARK STRIP IN THE STREET RIGHT-OF-WAY SHALL HAVE A UNIFIED DESIGN THEME IN PUD SUBDIVISIONS. MULTIPLE FAMILY PUD'S SHALL PROVIDE A MINIMUM OF ONE (1) DECIDUOUS OR EVERGREEN TREE PER TWO (2) UNITS, AND TWO (2) SHRUBS PER UNIT. c.LANDSCAPE PLAN. APPLICANT MAY PROVIDE A LANDSCAPE PLAN THAT VARIES FROM THESE REQUIREMENTS TO THE PLANNING AND ZONING COMMISSION FOR APPROVAL AS MEETING THE “SPIRIT” OF THE REQUIREMENTS. d.DECIDUOUS TREES. THE PLACEMENT AND TYPES OF DECIDUOUS TREES SHALL TAKE INTO CONSIDERATION USE OF THE TREES FOR SUMMER COOLING AND WINTER SOLAR ACCESS. e.EVERGREEN TREES. EVERGREEN TREES SHOULD BE USED AS WINDBREAKS, SCREENING, AND ACCENT PLANTINGS. f. WATER CONSERVATION. THE MAJORITY OF NEW PLANT MATERIAL USED FOR LANDSCAPING THE DEVELOPMENT SHOULD BE WATER CONSERVING PLANTS. THE LANDSCAPING DESIGN SHALL LOCATE PLANT MATERIALS IN SIMILAR WATER USAGE DEMAND ZONES TO INSURE PROPER IRRIGATION COVERAGE AND REDUCE WASTEFUL IRRIGATION COVERAGE AND REDUCE WASTEFUL WATERING. NATIVE PLANTS ARE PREFERRED. SITE REQUIREMENT CALCULATIONS LANDSCAPE REQUIREMENTS REQ'D:PROVIDED: RE-LANDSCAPED AREA 100% STREET TREE BOULEVARD: 1 TREE /50 LINEAR FT. 31 EACH SIDE 31/SIDE YELLOWSTONE HIGHWAY - BERM WITH TREES FOR DESIGN INTENT 56 BUILDING TREE/SHRUB CALCULATIONS TYPE A 15 / 60 16 TYPE B 10 / 40 16 TYPE 1 2 / 8 6 TYPE 2 3 / 12 6 TYPE 3 4 / 14 6 SINGLE FAMILY LOTS 1 STREET TREE/LOT LINE TRASH ENCLOSURES: SCREENING WALL WITH VEGETATION TO SCREEN STRUCTURE LANDSCAPE POINTS SHADE TREES. AREAS WITH FIVE (5) OR MORE UNCOVERED PARKING STALLS ARE DESIGNED TO INCLUDE MINIMUM TWO (2”) INCH CALIPER TREES LOCATED IN SUCH A MANNER AS TO SHADE FIFTY (50%) PERCENT OF THE PARKING AREA UPON MATURATION OF THE TREES EXTRA TREES. DESIGN AND PLANTING MORE THAN THE MINIMUM NUMBER OF TREES, SHRUBS, AND PERENNIALS PER DWELLING UNIT IN THE DEVELOPMENT. (UP TO 20 POINTS) SOFTEN FENCE APPEARANCE. AREAS WHICH ARE TO BE SCREENED USE A SOLID NON-SEE-THROUGH WOOD OR MASONRY FENCE AND LANDSCAPING WHICH ACTS TO SOFTEN THE APPEARANCE OF THE FENCE. LANDSCAPING MAY BE VINES, SHRUBS, OR TREES. (UP TO 15 POINTS) DESIGNED PLAN. OPEN GREEN SPACE IS DESIGNED (NOT LEFT OVER SPACE BETWEEN BUILDINGS) AND FLOWS UNINTERRUPTED THROUGH THE ENTIRE DEVELOPMENT LINKING DWELLINGS AND RECREATION AMENITIES. (UP TO 25 POINTS) MULTIPLE USE. STORM WATER DETENTION FACILITIES ARE DESIGNED AND USED FOR MULTIPLE PURPOSES WHICH BLEND WITH THE OVERALL THEME OF THE OPEN SPACE DESIGN I.E., SHAPE OF THE AREA IS FREE FLOWING, THE GRADING AND LANDSCAPING ARE CARRIED OUT IN SUCH A MANNER THAT THE USE AS A DETENTION POND IS NOT DISCERNIBLE. (UP TO 20 POINTS) NATIVE PLANTS. NATIVE PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 15 POINTS) DROUGHT TOLERANT PLANTS. DROUGHT TOLERANT PLANTS ARE USED FOR COMMON OPEN SPACE ELEMENTS. (UP TO 10 POINTS) S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS 6 8 . 0 ' SD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW S D D 40' CLEAR VIEW AREA FA'AFA'A FA'AA'A A'A 'A FA'A'A FA'AA'A FA'A FA'A FA'A FA'A ZS ZS ZS ZS ZS ZS ZS ZS AP'EAP'EAP'EAP'EAP'EAP'E PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.19 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 16 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 25 2" CAL. MODERATE'EMERALD QUEEN' MAPLE FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 18 2" CAL. LOW'AUTUMN PURPLE' SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS 7 9 . 0 ' SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW FA'A FA'A FA'A FA'A ZS ZS ZS ZS ZS ZS ZS ZS AP'EAP'EAP'EAP'EAP'E AP'E PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.20 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 16 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 25 2" CAL. MODERATE'EMERALD QUEEN' MAPLE FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 18 2" CAL. LOW'AUTUMN PURPLE' SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' SSSSSSSSSSSS 68.0' RIT A J A N E & G E R A L D J E P P E S E N W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWW FA'A FA'A AP'E AP'E AP'E PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.21 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 16 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 25 2" CAL. MODERATE'EMERALD QUEEN' MAPLE FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 18 2" CAL. LOW'AUTUMN PURPLE' SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS 6 8 . 0 ' 68.0 68.0' S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWW FA'A FA'A FA'AFA'A FA'A FA'A FA'A FA'A FA'AFA'A FA'A FA'A AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E AP'E PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. LP-1.22 NO. REVISION DATE 1 2 3 4 5 6 7 PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com N 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 SYMBOL SITE MATERIAL QUANTITY SPECIAL NOTES 3/4" OQUIRRH GRAVEL 5,480 SQ.FT. (67 CU.YD) LOCATED WHERE SPECIFIED (DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS) LAWN (SOD) AREA 9,200 SQ.FT. DROUGHT TOLERANT VARIETY*SEE NOTE BELOW TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES 1. LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES OF ALL MATERIALS FOR BIDDING AND INSTALLATION PURPOSES. IF DISCREPANCIES EXIST, THE PLAN SHALL DICTATE QUANTITIES TO BE USED. 2. PLANT MATERIAL TO BE INSTALLED PER PLANT LEGEND. IF SUBSTITUTIONS ARE WANTED, PROPOSED LANDSCAPE CHANGES MUST BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO PLANTING. 3. NEW LAWN AREAS TO BE SODDED WITH DROUGHT TOLERANT VARIETY. FINE LEVEL ALL AREAS PRIOR TO LAYING SOD. 4. SANDY LOAM TOPSOIL TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 6" TOPSOIL (WITH 2" HUMUS MIXED INTO TOPSOIL PRIOR TO SPREADING) IN ALL NEW PLANTER AREAS AND 4" IN ALL NEW LAWN AREAS. PLANTER BEDS TO BE EXCAVATED AS NECESSARY IN ORDER TO ACCOMMODATE NEW TOPSOIL AND/OR PLANTER BED MULCH TO REACH FINISHED GRADE. 5. 4"X6" EXTRUDED CONCRETE MOW CURB TO BE INSTALLED BETWEEN ALL LAWN AND PLANTER AREAS PER PLAN. ANY TREES LOCATED IN LAWN MUST HAVE A 4' CONCRETE TREE RING. 6. DeWitt 5 OZ. WEED BARRIER FABRIC TO BE INSTALLED IN ALL PLANTER AREAS EXCEPT UNDER ANNUAL PLANTING AREAS AS SHOWN ON PLAN. 7. ROCK MULCH TO BE IMPLEMENTED AT THE FOLLOWING DEPTHS: 4" IN ALL TREE, SHRUB, AND PERENNIAL PLANTER AREAS; ANNUAL PLANTING AREAS AS SHOWN ON PLAN TO RECEIVE 4" OF SOIL AID MATERIAL. PULL BARK MULCH MIN. 3" AWAY FROM BASE OF ALL PERENNIALS AND SHRUBS AND MIN. 6" AWAY FROM ALL TREES. 8. CONTRACTOR TO PROVIDE NEW AUTOMATIC UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED IN ALL LANDSCAPE AREAS. ALL LAWN AREA TO RECEIVE 100% HEAD TO HEAD COVERAGE WITH SPRAY AND ROTARY SPRINKLER HEADS. ALL PLANTER AREAS NEED TO RECEIVE A FULL DRIP SYSTEM TO EACH TREE AND SHRUB ON PROJECT. SEE IRRIGATION PLAN. LANDSCAPE NOTES TREE LEGEND SYMBOL BOTANICAL NAME COMMON NAME QTY. SIZE HYDROZONE SPECIAL NOTES ZS ZELKOVA SERRATA JAPANESE 16 2" CAL LOWZELKOVA AP'E ACER PLATANOIDES EMERALD QUEEN 25 2" CAL. MODERATE'EMERALD QUEEN' MAPLE FA'A FRAXINUS AMERICANA AUTUMN PURPLE ASH 18 2" CAL. LOW'AUTUMN PURPLE' SITE MATERIALS (TOTALS FOR WHOLE SITE) GRAPHIC SCALE: 1" =20' 80'40'20'10'0' CALL BEFORE YOU DIG. IT'S FREE AND IT'S THE LAW DIGLINE INC OF IDAHO UTILITY NOTIFICATION CENTER, INC 1-800-342-1585 www.digline.com A NOT TO SCALE PKJ DESIGN GROUP NOTES: 1. PLANT SO THAT THE TOP OF THE ROOT BALL IS EVEN WITH THE FINISHED GRADE. 2.BACKFILL MIX: 1/2 SANDY LOAM TOPSOIL + 1/4 ORGANIC MULCH, & 1/4 NATIVE SOILS. 3. DO NOT DAMAGE MAIN ROOTS OR DESTROY ROOT BALL WHEN INSTALLING TREE STAKES. 4. WATER THOROUGHLY AFTER INSTALLATION. 5.STAKING IS REQUIRED: LOOSEN TREE STAKES AFTER FIRST GROWING SEASON AND REMOVE TREE STAKES AFTER SECOND GROWING SEASON. 6. OVER EXCAVATE PITS TO 3' DEPTH AND INSTALL ADDITIONAL COMPACTED TOPSOIL UNDER TREE. 7. PULL MULCH A MINIMUM OF 6" AWAY FROM TRUNK OF TREE. 8. LEAVE PLANT I.D. TAGS ON THE TREES UNTIL ACCEPTANCE BY THE OWNER. AFTER FINAL ACCEPTANCE, REMOVE I.D. TAGS. CINCH TIES 1" DIA. 2" DIA. ROUND FIR POSTS; 2 PER TREE MAINTAIN TREE BASE AT OR SLIGHTLY HIGHER THAN EXISTING GRADE, TO ALLOW FOR SETTLEMENT MULCH PER PLAN, CREATE WATER BASIN AROUND TREE FINISHED GRADE CUT AND REMOVE ALL BURLAP AND WIRE FROM TOP 1/3 OF B&B ROOT BALL BACKFILL MIX AS SPECIFIED BELOW SCARIFY PIT BOTTOM (MIN. 6") 2 X BALL DIA. DECIDUOUS TREE PLANTING DETAIL TRUNK CALIPER SHALL MEET ANSI Z60 CURRENT EDITION FOR ROOT BALL SIZE. ROUND-TOPPED SOIL BERM 4" HIGH X 8" WIDE ABOVE ROOT BALL SURFACE SHALL BE CENTERED ON THE DOWNHILL SIDE OF THE ROOT BALL FOR 240°. BERM SHALL BEGIN AT ROOT BALL PERIPHERY. ORIGINAL GRADE. BOTTOM OF ROOT BALL RESTS ON EXISTING OR RECOMPACTED SOIL. ORIGINAL SLOPE SHOULD PASS THROUGH THE POINT WHERE THE TRUNK BASE MEETS SUBSTRATE/SOIL. 3" LAYER OF MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). MODIFIED SOIL. DEPTH VARIES. (SEE SOIL PREPARATION PLAN OR SPECIFICATION). ROOT BALL MODIFIED AS REQUIRED. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. NOTES: 1- TREES SHALL BE OF QUALITY PRESCRIBED IN CROWN OBSERVATIONS AND ROOT OBSERVATIONS DETAILS AND SPECIFICATIONS. 2- SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. TOP OF ROOT BALL SHALL BE FLUSH WITH FINISHED GRADE 3" LAYER OF MULCH. NO MORE THAN 1" OF MULCH ON TOP OF ROOT BALL. (SEE SPECIFICATIONS FOR MULCH). TRUNK CALIPER SHALL MEET ANSI Z60 CURRENT EDITION FOR ROOT BALL SIZE. CENTRAL LEADER. (SEE CROWN OBSERVATION DETAILS). ROOT BALL MODIFIED AS REQUIRED. ROUND-TOPPED SOIL BERM 4" HIGH X 8" WIDE ABOVE ROOT BALL SURFACE SHALL BE CENTERED ON THE DOWNHILL SIDE OF THE ROOT BALL FOR 240°. BERM SHALL BEGIN AT ROOT BALL PERIPHERY. FINISHED GRADE. MODIFIED SOIL. DEPTH VARIES. (SEE SOIL PREPARATION PLAN) EXISTING SOIL. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. BOTTOM OF ROOT BALL REST ON EXISTING OR RECOMPACTED SOIL. TREE w/ BERM (EXISTING SOIL MODIFIED) NOTES: 1- TREES SHALL BE OF QUALITY PRESCRIBED IN CROWN OBSERVATIONS AND ROOT OBSERVATIONS DETAILS AND SPECIFICATIONS. 2- SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. EVERGREEN TREE PLANTING DETAIL NOTES: 1. PLANT SO THAT THE TOP OF THE ROOT BALL IS EVEN WITH THE FINISHED GRADE. 2.BACKFILL MIX: 1/2 SANDY LOAM TOPSOIL + 1/4 ORGANIC MULCH, & 1/4 NATIVE SOILS. 3. DO NOT DAMAGE MAIN ROOTS OR DESTROY ROOT BALL WHEN INSTALLING TREE STAKES. 4. WATER THOROUGHLY AFTER INSTALLATION. 5.STAKING IS REQUIRED: LOOSEN TREE STAKES AFTER FIRST GROWING SEASON AND REMOVE TREE STAKES AFTER SECOND GROWING SEASON. 6. OVER EXCAVATE PITS TO 3' DEPTH AND INSTALL ADDITIONAL COMPACTED TOPSOIL UNDER TREE. 7. PULL COBBLE ROCK A MINIMUM OF 6" AWAY FROM TRUNK OF TREE. 8. LEAVE PLANT I.D. TAGS ON THE TREES UNTIL ACCEPTANCE BY THE OWNER. AFTER FINAL ACCEPTANCE, REMOVE I.D. TAGS. 2 X BALL DIA. CINCH TIES 1" DIA. MULCH PER PLANS FORM WATER BASIN 32"X4"X24" PRESS TREATED STAKES - TOP OF STAKE 6" ABOVE GROUND SPECIFIED BACKFILL MIX WATER & TAMP TO REMOVE AIR POCKETS 3'-4' SPREAD 1 3 H E I G H T OF T R E E HE I G H T V A R I E S NOTES: 1. IF PLANT IS BALL & BURLAP, CUT AND REMOVE TOP 1/3 OF BURLAP FROM ROOT BALL. 2. IF PLANT IS CONTAINERIZED, SCARIFY ROOT BALL PRIOR TO PLANTING. 3. BACKFILL MIX: 1/2 SANDY LOAM + 1/4 ORGANIC MULCH + 1/4 NATIVE SOILS IF NATIVE SOILS ARE SUITABLE. 4. DO NOT DAMAGE MAIN ROOTS OR DESTROY ROOT BALL WHEN INSTALLING TREE STAKES. 5. WATER THOROUGHLY AFTER INSTALLATION. 8. LEAVE PLANT I.D. TAGS ON THE TREES UNTIL ACCEPTANCE BY THE OWNER. AFTER FINAL ACCEPTANCE, REMOVE I.D. TAGS. MULCH, PER PLANS.FORM WATER BASIN WITH 3" CONTINUOUS RIM - REQ'D SPECIFIED BACKFILL MIX. WATER & TAMP TO REMOVE AIR POCKETS - REQ'D 2 X BALL DIA. SHRUB PLANTING DETAIL PLANTING SOIL MIXTURE FINISHED GRADEMULCH SEE PLANTING SCHEDULE FOR ON CENTER SPACING 1' M I N . E Q .EQ. PLAN SECTION VIEW 6" m i n . GROUNDCOVER PLANTS TO BE TRIANGULARLY SPACED. MULCH. PAVEMENT. EXISTING SOIL. MODIFIED SOIL. DEPTH VARIES. (SEE SPECIFICATIONS FOR SOIL MODIFICATION). FINISHED GRADE. 2-3" THICK LAYER OF MULCH. NOTES: 1- SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES, SIZE, AND SPACING DIMENSION. 2- SMALL ROOTS (1 4" or less) THAT GROW AROUND, UP, OR DOWN THE ROOT BALL PERIPHERY ARE CONSIDERED A NORMAL CONDITION IN CONTAINER PRODUCTION AND ARE ACCEPTABLE HOWEVER THEY SHOULD BE ELIMINATED AT THE TIME OF PLANTING. ROOTS ON THE PERIPHERY CAN BE REMOVED AT THE TIME OF PLANTING. (SEE ROOT BALL SHAVING CONTAINER DETAIL). 3- SETTLE SOIL AROUND ROOT BALL OF EACH GROUNDCOVER PRIOR TO MULCHING. MULCH PER PLANS 12" RADIUS, BOTH SIDES NEW TURF PER PLAN SCREENED & AMENDED TOPSOIL COMPACTED AGGREGATE BASE UNDER CURBING 85% COMPACTED SOIL UNDER AGGREGATE BASE NOTE: 1. PROVIDE CONTROL JOINT IN CONCRETE EDGE AT 10' INTERVALS, PROVIDE EXPANSION JOINTS EVERY 30'. 6" 4" 1" - 2 " B NOT TO SCALE PKJ DESIGN GROUP TREE ON SLOPE 5% (20:1) TO 50% (2:1) C NOT TO SCALE PKJ DESIGN GROUP D NOT TO SCALE PKJ DESIGN GROUP E NOT TO SCALE PKJ DESIGN GROUP F NOT TO SCALE PKJ DESIGN GROUP G NOT TO SCALE PKJ DESIGN GROUP H NOT TO SCALE PKJ DESIGN GROUP I NOT TO SCALE PKJ DESIGN GROUP J NOT TO SCALE PKJ DESIGN GROUP K NOT TO SCALE PKJ DESIGN GROUP L NOT TO SCALE PKJ DESIGN GROUP PERENNIAL PLANTING GROUNDCOVER CONCRETE MOWCURB DETAIL MULCH DETAIL FINISH GRADE WHERE BOULDER RETAINS GRADE BOULDER FINISH GRADE BOULDER FINISH GRADE NOTE: PLACE ALL BOULDERS SUCH THAT 1/4 OF THE TOTAL MASS OF EACH BOULDER IS BELOW FINISH GRADE. GROUP BOULDERS SO AS TO APPEAR NATURAL. CUT FABRIC SO THAT BOULDER CAN REST ON TOP OF FABRIC. DO NOT REMOVE FABRIC FROM UNDER THE BOULDERS. BOULDER PLACEMENT DETAIL SOD LAYING DETAIL NOTES: . 1. ENSURE FINISH GRADE IS 1"- 2" BELOW TOP OF CURB, WALK, OR EDGING. 2. TURF IS THE MOST HEALTHY AND WATER EFFICIENT WHEN MOWED AT A MIN. HEIGHT OF 2" - 2 1 2". CONCRETE CURB, SIDEWALK OR EDGING - SEE PLAN SOD BASE OR ROOT AREA 4" DEPTH OF TOPSOIL UNDER SOD CROSS RIP OR TILL SUBGRADE AGGREGATE BASE SUBGRADE COMPACTED TO 85% RELATIVE DENSITY 3/ 4 " S O D T H I C K N E S S 4" 2" 6" COBBLE ROCK AND WEED BARRIER DETAIL FINISHED SURFACE OF ADJACENT CONCRETE SIDEWALK, CURB, OR OTHER HARDSCAPE ELEMENT PER PLAN. FINISH GRADE OF ROCK TO BE 1-1/2" BELOW TOP OF ADJACENT CONCRETE SURFACE, SEE PLANS. BOULDER - SEE DETAIL 'J', THIS SHEET. ROCK PER PLANS. LANDSCAPE WEED BARRIER FABRIC. UNDISTURBED SOIL NOTES: 1. KEEP TOP OF COBBLE ROCK 1 1 2" BELOW ADJACENT WALKS AND CURBS. DO NOT ALLOW COBBLE ROCK TO TOUCH THE TRUNK OF ANY PLANT. INSTALL COBBLE ROCK AFTER INSTALLATION OF WEED BARRIER FABRIC AND PLANT MATERIAL. 2. CONTRACTOR TO ENSURE THAT TOP OF WEED BARRIER FABRIC IS FREE OF SOILS AND DEBRIS PRIOR TO PLACING COBBLE ROCK. 3. SEE LANDSCAPE PLANS FOR ROCK TYPE AND DEPTH. 4. COBBLE ROCK TO BE SCREENED AND WASHED PRIOR TO INSTALLATION. 1- 1 / 2 " M I N . C L E A R A N C E FINISHED SURFACE OF ADJACENT CONCRETE SIDEWALK, CURB, OR OTHER HARDSCAPE ELEMENT PER PLAN FINISH GRADE OF SHREDDED BARK MULCH TO BE 1"-11 2" BELOW TOP OF ADJACENT CONCRETE SURFACE 3" DEPTH OF MULCH DEWITT 5 OZ WEED BARRIER FABRIC UNDISTURBED SOIL 1" M I N . C L E A R A N C E 3" LP-2.5 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION DEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE LANDSCAPE PLAN NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018 LANDSCAPE ARCHITECT / PLANNER NO. REVISION DATE 1 2 3 4 5 6 7 02-12-2017 ID17008 472 NORTH YELLOWSTONE HWY REXBURG, IDAHO THOMSON FARMS STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 I R R I G A T I O N L E G E N D M A S T E R V A L V E F L O W S E N S O R G P M Q T H T T T Q F . 1 0 . 2 6 . 3 9 . 6 5 . 9 2 . 1 5 . 3 5 . 5 3 . 8 7 1 . 2 3 . 2 0 . 5 2 . 7 9 1 . 3 0 1 . 8 5 n a n a n a 1 . 7 4 2 . 4 8 n a n a n a 1 . 9 5 2 . 7 8 . 4 0 1 . 0 5 1 . 5 8 2 . 6 0 3 . 7 0 5 ' 3 0 8 ' 3 0 1 0 ' 3 0 1 2 ' 3 0 1 5 ' 3 0 U S E H E - V A N N O Z Z L E S A S N E C E S S A R Y U S E H E - V A N N O Z Z L E S A S N E C E S S A R Y U S E H E - V A N N O Z Z L E S A S N E C E S S A R Y U S E H E - V A N N O Z Z L E S A S N E C E S S A R Y U S E H E - V A N N O Z Z L E S A S N E C E S S A R Y S E E D E T A I L 1 0 " R N D . V A L V E B O X . S E E D E T A I L S E E D E T A I L I N S T A L L F L U S H C A P . S E E D E T A I L S E E P I P E S I Z I N G C H A R T S E E D E T A I L S E E D E T A I L S E E D E T A I L R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 1 0 U - S E R I E S R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 8 U - S E R I E S R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 5 S E R I E S R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 1 2 U - S E R I E S R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 1 5 U - S E R I E S W A L L M O U N T . C O O R D I N A T E W I T H O W N E R F O R E X A C T L O C A T I O N Q U I C K C O U P L E R : R A I N B I R D 4 4 L R C I N S T A L L P E R M A N U F A C T U R E R ' S S P E C . C O N T R O L L E R : R A I N B I R D E S P - L X D C O N T R O L L E R W I T H L I M R R E M O T E K I T , P L A C E I N L X M M P E D I S T A L , C O N T R A C T O R T O A D J U S T L O C A T I O N W I T H O W N E R P R I O R T O C O N S T R U C T I O N . I S O L A T I O N B A L L V A L V E - L I N E S I Z E D I N S T A L L P E R M A N U F A C T U R E R ' S S P E C . R E M O T E C O N T R O L V A L V E : R A I N B I R D P E S B - N P - P R S - D A U T O M A T I C C O N T R O L V A L V E ( S I Z E A S N O T E D O N P L A N ) D R I P C O N T R O L Z O N E K I T : R A I N B I R D X C Z - ( P E R P L A N ) - P R B R - C O M M E D F L O W ( S I Z E A S N O T E D O N P L A N ) L O O P M A I N L I N E : S C H E D U L E 4 0 P V C W I T H S C H E D U L E 8 0 F I T T I N G S , 4 " D I A M E T E R 2 4 " M I N . C O V E R L A T E R A L L I N E : S C H E D U L E 4 0 P V C W I T H S C H . 4 0 F I T T I N G S . S E E P I P E S I Z I N G C H A R T C L A S S 2 0 0 S L E E V E P E R P L A N W I R E C H A S E , S I Z E T O B E T W I C E T H E D I A M E T E R O F T H E W I R E B U N D L E W I T H I N . 1 . 1 / 4 " D I A M E T E R M I N I M U M N O T S H O W N D R I P C O N N E C T I O N . P R O V I D E D R I P I R R I G A T I O N T O A L L T R E E S , S H R U B S , A N D P E R E N N I A L S I N P L A N T E R A R E A S S E E D E T A I L Q T Y - - - - - - - - - - S E E D E T A I L N O T S H O W N Q , T , H , T T , T Q , F Q , T , H , T T Q , T , H , F Q , T , H , F Q , T , H , F S E E D E T A I L ' C ' - - - - - - - - - - - - - - - - - - - - - - - - - - - - R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 1 5 S S T R A I N B I R D R D 0 4 - S - P R S P O P U P S P R A Y 1 5 E S T 1 . 2 1 . 6 1 3 0 3 0 1 5 ' 1 5 ' S S T E S T D R I P L I N E : R A I N B I R D X F S P - 0 9 - 1 8 - 1 0 0 O R E Q U I V A L E N T J U M B O B O X - P U R P L E L I D 1 4 G A U G E S O L I D C O P P E R S I N G L E S T R A N D C O N T R O L W I R E . I N S T A L L P E R M A N U F A C T U R E R ' S S P E C . P R O V I D E 2 W I R E L O O P S Y S T E M . R R A I N B I R D W R 2 - R C W I R E L E S S R A I N S H U T O F F D E V I C E S E E D E T A I L - - S E E D E T A I L - - S E E D E T A I L - - S E E D E T A I L - - L L I G H T N I N G A R R E S T E R ( A T A L L V A L V E G R O U P I N G S ) I N S T A L L P E R M A N U F A C T U R E R ' S S P E C . D E C V A L V E D E C O D E R ( A T A L L V A L V E G R O U P I N G S ) I N S T A L L P E R M A N U F A C T U R E R ' S S P E C . - - - - 2 " T S U P E R A M I A D P L A S T I C F I L T E R - I N S T A L L P E R M A N U F A C T U R E ' S . R E C O M M E N D A T I O N S ( 1 3 0 M I C R O N ) P O I N T O F C O N N E C T I O N ( S E C O N D A R Y W A T E R ) S E E P L A N F O R S I Z E G P M R A I N B I R D 8 0 0 5 S E R I E S # 8 , # 1 4 , # 2 6 N O Z Z L E S 6 5 ' 3 0 Q , T , H , F n a n a 6 . 6 D R I P Z O N E 1 8 " 1 8 " 1 8 - 2 1 I N . . 9 G P H X F S - 0 9 - 1 8 X F S P D R I P L I N E T O T A L D R I P Z O N E F L O W 2 0 G P M M A X I M U M L A T E R A L L E N G T H O F T U B I N G 3 5 0 F T T O T A L L E N G T H O F Z O N E D R I P L I N E A P P L I C A T I O N R A T E . 6 4 I N C H P E R H O U R T I M E T O A P P L Y 1 / 4 " O F W A T E R 2 3 R E Q U I R E D N U M B E R O F S T A K E S 5 0 0 N U M B E R O F F L U S H P O I N T S S U G G E S T E D H E A D E R A N D F O O T E R P I P E S I Z E 2 C L A S S 2 0 0 1 1 / 4 " 2 , 0 0 0 F T ( v a r i e s p e r p l a n ) S U B - M A I N L I N E : S C H E D U L E 4 0 P V C W I T H S C H E D U L E 8 0 F I T T I N G S , 2 " D I A M E T E R 2 4 " M I N . C O V E R S E E P I P E S I Z I N G C H A R T 1 2 . 6 2 4 . 3 v a r i e s D R I P R W S - S - B - 1 4 0 1 ( R O O T W A T E R I N G S Y S T E M ) P R O V I D E 2 T O E A C H T R E E L O C A T E D I N T H E L A W N A R E A S . R A I N B I R D 5 0 0 0 S E R I E S M P R N O Z Z L E S v a r i e s 3 0 Q , T , H , F n a n a v a r i e s v a r i e s v a r i e s v a r i e s - - S E E D E T A I L S E E D E T A I L S E E D E T A I L S E E D E T A I L * N U M B E R S M A Y C H A N G E D U E T O S I Z E O F D R I P Z O N E P E R P L A N P R E L I M I N A R Y P L A N S N O T F O R C O N S T R U C T I O N N O T F O R C O N S T R U C T I O N N 2 / 1 2 / 2 0 1 8 PROJECT IN F O R M A T I O N L A N D S C A P E A R C H I T E C T / P L A N N E R D E V E L O P E R / P R O P E R T Y O W N E R / C L I E N T ISSUE DATE I R R . P E R F O R M A N C E S P E C 3 4 5 0 N . T R I U M P H B L V D . S U I T E 1 0 2 L E H I , U T A H 8 4 0 4 3 ( 8 0 1 ) 9 6 0 - 2 6 9 8 w w w . p k j d e s i g n g r o u p . c o m P K J D E S I G N G R O U P L . L . C . I R - C O V E R NO.REVISIONDATE1234567 XX-XX-XX XXXX P M : D R A W N : C H E C K E D : J T A K B A T M PLAN INFORMATIONPROJECT NUMBER L I C E N S E S T A M P GRAPHIC SCALE: 1" =100'400'200'100'50'0' P L O T D A T E : D e v e l o p e r / P r o p e r t y O w n e r : C l i e n t / E n g i n e e r : BLUE STAKES OF UTAHUTILITY NOTIFICATION CENTER, INC1-800-662-4111www.bluestakes.org T H O M S O N F A R M S R E X B U R G , I D A H O 4 7 2 N O R T H Y E L L O W S T O N E H W Y . R E X B U R G , I D A H O ID17008 T H O M S O N F A R M S 02-12-2018 IRRIGATION SPECIFICATIONSPART I - GENERAL1.1SUMMARYWORK TO BE DONE INCLUDES ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES REQUIRED TO COMPLETE THEPROJECT IRRIGATION SYSTEM AS INDICATED ON THE CONSTRUCTION DRAWINGS, AND AS SPECIFIED HEREIN. INCLUDESBUT IS NOT LIMITED TO: FURNISHING AND INSTALLING UNDERGROUND AND ABOVE GROUND SPRINKLER SYSTEMCOMPLETE WITH ANY ACCESSORIES NECESSARY FOR PROPER FUNCTION AND OPERATION OF THE SYSTEM. ALL PLANTMATERIAL ON THE PROJECT SHALL BE IRRIGATED. REMOVAL AND DISPOSAL OF ANY EXISTING SPRINKLER SYSTEMCOMPONENTS ARE NOT TO BE SAVED, WHICH ARE DISTURBED DURING THE CONSTRUCTION PROCESS. RESTORATION OFANY ALTERED OR DAMAGED EXISTING LANDSCAPE TO ORIGINAL STATE AND CONDITION. CONTRACTOR TO FOLLOWWORK SCOPE AND MASTER SERVICE AGREEMENT FOR ALL WARRANTY INSTALLATION SERVICE AND MAINTENANCEREQUIREMENTS.1.2SYSTEM DESCRIPTIONA.DESIGN OF IRRIGATION COMPONENTS: LOCATIONS OF IRRIGATION COMPONENTS ON CONSTRUCTION DRAWINGSMAY BE APPROXIMATE. PIPING, SLEEVING AND/OR OTHER COMPONENTS SHOWN ON CONSTRUCTION DRAWINGSMAY BE SHOWN SCHEMATICALLY FOR GRAPHIC CLARITY AND DEMONSTRATION OF COMPONENT GROUPINGS ANDSEPARATIONS. ALL IRRIGATION COMPONENTS SHALL BE PLACED IN LANDSCAPED AREAS, WITH THE EXCEPTION OFPOPE AND WIRE IN SLEEVING UNDER HARDSCAPES. ACTUAL ROUTING OF PIPE, WIRE OR OTHER COMPONENTS MAY BEALTERED DUE TO SITE CONDITIONS NOT ACCOUNTED FOR IN THE DESIGN PROCESS.B.CONSTRUCTION REQUIREMENTS: ACTUAL PLACEMENT MAY VARY AS REQUIRED TO ACHIEVE A MINIMUM OF 100%COVERAGE WITHOUT OVERSPRAY ONTO HARDSCAPE, BUILDINGS OR OTHER FEATURES.C.LAYOUT OF IRRIGATION COMPONENTS: DURING LAYOUT AND STAKING, CONSULT WITH OWNER APPROVEDREPRESENTATIVE (HEREAFTER REFERRED TO AS OAR) TO VERIFY PROPER PLACEMENT OF IRRIGATION COMPONENTSAND TO PROVIDE CONTRACTOR RECOMMENDATIONS FOR CHANGES, WHERE REVISIONS MAY BE ADVISABLE. SMALLOR MINOR ADJUSTMENTS TO SYSTEM LAYOUT ARE PERMISSIBLE TO AVOID EXISTING FIELD OBSTRUCTIONS SUCH ASUTILITY BOXES OR STREET LIGHT POLES. CONTRACTOR SHALL PLACE REMOTE CONTROL VALVES IN GROUPS ASPRACTICAL TO ECONOMIZE ON QUANTITY OF MANIFOLD ISOLATION VALVES. QUICK COUPLER VALVES SHALL BEPLACED WITH MANIFOLD GROUPS AND PROTECTED BY MANIFOLD ISOLATION VALVES. QUICK COUPLER VALVES ARESHOWN ON CONSTRUCTION DOCUMENTS IN APPROXIMATE LOCATIONS.1.3DEFINITIONSA.WATER SUPPLY: SECONDARY WATER PIPING AND COMPONENTS, FURNISHED AND INSTALLED BY OTHERS TO PROVIDEIRRIGATION WATER TO THIS PROJECT, INCLUDING BUT NOT LIMITED TO SADDLES, NIPPLES, SPOOLS, SHUT OFFVALVES, CORPORATION STOP VALVES, WATER METERS, PRESSURE REGULATION VALVES, AND PIPING UPSTREAM OF(OR PRIOR TO) THE POINT OF CONNECTION.B.POINT OF CONNECTION: LOCATION WHERE THE CONTRACTOR SHALL TIE INTO THE WATER SUPPLY. MAY REQUIRESADDLE, NIPPLES, SPOOLS, ISOLATION VALVES OR STOP AND WASTE VALVE FOR LANDSCAPE IRRIGATION NEEDS ANDUSE.C.MAIN LINE PIPING: PRESSURIZED PIPING DOWNSTREAM OF THE POINT OF CONNECTION TO PROVIDE WATER TOREMOTE CONTROL VALVES AND QUICK COUPLERS. NORMALLY UNDER CONSTANT PRESSURE.D.LATERAL LINE PIPING: CIRCUIT PIPING DOWNSTREAM OF REMOTE CONTROL VALVES TO PROVIDE WATER TOSPRINKLER HEADS, SPRINKLER HEADS, DRIP SYSTEMS OR BUBBLERS.1.4REFERENCESA.THE FOLLOWING STANDARDS WILL APPLY TO THE WORK OF THIS SECTION:i.ASTM-AMERICAN SOCIETY FOR TESTING AND MATERIALSi.a.THE IRRIGATION ASSOCIATION: MAIN BMP DOCUMENT, LANDSCAPE IRRIGATION SCHEDULING AND WATERMANAGEMENT DOCUMENT.1.5SUBMITTALSA. SHALL ONLY BE REQUIRED IN JURISDICTIONS WHERE THE CITY MAINTAINS THE COMMON AREAS. OR IF REQUIRED BYTHE JURISDICTION. AT LEAST THIRTY (30) DAYS PRIOR TO ORDERING OF ANY MATERIALS, THE CONTRACTOR SHALLPROVIDE MANUFACTURER CATALOG CUT SHEET AND CURRENT PRINTED SPECIFICATIONS FOR EACH ELEMENT ORCOMPONENT OF THE IRRIGATION SYSTEM. SUBMITTALS SHALL BE IN THREE RING BINDERS OR OTHER SIMILAR BOUNDFORM. PROVIDE FIVE COPIES OF SUBMITTALS TO OAR FOR DISTRIBUTION. PLACE COVER OR INDEX SHEET INDICATINGORDER IN SUBMITTAL DOCUMENT. NO MATERIAL SHALL BE ORDERED, DELIVERED OR ANY WORK PRECEDED IN THEFIELD UNTIL THE REQUIRED SUBMITTALS HAVE NEED REVIEWED IN ITS ENTIRETY AND STAMPED APPROVED.DELIVERED MATERIAL SHALL MATCH THE APPROVED SAMPLES.B.OPERATION AND MAINTENANCE MANUAL:ii.SHALL BE LEFT ON CONTROL TIMER FOR OWNER AND REPRESENTATIVE.a.SECTION LISTING INSTRUCTIONS TO BE PROVIDED TO OWNER. A COMPUTER VIDEO LINK PER WORKSCAPE ANDMASTER SERVICE AGREEMENT FOR OVERALL SYSTEM OPERATION AND MAINTENANCE. INCLUDE DIRECTIONS FORSPRING START-UP AND WINTERIZATION.D.INSTALLER IS TO PROVIDE TO OWNER AS-BUILT DRAWINGS OF MAINLINE AND WIRE SCHEMATICS AND SLEEVING ANDZONING LOCATIONS.C.DIMENSIONS ARE TO BE TAKEN FROM PERMANENT CONSTRUCTED SURFACES, FEATURES, OR FINISHED EDGESLOCATED AT OR ABOVE FINISHED GRADE.1.6QUALITY ASSURANCEA.ACCEPTANCE: DO NOT INSTALL WORK OF THIS SECTION PRIOR TO ACCEPTANCE BY OWNER FIND OF AREA TO RECEIVESUCH WORK.B.REGULATORY REQUIREMENTS: ALL WORK AND MATERIALS SHALL BE ACCORDING TO ANY AND ALL RULES,REGULATIONS OR CODES, WHETHER THEY ARE STATE OR LOCAL LAWS AND ORDINANCES. CONTRACT DOCUMENTS,DRAWINGS OR SPECIFICATIONS MAY NOT BE CONSTRUED OR INTERPRETED TO PERMIT WORK OR MATERIALS NOTCONFORMING TO THE ABOVE CODES.C.ADEQUATE WATER SUPPLY: WATER SUPPLY TO THIS PROJECT EXISTS, INSTALLED BY OTHERS. CONNECTIONS TO THESESUPPLY LINES SHALL BE BY THIS CONTRACTOR. VERIFY THAT PROPER CONNECTION IS AVAILABLE TO SUPPLY LINE ANDIS OF ADEQUATE SIZE. VERIFY THAT SECONDARY CONNECTION COMPONENTS MAY BE INSTALLED IF NECESSARY.PERFORM STATIC PRESSURE TEST PRIOR TO COMMENCEMENT OF WORK. NOTIFY OAR IN WRITING OF PROBLEMSENCOUNTERED PRIOR TO PROCEEDING.D.WORKMANSHIP AND MATERIALS:i.IT IS THE INTENT OF THIS SPECIFICATION THAT ALL MATERIAL HEREIN SPECIFIED AND SHOWN ON THECONSTRUCTION DOCUMENTS SHALL BE OF OWNER APPROVED COMPONENTS OR EQUAL QUALITY.j.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE BEST STANDARDS OF PRACTICE RELATING TO THETRADE.E.CONTRACTOR QUALIFICATIONS:ii.INSTALLER TO BE LICENSED AND INSURED AND MEET REQUIREMENTS OF EDGE HOMES WORK SCOPE ANDMASTER SERVICE AGREEMENT (MSA)1.7DELIVERY-STORAGE-HANDLINGA.DURING DELIVERY, INSTALLATION AND STORAGE OF MATERIALS FOR PROJECT, ALL MATERIALS SHALL BE PROTECTEDFROM CONTAMINATION, DAMAGE, VANDALISM, AND PROLONGED EXPOSURE TO SUNLIGHT. ALL MATERIAL STOREDAT PROJECT SITE SHALL BE NEATLY ORGANIZED IN A COMPACT ARRANGEMENT AND STORAGE SHALL NOT DISRUPTPROJECT OWNER OR OTHER TRADES ON PROJECT SITE. ALL MATERIAL TO BE INSTALLED SHALL BE HANDLED BYCONTRACTOR WITH CARE TO AVOID BREAKAGE OR DAMAGE. DAMAGED MATERIALS ATTRIBUTED TO CONTRACTORSHALL BE REPLACED WITH NEW AT CONTRACTOR'S EXPENSE.1.8SEQUENCINGA.PERFORM SITE SURVEY, RESEARCH UTILITY RECORDS, CONTACT UTILITY LOCATION SERVICES. THE CONTRACTOR SHALLFAMILIARIZE HIMSELF WITH ALL HAZARDS AND UTILITIES PRIOR TO WORK COMMENCEMENT. CONTRACTOR SHALLVERIFY ALL SLEEVE INSTALLATION, PERFORMED BY OTHERS, IS INTACT AND IN PLACE. IF NOT, CONTACT OWNERREPRESENTATIVE. IRRIGATION SYSTEM POINT OF CONNECTION COMPONENTS, BACKFLOW PREVENTION ANDPRESSURE REGULATION DEVICES SHALL BE INSTALLED AND OPERATIONAL PRIOR TO ALL DOWNSTREAMCOMPONENTS. ALL MAIN LINES SHALL BE THOROUGHLY FLUSHED OF ALL DEBRIS PRIOR TO INSTALLATION OF ANYSPRINKLER HEADS.1.9WARRANTYA.CONTRACTOR SHALL PROVIDE ONE YEAR WARRANTY. WARRANTY SHALL COVER ALL MATERIALS, WORKMANSHIP AND LABOR. WARRANTY SHALL INCLUDE FILLING AND OR REPAIRING DEPRE S S I O N S O R R E P L A C I N G T U R F O R O T H E R PLANTINGS DUE TO SETTLEMENT OF IRRIGATION TRENCHES OR IRRIGA T I O N S Y S T E M E L E M E N T S . V A L V E B O X E S , SPRINKLERS OR OTHER COMPONENTS SETTLED FROM ORIGINAL FINIS H G R A D E S H A L L B E R E S T O R E D T O P R O P E R GRADE. IRRIGATION SYSTEM SHALL HAVE BEEN ADJUSTED TO PROVID E P R O P E R , A D E Q U A T E C O V E R A G E O F I R R I G A T E D AREAS. PER EDGE HOMES WORK SCOPE AND MASTER SERVICE AGREE M E N T / I N S T A L L E R . 1.10MAINTENANCEA.FURNISH THE FOLLOWING ITEMS TO OWNER'S REPRESENTATIVE:i.TWO QUICK COUPLER KEYS WITH HOSE SWIVELS.PART 2 - PRODUCTS2.1POINT OF CONNECTIONA.THE CONTRACTOR SHALL CONNECT ONTO EXISTING IRRIGATION OR W A T E R M A I N L I N E A S N E E D E D F O R P O I N T ( S ) O F CONNECTION. CONTRACTOR SHALL INSTALL NEW MAIN LINE AS INDIC A T E . 2.2CONNECTION ASSEMBLYA.SECONDARY WATER SHALL BE USED ON THIS PROJECT.2.3CONTROL SYSTEMA.POWER SUPPLY TO THE IRRIGATION CONTROLLER SHALL BE PROVIDED F O R B Y O W N E R . B.CONTROLLER SHALL BE AS SPECIFIED IN THE DRAWINGS. CONTROLLER S H A L L B E S U R G E P R O T E C T E D . i.INSTALLATION OF WALL-MOUNT OR PEDESTAL MOUNTED CONTROLL E R S : I R R I G A T I O N C O N T R A C T O R S H A L L B E RESPONSIBLE FOR THIS TASK. POWER CONFIGURATION FOR WALL-MO U N T O R P E D E S T A L C O N T R O L L E R S S H A L L B E 1 2 0 VAC UNLESS OTHERWISE NOTED.2.4SLEEVINGA.CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT EXISTING UNDERG R O U N D U T I L I T I E S A N D C O M P O N E N T S . S L E E V I N G MINIMUM SIZE SHALL BE 2”. SLEEVING 2” THROUGH 4” IN SIZE SHALL B E S / 4 0 P V C S O L V E N T W E L D . S L E E V I N G 6 ” A N D LARGER SHALL BE CL 200 PVC GASKETED. SLEEVE DIAMETER SHALL BE A T L E A S T T W O T I M E S T H E D I A M E T E R O F T H E PIPE WITHIN THE SLEEVE. SLEEVES SHALL BE EXTENDED 6” MINIMUM B E Y O N D W A L K O R E D G E O F P A V E M E N T . W I R E OR CABLE SHALL NOT BE INSTALLED IN THE SAME SLEEVE AS PIPING, B U T S H A L L B E I N S T A L L E D I N S E P A R A T E S L E E V E S . SLEEVE ENDS ON SLEEVE SIZES 4” AND LARGER SHALL BE CAPPED WIT H I N T E G R A L C O R R E S P O N D I N G S I Z E D P V C S L I P CAP, PRESSURE FIT, UNTIL USED, TO PREVENT CONTAMINATION. SLEE V E S S H A L L B E I N S T A L L E D A T A P P R O P R I A T E DEPTHS FOR MAIN LINE PIPE OR LATERAL PIPE.2.5MAIN LINE PIPEA.ALL MAIN LINE PIPE 4” AND LARGER SHALL BE CLASS 200 GASKETED BE L L E N D . A L L M A I N L I N E P I P E 3 ” I N S I Z E A N D SMALLER SHALL BE SCHEDULE 40 PVC SOLVENT WELD BELL END.ii.MAXIMUM FLOWS ALLOWED THROUGH MAIN LINE PIPE SHALL B E : ii.22 GPM - 1 ¼” PIPEiii.30 GPM - 1 ½” PIPEiv.50 GPM - 2” PIPEv.75 GPM 2 ½” PIPEvi.100 GPM - 3” PIPEvii.200 GPM - 4” PIPEviii.400 GPM - 6” PIPEix.MAIN LINE PIPE SHALL BE BURIED WITH 18” COVER2.6MAIN LINE FITTINGSA.ALL MAIN LINE FITTINGS 3” AND LARGER SHALL BE GASKETED DUCTILE I R O N M A T E R I A L . A L L D U C T I L E I R O N F I T T I N G S HAVING CHANGE OF DIRECTION SHALL HAVE PROPER CONCRETE THRU S T B L O C K I N S T A L L E D . A L L M A I N L I N E F I T T I N G S SMALLER THAN 1 1/2” IN SIZE SHALL BE SCHEDULE 40 PVC. FITTINGS 1 1 / 2 " - 3 " S H A L L B E S C H E D U L E 8 0 . 2.7ISOLATION VALVESA.ISOLATION VALVES 3” AND LARGER SHALL BE CAST IRON GATE VALVE, R E S I L I E N T W E D G E , P U S H O N TYPE, WITH 2” SQUARE OPERATING NUT. PLACE SLEEVE OF 6” OR LAR G E R P I P E O V E R T O P O F V A L V E V E R T I C A L L Y A N D THEN EXTEND TO GRADE. PLACE 10” ROUND VALVE BOX OVER SLEEVE A T G R A D E . B.ISOLATION VALVES 2-1/2” AND SMALLER SHALL BE BRASS BALL VALVES , C O N T A I N E D I N A S T A N D A R D S I Z E V A L V E BOX. VALVES SHALL BE INSTALLED WITH S/80 PVC TOE NIPPLES ON BO T H S I D E S O F T H E V A L V E . V A L V E S H A L L B E PLACED SO THAT THE HANDLE IS VERTICAL TOWARD THE TOP OF THE V A L V E B O X I N T H E ' O F F ' P O S I T I O N . 2.8REMOTE CONTROL VALVESA.REMOTE CONTROL VALVES SHALL BE AS SPECIFIED ON THE DRAWINGS . R E M O T E C O N T R O L V A L V E S S H A L L B E L O C A T E D SEPARATELY AND INDIVIDUALLY IN SEPARATE CONTROL BOXES.2.9MANUAL CONTROL VALVESA.QUICK COUPLER VALVE SHALL BE ATTACHED TO THE MANIFOLD SUB- M A I N L I N E U S I N G A S W I N G J O I N T A S S E M B L Y WITH SNAP-LOCK OUTLET AND BRASS STABILIZER ELBOW. QUICK COU P L E R V A L V E S H A L L B E P L A C E D W I T H I N A 10” ROUND VALVE BOX. TOP OF QUICK COUPLER VALVE COVER SHA L L A L L O W F O R C O M P L E T E I N S T A L L A T I O N O F VALVE BOX LID, BUT ALSO ALLOW FOR INSERTION AND OPERATION OF K E Y . B A S E O F Q U I C K C O U P L E R V A L V E A N D T O P OF QUICK COUPLER SWING JOINT SHALL BE ENCASED IN ¾” GRAVEL. C O N T R A C T O R S H A L L N O T P L A C E Q U I C K C O U P L E R VALVES FURTHER THAN 200 FEET APART, TO ALLOW FOR SPOT WATER I N G O R S U P P L E M E N T A L I R R I G A T I O N O F N E W PLANT MATERIAL. QUICK COUPLER VALVE AT POC SHALL NOT BE ELIMI N A T E D O R R E L O C A T E D . 2.10LATERAL LINE PIPEA.ALL LATERAL PIPING SHALL BE SCHEDULE 40 PVC, SOLVENT WELD, AN D B E L L E N D . L A T E R A L P I P E S H A L L B E B U R I E D WITH 12-18” OF COVER TYPICALLY. LATERAL PIPE SHALL BE ¾”, 1”, 1 ¼ ” , 1 ½ ” O R 2 ” I N S I Z E A S I N D I C A T E D O N CONSTRUCTION DRAWINGS.2.11LATERAL LINE FITTINGSA.ALL LATERAL LINE FITTINGS SHALL BE S/40 PVC2.12SPRAY SPRINKLERSA.SPRAY HEAD SPRINKLERS SHALL BE AS SPECIFIED ON THE DRAWINGS. N O Z Z L E S S H A L L B E A S S P E C I F I E D O N T H E DRAWINGS.2.13VALVE BOXESA.VALVE BOXES SHALL BE USED ON THIS PROJECT. SIZES ARE AS DIRECTE D I N T H E S E S P E C I F I C A T I O N S , D E T A I L S H E E T S O R PLAN SHEETS. VALVE BOXES SHALL BE CENTERED OVER THE CONTROL V A L V E O R E L E M E N T T H E Y C O V E R . V A L V E B O X SHALL BE SIZED LARGE ENOUGH TO ALLOW AMPLE ROOM FOR SERVIC E S A C C E S S , R E M O V A L O R R E P L A C E M E N T O F VALVE OR ELEMENT. VALVE BOX SHALL BE SET TO FLUSH TO FINISH GR A D E O F T O P S O I L O R B A R K E D A R E A S . CONTRACTOR SHALL PROVIDE EXTENSIONS OR STACK ADDITIONAL VA L V E B O X E S A S N E C E S S A R Y T O B R I N G V A L V E B O X PIT TO PROPER GRADE.2.14IMPORT BACKFILLA.ALL MAIN LINE PIPE, LATERAL LINE PIPE AND OTHER IRRIGATION ELEM E N T S S H A L L B E B E D D E D A N D B A C K F I L L E D W I T H CLEAN SOIL, FREE OF ROCKS 1” AND LARGER. CONTRACTOR SHALL FUR N I S H A N D I N S T A L L A D D I T I O N A L B A C K F I L L MATERIAL AS NECESSARY DUE TO ROCKY CONDITIONS. TRENCHES AND O T H E R E L E M E N T S S H A L L B E C O M P A C T E D AND/OR WATER SETTLED TO ELIMINATE SETTLING. DEBRIS FROM TRE N C H I N G O P E R A T I O N S U N - U S A B L E F O R F I L L SHALL BE REMOVED FROM PROJECT AND DISPOSED OF PROPERLY BY C O N T R A C T O R . 2.15OTHER PRODUCTSA.SUBSTITUTION OF EQUIVALENT PRODUCTS IS SUBJECT TO THE OAR'S A P P R O V A L A N D M U S T B E D E S I G N A T E D A S ACCEPTED IN WRITING.i.THE CONTRACTOR SHALL PROVIDE AND INSTALL MATERIALS TO MAK E T H E S Y S T E M C O M P L E T E A N D O P E R A T I O N A L . PART 3 - EXECUTION3.1PREPARATIONA.CONTRACTOR SHALL REPAIR OR REPLACE WORK DAMAGED BY IRRIGA T I O N S Y S T E M I N S T A L L A T I O N . I F D A M A G E D WORK IS NEW, REPLACEMENT OR THE ORIGINAL INSTALLER OF THAT W O R K S H A L L P E R F O R M R E P A I R S . T H E E X I S T I N G LANDSCAPE OF THIS PROJECT SHALL REMAIN IN PLACE. CONTRACTOR S H A L L P R O T E C T A N D W O R K A R O U N D E X I S T I N G P L A N T M A T E R I A L . C O O R D I N A T I O N O F T R E N C H A N D V A L V E L O C A T I O N S S H A L L B E L A I D O U T T H E O A R P R I O R T O A N Y E X C A V A T I O N O C C U R R I N G . P L A N T M A T E R I A L D E E M E D D A M A G E D B Y T H E O A R S H A L L B E R E P L A C E D W I T H N E W P L A N T M A T E R I A L A T C O N T R A C T O R ' S E X P E N S E . C O N T R A C T O R S H A L L N O T C U T E X I S T I N G T R E E R O O T S L A R G E R T H A N 2 ” T O I N S T A L L T H I S P R O J E C T . R O U T E P I P E , W I R E A N D I R R I G A T I O N E L E M E N T S A R O U N D T R E E C A N O P Y D R I P L I N E T O M I N I M I Z E D A M A G E T O T R E E R O O T S . C O N T R A C T O R S H A L L H A V E N O P A R T O F E X I S T I N G S Y S T E M U S E D B Y O T H E R P O R T I O N S O F S I T E L A N D S C A P E W I T H O U T W A T E R F O R W I T H O U T W A T E R F O R M O R E T H A N 2 4 H O U R S A T A T I M E . 3 . 2 T R E N C H I N G A N D B A C K F I L L I N G A . P U L L I N G O F P I P E S H A L L N O T B E P E R M I T T E D O N T H I S P R O J E C T . O V E R E X C A V A T E T R E N C H E S B O T H I N W I D T H A N D D E P T H . E N S U R E B A S E O F T R E N C H I S R O C K O R D E B R I S F R E E T O P R O T E C T P I P E A N D W I R E . G R A D E T R E N C H B A S E T O E N S U R E F L A T , E V E N S U P P O R T O F P I P I N G . B A C K F I L L W I T H C L E A N S O I L O R I M P O R T M A T E R I A L . C O N T R A C T O R S H A L L B A C K F I L L N O L E S S T H A N 2 ” A R O U N D E N T I R E P I P E W I T H C L E A N , R O C K F R E E F I L L . M A I N L I N E P I P I N G A N D F I T T I N G S S H A L L N O T B E B A C K F I L L E D U N T I L I N S T A L L E R H A S I N S P E C T E D A N D P I P E H A S P A S S E D P R E S S U R E T E S T I N G . P E R F O R M B A L A N C E O F B A C K F I L L O P E R A T I O N T O E L I M I N A T E A N Y S E T T L I N G . 3 . 3 S L E E V I N G A . S L E E V E A L L P I P I N G A N D W I R I N G T H A T P A S S U N D E R P A V I N G O R H A R D S C A P E F E A T U R E S . W I R I N G S H A L L B E P L A C E D I N S E P A R A T E S L E E V I N G F R O M P I P I N G . S L E E V E S S H A L L B E P O S I T I O N E D R E L A T I V E T O S T R U C T U R E S O R O B S T R U C T I O N S T O A L L O W F O R P I P E O R W I R E W I T H I N T O B E R E M O V E D I F N E C E S S A R Y . E X C L U D I N G S I D E W A L K S 6 0 " W I D E O R L E S S . 3 . 4 G R A D E S A N D D R A I N A G E A . P L A C E I R R I G A T I O N P I P E A N D O T H E R E L E M E N T S A T U N I F O R M G R A D E S . W I N T E R I Z A T I O N S H A L L B E B Y E V A C U A T I O N W I T H C O M P R E S S E D A I R . A U T O M A T I C D R A I N S W I L L B E I N S T A L L E D O N T H I S P R O J E C T . M A N U A L D R A I N S S H A L L O N L Y B E I N S T A L L E D A T P O C W H E R E D E S I G N A T E D O N C O N S T R U C T I O N D R A W I N G S , U N L E S S P I P E E X C E E D S 2 " O R L E S S . 3 . 5 P V C P I P E A . I N S T A L L P I P E T O A L L O W F O R E X P A N S I O N A N D C O N T R A C T I O N A S R E C O M M E N D E D B Y P I P E M A N U F A C T U R E R . B . I N S T A L L M A I N L I N E P I P E S W I T H 1 8 ” O F C O V E R , L A T E R A L L I N E P I P E S W I T H 1 2 ” O F C O V E R . C . D R A W I N G S S H O W D I A G R A M M A T I C O R C O N C E P T U A L L O C A T I O N O F P I P I N G - C O N T R A C T O R S H A L L I N S T A L L P I P I N G T O M I N I M I Z E C H A N G E O F D I R E C T I O N , A V O I D P L A C E M E N T U N D E R L A R G E T R E E S O R L A R G E S H R U B S , A V O I D P L A C E M E N T U N D E R H A R D S C A P E F E A T U R E S . D . P L A S T I C P I P E S H A L L B E C U T S Q U A R E L Y . B U R R S S H A L L B E R E M O V E D . S P I G O T E N D S O F P I P E S 3 ” A N D L A R G E R S H A L L B E B E V E L E D . E . P I P E S H A L L N O T B E G L U E D U N L E S S A M B I E N T T E M P E R A T U R E I S A T L E A S T 5 0 D E G R E E S F , U N L E S S A P P R O V E D B Y M A N U F A C T U R E R ' S S P E C I F I C A T I O N S . P I P E S H A L L N O T B E G L U E D I N R A I N Y C O N D I T I O N S U N L E S S P R O P E R L Y T E N T E D . A L L S O L V E N T W E L D J O I N T S S H A L L B E A S S E M B L E D U S I N G I P S 7 1 1 G L U E A N D P 7 0 P R I M E R A C C O R D I N G T O M A N U F A C T U R E R ' S S P E C I F I C A T I O N , N O E X C E P T I O N S . A L L W O R K E R S P E R F O R M I N G G L U E O P E R A T I O N S S H A L L P R O V I D E E V I D E N C E O F C E R T I F I C A T I O N . G L U E D M A I N L I N E P I P E S H A L L C U R E A M I N I M U M O F 2 4 H O U R S P R I O R T O B E I N G E N E R G I Z E D . L A T E R A L L I N E S S H A L L C U R E A M I N I M U M O F 2 H O U R S P R I O R T O B E I N G E N E R G I Z E D A N D S H A L L N O T R E M A I N U N D E R C O N S T A N T P R E S S U R E U N L E S S C U R E D F O R 2 4 H O U R S . F . A P P R O P R I A T E T H R U S T B L O C K I N G S H A L L B E P E R F O R M E D O N F I T T I N G S 3 ” A N D L A R G E R . A L L T H R E A D E D J O I N T S S H A L L B E W R A P P E D W I T H T E F L O N T A P E O R P A S T E U N L E S S D I R E C T E D B Y P R O D U C T M A N U F A C T U R E R O R S E A L I N G B Y O - R I N G . 3 . 6 C O N T R O L L E R S A . A L L G R O U N D I N G F O R P E D E S T A L C O N T R O L L E R S , I F U S E D , S H A L L B E A S D I R E C T E D B Y C O N T R O L L E R M A N U F A C T U R E R A N D A S I C G U I D E L I N E S , N O T T O E X C E E D A R E S I S T A N C E R E A D I N G O F 5 O H M S . B . L O C A T E C O N T R O L L E R S I N P R O T E C T E D , I N C O N S P I C U O U S P L A C E S , W H E N P O S S I B L E . C O O R D I N A T E L O C A T I O N O F C O N T R O L L E R S W I T H L A N D S C A P E A R C H I T E C T T O M I N I M I Z E V I S I B I L I T Y . C . C O O R D I N A T E L O C A T I O N O F W A L L M O U N T C O N T R O L L E R S W I T H B U I L D I N G O R E L E C T R I C A L C O N T R A C T O R T O F A C I L I T A T E E L E C T R I C A L S E R V I C E A N D F U T U R E M A I N T E N A N C E N E E D S . W A L L M O U N T S H A L L B E S E C U R E L Y F A S T E N E D T O S U R F A C E . I F E X T E R I O R M O U N T E D , W A L L M O U N T C O N T R O L L E R S S H A L L H A V E E L E C T R I C A L S E R V I C E W I R E A N D F I E L D C O N T R O L W I R E I N S E P A R A T E , A P P R O P R I A T E S I Z E D W E A T H E R P R O O F E L E C T R I C A L C O N D U I T , P V C P I P E S H A L L N O T B E U S E D . D . W I R E U N D E R H A R D S C A P E S U R F A C E S S H A L L B E P L A C E D C O N T I N U O U S L Y I N C O N D U I T . C O N T R A C T O R S H A L L B E R E S P O N S I B L E T O C O O R D I N A T E S L E E V I N G N E E D S F O R C O N D U I T O R S W E E P S E L B O W S F R O M E X T E R I O R T O I N T E R I O R O F B U I L D I N G . T H I S E X C L U D E S H A R D S C A P E S L E S S T H A N 6 0 " I N W I D T H . E . P L A C E S T A N D A R D V A L V E B O X A T B A S E O F C O N T R O L L E R O R N E A R B Y T O A L L O W F O R T H R E E T O F I V E F E E T O F S L A C K F I E L D C O N T R O L W I R E T O B E P L A C E D A T E A C H C O N T R O L L E R . T H I S C O N T R A C T O R S H A L L P R O V I D E C O N D U I T A C C E S S I F N E E D E D F O R E L E C T R I C A L C O N T R A C T O R . E L E C T R I C A L S U P P L Y A N D I N S T A L L A T I O N , A S W E L L A S H O O K - U P T O C O N T R O L L E R S H A L L B E B Y T H I S C O N T R A C T O R . 3 . 7 V A L V E S A . I S O L A T I O N V A L V E S , R E M O T E C O N T R O L V A L V E S , A N D Q U I C K C O U P L E R V A L V E S S H A L L B E I N S T A L L E D A C C O R D I N G T O M A N U F A C T U R E R R E C O M M E N D A T I O N A N D C O N T R A C T S P E C I F I C A T I O N S A N D D E T A I L S . B . V A L V E B O X E S S H A L L B E S E T O V E R V A L V E S S O T H A T A L L P A R T S O F T H E V A L V E C A N B E R E A C H E D F O R S E R V I C E . C . V A L V E B O X A N D L I D S H A L L B E S E T T O B E F L U S H W I T H F I N I S H E D G R A D E . 3 . 8 S P R I N K L E R H E A D S A . N O S P R I N K L E R S H A L L B E L O C A T E D C L O S E R T H A N 6 ” T O W A L L S , F E N C E S , O R B U I L D I N G S . B . H E A D S A D J A C E N T T O W A L K S , C U R B S . O R P A T H S S H A L L B E L O C A T E D A T G R A D E A N D 2 ” A W A Y F R O M H A R D S C A P E . C . C O N T R O L V A L V E S S H A L L B E O P E N E D A N D F U L L Y F L U S H L A T E R A L L I N E P I P E A N D S W I N G J O I N T S P R I O R T O I N S T A L L A T I O N O F S P R I N K L E R S . D . S P R A Y H E A D S S H A L L B E I N S T A L L E D A N D F L U S H E D A G A I N P R I O R T O I N S T A L L A T I O N O F N O Z Z L E S . E . C O N T R A C T O R S H A L L B E R E S P O N S I B L E F O R A D J U S T M E N T I F N E C E S S A R Y D U E T O G R A D E C H A N G E S D U R I N G L A N D S C A P E C O N S T R U C T I O N . 3 . 9 F I E L D Q U A L I T Y C O N T R O L A . M A I N L I N E P I P E S S H A L L N O T B E B A C K F I L L E D O R A C C E P T E D U N T I L T H E S Y S T E M H A S B E E N T E S T E D F O R 2 H O U R S A T 1 0 0 P S I . B . M A I N L I N E P R E S S U R E T E S T S H A L L I N C L U D E A L L P I P E A N D C O M P O N E N T S F R O M T H E P O I N T O F C O N N E C T I O N T O T H E U P S T R E A M S I D E O F R E M O T E C O N T R O L V A L V E S . T E S T S H A L L I N C L U D E A L L M A N I F O L D C O M P O N E N T S U N D E R C O N S T A N T P R E S S U R E . P I P I N G M A Y B E T E S T E D I N S E C T I O N S T H A T C A N B E I S O L A T E D . C . S C H E D U L E T E S T I N G W I T H O A R 4 8 H O U R S I N A D V A N C E F O R A P P R O V A L . S P R I N K L E R S Y S T E M S H A L L P A S S F I N A L I N S P E C T I O N P E R W O R K S C O P E A N D M A S T E R S E R V I C E A G R E E M E N T . D . L E A K S O R D E F E C T S S H A L L P R O M P T L Y B E R E P A I R E D O R R E C T I F I E D A T T H E C O N T R A C T O R S E X P E N S E A N D R E T E S T E D U N T I L A B L E T O P A S S T E S T I N G . E . G R O U N D I N G R E S I S T A N C E A T P E D E S T A L C O N T R O L L E R , I F U S E D , S H A L L A L S O B E T E S T E D A N D S H A L L N O T E X C E E D 5 O H M S . 3 . 1 0 A D J U S T M E N T A . S P R I N K L E R H E A D S S H A L L B E A D J U S T E D T O P R O P E R H E I G H T W H E N I N S T A L L E D . C H A N G E S I N G R A D E O R A D J U S T M E N T O F H E A D H E I G H T A F T E R I N S T A L L A T I O N S H A L L B E C O N S I D E R E D A P A R T O F T H E O R I G I N A L C O N T R A C T A N D A T C O N T R A C T O R ' S E X P E N S E . B . A D J U S T A L L S P R I N K L E R H E A D S F O R A R C , R A D I U S , P R O P E R T R I M A N D D I S T R I B U T I O N T O C O V E R A L L L A N D S C A P E D A R E A S T H A T A R E T O B E I R R I G A T E D . C . A D J U S T S P R I N K L E R S S O T H E Y D O N O T W A T E R B U I L D I N G S , S T R U C T U R E S , O R O T H E R H A R D S C A P E F E A T U R E S . D . A D J U S T R U N T I M E S O F S T A T I O N T O M E E T N E E D S O F P L A N T M A T E R I A L T H E S T A T I O N S E R V I C E S . 3 . 1 1 C L E A N I N G A . C O N T R A C T O R S H A L L B E R E S P O N S I B L E F O R C L E A N L I N E S S O F J O B S I T E . W O R K A R E A S S H A L L B E S W E P T C L E A N L Y A N D P I C K E D U P D A I L Y . B . O P E N T R E N C H E S O R H A Z A R D S S H A L L B E P R O T E C T E D W I T H Y E L L O W C A U T I O N T A P E . C . C O N T R A C T O R I S R E S P O N S I B L E F O R R E M O V A L A N D D I S P O S A L O F F S I T E O F T R A S H A N D D E B R I S G E N E R A T E D A S A R E S U L T O F T H I S P R O J E C T . D . O A R S H A L L P E R F O R M P E R I O D I C A S W E L L A S A F I N A L C L E A N L I N E S S I N S P E C T I O N . E . C O N T R A C T O R S H A L L L E A V E P R O J E C T I N A T L E A S T A ' B R O O M C L E A N ' C O N D I T I O N . E N D O F S E C T I O N IRRIGATION SPECIFICATIONS 1 . A L L C O N N E C T I O N S A R E S E C O N D A R Y W A T E R A N D S H O U L D B E N O T E D A S S U C H . T H E R E F O R E A L L P A R T S M U S T M E E T S E C O N D A R Y W A T E R S T A N D A R D S . 2 . A L L P I P E T O B E S C H E D U L E 4 0 P V C P I P E . N O P O L Y P I P E S H A L L B E I N C L U D E D . F I T T I N G S U P T O 1 . 1 / 2 " M U S T B E S C H E D U L E 4 0 O R B E T T E R . F I T T I N G S L A R G E R T H A N 1 . 1 / 2 " M U S T B E S C H E D U L E 8 0 O R B E T T E R . 3 . C O N T R A C T O R S H A L L H A V E A L L U T I L I T I E S B L U E S T A K E D P R I O R T O D I G G I N G . A N Y D A M A G E T O T H E U T I L I T I E S S H A L L B E R E P A I R E D A T T H E E X P E N S E O F T H E C O N T R A C T O R W I T H N O A D D I T I O N A L C O S T T O T H E O W N E R . 4 . P L A C E A L L I R R I G A T I O N I N L A N D S C A P E A R E A S A N D O N T H E P R O P E R T Y O F T H E O W N E R . 5 . M O D I F Y L O C A T I O N O F I R R I G A T I O N C O M P O N E N T S T O A V O I D P L A C I N G T R E E S , S H R U B S A N D O T H E R S I T E E L E M E N T S D I R E C T L Y O V E R P I P E , P E R P L A N S . D O N O T L O C A T E V A L V E B O X E S I N L A W N A R E A S U N L E S S D I R E C T E D T O B Y L A N D S C A P E A R C H I T E C T . 6 . C O N T R A C T O R S H A L L I N S T A L L A 1 " T H R E A D E D T E E W I T H 1 " T H R E A D E D P L U G A T P O I N T O F C O N N E C T I O N I N O R D E R T O B L O W O U T T H E S Y S T E M W I T H A N A I R C O M P R E S S O R E A C H F A L L . 7 . C O N T R A C T O R S H A L L U S E O N L Y C O M M E R C I A L G R A D E I R R I G A T I O N P R O D U C T S A N D I S R E S P O N S I B L E F O R E N S U R I N G A C C U R A T E C O U N T S A N D Q U A N T I T I E S O F A L L I R R I G A T I O N M A T E R I A L S F O R B I D D I N G A N D I N S T A L L A T I O N P U R P O S E S . 8 . I N S T A L L D R I P I R R I G A T I O N P E R D E T A I L S . C O N T R A C T O R S H A L L M A K E A D J U S T M E N T S A S N E C E S S A R Y . 9 . C O N T R A C T O R S H A L L P R O V I D E A N D I N S T A L L S L E E V E S F O R A L L P I P E S A N D W I R E S U N D E R P A V E M E N T A N D S I D E W A L K S . S L E E V E S S H A L L B E 2 S I Z E S L A R G E R T H A N P I P E I N S I D E . A L L W I R E S H A L L B E I N S E P A R A T E S L E E V E S ( N O T S H O W N ) . A L L C O N T R O L W I R E S H A L L B E I N S T A L L E D I N C L A S S 2 0 0 P I P E . P L A C E J U N C T I O N B O X E S W H E R E N E C E S S A R Y T O M I N I M I Z E L O N G R U N S O R A T D I R E C T I O N A L C H A N G E S . 1 0 . W A T E R L I N E S A N D E L E C T R I C A L L I N E S M U S T N O T S H A R E C O N D U I T S . A L L W I R E C O N N E C T I O N S M U S T B E C O N T A I N E D I N V A L V E B O X W I T H 3 ' O F E X T R A W I R E . W I R E T O B E C O N N E C T E D T O M A I N L I N E P I P E W H E R E P O S S I B L E W I T H T A P E A T 2 5 ' I N T E R V A L S . S L A C K I N C O N T R O L W I R E S R E Q U I R E D A T E V E R Y C H A N G E O F D I R E C T I O N . W I R E S M U S T H A V E S E P A R A T E C O L O R S F O R C O M M O N , C O N T R O L A N D S P A R E . M I N I M U M 1 S P A R E W I R E F O R E V E R Y 5 V A L V E S . A L L C O N T R O L W I R E S T O B E I N S U L A T E D 1 4 G A U G E C O P P E R . A L L S P A R E W I R E S M U S T " H O M E R U N " T O C O N T R O L L E R A N D S P A R E W I R E S A V A I L A B L E A T A L L V A L V E M A N I F O L D S A N D C L U S T E R S . 1 1 . A L L S L E E V E S I N S T A L L E D S H A L L B E D U C T T A P E D T O P R E V E N T D I R T O R O T H E R D E B R I S E N T E R I N G P I P E . A L L S L E E V E S S H A L L B E I D E N T I F I E D B Y W O O D O R P V C S T A K E S A N D B E S P R A Y P A I N T E D W I T H M A R K I N G P A I N T . R E M O V E S T A K E S O N C E I R R I G A T I O N S Y S T E M I S C O M P L E T E . 1 2 . I R R I G A T I O N S Y S T E M M U S T C O N T A I N C H E C K V A L V E S T O P R E V E N T L O W P O I N T D R A I N A G E . 1 3 . S P A C E A L L S P R A Y H E A D S 2 " A W A Y F R O M A N Y H A R D S C A P E . 1 4 . C O N T R A C T O R S H A L L M A T C H P R E C I P I T A T I O N R A T E S A S M U C H A S P O S S I B L E F O R A L L L A N D S C A P E D A R E A S . O V E R H E A D I R R I G A T I O N M U S T H A V E A M I N I M U M D U ( D I S T R I B U T I O N U N I F O R M I T Y ) O F 6 0 % . 1 5 . I R R I G A T I O N C O N T R A C T O R S H A L L P R E S S U R E T E S T M A I N L I N E F O R L E A K S P R I O R T O B A C K F I L L I N G . 1 6 . M A I N L I N E S S H A L L B E 1 8 " D E E P M I N . A N D L A T E R A L L I N E S 1 2 " D E E P M I N . N O R O C K G R E A T E R T H A N 1 / 2 " D I A M E T E R S H A L L B E A L L O W E D I N T R E N C H E S . T R E N C H I N G B A C K F I L L M A T E R I A L S H A L L B E C O M P A C T E D T O P R O P E R F I N I S H E D G R A D E . 1 7 . A L L W O R K S H A L L B E I N A C C O R D A N C E W I T H A P P L I C A B L E C I T Y A N D / O R C O U N T Y C O D E S . T H E C O N T R A C T O R S H A L L A P P L Y A N D P A Y F O R A L L N E C E S S A R Y P E R M I T S . 1 8 . I R R I G A T I O N I N S T A L L A T I O N T O C O M P L Y W I T H A P P L I C A B L E C I T Y S P E C I F I C A T I O N S A N D D R A W I N G S . 1 9 . A C T U A L I N S T A L L A T I O N O F I R R I G A T I O N S Y S T E M M A Y V A R Y S O M E W H A T F R O M P L A N S . T H E C O N T R A C T O R I S R E S P O N S I B L E T O M A K E A D J U S T M E N T S A S N E E D E D T O E N S U R E P R O P E R C O V E R A G E O F A L L L A N D S C A P E D A R E A S . 2 0 . C O N T R A C T O R S H A L L I N S T A L L I R R I G A T I O N S Y S T E M W I T H H E A D T O H E A D C O V E R A G E I N A L L T U R F A R E A S . U S E V A N A N D / O R U - S E R I E S N O Z Z L E S A S N E C E S S A R Y T O P R O V I D E P R O P E R C O V E R A G E A N D T O K E E P W A T E R O F F O F B U I L D I N G S A N D H A R D S C A P E S . 2 1 . P O W E R T O C O N T R O L L E R T O B E P R O V I D E D B Y O W N E R . O W N E R T O S P E C I F Y E X A C T L O C A T I O N O F C O N T R O L L E R . I N S T A L L P E R M A N U F A C T U R E R S I N S T R U C T I O N S . C O N T R A C T O R S H A L L I N S T A L L A R A I N S E N S O R W I T H C O N T R O L L E R U N L E S S O T H E R W I S E D I R E C T E D B Y O W N E R O R L . A . 2 2 . I N V E S T I G A T E T O M A K E S U R E T H A T T H E I R R I G A T I O N S Y S T E M I S , I N F A C T , B E I N G C O N N E C T E D T O A S E C O N D A R Y S Y S T E M . I F I T I S N O T C O N N E C T E D T O S E C O N D A R Y , C O N T A C T T H E O W N E R A N D L A N D S C A P E A R C H I T E C T T O C O O R D I N A T E P R O V I S I O N A N D I N S T A L L A T I O N O F A B A C K F L O W P R E V E N T O R . 2 3 . L A T E R A L L I N E S S H A L L B E N O S M A L L E R T H A N 3 / 4 " . L A N D S C A P E C O N T R A C T O R T O E N S U R E T H E F O L L O W I N G P I P E S I Z E S D O N O T E X C E E D T H E S U G G E S T E D G P M L I S T E D B E L O W : 3 / 4 " 8 G P M 1 " 1 2 G P M 1 - 1 / 2 " 3 0 G P M 2 " 5 3 G P M 2 - 1 / 2 " 7 5 G P M 3 " 1 1 0 G P M 4 " 1 8 0 G P M I R R I G A T I O N N O T E S S T I L L W A T E R E Q U I T Y P A R T N E R S E N S I G N E N G I N E E R S 4 5 W E S T 1 0 0 0 0 S O U T H , S U I T E 5 0 0 S A N D Y , U T 8 4 0 7 0 1 6 0 W C A N Y O N C R E S T R D A L P I N E , U T A H 8 4 0 0 4 P H : 8 0 1 - 2 1 6 - 8 8 5 0 1-1/2" GRAY PVC CONDUIT FOR IRRIGATION CONTROLLER WIRE SAND BEDDING MATERIAL (.25 INCH SIEVE) 2 IN. THICK SURROUNDING THE PIPES REQ'D PVC SCHEDULE 40 LATERAL LINE REQ'D FINISH GRADE COMPACTED BACKFILL PVC SCHEDULE 40 MAINLINE REQ'D 12 " M I N . E NOT TO SCALE PKJ DESIGN GROUP TURF SUBGRADE 2" PVC SCH. 40 SLEEVE NOTCHED TO FIT OVER VALVE BALL VALE GRAVEL SUMP - VOLUME SUFFICIENT TO HOLD RUN OFF 18" x 18" x 12" MIN. 3/4" MARLEX STREET ELBOWMAINLINE NOTES: 1. ALL PVC NIPPLES AND ELBOWS TO BE SCH. 80 UNLESS OTHERWISE NOTED. 2. PROVIDE VALVE KEY TO OWNER MANUAL DRAIN ASSEMBLY 10" ROUND VALVE BOX B I NOT TO SCALE PKJ DESIGN GROUP POP-UP ROTOR SPRINKLER - SEE LEGEND FINISH GRADE NOTE: ALL ROTOR HEADS TO BE PLACED 2" CLEAR OF ALL HARDSCAPE SURFACES SCH. 80 THREADED NIPPLE PVC SCH. 40 SxSxT TEE (OR ELL) PVC LATERAL LINE, SIZE AS NOTED ON PLAN SWING JOINT ARM INSTALLED AT ANGLE BETWEEN 30 AND 45 DRG. OF LATERAL PIPE. USE MALE THREAD MODEL DEPTH - SEE NOTES & TRENCH DETAIL MARLEX STREET ELL'S (3) 1 2 3 4 5 69 7 8 9 POP UP ROTOR DETAIL 1 2 3 4 5 6 7 8 9 D NOT TO SCALE PKJ DESIGN GROUPSTOP AND WASTE VALVE ASSEMBLY GROUND COVER SUBGRADE PVC MAINLINE TO BACKFLOW PREVENTER BRASS STOP AND WASTE VALVE COPPER MAINLINE NOTES: 1. ALL PVC NIPPLES AND ELBOWS TO BE SCH. 40 UNLESS OTHERWISE NOTED. 2. PROVIDE VALVE KEY TO OWNER PVC 90 DEG. ELBOW THREADED BRASS NIPPLE (6" MIN.)BRASS COMPRESSION TEE TO MATCH MAINLINE SIZE 2" PVC SCH. 40 SLEEVE NOTCHED TO FIT OVER STOP AND WASTE VALVE THREADED BRASS NIPPLE (6" MIN.) PVC SNUG CAP 48 " M I N . NOTES: 1. FLUSH ALL PIPING PRIOR TO INSTALLING VALVE. 2. WRAP ALL THREADS WITH TEFLON TAPE. 1 1/2 TO 2 WRAPS MAXIMUM. 3. COMPACT SOILS AROUND VALVE BOX TO 80% OF ORIGINAL DRY DENSITY. 4. INSTALL GEOFABRIC UNDER VALVE BOXES AND TAPE TO PIPE NIPPLES AND VALVE BOX. 5. BOX COLOR - GREEN IN TURF AND TAN IN PLANTER AREAS. 6. IRRIGATION SYSTEM TO BE BLOWN OUT WITH AIR COMPRESSOR THROUGH QUICK COUPLERS BEFORE FREEZING TEMPERATURES OCCUR, TYP. RAINBIRD VALVE BOX (SIZE AS REQUIRED) WITH EXTENSIONS IF NECESSARY INSTALL VALVE BOX 2" ABOVE FINISH GRADE IN SHRUB AREAS FINISH GRADE HEAVY DUTY GALVANIZED FASTENERS (2 REQUIRED) GALV. NIPPLES 3/4" MIN GRAVEL BASE GALV. STREET ELL MAINLINE WITH SCH. 80 TEE. SIZE AS REQUIRED. GALV. ELL AND STREET ELL 30" X 1" GALVANIZED ANGLE IRON STAKE RAINBIRD V44LRC QUICK COUPLER VALVE 1 10" ROUND GREEN PLASTIC VALVE BOX W/ BOLT LOCK, 2 FINISH GRADE 3 6" PVC SCH. 40 PIPE SLEEVE, 4" - 6" BELOW GRADE 4 2" SQUARE OPERATING NUT 5 FLANGE X FLANGE GATE VALVE SEE EQUIPMENT SCHEDULE 6 SCH. 80 FLANGE ADAPTER 7 MAIN WATER SUPPLY LINE 8 6" MIN. GRAVEL 9 SUBGRADE COMPACTED TO 95% 10 DEPTH: 18" - 30" 11 SHRUBS - 2": SOD-11 2"; SEED 1" 1 2 3 4 5 6 7 8 9 10 11 FLOW MAIN WATER SUPPLY LINE JUMBO VALVE BOX WITH STAINLESS STEEL BOLTS (BOLT DOWN LID). INSTALL AT GRADE 30" MAX. DEPTH 10"-14" PVC SCH. 80 ELBOW PVC SCH. 80 NIPPLE; LENGTH AS REQUIRED (TYP.) PVC SCH. 80 ELL SAME SIZE AS VALVE SCH. 80 NIPPLE. SIZE AS NECESSARY MILWAUKEE BRAND OR APPROVED AMERICAN-MADE BRASS GATE VALVE W/ NON RISING STEM (LINE SIZE) ELECTRIC CONTROL VALVE - SEE EQUIPMENT SCHEDULE PVC SCH. 80 UNION WATER TIGHT CONNECTORS (3M DBY ONLY) PROVIDE 36" EXPANSION LOOP AT EACH WIRE CONNECTOR IN BOX SCH. 80 ELBOW WITH SCH. 80 NIPPLE INTO SxT BUSHING TO LATERAL LATERAL LINE CONTROL WIRES 6" MINIMUM DEPTH OF WASHED 3/4" GRAVEL PVC SCH. 80 TEE SxSxS WITH SCH. 80 SxT BUSHING OR DOUBLE STRAP SADDLE. ID TAG: RAINBIRD VID SERIES OR APPROVED EQUAL NOTES: 1. ONE REMOTE CONTROL VALVE PER BOX . 2. ALL FITTINGS AND PIPE IN MANIFOLD SHALL BE THREADED SCH. 80 PVC USING TEFLON TAPE AND #5 RECTOR SEAL. 24 " M I N . EXTEND ALL SLEEVING 18" MIN. BEYOND EDGE OF PAVING PAVING SURFACE SURROUND ALL SLEEVING WITH 2 INCHES OF MATERIAL PASSING A .25 IN. SIEVE ALL SLEEVES SHALL BE 2" LARGER THAN PIPE TO BE SLEEVED IN S T A L L B E L O W GR A N U L A R BO R R O W 18"18"PAVEMENT H NOT TO SCALE PKJ DESIGN GROUP TYPICAL SLEEVING K NOT TO SCALE PKJ DESIGN GROUP CONTROL VALVE ASSEMBLY G NOT TO SCALE PKJ DESIGN GROUP TRENCHING DETAIL C NOT TO SCALE PKJ DESIGN GROUP RAINBIRD QUICK COUPLER J NOT TO SCALE PKJ DESIGN GROUP SPRAY HEAD DETAIL F NOT TO SCALE PKJ DESIGN GROUP GATE VALVE ASSEMBLY NOTES: 1. INSTALL SPRAY AND ROTARY HEADS PER THIS DETAIL. 2. INSTALL 2" AWAY FROM HARDSCAPES. POP-UP BODY 12" BARBED MAE ELBOW REQ'D PVC LATERAL 12" BARBED MAE ELBOW REQ'D FLEXIBLE POLY PIPE (24" MAX. LENGTH) FINISH GRADE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE IRRIGATION PERFORMANCE NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. IR-5.1 NO. REVISION DATE 1 2 3 4 5 6 7 XX-XX-XX XXXX PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018 BLUE STAKES OF UTAH UTILITY NOTIFICATION CENTER, INC 1-800-662-4111 www.bluestakes.org BSPTPA 2" AMIAD R NOT TO SCALE PKJ DESIGN GROUP 2" PLASTIC FILTER DETAIL UNION, TYP. LOCKABLE LIFT OFF ENCLOSURE TO FIT OVER BACKFLOW PREVENTER. INSTALL PER MANUFACTURER'S RECOMMENDATIONS QUARTER TURN BALL VALVE AMIAD 2" T PLASTIC FILTER FINISHED GRADE FLOW FLOW IN NOTES: 1. 2. 3. PROVIDE PROPER GROUNDING COMPONENTS TO ACHIEVE GROUND RESISTANCE OF 10 OHMS OR LESS. A NOT TO SCALE PKJ DESIGN GROUPESP-LXME CONTROLLER IN METAL PEDISTAL 472 NORTH YELLOWSTONE HWY. REXBURG, IDAHO ID17008 THOMSON FARMS 02-12-2018 STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850 P NOT TO SCALE PKJ DESIGN GROUP MASTER VALVE & FLOW SENSOR Q NOT TO SCALE PKJ DESIGN GROUP GROUNDING DETAIL R NOT TO SCALE PKJ DESIGN GROUP 2-WIRE CONNECTION M NOT TO SCALE PKJ DESIGN GROUP DRIP IRRIGATION - IN LINE EMITTERS N NOT TO SCALE PKJ DESIGN GROUP FLUSH CAP BOXL NOT TO SCALE PKJ DESIGN GROUP DRIP CONTROL VALVE ASSEMBLY S NOT TO SCALE PKJ DESIGN GROUP DECODER WIRING NOTES: 1. LAYOUT DRIPLINE SO EMITTERS ARE IN TRIANGULAR PATTERN AS SHOWN 2. APPROXIMATELY 16.2 GPH PER TREE 8' RADIUS 16' RADIUS RAIN BIRD XFS-09-18-100 OR EQUIVALENT TREE (DECIDUOUS OR EVERGREEN) RAIN BIRD XT-700 TUBING OR EQUIVALENT AS APPROVED BY ARCHITECT LATERAL LINE 4-WAY BARBED TEE BARBED TEE 12" RADIUS RAIN BIRD XFS-09-18-100 OR EQUIVALENT SHRUB RAIN BIRD XT-700 TUBING OR EQUIVALENT AS APPROVED BY ARCHITECT LATERAL LINE BARBED TEE NOTE: 1. APPROXIMATELY 5.4 GPH PER SHRUB 24" EXTRA LENGTH OF XBS DRIP TUBING LINE COILED IN VALVE BOX NOTE: 1. INSTALL AT END OF DRIP LINE RUNS FOR WINTERIZATION IN THE FALL. SHRUB TREE NOTES: 1. SECURE ALL BARB FITTINGS WITH A STAINLESS STEEL PINCH CLAMP. 2. INSTALL A AIR/VACUUM RELIEF VALVE AT HIGH POINTS WITHIN DRIP ZONE. 3. INSTALL FILTER FABRIC AROUND EXTERIOR OF VALVE BOX. USE DUCT TAPE TO SECURE FABRIC TO PIPE AND VALVE BOX. FINISH GRADE STANDARD VALVE BOX WITH COVER: RAIN BIRD VB-STD WATERPROOF CONNECTION: RAIN BIRD DB SERIES VALVE ID TAG 30-INCH LINEAR LENGTH OF WIRE, COILED PRESSURE REGULATING FILTER: RAIN BIRD PRF-100-RBY (INCLUDED IN XCZ-100-PRF KIT) PVC SCH 40 FEMALE ADAPTOR LATERAL PIPE REMOTE CONTROL VALVE: RAIN BIRD 100-DV (INCLUDED IN XCZ-100-PRF KIT) PVC SCH 40 TEE OR ELL TO MANIFOLD 3-INCH MINIMUM DEPTH OF 3/4-INCH WASHED GRAVEL 10" ROUND VALVE BOX RAINBIRD XBV-075 1 CUBIC FOOT PEA GRAVEL SUMP FINISH GRADE O NOT TO SCALE PKJ DESIGN GROUP DRIP AIR/VACUUM RELIEF VALVE ASSEMBLY INLINE DRIP OR BLANK TUBING 3" MINIMUM DEPTH OF WASHED PEA GRAVEL BRICK SUPPORTS (THREE) INLINE DRIP TUBING 180 2-WAY ADAPTER TEE FILTER FABRIC 3/4"M X 1/2"F REDUCTION BUSHING AIR / VACUUM RELIEF VALVE VALVE BOX WITH COVER FINISH GRADE/TOP OF MULCH FLOW FINISH GRADE GREEN VALVE BOX AND COVER CONTROL WIRES WITH 12" MIN. SERVICE COIL AND WATERPROOF WIRE SPLICE CONNECTORS - FLOW SENSOR PER IRRIGATION LEGEND RAIN BIRD PESB SERIES MASTER VALVE STRAIGHT PIPE REQUIRED: MINIMUM 10x PIPE DIAMETER UPSTREAM & MINIMUM 5x PIPE DIAMETER DOWNSTREAM UNIONS PVC MAINLINE - LENGTH AS REQUIRED 6" DEPTH OF WASHED 3 4" GRAVEL CONTINUOUS BRICK SUPPORTS VALVE BOX EXTENSIONS REQUIRED ELEVATION GROUNDING ROD NOTES: 1. DO NOT INSTALL ANY OTHER WIRE OR CABLE WITHIN THE SPHERE OF INFLUENCE. 2. PLACE 100 LB POWER SET SOIL AMENDMENT TO EACH PLATE AS PER MANUFACTURER'S RECOMMENDATIONS. C #6 AWG SOLD BARE COPPER WIRE (TYP) ELECTRODE SPHERE OF INFLUENCE BOUNDARY (16" X 24") ELECTRODE SPHERE OF INFLUENCE BOUNDARY (10' DIA.)5/8" DIA 10' LONG UL LISTED COPPER CLAD GROUNDING ROD 5/8" DIA 10' LONG UL LISTED COPPER CLAD GROUNDING ROD COPPER GROUND PLATE (4" X 96" X 0.0625") #6 AWG SOLD BARE COPPER WIRE (TYP) 30" MINIMUM EARTH CONTACT MATERIAL CADWELD CONNECTION 12" MINIMUM IRRIGATION CONTROLLER CADWELD CONNECTION 1" ROUND VALVE BOX #6 AWG SOLID BARE COPPER WIRE (TYP) 5/8" DIA. 10' LONG UL LISTED COPPER CLAD GROUNDING ROD LIGHTNING ARRESTOR 5/8" X 8' COPPER CLAD GROUND ROD TW-SPLICE WATER-TIGHT CONNECTION STRIP WIRE NOTE: 1. MAXIMUM LENGTH OF SECONDARY WIRE PATH (14 AWG) FROM DECODER TO SOLENOID IS 450 FEET. FD-102 TURF M13004 WHITE WHITE BLUE BLUE DBY CONNECTORS DBY CONNECTORS SOLENOID WIRE SOLENOID WIRE COMMUNICATION CABLE TWO-WIRE CABLE COMMUNICATION CABLE SOLENOID (VALVE), MASTER VALVE, OR BOOSTER PUMP/VALVE (MAXIMUM 2) 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 89 10 11 1 2 3 4 5 6 6 5 4 321 1 2 3 34 5 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 99 6 1 2 3 4 5 6 7 8 9 10 11 6 6 10 10 1111 9 9 8 8 7 5 4 3 3 2 211 PRELIMINARY PLANS NOT FOR CONSTRUCTION PROJECT INFORMATION LANDSCAPE ARCHITECT / PLANNERDEVELOPER / PROPERTY OWNER / CLIENTISSUE DATE IRRIGATION PERFORMANCE NOT FOR CONSTRUCTION 3450 N. TRIUMPH BLVD. SUITE 102 LEHI, UTAH 84043 (801) 960-2698 www.pkjdesigngroup.com PKJ DESIGN GROUP L.L.C. IR-5.2 NO. REVISION DATE 1 2 3 4 5 6 7 XX-XX-XX XXXX PM: DRAWN: CHECKED: JTA KBA TM PLAN INFORMATIONPROJECT NUMBER LICENSE STAMP PLOT DATE: Developer / Property Owner: Client / Engineer: 2/12/2018 BLUE STAKES OF UTAH UTILITY NOTIFICATION CENTER, INC 1-800-662-4111 www.bluestakes.org 472 NORTH YELLOWSTONE HWY. REXBURG, IDAHO ID17008 THOMSON FARMS 02-12-2018 STILLWATER EQUITY PARTNERS ENSIGN ENGINEERS 45 WEST 10000 SOUTH, SUITE 500 SANDY, UT 84070 160 W CANYON CREST RD ALPINE, UTAH 84004 PH: 801-216-8850