Loading...
HomeMy WebLinkAboutSITE REVIEW 4/18/2018 PUBLIC WORKS - 18-00175 - Arbor Cove Bldg 1Review Report Current Public Works Review - Site Plan Status: REVISIONS Application Number: 18-00175Permit Details Application Received Date: 04/04/2018 Multi-Family Residential Application Approved Date: Application Approved Status: ACCEPTED 04/04/2018 220 S 2nd W Arbor Cove - Bldg #1 - 34 Units - New Dormitory Housing Status of Plan Reviews Completed 04/06/2018Fire Department Review - Site Plan COMPLETED 04/16/2018Planning and Zoning Review - Site Plan REVISIONS 04/18/2018Public Works Review - Site Plan REVISIONS 05/14/2018Building Review REVISIONS 06/07/2018Electrical Review COMPLETED 06/11/2018Plumbing Review COMPLETED 06/11/2018HVAC Review COMPLETED 06/27/2018Building Review REVISIONS Permit Review Status Plan Reviews Still in Progress Planning and Zoning Review - Site Plan Public Works Review - Site Plan Building Review DESCRIPTION COMMENTS STA TUS *Please respond to "REVISIONS" status items, with appropriate comment/documentation as needed! Plans are approved for a footing/foundation ONLY permit? YES Checked for linked cases YES Sewer: Line size/slope/type materials REVISIONS12" line needs to continue to 1st S with uniform grade between 1st and 2nd S. DEQ Approval required. *Revisions Response : Miscellaneous Review REVISIONSWhat is being done for pedestrian lighting in right of way? *Revisions Response : Miscellaneous Review REVISIONSFire Hydrants require storz adapter. *Revisions Response : Miscellaneous REVISIONSTraffic impact study and development agreement may require additional items. *Revisions Response : Reviewed By: Joel Gray Review Date: 04/18/2018 Plan Review Details joel.gray@rexburg.org Public Works Review - Site Plan Status: REVISIONS Page 1 of 2 Approval of plans does not constitue approval of variance from code Public Works Review - Site Plan (Continued) D ESCRIPTIO N CO MMEN TS STATUS Miscellaneous N/ATrash enclosure dimension of 32' is inside not outside dimension. Site Lighting : Photometric layout N/ANo site Lighting on plans. Parking Lot : Drainage COMPLETED Parking Lot: Accessibility/layout COMPLETED Street : Sidewalk setback/continuos Must connect to existing sidewalk at each end.COMPLETED Street : Curb type COMPLETED Street : Entrance placement COMPLETED Sewer: Manhole placement COMPLETED Sewer: Connection to mainline COMPLETED Water : Connection to main line COMPLETED Water : Valve placement COMPLETED Storm : Drainage calcs COMPLETED Storm : On-site retention Suggest elbow inside manhole prior to piping to storage area. COMPLETED Storm : Infiltrators COMPLETED Page 2 of 2 Approval of plans does not constitue approval of variance from code