HomeMy WebLinkAboutCOMMENT RESPONSES - 18-00305 - Approx. 1000 Yellowstone Hwy - Thomson Farms - The Grove Final Plat Phase 1Rexburg City Staff Review March 28, 2018
1 of 1
Thomson Farms PUD
PW Preliminary Plat Review:
1. The intersection of Stegelmeier Lane and the State Highway 33 needs to be reconfigured so that Stegelmeier Lane
meets the highway at a ninety-degree angle.
The intersection has been reconfigured.
2. Street and private storm drainage needs to be separate.
Additional chambers have been provided alongside public roadways to accommodate the extra storage. Public and
private storm water has been kept separate.
3. Entrances onto Hwy 33 not allowed per ITD.
The 2 entrances in question have been removed.
5. SH33 right-of-way width varies. Need to provide right-of-wat for total of 80 feet plus width for right turn lanes as
needed. Need revised Transportation impact study with ITD acceptance…
Updates have been made to the SH33 right -of-way.
8. Sanitary sewer lines stubbed out of manhole on Stegelmeier Lane to the East, on Harvest Street to the South and on
Thomson street to the East. Could look at consolidating Sewer to one crossing.
Consolidating sewer to one crossing does not work. Has not been shown on plans.
9. At least one stick of pipe after water valves where line will be continued.
Water lines have been shown to continue for at least 20’ after water valves before being plugged, capped, and marked
for future connection.
10. Street Cross sections are not per City of Rexburg standards based on type of street.
Keynotes regarding pavement sections have been update to reflect city of Rexburg standards.
13. the Developer is required to provide pedestrian connectivity between the Development and the existing City sidewalks
on 2nd East. All improvements in the State highway 33 right-of-way must be approved by ITD.
Plan for light to take care of pedestrian connectivity via trail on West Side.